European Code of Conductfor Data Centre
Presentation of the Awards 2014
Paolo Bertoldi
European Commission
DG JRC
Institute for Energy and Transport
The Code of Conduct for Data CentreResults
• European Programme to improve energy efficiency in data centre
• Started in 2008
• 91 Companies registered as Participants
• 225 Data centres approved as Participant
• Covering 3.7 TWh of energy consumption
• 205 Endorsers
3
The winners of the Data Centre Code of Conduct 20133
6 Winners
- New Data Centre: 2 winners
- Refurnished Data Centre: 3 winners
- Corporate Winner: 1 Winner
And thewinners
are…
5
Winner of the Award 2013
Category New Data Centres
6
Online SAS - data centre in Vitry sur Seine, France
• Datacenter is using outdoor vegetable oil-immersed transformers
• Only one stage of power transformation (20kV to 410V) in order to optimize efficiency and reliability,
• Cooling system is using outdoor dry-coolers in closed cooling circuit.
• Chilled water system is using a specific water temperature 9°C-19°C with 10°C water temperature drop difference. This specific water temperature permits to double all cooling exchange with the same water volume.
• High free-chilling capacity using heat exchangers between dry-coolers and chilled water can be used in a ‘mixed ‘ configuration (chillers and free-cooling) between 14,5°C to 4,5°C outdoor and in ’absolute‘ configuration (free-cooing only) on outside temperature below 4,5°C
• All the data center is using cold-aisle containment by default in order to get a return air to CRAC at more than 31°C
• PUE = 1.358 May 2013
7
TISSAT SA – data centre Walhalla in Castellon, Spain
An advanced structural design (e.g. using the Hot Aisle
Containment System “) solving the tradeoff between the high
availability needs of Tier IV DC and the reduction of energy
consumption.
Construction of an eco-efficient building.
Generation of primary energy and cooling with Tri-
generation.
Limitation of the power lost with the use of UPS allowing
99.9% of energy use.
Using the air conditioning condenser for rationalizing energy
consumption of air conditioning.
certified in ISO 50.001, ISO 14.001 and Spanish AENOR’s
EA-0044 DC Energetic Sustainability Certification
8 May 2013
8
Winner of the Award 2013
Category Refurbished Data Centres
9
Univerisity of St Andrews – data centre Butts Wynd Data Centre, UK
• Dual Coil free cooling system with EFC and ultimately
water-cooled DX
• Dry air coolers inside the plant room
• Variable speed pumps and fans
• Generator installed on the rejection side of the dry air
coolers
• Reuse of waste heat
• 250kW data centre
• Design PUE of 1.2
• Removed equipment from and turned off old inefficient AC
equipment in other areas
• Systems designed to be resilient, and to allow testing
without disruption
• Most of our older spaces were significantly worse than
sector average8 May 2013
10
United Nation Support Base – data centre in
Valencia, SpainSolar panel installation Phase A (February 2012) 700 solar panels 280 Watt each (196 KW peak, 300 MWh
per year), Phase B (September 2014), 1080 solar panels 300 Watt each (324 KW peak, 500 MWh per year)
UPS in power Efficiency boosting mode Estimated savings: Around 350 MWh per year
PVC Curtains in Data Center Cold Aisle
Free cooling System Hours of free cooling: Around 3000 hours per year Estimated Annual Savings: 180 MWh
per year
Data Center Infrastructure Management Software Monitorization of power consumption of the different
electrical systems, main electrical panels and all the PDU located in the racks.
An automatic light control system has been implemented in order to switch off unnecessary lights in the Data
Center out of working hours.
11
Already implemented energy efficiency improvements:
• Legacy DC Space rearranged all cabinets into hot/cold aisle
configuration
• Retrofitted Lighting motion sensor control in all DC Halls
• Retrofitted Cold Aisle containment curtains in all DC Halls
• Retrofitted brush strips to raised floor holes in all DC Halls
• Retrofitted gap sealing to all cabinets
• Fitted blanking panels in all cabinets
• Retrofitted power sub-metering on all primary switchgear
• Metered power strips provided to all cabinets
Currently implementing:
• Raising air delivery temperatures
• Raising Chiller water temperatures
• Retrofitting CRAC EC Fans
• Retrofitting Chiller compressor VSDs
Zen Internet – data centre DC 1 in Rochdale,
UK
12
Winner of the Award 2013
Category Corporate Participant
13
T - Systems International GmbH - 10 Data Centers, Germany
Energy Efficient Solutions (overview):
• Equalize the load over the DC; eliminate hot / cold spots
• All cabinets are in Cold Aisle arrangement
• Blanking panels in all cabinets; leak elimination
• Increase room t; ASHRAE 2008 or better
• Free cooling or free chilling; using increased t settings
• Technologies such as well water cooling; adiabatic cooling systems
High level timeline:
• 2009 Analysis in our research data centre DC 2020 in cooperation
with Intel
• 2010 Start project DC Optimization over all Data Centres with
implementation of the results of DC 2020
• 2012 Completion of the project DC Optimization
• 2013 Start EU CoC submission project
Thank you for your attention