  • 7/30/2019 Presentation Case study Rajsthan roadways

    1/31

    P R E P A R E D B Y :

    A D N A N A L I

    A R S H A D K H A N

    A D I L K H A N

    S A M A N N A A Z

    Rajasthan State Road TransportCorporation

    C GOPALAKRISHNANG RAGHURAM

  • 7/30/2019 Presentation Case study Rajsthan roadways

    2/31

    RSRTC : An Overview

    Established on 1st of October 1964

    Objective was to provide reliable, adequate, and efficient

    transportation service to the public

    Headquarter at Jaipur.

    Primarily operates on the trunk routes

  • 7/30/2019 Presentation Case study Rajsthan roadways

    3/31

    A Senior IAS officer

    Belongs to RajasthanState Cadre

  • 7/30/2019 Presentation Case study Rajsthan roadways

    4/31

    Prior Conditions

    Prolonged strikes deteriorated the conditions

    Continuous decline in productivity

    Trust of the public had faded significantly

    Urgent need of effective managerial intervention

  • 7/30/2019 Presentation Case study Rajsthan roadways

    5/31

    Measures Applied By Kaurani

    Transformed the organization from three-tiered totwo-tiered

    Assigned crucial powers to Depot Manager

    Introduced a profit linked incentive scheme

  • 7/30/2019 Presentation Case study Rajsthan roadways

    6/31

    First 25 years

    Years 1964-65 1968-69 1989-90

    Fleet size 421 536 +3000

    No. of Depots - 10 39

    Passengerstransported(perday)

    - 43175 634227

    Divisions - 1 8

    Buses/division - 536 393

    Routes operated - 81 1676

  • 7/30/2019 Presentation Case study Rajsthan roadways

    7/31

    Contd

    Gradual increase in fleet utilization, vehicleutilization, km/ litre etc.

    Load factor remained more or less constant

    Improvement in service figures

    Profitable in initial years and incurred losses thereafter

  • 7/30/2019 Presentation Case study Rajsthan roadways

    8/31

    Change of chairman

    In April 1991, Mr. Kaurani appointed as a newchairman

    Also headed the organization between 1981 1984 asmanaging director

    Determined to give overall boost to the corporation's

    functioning productivity

    Felt RSRTC having financial viability

  • 7/30/2019 Presentation Case study Rajsthan roadways

    9/31

    Strike(sep-nov 1990)

    Reason for the strike:

    Demanding benefits up to Rs 5 Crore

    Wage structure higher than that of Government scale

    Managements discontent with the amendment

    Lasted for 72 days

  • 7/30/2019 Presentation Case study Rajsthan roadways

    10/31

    Strike contd...

    Impact of the strike:

    Load factor increased

    Corporation incurred the loss of Rs 1209.7 lakh

    Fleet utilization decreased from 90 to 75 percent

    Strike called off on november 30th:

  • 7/30/2019 Presentation Case study Rajsthan roadways

    11/31

    PROBLEM ANALYSIS

  • 7/30/2019 Presentation Case study Rajsthan roadways

    12/31

    Three-tiered organization structure

    CHAIRMAN MANAGING DIRECTOR DEPARTMENTAL CHIEF

    1st tier

    DIVISION CONTROLLER DEPUTY GENERAL

    MANAGER2nd tier

    ASSISTANT DIVISIONALMANAGERS

    DEPOT MANAGERS3rd tier

  • 7/30/2019 Presentation Case study Rajsthan roadways

    13/31

    Two-tiered organization structure

    CHAIRMAN MANAGING DIRECTOR DEPARTMENTAL CHIEF

    1st tier

    CHIEF MANAGERS

    (Traffic/Accounts/Operation workshop)2nd tier

  • 7/30/2019 Presentation Case study Rajsthan roadways

    14/31

    Problem of Redeployment

    Restructuring of the organization

    Problem regarding the utilization of relieved manpower

    Existence of vacancies enabled easy redeployment

    Officers to opt for position of Chief manager or to join

    Head office

    Many of them opted for head office except few.

  • 7/30/2019 Presentation Case study Rajsthan roadways

    15/31

    Responsibility vs Authority

    Depot managers Division managers

    Report to division manager Report to chief manager

    Administrative reporting Functional reporting

    Vested with entire operational

    responsibility

    No responsibility in operations

    Hardly had any disciplinary/financialpower

    Vested with all disciplinary/financialpower

  • 7/30/2019 Presentation Case study Rajsthan roadways

    16/31

    Fare structure

    Last fare fixed at an average of 13.65 paise/passengerkm on 3rd aug,1989

    Substantial increase in input cost leading tocorporations loss

    30 percent increase in fares rose the fare level to 17.6paise/passenger km

    Kauranis comment on fare hike:

    This fare hike was different in that it was granted withthe presumption of earning Rs 7 crore profit during1991-92. The past fare hikes generally covered onlythe cost increases and didnt lead to profits

  • 7/30/2019 Presentation Case study Rajsthan roadways

    17/31

    Age Of Fleet

    Buses (%) Age of Fleet

    45 > 6 years

    32 > 10 years

    17 > 12 years

    Kauranis perception:

    High Operation cost High Maintenance cost Breakdown of services Cancellation of schedules

  • 7/30/2019 Presentation Case study Rajsthan roadways

    18/31

    Comparison with other STUs

    viz-a-viz GSRTC, UPSRTC, APSRTC

    These STUs were better than RSRTC in terms of fleetand vehicle utilization

    In terms of load factor and punctuality RSRTC ismuch better

    M D Kauranis decisions:

    Strengthening of depots to increase operationalefficiency

    Abolition of divisions

    Integration of command at depot level

  • 7/30/2019 Presentation Case study Rajsthan roadways

    19/31

    Integration of Command

    Empowering depot managers

    Depot managers designated as Chief manager

    Transfer and removal power given to Chief manager

    No involvement of Chief manager on issues relatedto deployment

  • 7/30/2019 Presentation Case study Rajsthan roadways

    20/31

    Other Related Reorganization

    Workshops at Division level were abolished.

    New workshops were made at depot level.

    Garages and workshops were upgraded.

  • 7/30/2019 Presentation Case study Rajsthan roadways

    21/31

    Other Related Reorganization

    No. of central workshops increased from 1 to 3

    Major bus stations were made independent entities

    Collaboration with Sulabh international for toiletcomplexes.

  • 7/30/2019 Presentation Case study Rajsthan roadways

    22/31

    Profit linked incentive scheme

    Each Depot was declared as an independent profit centre

    There were Monthly action plan.

    The targets in action plan were considered as minimumrequirement.

    The depots which earned more profits than the targetwere given 50 per cent of the excess amount earned.

  • 7/30/2019 Presentation Case study Rajsthan roadways

    23/31

    Profit linked incentive scheme

    The profitability target was fixed based on three majorparameters

    load factor.

    earnings per kilometer (EPKM)

    cost per kilometer (CPKM)

  • 7/30/2019 Presentation Case study Rajsthan roadways

    24/31

    Additions/Modifications to the Incentive Scheme

    Sick Depot Rehabilitation:

    Incentive for Depots Achieving Profits, but not

    Targets

    Incentive for Depots Achieving Targets, but not

    Profits

    Revision of Incentive Amount to the DepotOfficers.

  • 7/30/2019 Presentation Case study Rajsthan roadways

    25/31

    Additions/Modifications to the Incentive Scheme

    Production Incentive for Central Workshop Employees

    Special Cleaning Drive for Bus Stands and Buses

    Incentive for Ticket Booking

  • 7/30/2019 Presentation Case study Rajsthan roadways

    26/31

    Reorganization and After

    During 1991-92 and 1992-93 corporation hasshown a profit of Rs 13.6 crore and Rs 6.1 crorerespectively

    Improvement in physical parameters.

    daily kilometers operated fleet utilization,

    vehicle utilization, and

    passengers transported per day

  • 7/30/2019 Presentation Case study Rajsthan roadways

    27/31

    conclusion

    Corporation was in turbulent phase and there was a needfor strong leadership.

    Mr. Kaurani emerged as an effective leader for the

    organization.

    He proved that even loss making organizations can beturned into profit making entity without compromisingwith quality.

    Mr. Kaurani get the full support from the government formaking reasonable changes.

  • 7/30/2019 Presentation Case study Rajsthan roadways

    28/31

    conclusion

    He reorganized the corporation for better control.

    Performance linked incentive schemes boosted the

    employee motivation and sense of belongingness.

    These changes resulted in organizations visibility

  • 7/30/2019 Presentation Case study Rajsthan roadways

    29/31

    conclusion

    There was fair improvement in customer service.

    This became an example for other state transportcorporations to follow.

    Many magazines praises these phenomenal changes andrecommended for other PSUs.

  • 7/30/2019 Presentation Case study Rajsthan roadways

    30/31

    conclusion

    Strong leadership can help achieve even so

    called unrealistic and unachievable targets.

  • 7/30/2019 Presentation Case study Rajsthan roadways

    31/31