Coal Handling Plant SASAN ULTRA MEGA POWER PROJECT 6*660MW Singrauli,Madhya Pradesh Presented By:- ANINDYA BARAN GHOSH Payroll No- 41016163 Dated- 23.02.2015

Upload: anindya-baran-ghosh

Post on 10-Feb-2017

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Coal Handling PlantSASAN ULTRA MEGA POWER PROJECT

6*660MW Singrauli,Madhya Pradesh

Presented By:-ANINDYA BARAN

GHOSH Payroll No- 41016163

Dated- 23.02.2015

Page 2: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide

OBJECTIVES OF CHP OPERATION

1. To maintain healthy bunker level to ensure continuous operation of the coal-mills.

2. To see that the coal that is going into the mill is free of scrap materials ,boulders for safe operation of mill.

3. To stack coal in coal yards for future use and reclaiming purpose.

2

Page 3: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide

REQUIRED COAL CONSUMPTION :- As per Boiler Design Coal Consumption :-

Daily Coal Requirement = 49,500 TPD For Six Unit. = 343 TPH Per Unit(Approx.) Design Capacity = 1950 TPH Capacity for Three

Units. Bunker = 42 Nos. Each Unit = 07 Nos. ( 05 Nos. in Operation at a time). Bunker Capacity = 1100 MT (Approx) coal.

3

Page 4: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide

SILO

OLCU#3

MILL

MILL

Conv 6A/6B

Transfer Points

INTERNAL CHP LAYOUT

TP-3

TP-3A TP-18

TP-17

TP-4

Conv 16A/16B

Conv 4A/4B

Conv 1A/1B

TP-10

TP-16

Coal Stock Yard

Stacker cum

Reclaimer

Conv 14A/14B

TP-5

TP-6

TP-7

TP-8

TP-9

U#1

MILL

MILL

U#2

MILL

MILL

U#6

MILL

MILL

U#4

MILL

MILL

U#5

MILL

MILL

TP-1

TP-2B

TP-1A

TP-2C

TP-1B

TP4A

TP-19

TP-20TP-21TP-11

TP-12 TP-13 TP-14

TP-15

Page 5: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide

C.H.P LAYOUTCoal from Mines is brought to the SUMPP via OLC & then it is transferred to the INPLANT CHP area via COAL SILO and then fed to bunker through various conveyors.

OVER VIEW OF OVER LAND CONVEYORCapacity 4500 TPHLength 14.25 KMBelt Width 1800 mmSpeed 5.6 Mtr./SecThickness 22 mmNumber of Drives 6 (4 Head End,2 Tail End)Stand By drives 2(1 Head End, 1 Tail End)Motor 3 Phase Induction Motor of 1700 KW with 1493 RPM

5

Page 6: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide

Internal CHP Details :-Number of transfer point - 26.Number of Conveyors – 41. Speed of the Conveyor - 4 Mtr/Sec. Conveyor capacity - 1950 TPH.Number of Coal Silo - 1.Number of Belt Feeder - 4.Number of stacker cum reclaimer - 3.Number of Travelling Tripper – 12.Number of Belt weigher - 4.Number of Metal Detector - 4.Number of Coal Sampling Unit - 2.

Slide No 6

Page 7: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide Slide No 7

ACTIVITIES OF CHP OPERATION TEAM

• CONTINUOUS MONITORING OF ALL THE EQUIPMENTS TO SEE WHETHER THEY ARE IN WORKING CONDITION AND TO FIND OUT ABNORMALITY IF ANY .

2• STARTING AND STOPPING OF DIFFERENT

CONVEYORS,OIL-COOLERS,PUMPS,DS SYSTEM,DE SYSTEM AFTER TAKING CLEARANCE FROM FIELD OPERATORS.

• CONTROLLING FIRE AT ANY PLACE IN CHP.

Page 8: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide Slide No 8

4 • CREATING BREAKDOWN NOTIFICATIONS IN SAP AND INFORMING MAINTENANCE PEOPLE TO CORRECT ANY PROBLEM.

5• ENSURING ISOLATION OF EQUIPMENTS

AND ISSUE PERMITS THROUGH SAP TO MAINTENANCE ENGINEERS.

6 •EMPLOYING HOUSE-KEEPING MANPOWER TO KEEP ALL THE PLACES AND EQUIPMENTS CLEAN FOR SMOOTH OPERATION AND MAINTENANCE.

7 •THROUGH CHP CONTROL ROOM INFORMATION OF THE ON GOINGS IN CHP IS COMMUNICATED TO CCR,OLC HEAD-END ,MINES 24 *7

8• TAKING READINGS OF DIFFERENT

EQUIPMENTS AND BELT-WEIGHERS AND CALCULATE COAL-CONSUMPTION ,UTILIZATION DATA.

Page 9: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide Slide No 9

Mechanical System1) Belt-conveyor .2) Belt feeder.3)Traveling tripper.3)In Line Magnetic Seperator.3) Stacker-cum-Reclaimer.4) Motor.5) Gear-boxes.6) Fluid-coupling.7) Rigid-coupling.8) Pulley.9) Idlers.10) Rollers.

11)Oil Cooler.12) DS System.13) DE System.

DIFFERENT EQUIPMENTS IN CHP

Page 10: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide Slide No 10

ELECTRICAL SYSTEM1) HT Switchgear2) LT Switchgear3) Transformers

DIFFERENT EQUIPMENTS IN CHP

Page 11: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide

Choking of chutes by coal(specially in rainy season )

Mis-alignment of conveyors with pulleys and rubbing of belt with frames and folding of conveyors

Abnormal vibration in drive system due to misalignment between different parts

Fire hazard in coal yard Damage of rollers and

idlers in continuous operation

11

MAJOR PROBLEMS FACED BY SASAN OPERATION TEAM

Chute puncture due to continuous operation.

Oil leakage from fluid coupling/gearbox in high temperature operation

Heating up of equipments in continuous operation

Faulty operation of actuator operated flap-gates.

Page 12: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide

Conclusion Proper Communication

Work Load

Technical Training

Slide No 12

Page 13: Presentation ANINDYA BARAN GHOSH,Payroll no-41016163

Confidential Slide

Experiences… Biggest platform to start my career with Reliance Power Ltd.

Working in India’s one of the biggest CHP.

Facing lots of challenges during my work .

13