AGT SEP OKT NOP DES JAN

1 Arak-arak 89.394 72 4 4 2 1 14 12 37 1

2 Jangkar 47.517 49 - 3 5 4 8 13 33 2

3 Tamanan 56.200 108 3 8 6 2 7 4 30 3

4 Klabang 141.841 150 1 2 6 7 6 5 27 4

5 Olehan 26.387 76 4 2 5 2 3 10 26 5

6 Pasir putih 34.087 96 - 4 2 2 8 9 25 6

7 Pompa 32.669 103 - 6 2 3 6 4 21 7

8 Tlogosari 59.427 65 3 4 5 2 3 4 21 8

9 Ramban 69.222 93 3 1 5 3 4 4 20 9

10 Besuki 144.842 127 - 2 5 2 7 3 19 10

11 Kapongan 31.395 114 1 6 3 1 3 4 18 11

12 Maesan 61.636 70 2 1 5 3 4 3 18 12

13 Asem Bagus 64.189 116 2 2 3 - 7 3 17 13

14 Klampokan 157.274 74 1 4 2 1 4 5 17 14

15 Tal Kandang 25.924 95 - 1 4 2 6 3 16 15

16 Manggaran 36.363 60 2 1 2 1 4 4 14 16

17 Panarukan 48.995 63 - - - 1 6 6 13 17

18 Pejaten 29.838 34 1 2 1 1 5 3 13 18

19 A.Jafar 15.324 70 2 1 - 1 1 3 8 19

20 Prajekan 17.741 56 1 2 1 - 1 - 5 20

21 Tegal Ampel 10.567 49 - - 1 - 2 2 5 21

22 Bonindo 12.104 78 1 - 1 - 2 - 4 22

23 Curah Dami 11.778 84 - - - - 1 1 2 23

1,224.714 31 56 66 39 112 105 409

PERINGKAT GANGGUAN

NO PENYULANG BEBANBULAN

TOTALPANJANG (KMS)

PERINGKAT PENYULANG DENGAN GANGGUAN TERBANYAKAPJ SITUBONDO

TOTAL GANGGUAN

Page 4: PRESENTASI APJ SITUBONDO

PARETO GANGGUAN PENYULANG TERBANYAK APJ SITUBONDO

0

5

10

15

20

25

30

35

40

PENYULANG

KALI KALI TRIP

KALI TRIP 37 33 30 27 26 25 21 21 20 19

Arak - Arak Jangkar Tamanan Klabang Olehan Pasir Putih Pompa Tlogosari Ramban Besuki

Page 5: PRESENTASI APJ SITUBONDO

NO UNITJUMLAH GANGGUAN PER BULAN

AGS SEP OKT NOV DES JAN TOTAL

1 PANARUKAN 9 16 23 10 40 44 142

2 BONDOWOSO 14 19 23 9 37 29 131

3 WONOSARI 5 4 10 10 11 9 49

4 ASEMBAGUS 3 9 3 5 11 16 47

5 BESUKI 0 8 7 5 13 7 40

TOTAL 31 56 66 39 112 105 409

TOTAL GANGGUAN PER UNIT BULAN AGUSTUS - JANUARI 2011

Page 6: PRESENTASI APJ SITUBONDO

PROSENTASE PENYEBAB GANGGUAN PENYULANG DI APJ SITUBONDO

E169%

E27%

E37%

E42%

I15%

I28%

I31%

I41%

E1

E2

E3

E4

I1

I2

I3

I4

Page 7: PRESENTASI APJ SITUBONDO

• WILAYAH APJ SITUBONDO LEBIH DARI 69 % MERUPAKAN RAWAN WILAYAH APJ SITUBONDO LEBIH DARI 69 % MERUPAKAN RAWAN POHON (DAERAH PEGUNUNGAN, HUTAN, DAN POHON PRODUKTIF POHON (DAERAH PEGUNUNGAN, HUTAN, DAN POHON PRODUKTIF MASYARAKAT)MASYARAKAT)

• SEBAGIAN MERUPAKAN DAERAH PANTAI (RAWAN PENGGARAMAN) DAN SEBAGIAN MERUPAKAN DAERAH PANTAI (RAWAN PENGGARAMAN) DAN RAWAN PETIRRAWAN PETIR

• MASIH BANYAKNYA SUTM YANG MENGGUNAKAN TIANG TM 9M (EKS MASIH BANYAKNYA SUTM YANG MENGGUNAKAN TIANG TM 9M (EKS LISDES) PADAHAL DAERAH TERSEBUT MERUPAKAN DAERAH RAWAN LISDES) PADAHAL DAERAH TERSEBUT MERUPAKAN DAERAH RAWAN POHONPOHON

• SERINGNYA CUACA EKSTRIM (HUJAN ANGIN, ANGIN PUTING BELIUNG SERINGNYA CUACA EKSTRIM (HUJAN ANGIN, ANGIN PUTING BELIUNG DAN LAINLAIN)DAN LAINLAIN)

• DAERAH YANG MERUPAKAN RAWAN POHON SEBAGIAN MERUPAKAN DAERAH YANG MERUPAKAN RAWAN POHON SEBAGIAN MERUPAKAN POHON PRODUKTIF (MANGGA, SENGON, JATI DAN LAINNYA) SEHINGGA POHON PRODUKTIF (MANGGA, SENGON, JATI DAN LAINNYA) SEHINGGA SULIT UNTUK DILAKUKAN PERABASANSULIT UNTUK DILAKUKAN PERABASAN

• TIDAK ADANYA INVESTASI BASKET 1 (KEANDALAN) TAHUN 2010TIDAK ADANYA INVESTASI BASKET 1 (KEANDALAN) TAHUN 2010

Page 8: PRESENTASI APJ SITUBONDO

NONO URAIANURAIAN SATSAT JUMLAHJUMLAH KETERANGANKETERANGAN

1 PEMASANGAN GROUND WIRE Kms 5.75 TELAH TERPASANG

2 PENGGANTIAN JTM TELANJANG MENJADI AAAC-OC 150 MM2 Kms 26 HANYA MATERIAL YG SUDAH ADA,

JASA TIDAK ADA3 PEMASANGAN RECLOSER UNIT 3 TELAH TERPASANG

4 PEMASANGAN PMCB UNIT 3 TELAH TERPASANG - BO

• RECLOSERRECLOSER– TERPASANG 6 UNITTERPASANG 6 UNIT– 4 UNIT RUSAK/ TIDAK BEKERJA4 UNIT RUSAK/ TIDAK BEKERJA

• PMCBPMCB– TERPASANG 6 UNIT, 3 UNIT BELUM BEROPERASI (PROSES PENGOPERASIAN)TERPASANG 6 UNIT, 3 UNIT BELUM BEROPERASI (PROSES PENGOPERASIAN)

• USULANUSULAN– PENAMBAHAN PEMASANGAN PMCB PENYULANG (DIMASUKKAN DALAM PRK P2)PENAMBAHAN PEMASANGAN PMCB PENYULANG (DIMASUKKAN DALAM PRK P2)

Page 9: PRESENTASI APJ SITUBONDO

NONO BASKET I : KEANDALANBASKET I : KEANDALAN SATUAN SATUAN INVESTASI INVESTASI 2010 2010

INVESTASI 2011 INVESTASI 2011 PRK P0 + P1PRK P0 + P1

1 REKONFIGURASI JARINGAN - -

2PEMBANGUNAN PENYULANG BARU - -

3REHABILITASI JARINGAN - -

- PENGGANTIAN JTM TELANJANG MENJADI AAAC-OC 150 MM2 Kms - 54,05

- JASA PEMASANGAN AAAC-OC (2280 KM) Km - 204,13

4 PENGADAAN DAN PEMASANGAN BUS COPLER, CUBICLE PENYULANG DAN TRAFO PS UNTUK GARDU INDUK - -

5PENGADAAN & PEMASANGAN RECLOSER 20 KV 400 A

Set - 3,00

6 PENGADAAN & PEMAS. LBS MOTORIZED 20 KV 400 A & RTU KEY POINT, RADIO & ANTENNA Set - -

7PENGADAAN & PEMASANGAN LBS 20KV 400A Set - 5,00

Page 10: PRESENTASI APJ SITUBONDO

• A3C TO A3CSA3C TO A3CS• TREE BOMBTREE BOMB

• SEHARI BERSAMA PENYULANGSEHARI BERSAMA PENYULANG

• (SOPAN) (SOPAN) SOSOSIALISASI DAN SIALISASI DAN

PPENDEKATAN PELENDEKATAN PELANANGGANGGAN

Page 11: PRESENTASI APJ SITUBONDO

• KEGIATANKEGIATAN– PENGGANTIAN KONDUKTOR SUTM TELANJANG (A3C) MENJADI SUTM PENGGANTIAN KONDUKTOR SUTM TELANJANG (A3C) MENJADI SUTM

BERISOLASI (A3CS)BERISOLASI (A3CS)

• PELAKSANAANPELAKSANAAN– 15 FEBRUARI 2011 – 15 MEI 2011 (3 BULAN)15 FEBRUARI 2011 – 15 MEI 2011 (3 BULAN)

• LOKASILOKASI– SUTM PADA DAERAH RAWAN POHONSUTM PADA DAERAH RAWAN POHON

• VOLUMEVOLUME– 79 KM79 KM

• RENCANA KEDEPANRENCANA KEDEPAN– PENGGANTIAN KONDUKTOR SUTM TELANJANG (A3C) MENJADI SUTM PENGGANTIAN KONDUKTOR SUTM TELANJANG (A3C) MENJADI SUTM

BERISOLASI (A3CS) UNTUK PROGRAM PRK P10 DAN P1 TAHUN 2011 BERISOLASI (A3CS) UNTUK PROGRAM PRK P10 DAN P1 TAHUN 2011 SEPANJANG 54.05 KMS PADA DAERAH RAWAN POHONSEPANJANG 54.05 KMS PADA DAERAH RAWAN POHON

Page 12: PRESENTASI APJ SITUBONDO

• KEGIATANKEGIATAN– RABAS-RABAS POHON DENGAN MENGERAHKAN PERSONIL TAMBAHAN 10 RABAS-RABAS POHON DENGAN MENGERAHKAN PERSONIL TAMBAHAN 10

ORANG PER PENYULANG SERENTAK UNTUK SEMUA PENYULANG (KEGIATAN ORANG PER PENYULANG SERENTAK UNTUK SEMUA PENYULANG (KEGIATAN RABAS-RABAS HARIAN OLEH PERSONIL RABAS-RABAS TETAP BERJALAN)RABAS-RABAS HARIAN OLEH PERSONIL RABAS-RABAS TETAP BERJALAN)

• PELAKSANAANPELAKSANAAN– SATU KALI TIAP BULAN ATAU SESUAI KEBUTUHAN (TAHUN 2011 SUDAH SATU KALI TIAP BULAN ATAU SESUAI KEBUTUHAN (TAHUN 2011 SUDAH

TERLAKSANA 10 JANUARI 2011)TERLAKSANA 10 JANUARI 2011)

• LOKASILOKASI– SELURUH PENYULANGSELURUH PENYULANG

• VOLUMEVOLUME– 23 PENYULANG (230 PERSONIL RABAS-RABAS TAMBAHAN)23 PENYULANG (230 PERSONIL RABAS-RABAS TAMBAHAN)

• RENCANA KEDEPANRENCANA KEDEPAN– PELAKSANAAN TERUS DILAKSANAKAN UNTUK MENJAGA PENYULANG PELAKSANAAN TERUS DILAKSANAKAN UNTUK MENJAGA PENYULANG

BERSIHBERSIH

Page 13: PRESENTASI APJ SITUBONDO

• KEGIATANKEGIATAN– KEGIATAN JUMAT SEHAT DENGAN MENGERAHKAN SEMUA PEGAWAI PLN APJ KEGIATAN JUMAT SEHAT DENGAN MENGERAHKAN SEMUA PEGAWAI PLN APJ

SITUBONDO UNTUK MELAKUKAN INSPEKSI PENYULANGSITUBONDO UNTUK MELAKUKAN INSPEKSI PENYULANG

• PELAKSANAANPELAKSANAAN– SATU BULAN SEKALI ATAU SESUAI KEBUTUHAN (TAHUN 2011 TELAH SATU BULAN SEKALI ATAU SESUAI KEBUTUHAN (TAHUN 2011 TELAH

TERLAKSANA 7 JANUARI 2011)TERLAKSANA 7 JANUARI 2011)

• LOKASILOKASI– SELURUH PENYULANGSELURUH PENYULANG

• VOLUMEVOLUME– 23 PENYULANG23 PENYULANG

• RENCANA KEDEPANRENCANA KEDEPAN– PELAKSANAAN TERUS DILAKSANAKAN UNTUK MENJAGA PENYULANG PELAKSANAAN TERUS DILAKSANAKAN UNTUK MENJAGA PENYULANG

BERSIHBERSIH

Page 14: PRESENTASI APJ SITUBONDO

• KEGIATANKEGIATAN– SOSIALISASI DAN PENDEKATAN KEPADA PELANGGAN YANG POHONNYA SOSIALISASI DAN PENDEKATAN KEPADA PELANGGAN YANG POHONNYA

SULIT UNTUK DILAKUKAN PERABASAN.SULIT UNTUK DILAKUKAN PERABASAN.

• PELAKSANAANPELAKSANAAN– SESUAI KEBUTUHANSESUAI KEBUTUHAN

• LOKASILOKASI– SELURUH PENYULANGSELURUH PENYULANG

• VOLUMEVOLUME– 23 PENYULANG23 PENYULANG

• RENCANA KEDEPANRENCANA KEDEPAN– PELAKSANAAN TERUS DILAKSANAKAN UNTUK MENJAGA PENYULANG PELAKSANAAN TERUS DILAKSANAKAN UNTUK MENJAGA PENYULANG

BERSIHBERSIH