present sg group
TRANSCRIPT
Singapore
Marina Barrage
Smart Manager 4MBA
Ramkhamhaeng University
SG
-
SG
•
•
Singhapura) • 4
•
SG•
•
•
•
SG•
Stamford Raffles) Bencoolen)
Bengkulu) •
•
SG
• William Farquhar)
• Philip Jackson)
•
SG
•
•
•
•
Republic of Singapore)
SG
•
•
•
•
•
• 3•
• 1 Doing Business (
• 17%•
(Foreign Source Income)• (Investment
Holding Company) 3
-
Ranking 2013 2012 2011 2010
1 New York New York New York New York
2 London London London London
3 Hong Kong Hong Kong Hong Kong Hong Kong
4 Tokyo Tokyo Tokyo Tokyo
5 Singapore Singapore Singapore Paris
6 Shanghai Shanghai Shanghai Singapore
7 Paris Frankfurt Paris Frankfurt
8 Frankfurt Paris Frankfurt Shanghai
9 Chicago Zurich Sydney Washington
10 Sydney Chicago Amsterdam Sydney
Xinhua-Dow Jones International Financial Center Development Index 2013
•
A leading global city in the heart of Asia)•
- Economic growth that sustainable- Having a strong social security framework- A world-class environment and infrastructure- A Singapore that is secure and influential- Having strong families, cohesive society
•
21% -
SME- Human Capital Leader
Institution (HCLD)-
Creative Map• Clean
Energy •
•
Creative Map
Clean Energy
2011 2012 2013(e)Avg
2013-2015
(259.8 267.9(e) 277.86 289.5
(49,270.9
049,936.3
(e)50,899.1
852,099.
00
GDP, % 4.9 1.3 2.9 3.4
(56,989
56,142(e)
57,537 56,839
21.9 21.0(e) 20.7 19.7
AEC•
•
70%25%
/
•
1 (Doing Business 2013)•
•
•
•
5 •
•
•
•
•
•
•
(re-export)
•
•
•
•
•
•
•
•
100%
•
•
1
•
• 1
fDi Asia-Pacific Cities of the Future 2011/12)
• 1
7 8 (fDi Asia-Pacific Cities of the Future 2011/2012) 1 Doing Business 2012 Report, World Bank)
• 2
7 1
IMD World Competitiveness Yearbook 2011)
24th 11th 21st
1st
1st 17th
:
Gross National
Income(M.S
$)
Per Capi
ta GNI(S$)
Gross
Domestic Product
(M.S$)
GDPGrowth % % %
006
213,183.1
48,435
214,233.5 4.
007
234,246.2
51,050
230,871.4 4. 2
008
250,387.9
51,739
233,524.5
009(E) na na na
-- na
:
2007 2008
Total Manufacturing 253,380.6 259,339.2
Food, Beverage & Tobacco 5,707.7 6,598.7
Printing & Reproduction of Recorded Media 2,985.9 2,942.5
Refined Petroleum Products 48,040.0 60,372.7
Chemicals & Chemical Products 35,247.1 36,980.9
Pharmaceutical Products 21,206.9 16,686.4
Pharmaceutical Products 21,206.9 16,686.4
Rubber & Plastic Products 2,650.9 2,464.8
Non-metallic Mineral Products 1,905.8 1,953.9
Fabricated Metal Products except Machinery & Apparatus 8,892.5 9,128.9
Machinery & Equipment 18,965.1 18,758.4
Electrical Machinery & Apparatus 4,089.2 4,111.1
Electronic Products & Components 77,411.0 71,630.5
Medical, Precision & Optical Instruments, Watches & Clocks 5,915.9 5,752.1
Transport Equipment 15,275.6 16,469.3
:
891
2872
•
•
•
•
•
•
•
•
•
•
International Enterprise Singapore
(%)
2007 2008 2008 . .- . . 2009 . .- . . 2008 2009 . .- . .
561,746.02 669,883.56 340,066.88 230,125.42 19.25 -32.33
299,003.20 344,282.33 175,447.36 119,884.42 15.14 -31.67
262,742.82 325,601.23 164,619.51 110,241.00 23.92 -33.03
36,260.38 18,681.10 10,827.85 9,643.42 -48.48 -10.94
: International Enterprise, Singapore
Re-export)
SMEs
SMEs)
SMEs
SMEs
IMD
•
•
Growth
•
-
-
-
Growth
•
Clean Energy-
--
- Biomedical
ERI@N (Energy Research Institute @ Nanyang Technological University (NTU)
Growth
• >>>
- The Concept Plan
- The Master Plan
block street code
Growth
Growth
1. The Concept Plan
---
-
-
Growth
2. The Master Plan
“Singapore Way”
-
-
--
-
Growth
•
-- (Expressway) --- Changi International
Airport - Maritime and Port
Authority
Growth
• R&D
R&D
- . –R&D
- R&D
-
-
Growth
•
-
-
Growth
Management
Management
2,400 ./
715
Management
2011
50 ( . .2061)
Management
NEWater 4
Management
(see water process to fresh)
Marina Bay RunggolSerangoon
Management
5
7
( . .2030)
Management
1927 1961 1962
Johor Johor
Management
1965Tunku Abdul
Rahman“
Johor”
Management
Johor
Management
1963
•
• 4 1981
1983
•SeletaLower Seletar
1988
•
• 1990 Johor
Management
1998 – 2002)
Management
8
2061
Management
2002
1998 NEWater Study
2011
Management
2002
NEWaterNEWater
Management
2005
“ ” Marina Bay
2008
2011Runggol Serangoon
1961 2011
Management
1962 2061
The Institute of Southeast Asian Studies
380 7602010 2060
55%
Management
1890 James MacRitchie
James MacRitchie
Water Crisis
Water Crisis
19101911 3
Alexandra Road
1912 1915–
1917
Water Crisis
1955 - 1961
1963
Water Crisis
Water Crisis
NEWater
Water Crisis
3
• Local Catchments)
• Imported Water)•
Desalinated Water)•
NEWater4
Water Crisis
NEWater
NEWater
Microfiltration, Reverse Osmosis
Water Crisis
•
Water Efficiency Labeling Scheme : WELS)
•
Water Tariff) • Water Conservation
Tax)
Water Crisis
NEWater
•
“Let’s Not Waste Precious Water” 1981
11 • -
- (Public-Private-People Partnership)
Active, Beautiful and Clean (ABC) Waters
Water Crisis
147 2020
155
PUB
“ Water for All: Conserve,
Value and Enjoy “
Water Crisis
Water Crisis
• The Environment and Water Resources
(NEWR)
• The Public Utilities Board (PUB)
1 1963
National
Water Crisis
Water Crisis
• The National Environmental Agency
(NEA) 1 2002
• The Environment and Water Industry
Development Council (EWI)
2006
Global
hydrohub EWI
Marina Barrage
(Marina
Barrage)
008
,
-Recharge (Water Supply)-Regulate (Flood Control)-Relax (Lifestyle Attraction)
Benefit
Recharge (Water Supply)Marina Barrage
Benefit
Regulate (Flood Control)Marina barrage
Chinatown Boat Quay Jalan BesarGeylang
9
Benefit
Relax (Lifestyle Attraction)Marina barrage
Green roofs (
dragonboating
Benefit
3
250 3 1,000
Human Resource
(National
Public Unity Board (PUB)
• 17
1/6 Marina Reservoir
•
•
(Desalination)
Marina Barrage
Human Resource
“Sustainable Singapore”
Green Roof
Human Resource
•
•
Production
•
Production
- 3
( )
Production
Production
Production
Production
Source Control
Production
Production
2 Mitigation Measures
Production
Water Quality Monitoring and Prediction using Modeling
Model
Monitor
Production
Public, Private, & People (3P) Participation
Production
• NEWater
Production
• NEWaterDomestic wastewater)
Production
•
NEWater
Production
• NEWater
Microfiltration
Reverse osmosis Ultraviolet (UV)
Production
• NEWater
Production
• NEWater
• NEWater
Production
Operation
• Marina Barrage
* 10
30 50 • NEWater
Operation
Operation
Operation
• dual-flushing)
• -
Operation
Operation
•
•
•
•
•
Operation
Operation
Operation
Operation
Land Reclamation
Land Reclamation)
International
Operation
Operation
Marketing
PUB Water for All : Conserve Value and Enjoy
Marketing
-
Active Beautiful and Clean Waters ABC
Durability
DurabilityPricing
-
DurabilityLCFCs
Durability
“WEB Certificate” Water
Efficiency Labeling Scheme : WELS
NEWater
Success
•
•
•
•
•
•
•
Success
Summarize
•
•
•
•
•
•
•
- Internal and External Environment scanning
- Strategy formulation - Strategy implementation - Evaluation and control
•
Blue Ocean
•
Summarize
THE END