South Carolina Interconnection and Distributed Energy Resource Update Prepared for the South Carolina Public Service Commission Workshop - December 15, 2016 ~++ j5 DUKE P ENERGY.

Upload: others

Post on 28-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Prepared for the South Carolina Public Service Commission

South Carolina Interconnection and Distributed Energy Resource UpdatePrepared for the South Carolina Public Service Commission Workshop - December 15, 2016

~++

j5 DUKEP ENERGY.

Page 2: Prepared for the South Carolina Public Service Commission

Review Areas

1. DER Program Update2. Interconnection Processes,

Challenges, and Improvements3. Operational and Technical

Challenges of Large Solar Generators

2

Duke Energy Carolinas

Duke Energy Progress

Page 3: Prepared for the South Carolina Public Service Commission

1. DER Program Participation Updates

3

Page 4: Prepared for the South Carolina Public Service Commission

Duke Energy South Carolina Distributed Energy Resource (DER) Goals

Duke Energy CarolinasDistributed Energy Resource (DER) Program Goals

Before 2021, DEC will Procure 40,000 kW of solar

power from facilities 1,000-10,000 kW in size via RFP

Incent 40,000 kW of customer-sited solar power from facilities less than 1,000 kW via rebates, including ~10,000 kW from solar facilities less than 20 kW in size.

Upon completion of the above, the company has the option to invest in an additional 40,000 kW of solar power from facilities 1,000-10,000 kW in size

Duke Energy ProgressDistributed Energy Resource (DER) Programs Goals

Before 2021, DEP will Procure 13,000 kW of solar

power from facilities 1,000-10,000 kW in size via RFP

Incent 13,000 kW of customer-sited solar power from facilities less than 1,000 kW via rebates, including ~3,250 kW from solar facilities less than 20 kW in size.

Upon completion of the above, the company has the option to invest in an additional 13,000 kW of solar power from facilities 1,000-10,000 kW in size

40,000 kW

+40,000 kW

+40,000 kW120,000 kW

13,000 kW

+13,000 kW

+13,000 kW39,000 kW

4

Page 5: Prepared for the South Carolina Public Service Commission

DER Program Update – Rebate Program vs. Act 236 Goals

5

Duke Energy ProgressRebate Program Status - as of Nov. 16, 2016

Solar Installation Size

Rebate Application –total capacity for which customers have applied

Act 236 Goal

If all solar facilities that receive rebate are built, will Act 236 Goal be met?

Small Facilities (less than or equal to 20kW)

820 kw At least 3,250 kW*

No. Just 25% of small scale-goal has been met so DEP is still encouraging rebate applications

Large Facilities (greater than 20kW and less than or equal to 1,000kW)

9,900 kW At most 9,750 kW

Yes. Large Facility goal of 9,750 was met so Large Solar Rebate Wait List established.

Total 10,667 kW 13,000 kW No

Duke Energy CarolinasRebate Program Status - as of Nov. 16, 2016

Solar Installation Size

Rebate Application –total capacity for which customers have applied

Act 236 Goal

If all solar facilities that receive rebate are built, will Act 236 Goal be met?

Small Facilities (less than orequal to 20kW)

14,500 kW At least 10,000 kW*

Yes. 140% of small scale-goal has been met so Small Solar Rebate Wait List established.

Large Facilities (greater than 20kW and less than or equal to 1,000kW)

32,000 kW At most 30,000 kW

Yes.Aggregate goal of 40,000kW was met so Large Solar Rebate Wait List established.

Total 46,500 kW 40,000 kW Yes

**Duke may incent beyond 3,250 kW provided the aggregate total of small and large facilities does not exceed 13,000 kW, per Act 236.

*Duke may incent beyond 10,000 kW goal provided the aggregate total of small and large facilities does not exceed 40,000 kW, per Act 236.

Page 6: Prepared for the South Carolina Public Service Commission

DER Program Update – DER NEM Incentive Program

Duke Energy CarolinasNEM Program Status - as of Nov. 16, 2016

Rider Name

Number of customerswho have elected to net meter

Cumulative capacity of net metered generation

NEMStatutoryLimit*

Installed capacity as a percentageof utility’s retail SC peak

Rider RNM 1,241 customers 10,182 kW - -

Rider NM-SC 223 customers 2,495 kW - -

Total 1,464 customers 12,677 kW 80,000 kW 0.32%

(limit = 2%)

6*Per state law, (South Carolina Code Section 58-40-20 (B)) utility may limit net metered generation to two percent of their respective previous five-year average retail South Carolina peak demand. For DEC 2% = 80,000 kW-AC; DEP 2% = 26,000 kW-AC.

Duke Energy ProgressNEM Program Status - as of Nov. 16, 2016

Rider Name

Number of customerswho have elected to net meter

Cumulative capacity of net metered generation

StatutoryLimit*

Installed capacity as a percentageof utility’s retail SC peak

Rider RNM 60 customers 480 kW - -

Rider NM-SC 11customers 181 kW - -

Total 71 customers 661 kW 26,000 kW 0.051%

(Limit = 2%)

Page 7: Prepared for the South Carolina Public Service Commission

UTILITY METER

2. Electric utility measures energy output of array each month and transmits that to the Utility Billing System

UTILITY SYSTEM

3. Electric utility system transmits energy to all customers

UTILITY BILLING SYSTEM

4. Utility Billing System determines how much of the shared solar array’s kilowatt-hour output should be credited to each subscribing customer, based on his/her fractional share of the array, then applies a credit of ~6¢ per kilowatt-hour.

SHARED SOLAR SUBSCRIBERS

5. Subscribing customer pays electric utility bill, as usual, for electricity consumed each month. Also pays subscription fee for access to solar power. Then receives bill credit of ~6¢ per kilowatt-hour for his/her share of the actual solar energy produced at shared array, each month.

SHARED SOLAR ARRAY

1. Solar farm produces energy when sun shines

DER Program Participation Update – Shared Solar Program

7

Duke Energy anticipates that the Shared Solar Program will be available to retail customers by late 2017.

pnqng «Q e-tZ@~kg

Q

Page 8: Prepared for the South Carolina Public Service Commission

Utility Scale Solar Goal Update

53,000 kW* sought through Request for Proposals (closed Oct 2015) To-date 5,000 kW contracted Most bids seek to interconnect large solar farms (average size: 8,000 kW = 40 acres

of solar PV) to rural distribution circuits (average size: 12 kV). Bid evaluation based on economic value and technical feasibility

8

Duke Energy is engaging bidders to find solutions to interconnection of proposed solar farms on distribution circuits; Tier I completion in 2018

*53,000 kW represents DEC+DEP (combined) Utility-Scale Solar Goal, per Act 236

Page 9: Prepared for the South Carolina Public Service Commission

2. Interconnection Processes, Challenges, and Improvements

9

Page 10: Prepared for the South Carolina Public Service Commission

1. Renewable generator submits Interconnection Request (IR) and associated documents

2. Utility notifies generator of receipt of documents

3. Utility confirms that documents are in order, notifies generator again

4. Utility confirms that capacity is available on that line segment.

5. Generator/ Customer signs Intercon-nectionAgreement

6. Generator constructions facility

7. Utility or county inspects solar facility; utility sets meter, generator is energized

Process for Generators Less Than 20 kW is Relatively Straightforward

10

A. Interconnection Request Application

B. One-Line Electrical Diagram of Generating Facility

C. Proof of Insurance D. Inverter Equipment

Spec Sheet

E. Generating System Equipment Spec Sheet

Page 11: Prepared for the South Carolina Public Service Commission

1. Renewable generator submits Inter-connection Request (IR)

2. Utility notifies generator of receipt of documents

3. Utility confirms that documents are in order, notifies generator again

2. Utility evaluates generator against approved inter-connection procedure such as Pre-App, Fast Track, Supplemental and/or Full Study

3. Utility provides scope, cost, timeframe of interconnection study to generator

4. Generator responds to utility with proceed/do-not-proceed instructions

Utility provides Intercon-nectionAgreement (IA); Generator signs IA

5. Utility builds intercon-nectionfacilities as well as any System Improvements necessary for safe, reliable interconnection

6. Generator constructs facility, commissions it; utility and/or county inspects, generator is energized

Large Generator Interconnection Requires Additional Detail, Time, Care

11

A. Interconnection Request Application Form

B. Applicable Fee / Deposit Submitted with Request

C. Demonstrated Site Control Form

D. Site Plan of FacilityE. One Line Electrical

Diagram of Generating Facility

F. Inverter Equipment Specification Sheet

These processes are typically the most labor-intensive and most time-consuming due to the need for communication between proposed generator and utility

Page 12: Prepared for the South Carolina Public Service Commission

System Impact Study

• Operating Impacts• Circuit Capacity• Other Projects• Circuit Design• Project Size• Operating Profile

• System Upgrade Requirements

• Interconnection Facilities• Protection Requirements

• Scope of Interconnection• Cost of Interconnection• Estimated Timeline

12

Complete SystemImpact Study for

Project

Page 13: Prepared for the South Carolina Public Service Commission

Duke Energy Interconnected >700 Small Renewable Generators in 2016

13

0

200

400

600

800

1000

1200

0

2,000

4,000

6,000

8,000

10,000

12,000

2011 2012 2013 2014 2015 2016

# of

gen

erat

ors

Kilo

wat

ts in

terc

onne

cted

Cumulative Renewable Generation Interconnected, Duke Energy South Carolina, 2011-2016

renewable capacity (kW-ac) # of generators

From submission of IR to setting of meter, DEC and DEP average 50-60 days.

Page 14: Prepared for the South Carolina Public Service Commission

Interconnection Requests from Large Solar Generators Soared in 2016

DEC DEPSolar 465,851 1,154,487Non-solar 5,570 -

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

Kilo

wat

tsLarge Generators (greater than 20 kW) in Duke Energy South

Carolina Interconnection Queue, as of 12/5/2016

14

More than 600,000 of the kilowatts shown above are independent power producers whose generation is unrelated to Act 236.

Page 15: Prepared for the South Carolina Public Service Commission

Most Generators are interconnected within 90 days

15

17.1%

48.1%

75.2%

89.4% 94.7% 97.1% 98.1% 98.7% 99.3% 99.5% 99.7% 100.0%

0%

20%

40%

60%

80%

100%

120%

- 50

100 150 200 250 300 350 400 450 500

% o

f tot

al n

umbe

r of g

ener

ator

s in

terc

onne

cted

# of

gen

erat

ors

who

hav

e su

bmitt

ed

IRs

Days Required to Interconnect South Carolina GeneratorsHistorical Review of Interval from IR Receipt to Interconnection

# generators % of total number of generators interconnected

Duke Energy has successfully interconnected almost 90% of all generators within 120 days.

rp g&?& (p ~&5 g&?& q&?& g&?& rp q&?& p% rp @Q

o.&b ~5 ~b gQ) p4 qb qA ~Q

Page 16: Prepared for the South Carolina Public Service Commission

View of Today’s Large Generator Interconnection Queue

40

22

98

77

29 30

114

-

20

40

60

80

100

120

IR Processing Fast Track Study System Impact Study Facilities Study Contruction Phase Completed Projects Withdrawn

Current Status of Generators in SC Interconnection Process

Total

16

Page 17: Prepared for the South Carolina Public Service Commission

SC Interconnect Study Intervals (Jan. 1, 2016 – Sept. 30, 2016)

The average interval for studies completed in 2016 is trending at 60 business days and represents studies entering the queue prior to the new standards 17

Page 18: Prepared for the South Carolina Public Service Commission

Factors that Impacts to Time Required to Process Interconnection Requests

Queue Volume: Number of and Timing of New Interconnect Requests Interdependency with Other Proposed Generators in Queue Point of Interconnection: Is generator interconnecting as net metered facility

or sell-all? On distribution or transmission system? Operational Parameters: Generator details (size, expected output) and

System Details at Interconnection Point (e.g., near Voltage Regulator?) Operational Impacts: Location of Project Point of Interconnection (e.g.,

Circuit Stiffness Ratio) Business and Communication issues: proposed generator option sold to

another party; utility not notified and cannot contact new owner of solar option

18

Page 19: Prepared for the South Carolina Public Service Commission

Interconnection Organization – Distributed Energy Technology

RSCSmall Customer Process

IR Process Thru 10-day Letter Notice

OperationsStudy Process Oversight

Data Management Reporting Support

Billing Support

InterconnectionProcedure Oversight

Agreements and ContractsCoordination for Project Completion

19

Page 20: Prepared for the South Carolina Public Service Commission

Interconnection Process Improvements: Organizational Changes

Distribution Planning Team 5 engineers dedicated to South

Carolina interconnection studies

Transmission Engineering Team 2 engineers dedicated to South

Carolina interconnection studies

20

Interconnection Team Created Interconnection Account

Management unit tasked with communicating with the proposed generator (current: 10; future 17)

Created Interconnection Operations unit (current 10; future 13)

Duke Energy continues to hire additional employees to meet the demand for interconnection

Page 21: Prepared for the South Carolina Public Service Commission

Interconnection Process Improvements

Industry Education South Carolina Solar Council

Meetings – 100+ participants Webinars for Solar Installers – 100+

participants Quarterly DER Collaborative

Meetings

Customer Education & Assistance Renewable Service Center customerownedgeneration@duke-

energy.com Tel. 866.233.2290 (8am-5pm, M-Fri)

21

Online Application PowerClerk online available for

Small Generators less than 20 kW

V ENERGY.DUKE

a. a

0 PowerCferfC

PowerClark 2

.M r «w ~ aa hf~~f ~ »aa Iw.«w I aa.a Oaa ~ wa * fwf

O E: X

Page 22: Prepared for the South Carolina Public Service Commission

Process Improvement: Implementation of Salesforce Software

Salesforce is an online database software product customized to Duke Energy’s interconnection needs

Use of single database improves data quality and integrity for: Compliance with Record

Retention Policy Customer Communication

Record Customer/Developer Reporting

(possibility for Dashboard Interface)

22

$1.7MM enterprise investment Over the next 6-12 months,

Salesforce will: Enable Duke to launch online

Interconnection Request for Large Generators (no more paper applications)

Will automate communication to proposed generators, deadline management, form and agreement management, and exception processing

salesforce

Page 23: Prepared for the South Carolina Public Service Commission

Interconnection Process Improvement: Visibility

23

Duke Energy makes available (and updates twice monthly) a report for developers of Large Scale Solar Generators, showing their progress through the queue

@DMip)t dv. Iy ts Wp dmt P lid +II em q VPENERGY. Products & ServicesI DUKE IN THIS SECTION

Interconnection Queue

The Duke Energy mterconnection queue reflects the status of generators that have requested

mterconnection at distnhution voltage levels with generation capamty greeter than 20 kW

Ths t connect on q e mpon s pd ted on the 15th d 30th ot e ch mo th

Queue Report (Excel file) Queue Report (PDF)

Wt,NI hd slGN OP FQR EMAIL x

[ll~3 Eq "di

Page 24: Prepared for the South Carolina Public Service Commission

3. Operational and Technical Challenges of Interconnection of Large Solar Generators

24

Page 25: Prepared for the South Carolina Public Service Commission

Power Quality Events Prompted Discussion of Long-Term Sustainable Approach to Interconnection of Large Solar Generators

Background DEP on the leading edge: 1500+

megawatts in DEP interconnected today; industry Standards (e.g., IEEE) are not fully developed for large-scale solar generators

DEP has experienced multiple events indicating the necessity for more sustainable approaches to interconnection of large solar generators

25

It is incumbent upon Duke Energy to innovate sustainable approaches to interconnection of large solar generators on distribution circuits

US planned utility-scale solar projects in advanced development or under construction

MO

&~(.

Oevelopment status0 Ad Mad M~Qc*tm

Capacity(MW)0 D50

O 51-150

0 151-250

0 IMMM 20155 5NII~. MImudoPdah IM 0 I dll~

MM ~0 AIIA

o '~rc

Page 26: Prepared for the South Carolina Public Service Commission

Duke’s experiences with stand-alone solar

Starting in late 2015 and especially in 2016, we have started to experience unexpected events Voltage harmonics induced from transformer magnetizing inrush

(unrelated to inverters) Impacts experienced to nearby industrial customer

Inverter sensitivity to capacitor switching Impacts voltage & utility equipment

Harmonic production from inverters during magnetizing inrush Impacts to customer equipment

Inverter phase angle instability Impacts to voltage

26

Page 27: Prepared for the South Carolina Public Service Commission

Seeking a sustainable interconnection approach for stand-alone solar generators

Large solar generator investments are built to maximize kWh output exist solely to generate energy for

sale are stand-alone, not associated with

a load; are non-dispatchable, with

intermittent output; do not provide ancillary services or

system support services like voltage and regulation

Distribution system investments are built to deliver high quality, 24-7

reliable energy to consumers

Sustainable approach Locate such facilities at “stiffer”

parts of the system, where they have less potential to cause undesired impacts

27

Page 28: Prepared for the South Carolina Public Service Commission

Circuit Stiffness Review and Advanced Studies

28

CSR (Circuit Stiffness Review) is a screening evaluation which considers the ratio of the utility system “strength” at the point of interconnection, vs. the generating facility size. Stiffness ratio is a good proxy for assessing the voltage impact of a DER

facility.

CSR = 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝐶𝐶𝐶𝐶𝑆𝑆𝐶𝐶𝐶𝐶𝐶𝐶𝑆𝑆 𝑀𝑀𝑀𝑀𝑀𝑀 𝑎𝑎𝑆𝑆 𝐶𝐶𝑖𝑖𝑆𝑆𝑖𝑖𝑆𝑆𝐶𝐶𝑆𝑆𝑖𝑖𝑖𝑖𝑖𝑖𝐶𝐶𝑆𝑆𝐶𝐶𝑆𝑆𝑖𝑖𝐷𝐷𝐷𝐷𝐷𝐷 𝑠𝑠𝐶𝐶𝑠𝑠𝑖𝑖 𝐶𝐶𝑖𝑖 𝑀𝑀𝑀𝑀

CSR is evaluated at the interconnection, per site, and at the substation, for aggregate DER. For CSR ≥ 25 for both criteria, study proceeds as usual. CSR < 25 for either criteria initiates the “Advanced Study” phase.

“Advanced Study phase” of the System Impact Study (SIS) A more rigorous evaluation of harmonic impact of transformers, inverters;

also further evaluation of Rapid Voltage Changes and flicker. Allows the interconnection study to honor the “do no harm” intent.

Page 29: Prepared for the South Carolina Public Service Commission

Voltage Regulation & stand-alone solar facilities

29

Voltage regulators are one key asset, amongst many, to maintaining proper voltage to all customers

Substation regulator (3 phase)

Distribution voltage regulators

Page 30: Prepared for the South Carolina Public Service Commission

Voltage Regulator Location Policy for stand-alone solar: background Voltage regulators are a key part of distribution system voltage

management Placement is determined in a distribution planning study, typically

performed every 5-7 years In the interim, the circuit “runs on autopilot” while circuit load data is

collected and monitored for load growth patterns This policy requires “stand-alone” DER facilities to locate “upstream” of

line voltage regulators Voltage regulators are critical asset in proper operation of Integrated

Volt/Var Control (IVVC) systems “Stand-alone” distributed generation facilities are not necessarily easily

adapted further out on distribution circuits, beyond line voltage regulators

30

Page 31: Prepared for the South Carolina Public Service Commission

Review: Duke Energy ProgressDistribution System Demand Response (DSDR) project

A type of IVVC (Integrated Volt/Var management System), which provides peak demand reduction

Part of balanced solution to meet energy growth with energy efficiency

Approved Demand-Side Management/Energy Efficiency (DSM/EE) program in both NC and SC

Business case Defer two new combustion turbines (CT) Reduce emissions Displace more costly peak generation resources

Deployed on entire distribution grid Project initiated in 2008, fully operational in June 2014 A similar system remains a possibility in DEC; pilots

underway 31

Page 32: Prepared for the South Carolina Public Service Commission

DSDR Principles of Operation

ExistingFlattened Profile after feeder conditioning

Lower Regulatory Limit

Upper Regulatory Limit

• Flattened profile allows greater voltage reduction• Dynamically lower voltage to regulatory limit

o DMS network model used to maximize voltage reduction over timeo Each regulating zone and each phase is optimized independently

o Required adding a significant # of voltage regulators, with remote communications

Lower Voltage to Reduce MWs

Feed

er

Volta

ge

Feeder Distance

32

Page 33: Prepared for the South Carolina Public Service Commission

DSDR – Realized Benefits

200+ MW of capacity, on average, during annual (summer & winter) peak condition activations Maximum capability of 316 MW during summer peak

Over 195,000 MWH of total energy savings through 2015 Validation of 178 MW of peak generation spinning reserves Validation of benefit from emergency voltage reduction activations Used successfully in 2014 & 2015 Polar Vortex events to manage winter

peak load

33

Page 34: Prepared for the South Carolina Public Service Commission

Review: Circuit Stiffness and Voltage Regulator Policy

Duke is seeking to locate stand-alone solar facilities in a “smart” way Circuit Stiffness Review screen simply assures an adequate

evaluation of impacts Voltage regulator policy assures integrated operation of wide area

distribution system management technologies and stand-alone solar facilities

34

Page 35: Prepared for the South Carolina Public Service Commission

In Conclusion

35

Page 36: Prepared for the South Carolina Public Service Commission

Thank you Jason MartinDirector, [email protected] GajdaManager, DER Operations [email protected] FeltRenewable Strategy [email protected]

36

Page 37: Prepared for the South Carolina Public Service Commission

37