  • 8/11/2019 PRE9053 Well Test Report

    1/7

    ARPO

    ORGANIZING

    DEPARTMENT

    TYPE OF

    ACTIVITY'

    ISSUING

    DEPT.

    DOC.

    TYPE

    REF. N. PAG. 1

    OF 7

    STAP G 1 F 9053

    The present document is CONFIDENTIAL and it is the property of AGIP

    It shall not be shown to third parties nor shall it be used for reasons different from those owing to which it was given.

    TITLE

    SPER 53

    WELL TEST REPORT

    DISTRIBUTION LIST

    CEAD CortemaggioreDICR CremaDIGE Gela

    DIRA RavennaDORT Ortona

    Agip NAME (O.G.T.T.) San Donato MilaneseARCO San Donato Milanese

    ATAP San Donato MilaneseRIAP San Donato MilaneseSTAP Archivio San Donato MilaneseTEAP San Donato Milanese

    ACT Operator Group Shekou R.P. Cina

    AGIBA Cairo EgyptIEOC Cairo EgyptAgip Africa Algerie Alger AlgerieAgip Africa Tunisie Tunis Tunisie

    Agip Oil Company Ltd. Tripoli LibyaAgip Petroleum Co. Inc. Houston U.S.A.

    Agip Recherches Congo Pointe Noire R.P. du CongoAgip UK Aberdeen U.K.

    KEEIG (KOS) Aksai R. of KazakhstanNAOC Port Harcourt NigeriaNORSK Agip Stavanger NorwayPetrex Milano ItalySPI Fornovo Taro (PR) Italy

    Date of issue:

    Issued by STAP C.LanzettaV.Pozzi

    I.Titone

    11-12-95 15-12-95 15-12-95

    REVISIONS PREP'D CHK'D APPR'D

  • 8/11/2019 PRE9053 Well Test Report

    2/7

    ARPO

    IDENTIFICATION CODE PAG 2 OF 7

    REVISION

    STAP-G-1-F-9053 0

    SPER 53

    WELL TEST REPORT

    CONTENTS

    1. SCOPE

    2. INSTRUCTIONS

    3. RESPONSIBILITY

    4. DISTRIBUTION AND FILING

    5. COMPILATION FREQUENCY

    FIG. 1. DISTRIBUTION CHARTATTACHMENT 1 SPER 53 FORM : SHEETS A, B, C

    NOTE: This document replaces STAP-P-1-M-0078

    NOTE 2: This document has been prepared by an ad hoc team, composed with the

    following Wireline Supervisors of the Agip Districts in Italy:

    G. Albasi, E. Barbieri, D. Facen, A. Iervese, P. Occhipinti

  • 8/11/2019 PRE9053 Well Test Report

    3/7

    ARPO

    IDENTIFICATION CODE PAG 3 OF 7

    REVISION

    STAP-G-1-F-9053 0

    1. SCOPE

    The Sper-53 form, herein included and consisting of 3 sheets (A, B, C), provides a means of

    organically reporting, in a simple and concise way, information concerning well testoperations carried out during drilling, completion, workover, and production activities.

    It is a standard form, whose aim is giving information feedback to the departments involved.

    2. INSTRUCTIONS

    The form is supplied by the Company in multiple copy carbon paper to allow the availabilityof copies of the form when a Xerox is not installed on the site of operations.However it is recommended the utilization of Xerox machine in order to have always good

    quality copies of the original.

    The form is filled out by the Company Representative, who makes sure that the data

    included are correct.

    The form organically reports the sufficient information to offer to the reader (who, in any case

    will be an expert) a complete view of the operation.

    Sheet A is for general data reporting and sheet C is for test string composition reporting.

    These sheets will be filled out once for each well testing operation.Sheet B is for test data reporting; it will be updated daily and transmitted daily by telefax asattachment of daily operation report (SPER 41).

    3. RESPONSIBILITY

    The Company Representative will be responsible for correct filling out of the forms and

    signing for approval.

    The Company Representative will be responsible for the first stage of distribution.

    The Drilling & Completion Manager ("Responsabile Area Pozzo di Distretto" for Agipdomestic activities) will be responsible for ensuring the forwarding of a copy to STAP

    department at Agip Headquarters in San Donato Milanese.

    4. DISTRIBUTION AND FILING

    The Company Representative transmits the form via telefax to the Operating Base: inparticular he will send sheet B every morning updated as attachment of the daily operation

    report (SPER 41).

    He files a copy and sends the original copy to the Operating Base (or District).

    The Superintendent in District (or Operating Base) files the original copy and forwards a copyof the form to STAP.

    STAP receive the copy, file it in SIDAS (electronic-optical archive) and place the paper copyon file.

    Fig.1 shows the distribution chart.

    5. COMPILATION FREQUENCY

    This form must be compiled on occurrence and forwarded at the end of well test operations.

  • 8/11/2019 PRE9053 Well Test Report

    4/7

    ARPO

    IDENTIFICATION CODE PAG 4 OF 7

    REVISION

    STAP-G-1-F-9053 0

    S

    A

    SUPPLY THE FORM

    APPROVE THE REPORT

    RECEIVE THE REPORTR

    I ISSUE THE REPORT

    Figure 1

    RECEIVE FOR THE ACTIONPERTAINING TO THEM

    D I S T R I B U T I O N C H A R T

    D O C U M E N T:

    C O D E:

    D R I L L I N G R I G H E A D O F F I C E

    TEAPSTAP ARCO

    S

    A

    R

    SPER 53

    OPERATINGBASE

    COMPANYREPRESENTATIVE

    DRILLINGMANAGER

    OTHER

    AGIPDEPTSCONTRACTOR

    OR

    WELL TEST REPORT

    OR

    X

    I

    R

    FAX TRANSMISSION

    FILING ON SIDAS

    SIDAS EXAMINATION

    X

    F

    ORIGINALOR

    FFILE THE REPORT

    R*

    COPYX

    C1 COOPERATE FOR ISSUING

  • 8/11/2019 PRE9053 Well Test Report

    5/7

    ARPO

    IDENTIFICATION CODE PAG 5 OF 7

    REVISION

    STAP-G-1-F-9053 0

    ATTACHMENT 1

    SPER 53 FORM : SHEETS A, B, C

    WELL TEST REPORT

  • 8/11/2019 PRE9053 Well Test Report

    6/7

    ARPO

    IDENTIFICATION CODE PAG 6 OF 7

    REVISION

    STAP-G-1-F-9053 0

    DISTRICT

    SPER 53/ACOMPANY REPRESENTATIVE

    WELL TEST REPORT

    Remarks

    Casing size

    Liner size from to

    R.T. / 1st Fl.

    Tubing size

    Tubing size

    Tbg shoe depth

    Packer depth

    Packer depth

    Bottom hole

    Completion fluid

    Type of formation

    from to

    from to

    Acid job performed Yes No

    Density

    pH

    from to

    DATE TEST NCOST CENTERCONTRACTOR

    FIELD NAME

    SINGLE COMPLETION DUAL COMPLETION SELECTIVE STRING :Long

    Short

    WELL CODE

    Perforations Wire line T.C.P.

    Underbalance

    from to

    from to

    from to

    from to

    from to

    from to

    from to

    from to

    Gun size

    Shoots / ft

    Charge type

    On date

    Open hole

    Slotted casing

    Gravel packing

    from to

    from to

    from to

    m

    m

    m

    m

    m

    Type

    NaCl

    m

    m

    m

    m

    m

    m

    m

    m

    WELL SKETCH

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    m

    WELL NAME RIG NAME

    Kg/l

  • 8/11/2019 PRE9053 Well Test Report

    7/7

    ARPO

    IDENTIFICATION CODE PAG 7 OF 7

    REVISION

    STAP-G-1-F-9053 0

    SPER 53/BCOMPANY REPRESENTATIVE

    Time THP THT

    Q GOR WOR TOT

    CHOKECHP

    h:min

    OIL

    UP DOWN

    Kg/cm2 C

    BHP BHT

    C Kg/cm2

    inch

    FLOWRATE

    GAS

    Nm3/gx1000 m3/g Nm3/m3m3/m3 m3

    SINGLE COMPLETION DUAL COMPLETION SELECTIVE STRING:ShortLong

    Progressive

    Time STREAM STREAM

    DENS BSW

    WATER

    DENS pHNaCl

    m3/g

    Q TOT

    %

    RemarksAPI gr / l gr / l m3

    DISTRICTWELL TEST REPORTFIELD NAME WELL NAME WELL CODE TEST NRIG NAME

    PAGE .................. OF.........................

    m...........m.........

    Kg/cm2