Page 1: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

MONKEY RUN , ARCADE, NY.

HISTORIC RAILROAD

PROTECTION & DEMONSTRATION

PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION

Page 2: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

This project was funded by the Great Lakes Commission, through the Seneca Trail Resource Conservation and Development Council, Inc. and

implemented with the assistance of the Wyoming County Soil & Water Conservation District

Alleghany Ecological ServicesU.S. Army Corps of Engineers

NYS DEC Region 9Cattaraugus County Soil & Water Conservation District

NRCS Area Office, Batavia, NY

Attica and Arcade Historic Railroad

• ,

Page 3: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

PRE-PROJECT CONDITIONS AT MONKEY RUN

• Stream has been straightened in mid-1800’s (railroad), & 1959, & 1965 (NY State Highway Dept.)

• Stream is incised (disconnected from the flood plain)

• Active knickpoints (headcuts) throughout the system

• Stream is shallow and overwidened.

• We turned 2 bends and one crossing into 6 bends and 5 crossings. The grade control structures consist of a 3-log Log Digger, a 6-log Log Aerator-riffle, one Engineered Rock Riffle, two Solid-Sill Engineered Rock Riffles, and one Adjustable Random-Boulder Rocked Riffle

Page 4: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

From the air, flow is left to right, 5/18/2005, YELLOW IS NEW CHANNEL ALIGNMENT

Pix by Derrick

Page 5: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

From the air, flow is left to right, 5/18/2005, WHERE THE NEW CHANNEL SHOULD HAVE BEEN LOCATED–BUT THE BYPASS CHANNEL WAS PUT

IN THE WRONG PLACE, THINK AHEAD !!

Pix by Derrick

Page 6: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

THE PROJECT

Construction Oct 25-Nov 11, 2004

In addition to protecting the railroad at two sites, we will replace two bends and one

crossing with 6 bends and 5 crossings (riffles)

Page 7: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Log Outer-Bank Bend Protection with Living Retard

& Solid-Sill Engineered Rock

Riffle (Bend #1 and Riffle #1 in the Monkey Run realigned

channel, Arcade, NY, constructed Oct-Nov 2004)

Page 8: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Looking US at Pool #1, log revetment in place and anchored

with duckbill anchors

Page 9: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Backfilling behind log revetment in Pool #1. Logs are designed to be undercut and act as LUNKERS

Page 10: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

TRANSPLANTED LIVING WILLOW RETARDS

MONKEY RUN STREAM REALIGNMENT PROJECT, ARCADE, NY {rural, gravel-cobble, straightened three times,

re-meandered during project, incised}

• THINK BIG!!!! THINK INSTANT!!!• Transplanting an entire big clump of

willows (roots and all) a track hoe bucket (4 ft wide) at a time

• Multi-function, used to weigh down bank protection and provide bank protection, shade, cover, insect habitat, etc

Page 11: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Backfilling behind log revetment in Pool #1. Logs are designed to be undercut and act as LUNKERS

Mini case study: 1 of 7

Page 12: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Grab a scoop of willows

Mini case study: 2 of 7

Page 13: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Place them on the outer bank.

Looking US in Bend 1. Mini case study: 3 of 7

Page 14: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Get some more willows

Mini case study: 4 of 7

Page 15: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

More willows

Mini case study: 5 of 7

Page 16: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Looking US. Skilled track hoe operator has managed to orient willows out over pre-dug pool. The entire transplanting operation took about 20 minutes

Mini case study: 6 of 7

Page 17: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Looking US at Living Willow Retard two growing seasons after planting Aug 24, 2006

Pix by Derrick

Mini case study: 7 of 7

Page 18: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Looking US at Living Willow Retard at beginning of the third growing season after planting-June 14, 2007

Pix by Derrick

Page 19: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

The next 5 slides are looking

downstream thru the same bend,

Bend #1.

Page 20: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Looking DS at the flow cut-off structure on LDB & into constructed Bends 1 and 2 -Nov 2004

Page 21: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Nov 5, 2004. It took approx. 20 minutes to place the entire Living Willow Retard, if I were a fish I would be……..

Page 22: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

……. swimming under the overhanging veg!!! Aug 24, 2006. Looking DS at Living

Willow Retard on left bank in Bend #1

Pix by Derrick

Page 23: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

After two growing seasons, Aug 24, 2006. Looking DS at Living Willow Retard on left

bank in Bend #1

Pix by Derrick

Page 24: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Bend #2 “BioD-Block” Coir Block System

• Proprietary method, introduced 2003

• An easier way to construct encapsulated earth-filled system of lifts

• Locked Logs and/or Locked Limbs can be integrated between underwater lifts

• Vegetation can be integrated between emergent lifts

• Living Retards/Living Dikes can be placed on top of the BioD-Blocks

Page 25: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Display booth at IECA conference, Philly PA., Feb 2004

Page 26: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN
Page 27: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Looking DS at Pre-dug Pool #2, BioD-Block material in foreground

Page 28: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Looking DS at BioD-Block, ready for

willow retard installation on top of coir logs Nov 5, 2004

Page 29: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Fred Kelly cutting Locked Limbs and

Locked Logs for that pre-formed pool in

the previous picture

Page 30: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

After two years, looking at Locked Limbs & Locked Logs in Bend #2, Monkey Run. Aug 24, 2006

Pix by Derrick

Page 31: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Two years later, looking DS at BioD-Block bank, Aug 24, 2006

Pix by Derrick

Page 32: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Nov 5, 2004. Looking DS, at engineered solid-sill rocked riffle #1, then Bend #2 with BioD-Block coir bank protection (single 16 inch lift) with

some black willow (tall light-colored branches)

Page 33: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

After two growing seasons, Aug 24, 2006. Looking DS at rocked riffle and Bio-D Block in Bend 2. Willows on left bank in Bend 1 and outer bank of Bend 2 were planted. Pointbar of Bend 2 is transplanted creeping bent grass

Pix by Derrick

Page 34: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

TRANSPLANT A LITTLE BITTY

CLUMP OF STUFF MONKEY RUN,

ARCADE, NYMini case study: 1 of 5

Page 35: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Looking DS. Creeping bent grass sod transplantation to define channel width-Nov 5, 2006

Mini case study: 2 of 5

Page 36: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Aug 24, 2006. Looking DS at Bend #2, note

nice growth on pointbar

Pix by DerrickMini case study: 3 of 5

Page 37: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Aug 24, 2006. Looking DS at the Bend #2 pointbar

Pix by DerrickMini case study: 4 of 5

Page 38: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Aug 24, 2006. Great diversity & shallow areas on the pointbar. Almost a hemi-wetland!!!!

Pix by DerrickMini case study: 5 of 5

Page 39: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

The UB class pulling non-biodegradable netting out of Monkey Run. Aug 24, 2006

Pix by Paul Fuhrmann

Page 40: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

Freeing several dozen trapped crawfish from the

non-biodegradable netting at Monkey Run-Aug 24, 2006

Pix by Paul Fuhrmann

Page 41: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

When regulatory is happy…

Page 42: PRE-PROJECT  CONDITIONS  AT MONKEY  RUN

And the designers are confused…. Only then is the project complete………