03:10-11 Issue 4 en-GB
Pre-delivery inspection: Checklist
General informationVEHICLE INFORMATION
Vehicle identity:
(VIN code)
Bodywork:
Bodybuilder:
Date:
Signature:
Name:
Stamp:
More information is found in the following documents:
• Pre-delivery inspection: Instructions• Declaration of Conformity• Use and responsibility
General informationThe bodybuilder is responsible for ensuring that the quality and safety inspection is carried out and that this document is filled out and supplied with the vehicle.
Note:Use the document Pre-delivery inspection: Instructions as an aid to fill out this doc-ument.
1 (3)© Scania CV AB 2017, Sweden
Pre-delivery inspection: ChecklistChecklist
e supplied with the vehicle
operation and handling of the bodywork functions.
tenance of the bodywork.
akage test.
ams used.
chinery Directive is CE marked.
d products.
operational testing of overflow valves.
are no remains from the bodybuilding.
work and the chassis frame is clean and smooth.
ving parts of the chassis to move to their end positions.
that access for maintenance and repairs is possible.
d to the bodywork.
rked with complementary information.
worn or chafed. The fuse panels can be folded out without stretching any cables.
nd colour-coded to simplify troubleshooting.
ect encapsulation class.
ed at least 100 mm from hot components.
assis are located in the left-hand frame side member.
are located in the intended grounding point.
the specified frame connection.
ChecklistCheck point Checked The following documents ar
1 Declaration of Conformity.
Manual that describes the safe
Instructions on care and main
Protocol from test drive and le
Description of the BICT diagr
2 Equipment covered by the Ma
Document showing CE marke
Protocol from leakage test and
Check point Checked Description of check point
3 The vehicle is clean and there
4 The surface between the body
5 The bodywork permits the mo
6 The bodywork is designed so
7 A manufacturer’s plate is fitte
8 The central electric unit is ma
9 No electrical cables risk being
10 Electrical cables are marked a
11 Cable harnesses have the corr
12 The electrical cables are locat
13 Ground connections on the ch
14 Ground connections in the cab
15 Voltage supply is taken from
© Scania CV AB 2017, Sweden03:10-11 Issue 4 en-GB 2 (3)
Pre-delivery inspection: ChecklistChecklist
ide the cab are adequately protected from moisture and electrical components are K.
es are clamped at a distance of max. 900 mm between clamping points.
rk is connected to manifold fitting 65.
icle’s cooling system is connected to the engine’s connection for that purpose.
cooling system is connected to the return connection.
hose used:
rther away than 100 mm from hot components.
ed from high heat.
n a way that minimises the risk of chafing. Chafing covers are fitted in exposed po-
nents in the hydraulic system and components attached to the chassis.
and pipes have strain reliefs at max. 300 mm between them.
plings are placed above hot components with temperatures higher than 250°C.
t cannot come in contact with any flammable material.
d from collecting close or next to hot components.
ith the type of fluid they are intended for.
luid reservoirs can be read easily.
16 All electrical connections outsclassified according to IP6K9
17 Pipes, hoses and cable harness
18 Compressed air to the bodywo
19 Coolant take-out from the veh
20 Coolant return to the vehicle’s
21 Specify the type of hydraulic
Make:
Type of hose:
Heat resistance:
Pressure resistance:
22 Hydraulic hoses are placed fu
23 The hydraulic pump is protect
24 Hydraulic hoses are installed isitions.
25 Clearance between the compo
26 The hydraulic system: Hoses
27 The hydraulic system: No cou
28 The area for the exhaust outle
29 Flammable loads are prevente
30 Fluid reservoirs are marked w
31 The Max and Min levels for f
Check point Checked Description of check point