PRE –COMMISSIONING CHECK LIST OF GENERATOR
1. TECHNICAL SPECIFICATION MANUFACTURER SL NO.TYPERATED OUTPUTMAXIMUM CONTINUOUS OUTPUTRATED VOLTAGERATED CURRENTRATED POWER FACTORRATED FREQUENCYRATED SPEEDNO OF PHASESSTATOR WINDING CONNECTIONNO OF TERMINALINSULATION CLASSCOOILNG MODERATED H2 PRESSUREEXCITATION TYPESHORT CIRCUIT RATIOEFFICIENCYRATED FIELD VOLTAGERATED FIELD CURRENTREACTANCE DATA SATURATION UNSATURATIONDIRECT AIXS Synchronous(Xd)QUADRATURE AIXS Synchronous(Xq)DIRECT AXIS TRANSIENT(Xd’)QUADRATURE AXIS TRANSIENT(Xq’)DIRECT AXIS SUB-TRANSIENT(Xd”)QUADRATURE AXIS SUB-TRANSIENT(Xq”)NAGATIVE PHASE SEQUENCE(X2)ZERO SEQUENCE(X0)CAPACITANCE OF STATOR WINDING(PER PHASE)INDUCTANCE OF ROTOR WINDINGFIELD WINDING TIME CONSTANT(OPEN CIRCUIT)TRANSIENT TIME CONSTANT(3-PHASE SHORT CIRCUIT)TRANSIENT TIME CONSTANT(LINE-LINE SHORT CIRCUIT)TRANSIENT TIME CONSTANT(LINE-NEUTRAL)SUB-TRANSIENT TIME CONSTANT(3 PHASE,LINE-LINE,LINE- NEUTRAL)ARMATURE TIME CONSTANT(Aperiodic componet,3 phase,line-line)ARMATURE TIME CONSTANT(Aperiodic time constant,line-neutral)
PRE –COMMISSIONING CHECK LIST OF GENERATOR
MECHANICAL INERTIA TIME CONSTANT OF ROTORCRITICAL SPEED OF ROTORVIBRATION(BEARING PEDESTAL,SHAFT) at 3000 rpmLIMITATION OF TEMPERATURESTATOR WINDING OUTLET WATERSTATOR WINDINGSTATOR WINDING TEMP DIFFERENCE( MAX-AV)FIELD WINDINGSTATOR CORESTRUCTURE PART OF STATOR ENDCOLLECTOR RINGBEARINGBEARING OUTLET/SEAL OUTLET OIL
PRE –COMMISSIONING CHECK LIST OF GENERATOR
ITEM CHECK LIST
GENERATOR COIL PRESSURE TESTS NO ACTIVITY/CHECK STATUS1. Erection work is completed and clearance taken from
project (Civil, Elect, Mech.)2. Ensure the Availability of Nitrogen cylinder of
required Pressure and purity3. Ensure the sealing of the generator windings cooling
water out let header. 4. Ensure the cooling water Inlet and outlet header
drain valve closed5. Check the cleanliness of external pipes from inside6. Availability of instrument to measure ambient
temperature7 Pressure gauge and temperature gauge is calibrated
REMARKS:Stator Winding IR and PI Test
S NO ACTIVITY/CHECK STATUS1.
Generator Flexible links to be Opened 2. Other circuits not under test to be kept disconnected
and keep enough clearance3.
Insulation tester connections to be done correctly4. RTDs and Hydrogen tank to be guarded to Megger and
CTs’ secondary to be shorted5. Test device terminal lead, and the connection point with
windings are clean.
6 LAPT Panel to be in rack out condition7. Winding surface, core, and bushings should be free
from dust, moisture etc and clean.8 Ensure that NGT Knife gate to be opened
REMARKS:
Stator Winding DC Resistance MeasurementS NO ACTIVITY/CHECK STATUS
PRE –COMMISSIONING CHECK LIST OF GENERATOR
1. All the test devices connection should be correct.
2.Lead terminals of test kit and winding should be clean
3. Rotor shaft is connected through brush to earth properly.
4 Availability of instrument to measure ambient temperature
REMARKS:
DC/AC High Voltage TestS NO ACTIVITY/CHECK STATUS1 IR testing of winding completed and values are
acceptable2.
Test lead not to touch ground surface.3. Rotor winding, Test kit earth point and all other portion
which are not under test to be properly earthed.4. Test transformer and all other connections to be done
correctly5. RTDs to be grounded and CTs’ secondary to be shorted
6. Availability of instrument to measure ambient temperature
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
ROTOR AIR TIGHTNESS TESTS NO ACTIVITY/CHECK STATUS1.
Rotor is on proper support2.
External pipes to be used are clean from inside3. Flange joint between nitrogen pipe and rotor shaft is
properly tight.4. Nitrogen cylinder should be of moisture free and
proper purity.5 Pressure gauge and temperature gauges are
calibrated
REMARK
ROTOR AIR FLOW TESTS NO ACTIVITY/CHECK STATUS1. There must not be any leak point in the bellow from
test kit to rotor.2.
All ventilation holes of rotor are approachable 3. Compressed air should be of adequate pressure and
moisture free4
Flow measurement instrument is calibrated
REMARKS:
Rotor IR TestS NO ACTIVITY/CHECK STATUS1.
All the test devices connection should be correct
PRE –COMMISSIONING CHECK LIST OF GENERATOR
2. Connection point of test lead and slip ring should be clean
3.Rotor surface should be free from dust, moisture.
4.Test lead not to touch ground surface
5. Rotor shaft should be properly earthed6 Temp gauge is available to measure ambient
temperature
REMARKS:
AC HIGH VOLTAGE TEST OF ROTORS NO ACTIVITY/CHECK STATUS1 IR test completed and values are acceptable.2. All the test devices connection should be correct.
3.Rotor shaft to be connected to earth.
4.Test lead should not touch ground
REMARKS:
ROTOR WINDING DC/AC RESISTANCE MEASUREMENT AND RSO TEST
S NO ACTIVITY/CHECK STATUS1. All the test devices connection should be correct.
2. Connection point of test lead and slip ring should be free from dust
3.Test leads should not touch ground surface
PRE –COMMISSIONING CHECK LIST OF GENERATOR
4. Rotor surface should be free from dust, moisture etc
REMARKS:
HIGH VOLTAGE TEST OF BUSHINGS NO ACTIVITY/CHECK1 IR test is completed and values are acceptable STATUS2. All the test devices connection should be correct.
3. Connection point of test lead and bushing internal conductor should be free from dust
4.Test leads should not touch ground surface
5.bushing surface should be free from dust, moisture etc
6.Bushing insulation to be earthed properly.
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
BRUSH EXCITATION SYSTEMS NO ACTIVITY/CHECK STATUS1 Visual checking of carbon brushes 2. Proper tightness of Brush terminals
3.Ensure the Cooling system is healthy
4.Ensure proper tightness of the Input DC Cable/Bus
TERMINAL CT OF GENERATORS NO ACTIVITY/CHECK STATUS1 Ensure the tightness of Secondary of the CT2. CT Marshaling Box Wiring to be done according to the
Scheme.
3.Spare cores of the CT to be Shorted
4.Visual checking of any abnormality
Remarks:
12.0 DATA SHEET
12.1 GENERATOR COIL PRESSURE TEST
DATE:
TIME Pressure(KSC) Ambient Temp(degC) Pressure Drop
PRE –COMMISSIONING CHECK LIST OF GENERATOR
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12. 2 IR TEST OF STATOR WINDING
TESTING EQUIPMENT USED:DATE:
Equipment Name: MAKE : Sl.no : Model No:Voltage Rating: Due Date for Calibration:
AMBIENT TEMP: HUMIDITY:
S.NO REFERENCE R15 R60 R600 PI = R600 /R601. R-(Y+B+E)2. Y-(R+B+E)3. B-(R+Y+E)4. R-Y (B+E)5. Y-B (R+E)6 R-B (Y+E)
CRITERIA: PI should be more than 1.5
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.3: DC RESISTANCE OF WINDING
TESTING EQUIPMENT USED:DATE:
Equipment Name: MAKE : Sl.no : Model No:Current Rating:- Due date for calibration:
APPLIED CURRENT: AMBIENT TEMP: HUMIDITY:
PHASE RESISTANCE(OHM)
RESISTANCE AT BASE VALUE TEMP
% DEVIATION FROM BASE VALUE
R1 – R2Y1-Y2B1-B2
CRITERIA: Deviation shouldn’t be more than 2%.
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.4: DC HIGH VOLTAGE TEST TESTING EQUIPMENT USED:Equipment Name : Make : Model No. : Sl. No. : Due date for Calibration:
Humidity: Ambient Temp: Date:
Rated Voltage Un=
PHASE 1Un 1.5Un 2 Un 2.5Un 3Un15sec
60sec
15sec
60sec
15sec
60sec
15sec
60sec
15sec
60sec
R-(Y+B+E)Y-(R+B+E)B-(R+Y+E)
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.5: AC HIGH VOLTAGE TEST
TESTING EQUIPMENT USED:Equipment Name : Make : Model No. : Sl. No. :Due date for calibration: DATE:
Humidity: Ambient Temp:
ReferenceMeasured Values
Applied Volt(KV) Duration(mins) Leakage current(A)
R - Phase Y- Phase B - Phase
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.6 ROTOR AIR TIGHTNESS TEST
DATE:
TIME PRESSURE(ksc) TEMPERATURE(degC)
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.7 ROTOR AIRFLOW TEST
DATE:
PATH NO FLOW VELOCITY(m/s)
CRITERIA: Flow should be uniform and through in all paths.
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.8: IR TEST OF ROTOR WINDING
TESTING EQUIPMENT USED:Equipment Name : Make : Model No. : Sl. No. : Due date for Calibration:
AMBIENT TEMP: HUMIDITY: Date:
Applied Volatage(slip ring- Core) IR for 1 min
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.9 AC HIGH VOLTAGE TEST OF ROTOR WINDING
TESTING EQUIPMENT USED:Equipment Name : Make : Model No. : Sl. No. : Due Date for Calibration:
AMBIENT TEMP: HUMIDITY: Date:
ReferenceMeasured Values
KV Mins Leakage current(A)
SLIP RING- EARTH
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.10 DC Resistance of Rotor winding
TESTING EQUIPMENT USED: Date:Equipment Name : Make : Model No. : Sl. No. : Current Rating :Due Date for Calibration:
CURRENT APPLIED: TEMP: HUMIDITY:
PHASE Winding Resistance 1st attempt
Winding Resistance 2st attempt
ACROSS SLIP RING
CRITERIA: Deviation from base value should not be more than 2%.
REMARKS:
12.11 AC Resistance of Rotor winding
TESTING EQUIPMENT USED:
Equipment Name : Make :
PRE –COMMISSIONING CHECK LIST OF GENERATOR
Model No. : Sl. No. :Due date for Calibration:
Humidity: Ambient Temp: Date
VOLTAGE APPLIED(V)
CURRENT MEASURED(A) IMPEDANCE
CRITERIA:
REMARKS
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.12 HIGH VOLTAGE TEST OF BUSHING
TESTING EQUIPMENT USED:
Equipment Name : Make : Model No. : Sl. No. : Due date for calibration:
AMBIENT TEMP: HUMIDITY: Date:
BUSHING Sl No:
ReferenceMeasured Values
KV Mins Leakage current(A)
Phase- Earth
REMARKS:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.13 CT NAMEPLATE DETAIL:
CT Manufacturer: Date:
CT Serial No Ratio VA Class Knee Point
Remarks:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.13.1 CT POLARITY CHECKS:
Date:
CT Serial No POLARITY
Remarks:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.13.2 INSULATION RESISTANCE TEST:
TESTING EQUIPMENT USED:Equipment Name : Make : Model No. : Sl. No. : Due date for Calibration:
AMBIENT TEMP: HUMIDITY: Date:
CT Serial No Voltage Applied Duration IR Value
Remarks:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.13.3 WINDING RESISTANCE TEST:
TESTING EQUIPMENT USED:Equipment Name : Make : Model No. : Sl. No. : Due date for Calibration:Current Rating :
AMBIENT TEMP: HUMIDITY: Date:
CT Serial No Winding Resistance
Corrected base value
Factory value
CRITERIA: Deviation of base value from factory value should not be more than 2%.Remarks:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.13.4 PRIMARY INJECTION TEST
TESTING EQUIPMENT USED:Equipment Name : Make : Model No. : Sl. No. : Due date for Calibration:Current Rating :
AMBIENT TEMP: HUMIDITY: Date
CT Serial No Primary Current Applied
Measured Secondary Current
Ratio
CRITERIA: Ratio should match with the name plate data
Remarks:
PRE –COMMISSIONING CHECK LIST OF GENERATOR
12.13.5 CT Knee Point Test:
TESTING EQUIPMENT USED:Equipment Name : Make : Model No. : Sl. No. : Due date for Calibration: DATE:
CT Serial No Applied Voltage Measured Current
CRITERIA: Knee point should match with the name plate data.
REMARKS: