pradip kumar mohapatra - resume
TRANSCRIPT
CURRICULUM VITAERESUME HIGHLIGHTS
Top performing maintenance engineer, adept in planning, testing, executing, evaluating and diagnosing, and routine upkeep of equipment, machinery and systems in the production area.
Experience in Project, Commissioning, O&M of 11.25 MTPA Iron Ore Beneficiation Plant at Jindal Steel & Power Ltd.
Experience in Project, Commissioning, O&M of 4.5 MTPA Pellet Plant at Jindal Steel & Power Ltd.
Experience in Commissioning, of O&M 4 MTPA Beneficiation Plant at Brahmani River Pellets Ltd.
Worked in Pellet Plant Project for Managing Fabrication & Erection of Cable Trey & Pipe Gallery.
Worked in 1000 TPH Jaw Crusher and 3000 TPH Gyratory Crusher as O&M in-charge.
Done erection and laying of 610 Ө NB pipe of 14 KM Distance from River Baitarani to Jindal Plant.
Worked for Technical Support of Microsoft. Post-Graduation Diploma in Mineral Engineering
from Institute of Minerals & Materials Technology under CSIR.
Post-Graduation Diploma in Business Administration (Operations Management) from SCDL, Pune with Distinction.
B.Tech in Mechanical from Krupajal Engineering College under BPUT.
.
CAREER STATEMENT
Seeking a responsible job
with an opportunity
for professional challenges
to solve problems by using
my skills in the best
possible way for achieving
the Company’s Goals in an
effective / creative manner
in a challenging position
and to keep up with the
cutting edge of technologies
in finest professional,
efficient and creative ways.
AREAS OF EXPERTISE:
Target Oriented Modification Elimination of loop holes Product development Contract administration Process improvement Supervising Managing quality Project planning Project reporting Resource management
NAME:
PRADIP KUMARMOHAPATRA
CONTACT INFORMATION:ROOM NO-211BRAHMANI RIVER PELLETS LTD.(BRPL),TONTO,P.O-BARBIL-758035,DIST.-KEONJHAR,ODISHAMOBILE:+91 9937035555+91 7894446660+91 9438730481
E-MAIL:[email protected] / [email protected]
Approximately 7 Years 8 Months of Experience in Different Organization & Fields in maintaining different kind of facilities, demonstrating the following core skills:
Accuracy - Attention to minute details.
Exceptional problem solving and analytical abilities. Excellent communication, managerial and interpersonal skills. Ability to work in a team environment and collaborate with cross-company departments. Assigned personnel and technical support teams to sites requiring 24/7 maintenance. Worked with company’s vendors and supervised subcontractors during various maintenance projects to ensure proper completion of work performed at customers’ facilities. Utilized different reliability and testing strategies in plants to maintain and improve operation’s profitability. Directed storage of equipment and assured safety measures were followed
SUMMARY – WORK EXPERIENCE
Approximately 7 years 8 months of experience in different organization/fields like, Current employee with BRPL for O & M of 4 MTPA Beneficiation plant Since july-2013. 5 years of experience in Jindal Steel and Power Ltd. from GET to Deputy Manager. 8 months of experience in M/S Mahaveer Engineering, responsible for erection and laying of 14 KM pipeline of 610 NB as an Engineer. 4 months in Aditya Birla Minacs working for Technical Support of
Microsoft as Associate.WORK EXPERIENCE
CURRENTLY WORKING WITH BRPL (STEMCOR) AS HEAD OF MECHANICAL
MAINTENACE DEPARTMENT SINCE 08-JULY-2013.
Currently I am taking care the Maintenance of 4 MTPA Iron ore Beneficiation Plant at BRPL Barbil unit and the KRAs were as follows.
Directs and leads daily activities for a team of maintenance managers, engineers and technicians.
Responsible for maintaining mechanical, equipment necessary for safe and reliable performance of continuous hazardous production processes.
Instills operational/systematic discipline in team. Makes technical decisions based on full awareness of viability, cost and
other benefits. Implements best practices for equipment inspection, spare parts
management, repair methodology, and preventative maintenance (PM) of plant equipment.
Leads compliance with mechanical integrity programs- compliance to maintenance program, monitoring of program for effective reduction in downtime and cost.
Initiation and modification in Beneficiation plant and intake pump house to decreased plant downtime.
Responsible for annual maintenance budgeting and monthly business plan, Budget tracking on monthly basis and cost control.
Do Downtime analysis and follow up action plan for its reduction, Lead Root cause analysis program and completion of actions by team members. Reliability Assessment and follow up reports.
Coordinate between maintenance team and operations team for effective time bound solutions to issues.
Support plant management in complying with all internal and external safety and environmental requirements and in meeting site safety, reliability and efficiency goals.
Establish, monitor, and sustain recommended lubrication practices for trouble free operation to maintain work area free of spillages.
Implements effective cross-functional teams with reliability, process engineering, safety, and maintenance personnel.
Increased feed capacity from 250TPH to 800 TPH. Modified all Conveyor discharge chutes and bins discharge at RMHS
area. 100% critical spare availability. Ensuring sustainability of TPM & 5S practices.
WORKED AS GET to DEPUTY MANAGER IN JINDAL STEEL & POWER LTD.
PERSONAL SKILLS:
Solution orientated Relationship building Detail orientated Decision making Perseverance Attention to detail Confident Flexible & adaptable Positive attitude
CORE STRENGTHS:
Attention to details and
problem solving skills.
Good communication skills and advanced organizational skills
LANGUAGES KNOWN: English Hindi Oriya
SINCE 12-SEP-2008 TO 20-JUNE-2013.
I was taking care the Operation and Maintenance of 11.2 MTPA Iron ore Beneficiation Plant at JSPL.Prior to this I was in Pellet Plant field Engineer in the areas like Mixing & Blending, Ball Mill, Dryer, Bentonite Grinding during the initial stages of commissioning of the plant.
At 11.2 MTPA Iron ore Beneficiation Plant my KRAs was as follows. To obtain the desired target of production by increasing the machine
availability with required grade for the customer. To increase the availability of the equipments by doing Preventive and
Shutdown Maintenance as per schedule without hindering operations, trouble-shooting problems across the plan to avoid breakdowns.
To do the necessary modification for plant, process requirements for safe and healthy work place. I am responsible for small projects (Modification in plant) like installation of 4 nos of pumps for floor cleaning, installation of distributor box to increase productivity, replacement of rubber hoses with ceramic lagging pipes to increase life, modify the design of feed box of M/S Sandvik and modification in VSI crusher for which I with my team received gold medal in CCQC Durgapur chapter-2012.
Proper spare planning through DIT methods and execution of activities through schedule planning. Maintaining minimum spare and to maintain critical spares available by using SAP PM Module is also a part of job responsibility.
Establish, monitor, and sustain recommended lubrication practices for trouble free operation to maintain work area free of spillages.
Ensuring sustainability of TPM practices. Up keeping the TPM methods for maximizing machine availability and performance.
Implementing safety practices & sustaining them at all level of work chain & implementing the skill knowledge to downstream & up keeping the maintenance practices.
Prior to this I had worked in project for Beneficiation plant for erection/installation of pump-house and all pumps and pipelines. Out of 24 Km of pipeline I had laid 10 Km and out of 140 no. of pump I installed approx. 19 no of pumps. Being in this profession my role was to co-ordinate with different resources to achieve smooth work performance, Liaison with clients, Consultants, local Authorities, Sub contractors & Suppliers coordinating with vendors for material supply, Preparing weekly, monthly and master work schedules and monitoring the actual progress against the schedules by leading a team to ensure smooth and efficient running of the project.
At Pellet Plant I was the maintenance in charge of Raw material section up to feeding to bin.. Prior to this job I was the in-charge for Operation and Maintenance job
of 1000 TPH Jaw-Crusher and 3000 TPH Gyratory Crusher. To increase the availability of the equipments by doing Preventive and
Shutdown, trouble-shooting problems across the plant to avoid break downs. Being in this profession I was also responsible for small projects (Modification in plant).Maintain the ISO records update, material management by using SAP PM Module, implementing TPM inside plant buildings was my job.
Along with I was the Lubrication in charge responsible for maintaining the zero leakage and proper lubrication of equipments in plant (1000 TPH Jaw crusher, 3000 TPH Gyratory crusher, 1500 TPH Wash Plant & 1500 TPH Down Hill Conveyor).
EQUIPMENT KNOWLEDGE
&UNDERSTANDINGS:
Ball Mill, Rod Mill, Scrubber
Silo VSI, Jaw & Gyratory
Crusher Belt Filter Screw Classifier WHIMS ALLFLUX Dewatering Cyclones Hydrocyclones Linear Vibrating
Screens Dewatering Screens Jigs Various Pumps &
Conveyors
PLANT KNOWLEDGE & UNDERSTANDINGS:
3000 TPH Gyratory Crusher Plant 1000 TPH Jaw Crusher
Plant 1500 TPH Wash Plant 11.2 MTPA Beneficiation Plant 4.5 MTPA Pellet Plant 4 MTPA Beneficiation
Plant.
INTERESTS & HOBBIES:
Playing Chess Playing Badminton Playing PC game Listening Music Watching Movies Surfing Internet
INTERESTS & HOBBIES:
Playing Chess Playing Badminton Playing PC game Listening Music Watching Movies Surfing Internet