  • 8/10/2019 ppt on power quality improvement

    1/84

    1P. Ribeiro June, 2002

    "An Overview on FACTS and Power Quality Issues:

    Technical Challenges, Research Oortunities

    and Cost Considerations!"

    Paulo F. Ribeiro, BSEE, MBA, PHD, PE

    CALVIN COLLEGEEngineering Department

    Grand Rapids, MI 4!4"

    http://engr.calvin.edu/PRibeiro!EBPA"E/

    PRI#EIRO$CALVIN.ED%

    1& ! & ! 1&'

    &

    '

  • 8/10/2019 ppt on power quality improvement

    2/84

    'P. Ribeiro June, 2002

    FA#$S

    ( $he #oncept( Hi%tor& / Bac'ground ( )rigin o* FA#$S, )pportunitie%, $rend%( S&%te+ Architecture% and i+itation%( Po-er Flo- #ontrol on A# S&%te+%( Application Studie% and +ple+entation

    ( Ba%ic S-itching Device%( S&%te+% Studie%( A# $ran%+i%%ion Funda+ental%( oltage Source v%. #urrent Source( oltage Source%( Static ar #o+pen%ator 0S#1, S$A$#)M, $#S#, 2PF#, SMES( S&%te+ Studie% 0b& EM$P, A$P, Saber, EDSA, EM$D#1( S&%te+% ntegration, Speci*ication, #o%t #on%ideration% and $echnolog& $rend%( +pact o* FA#$S in interconnected net-or'%( Mar'et A%%e%%+ent, Deregulation and Prediction%

  • 8/10/2019 ppt on power quality improvement

    3/84

    )P. Ribeiro June, 2002

    Power Quality

    Objectives - Motivation - Background

    Limitation of Traditional Tools

    Advanced Tecni!ues"# $avelet Teory Making $aves

    # %&'ert (ystems To (ag or )ot to (ag" Tis is Te *

    # +u,,y Logic )ot eally a .armonic /istortion

    # )eural )etworks emembering $ave (ignatures

    # 0enetic Algoritms %volutionary /istortions

    # 1ombining Tecni!ues Power Quality /iagnostic (ystemPower %lectronics 2m'lementing Advanced Power

    1once'ts

  • 8/10/2019 ppt on power quality improvement

    4/84

    4P. Ribeiro June, 2002

    The reason, therefore, that some intuitive minds are not mathematical is that they

    cannot at all turn their attention to the principles of mathematics. But the reason

    that mathematicians are not intuitive is that they do not see what is before them,

    and that, accustomed to the exact and plain principles of mathematics, and not

    reasoning till they have well inspected and arranged their principles, they are lost

    in matters of intuition where the principles do not allow of such arrangement.

    They are scarcely seen; they are felt rather than seen; there is the greatest

    difficulty in maing them felt by those who do not of themselves perceive them.These principles are so fine and so numerous that a very delicate and very clear

    sense is needed to perceive them, and to !udge rightly and !ustly when they are

    perceived, without for the most part being able to demonstrate them in order as in

    mathematics, because the principles are not nown to us in the same way, and

    because it would be an endless matter to undertae it. "e must see the matter at

    once, at one glance, and not by a process of reasoning, at least to a certain

    degree.

    #$$0 %&'(&&( by Blaise %ascal

  • 8/10/2019 ppt on power quality improvement

    5/84

    !P. Ribeiro June, 2002

    %tg%)

    )

    %*

    *

    %

    +

    +

    =

    $he #oncept

  • 8/10/2019 ppt on power quality improvement

    6/84

    "P. Ribeiro June, 2002

    A transmission system can carry power up to its thermal loading limits. But inpractice the system has the following constraints:

    -Transmission stability limits-Voltage limits-Loop ows

    Transmission stability limits: limits of transmittable power with which a transmissionsystem can ride through major faults in the system with its power transmissioncapability intact.

    Voltage limits: limits of power transmission where the system oltage can be !eptwithin permitted deiations from nominal. Voltage is goerned by reactie power "#$.

    # in its turn depends of the physical length of the transmission circuit as well as fromthe ow of actie power. The longer the line and%or the heaier the ow of actiepower& the stronger will be the ow of reactie power& as a conse'uence of which theoltage will drop& until& at some critical leel& the oltage collapses altogether.

    Loop ows can be a problem as they are goerned by the laws of nature which maynot be coincident with the contracted path. This means that power which is to be

    sent from point (A( to point (B( in a grid will not necessarily ta!e the shortest& directroute& but will go uncontrolled and fan out to ta!e unwanted paths aailable in the

    $he #oncept

  • 8/10/2019 ppt on power quality improvement

    7/84*P. Ribeiro June, 2002

    FA#$S device%

    +AC- are designed to remoe s/0 0onstraints and to meet p2anners3, inestors3 and operators3 goa2s

    ito/t teir aing to /nderta5e ma6or s7stem additions. is o88ers a7s o8 attaining an in0rease o8

    poer transmission 0apa0it7 at optim/m 0onditions, i.e. at ma9im/m aai2abi2it7, minim/m transmission

    2osses, and minim/m enironmenta2 impa0t. P2/s, o8 0o/rse, at minim/m inestment 0ost and time

    e9pendit/re.

    e term :+AC-: 0oers seera2 poer e2e0troni0s based s7stems /sed 8or AC poer transmission.

    Gien te nat/re o8 poer e2e0troni0s e;/ipment, +AC- so2/tions i22 be parti0/2ar27 6/sti8iab2e in

    app2i0ations re;/iring one or more o8 te 8o22oing ;/a2ities/a2it7 dei0esecting voltage in %erie% and perpendicular to the current *lo-, can increa%e or

    decrea%e

    !&F -eries Compensation

  • 8/10/2019 ppt on power quality improvement

    13/841)P. Ribeiro June, 2002

    Transmission Transfer )apacity *nhancement

    Advanced Solution%

    ransmission

    Lin5

    Enan0ed

    Poer rans8er

    and -tabi2it7

    Line

    Re0on8ig/ration

    +i9ed

    Compensation

    +AC-

    Energ7 -torage

    #etter

    Prote0tion

    In0reased

    Inertia

    #rea5ing

    Resistors Load-edding

    +AC-

    Dei0es

    $raditional Solution%

    -VC

    -ACOM

    C-C, ---C

    %P+C

    Stead& State

    %%ue%

    Vo2tage Limits

    erma2 LimitsAng/2ar -tabi2it7 Limits

    Loop +2os

    D&na+ic

    %%ue%

    ransient -tabi2it7Damping Poer -ings

    Post=Contingen07 Vo2tage

    Contro2

    Vo2tage -tabi2it7

    -/bs7n0rono/s Res.

    FA#$S Application% and +ple+entation%

  • 8/10/2019 ppt on power quality improvement

    14/8414

    P. Ribeiro June, 2002

    FA#$S Device%

    Shunt #onnectedStatic AR #o+pen%ator 0S#1

    Static S&nchronou% #o+pen%ator 0S$A$#)M1

    Static S&nchronou% "enerator ( SS"

    Batter& Energ& Storage S&%te+ 0BESS1

    Superconducting Magnetic Energ& Storage 0SMES1

    #o+bined Serie% and Serie%(Shunt #onnected

    Static S&nchronou% Serie% #ontroller% 0SSS#1

    $h&ri%tor #ontrolled Pha%e(Shi*ting $ran%*or+er or

    Pha%e Angle Regulator 0PAR1

    nterline Po-er Flo- #ontroller 0PF#1

    $h&ri%tor #ontrolled Serie% #apacitor 0$#S#12ni*ied Po-er Flo- #ontroller 02PF#1

    Relative +portance o* Di**erent $&pe% o* #ontroller%

    Shunt, Shunt(Serie Energ7 -torage

    Energ7 -torage

  • 8/10/2019 ppt on power quality improvement

    15/841!

    P. Ribeiro June, 2002

    Device%Diode 0pn ?unction1

    Silicon #ontrolled Recti*ier 0S#R1

    "ate $urn()** $h&ri%tor 0"$)1 "EM)S $urn()** $h&ri%tor 0M$)1 SP#)

    E+itter $urn()** $h&ri%tor 0E$)1 irginia $ech

    ntegrated "ate(#o++utated $h&ri%tor 0"#$1 Mit%ubi%hi, ABB

    M)S(#ontrolled $h&ri%tor 0M#$1 ictor $e+ple

    n%ulated "ate Bipolar $ran%i%tor 0"B$1

    Po-er Electronic% ( Se+iconductor Device%

    Diodesransistors

    IG#

    7ristors

    -CR, GO, MO, EO, GC, IGC, MC

  • 8/10/2019 ppt on power quality improvement

    16/841"

    P. Ribeiro June, 2002

    Po-er Electronic% ( Se+iconductor Device%Prin0ipa2 Cara0teristi0s

    Vo2tage and C/rrent

    Losses and -peed o8 -it0ing

    -peed o8 -it0ing

    -it0ing Losses

    Gate=drier poer and energ7 re;/irements

    Parameter rade=o88

    Poer re;/irements 8or te gate

    didt and ddt 0apabi2it7

    t/rn=on and t/rn=o88 time

    %ni8ormit7>/a2it7 o8 si2i0on a8ers

    IGBT has pushed out the conventional GTO as IGBTs ratings go up.

    IGBTs - Low-switching losses, fast switching, current-limiting capability

    GTOs - large gate-drive reuirements, slow-switching, high-switching losses

    IGBTs !higher forward voltage drop"

  • 8/10/2019 ppt on power quality improvement

    17/841*

    P. Ribeiro June, 2002

    V-I C-I

    Nat/ra2 +or0ed

    -7n0rono/s PM

    ard -o8t

    o=Lee2 M/2ti=Lee2

    -CR GO IG# MC MO

    -7stem

    Comm/tationApproa0

    -it0inge0no2og7

    ransitionApproa0

    Cir0/itopo2og7

    Dei0e7pe

    Po-er Electronic% ( Se+iconductor Device%Deci%ion(Ma'ing Matri

    E1

    E'

    E1 . sin ?@

    E' . 0os?@

    ?E1 = E' . 0os?@E' . sin?@

    I

    ?E' = E1 . 0os?@I;1 K ?E1 = E' . 0os?@

    E1 . Cos ?@

    Ip1 K E' sin?@

    E1 = E'P1 K E1 . Ip1

    A# $ran%+i%%ion Funda+ental%

  • 8/10/2019 ppt on power quality improvement

    21/84

    '1P. Ribeiro June, 2002

    A0tie 0omponent o8 te 0/rrent 82o at E1

    p4 @ 0E . %in 011 / =

    Rea0tie 0omponent o8 te 0/rrent 82o at E1

    4 @ 0E4 ( E . co% 011/=

    A0tie Poer at te E1 end

    P4 @ E4 0E . %in 011/=

    Rea0tie Poer at te E1 end

    C4 @ E40E4 ( E . co% 011 / =

    A# $ran%+i%%ion Funda+ental%

  • 8/10/2019 ppt on power quality improvement

    22/84

    ''P. Ribeiro June, 2002

    E' '

    P4 @ E40E . %in 0

    11/=

    I

    E1

    E'

    E1 = E'

    Reg/2ating end b/s o2tage most27 0ange rea0tie poer = Compensating at an intermediate

    point beteen b/ses 0an signi8i0ant27 impa0t poer 82o

    E1 1 I PJ>

    > VP4 @ '4.E40E . %in 0/'11/=

    A# $ran%+i%%ion Funda+ental% 0oltage ( Shunt #ontrol1

  • 8/10/2019 ppt on power quality improvement

    23/84

    ')P. Ribeiro June, 2002

    E1

    E'

    I

    E1 = E'

    In6e0ted Vo2tage

    In6e0ting Vo2tage in series it te 2ine most27 0ange rea2 poer

    E1 1

    E' '

    IPJ>

    Vin6

    P4 @ E4 . E . %in 0

    1 / 0= ( in>/ 1

    A# $ran%+i%%ion Funda+ental% 0oltage(Serie% n>ection1

  • 8/10/2019 ppt on power quality improvement

    24/84

    '4P. Ribeiro June, 2002

    E1 1

    E' '

    I PJ>

    & &.! 1 1.! ' '.! ) ).!&

    1

    ''

    &

    P 1 9 d e2 ta, V1,? @

    ).14& de2ta

    Rea2 Poer Ang2e C/re

    Canges in i22 in0rease or de0rease rea2 poer 82o 8or a 8i9ed ang2e or 0ange ang2e 8or a 8i9ed poer 82o.

    A2ternatie27, te rea0tie poer 82o i22 0ange it te 0ange o8 . Ad6/stments on te b/s o2tage ae

    2itt2e impa0t on te rea2 poer 82o.

    V9

    I

    V9o

    Vs

    I

    e88 K = 0

    V9

    Vr

    V0

    Vse88 K Vs V0

    Vr

    V0

    Vse88

    P4 @ E4 . E . %in 0

    1 / 0= ( =c1

    Vs

    Pase Ang2e

    Po4er,rans8er

    A# $ran%+i%%ion Funda+ental% 0Serie% #o+pen%ation1

  • 8/10/2019 ppt on power quality improvement

    25/84

    '!P. Ribeiro June, 2002

    E1 1 E' '

    I

    PJ>

    P

    E1

    E'

    I

    E1 = E'

    In6e0ted Vo2tage

    Integrated o2tage series in6e0tion and b/s o2tage reg/2ation ?/ni8ied@ i22

    dire0t27 in0rease or de0rease rea2 and rea0tie poer 82o.

    A# $ran%+i%%ion Funda+ental% 0oltage(Serie% and Shunt #o+p.1

  • 8/10/2019 ppt on power quality improvement

    26/84

    '"P. Ribeiro June, 2002

    1 = prior to 8a/2t

    ' = 8a/2t 02eared

    ) = e;/a2 area

    ) 0rit = 2oss o8 s7n0ronism

    Improement o8 ransient -tabi2it7 it +AC- Compensation

    E;/a2 Area Criteria

    1 ' ) 0rit

    A1

    A'

    Amargin

    Ma9im/m

    Po4er,rans8er

    Pase Ang2e

    no 0ompensation

    it VAR 0ompensation ?idea2 midpoint@

    A1 K A00e2eration Energ7

    A' K De0e2eration Energ7

    ere8ore, +AC- 0ompensation 0an in0rease

    poer trans8er ito/t red/0ing te stabi2it7 margin

    > V

    A# $ran%+i%%ion Funda+ental% 0Stabilit& Margin1

  • 8/10/2019 ppt on power quality improvement

    27/84

    '*P. Ribeiro June, 2002

    oltage Source %. #urrent Source #onverter%

    C-C AdDis V-C AdDis

    Dei0e ,7pe ,17ristor-e28=Comm/tation

    ,17ristor-e28=Comm/tation

    Dei0eC1ara0teristi0

    -7mmetr7

    -7mmetri0a2 As7mmetri0a2

    -1ort=Cir0/itC/rrent

    Lo4er ig1er

    Rate o8 Rise o8+a/2t C/rrent

    Limited b7 DC Rea0tor +ast Rise ?D/e to0apa0itor dis01arge@

    Losses ig1er = Lo4er

    AC Capa0itors Re;/ired Not Re;/ired

    DC Capa0itors Not Re;/ired Re;/ired

    Va2es ddt Lo4er?AC Capa0itors@

    ig1er

    Inter8a0e 4it1 AC-7stem

    More Comp2e9 Less Comp2e9

    Rea0tie Po4erGeneration

    Depends on C/rrent+2o4ing t1ro/g1

    Energ7 -torage

    Independent o8Energ7 -torage

    Per8orman0e

    armoni0s AC 0apa0itors ma7prod/0e resonan0esnear t1e 01ara0teristi01armoni0s ma7 0a/seoero2tages on a2esand trans8ormer.

    (

  • 8/10/2019 ppt on power quality improvement

    28/84

    'P. Ribeiro June, 2002

    Syste#$us

    )onerterwitching4)-A)

    C%

    &dc

    s

    (unt 1om'ensation

    Syste#$us 3

    Trans'or#er lea(ageinductance

    Trans'or#er

    o

    )

    3

    2

    Couling

    C%

    &dc

    s

    )onerterwitching4)-A)

    Trans'or#er lea(ageinductance

    Trans'or#erCouling

    (eries1om'ensation

    o

    )

    3

    2

    33

    oltage Source #onverter%

  • 8/10/2019 ppt on power quality improvement

    29/84

    'P. Ribeiro June, 2002

    Basic 4-Pulse5 6-level5 3oltage-(ource 1onverter

    cec

    Ta* a*+ T$*

    a

    $

    e

    e

    ai aT

    i$

    i

    a $+ T

    + T$* c* +c*

    dc

    *

    &

    $ c+ T c+

    dc%

    Cs

    &

    dci

    dc&

    -yotheticalneutral oint

    *

    oltage Source #onverter%

  • 8/10/2019 ppt on power quality improvement

    30/84

    )&P. Ribeiro June, 2002

    65 75 8-level5 3(1 $aveforms

    vdc*

    vdc*

    %

    vdc*

    vdc*

    eout

    vdc%

    .eutral/#id01oint

    dc%

    v

    eout0 v dc

    %v dc

    %vdc

    dc

    %v

    .eutral/#id01oint

    %vdc

    dc

    %v

    *

    eout

    * dcv

    dcv

    oltage Source #onverter%

  • 8/10/2019 ppt on power quality improvement

    31/84

    )1P. Ribeiro June, 2002

    3oltage-(ource 1onverter Bridges

    Three0hase, two0level si20ulse$ridge

    Single0hase,two0level -0$ridge

    11

    vdc

    1

    vdc

    voa vvoa o$ voc

    Three0hase, three0level *0ulse$ridge

    1961

    dc3 dc3

    196

    vvoa o$ voc

    oltage Source #onverter%

  • 8/10/2019 ppt on power quality improvement

    32/84

    )'P. Ribeiro June, 2002

    Out'ut voltage control of a two-level 3(1

    v

    o+v :

    ov: ;

    ov: ;

    +

    v; dcdcnominalv

    dcv;:v-

    t

    v

    ?dci dt

    f1

    dci

    t :3=vo o ;

    @io

    3v=

    oltage Source #onverter%

  • 8/10/2019 ppt on power quality improvement

    33/84

    ))P. Ribeiro June, 2002

    Out'ut voltage control of a tree-level 3(1

    =

    =

  • 8/10/2019 ppt on power quality improvement

    34/84

    )4P. Ribeiro June, 2002

    Multi-'ulse 3(1 wit

    wave-forming magnetic circuits

    5agneticstructurefor multi-pulsewaeformsynthesis

    )onerter6 )onerter 7

    Syste#3us$ar

    )onerter n

    Trans'or#er

    Couling

    Inter'ace4agnetics

    ,56(&3us

    CoulingTrans'or#er

    oltage Source #onverter%

  • 8/10/2019 ppt on power quality improvement

    35/84

    )!P. Ribeiro June, 2002

    FA#$S $echnolog& ( Po%%ible Bene*it%

    ( #ontrol o* po-er *lo- a% ordered. ncrea%e the loading capabilit& o* line% to theirther+al capabilitie%, including %hort ter+ and %ea%onal.

    ( ncrea%e the %&%te+ %ecurit& through rai%ing the tran%ient %tabilit& li+it, li+iting

    %hort(circuit current% and overload%, +anaging ca%cading blac'out% and

    da+ping electro+echanical o%cillation% o* po-er %&%te+% and +achine%.

    ( Provide %ecure tie line% connection% to neighboring utilitie% and region% thereb&

    decrea%ing overall generation re%erve reuire+ent% on both %ide%.

    ( Provide greater *le

  • 8/10/2019 ppt on power quality improvement

    36/84

    )"P. Ribeiro

    June, 2002

    FA#$S and HD#: #o+pli+entar& Solution%HD#

    Independent 8re;/en07 and 0ontro2

    Loer 2ine 0osts

    Poer 0ontro2, o2tage 0ontro2,

    stabi2it7 0ontro2

    FA#$SPoer 0ontro2, o2tage 0ontro2,

    stabi2it7 0ontro2

    n%talled #o%t% 0+illion% o* dollar%1

    $hroughput M! HD# $er+inal% FA#$S

    '&&& M 4&=!& M !=1& M

    !&& M *!=1&&M 1&='&M

    1&&& M 1'&=1*&M '&=)&M

    '&&& M '&&=)&&M )&=!&M

    ?@ingoraniG7/g7i

  • 8/10/2019 ppt on power quality improvement

    37/84

    )*P. Ribeiro

    June, 2002

    FA#$S and HD#: #o+pli+entar& Solution%

    arge +ar'et potential *or FA#$S i% -ithin the ac %&%te+ on a value(added ba%i%, -here:

    ( $he e

  • 8/10/2019 ppt on power quality improvement

    38/84

    )P. Ribeiro

    June, 2002

    FA#$S Attribute% *or Di**erent #ontroller%

    +AC- Contro22er Contro2 Attrib/tes-tati0 -7n0rono/s Compensator?-ACOM ito/t storage@

    Vo2tage 0ontro2, VAR 0ompensation, damping os0i22ations, o2tagestabi2it7

    -tati0 -7n0rono/s Compensator?-ACOM it storage, #E--, -ME-,2arge d0 0apa0itor@

    Vo2tage 0ontro2, VAR 0ompensation, damping os0i22ations, transientand d7nami0 stabi2it7, o2tage stabi2it7, AGC

    -tati0 VAR Compensator ?-VC, CR,C-, R-

    Vo2tage 0ontro2, VAR 0ompensation, damping os0i22ations, transientand d7nami0 stabi2it7, o2tage stabi2it7

    7ristor=Contro22ed #ra5ing Resistor?C#R@

    Damping os0i22ations, transient and d7nami0 stabi2it7

    -tati0 -7n0rono/s -eries Compensator?---C ito/t storage@

    C/rrent 0ontro2, damping os0i22ations, transient and d7nami0 stabi2it7,o2tage stabi2it7, 8a/2t 0/rrent 2imiting

    -tati0 -7n0rono/s -eries Compensator?---C it storage@

    C/rrent 0ontro2, damping os0i22ations, transient and d7nami0 stabi2it7,o2tage stabi2it7

    r7stor=Contro22ed -eries Capa0itor?C-C, --C@

    C/rrent 0ontro2, damping os0i22ations, transient and d7nami0 stabi2it7,o2tage stabi2it7, 8a/2t 0/rrent 2imiting

    7ristor=Contro22ed -eries Rea0tor?C-R, --R@

    C/rrent 0ontro2, damping os0i22ations, transient and d7nami0 stabi2it7,o2tage stabi2it7, 8a/2t 0/rrent 2imiting

    7ristor=Contro22ed Pase=-i8tingrans8ormer ?CP- or CPR@

    A0tie poer 0ontro2, damping os0i22ations, transient and d7nami0stabi2it7, o2tage stabi2it7

    %ni8ied Poer +2o Contro22er ?%P+C@ A0tie and rea0tie poer 0ontro2, o2tage 0ontro2, VAR

    0ompensation, damping os0i22ations, transient and d7nami0 stabi2it7,o2tage stabi2it7, 8a/2t 0/rrent 2imiting

    7ristor=Contro22ed Vo2tage Limiter?CVL@

    ransient and d7nami0 o2tage 2imit

    7ristor=Contro22ed Vo2tage Reg/2ator?CVR@

    Rea0tie poer 0ontro2, o2tage 0ontro2, damping os0i22ations,transient and d7nami0 stabi2it7, o2tage stabi2it7

    Inter2ine Poer +2o Contro22er ?IP+C@ Rea0tie poer 0ontro2, o2tage 0ontro2, damping os0i22ations,transient and d7nami0 stabi2it7, o2tage stabi2it7

  • 8/10/2019 ppt on power quality improvement

    39/84

    )P. Ribeiro

    June, 2002

    Reg/2ating #/s Vo2tage

    Can A88e0t Poer +2o Indire0t27 D7nami0a227

    E1 1

    E' '

    I PJ>

    P4 @ E40E . %in 0

    11/=

    FA#$S +ple+entation ( S$A$#)M

  • 8/10/2019 ppt on power quality improvement

    40/84

    4&P. Ribeiro

    June, 2002

    Line Impedan0e Compensation

    Can Contro2 Poer +2o Contin/o/s27

    E1 1 E' 'PJ>

    P4 @ E4 0E . %in 0

    11 / =e**

    FA#$S +ple+entation ( $#S#

    =e** @ =( =c

    e a2ternatie so2/tions need to be distrib/tedQ o8ten series 0ompensation as to be insta22ed in seera2 p2a0es a2ong a 2ine b/t man7 o8 te

    oter a2ternaties o/2d p/t bot o2tage s/pport and poer 82o 0ontro2 in te same 2o0ation. is ma7 not be /se8/2. +or instan0e, i8

    o2tage s/pport ere needed at te midpoint o8 a 2ine, an IP+C o/2d not be er7 /se8/2 at tat spot. C-C 8or damping os0i22ations ...

  • 8/10/2019 ppt on power quality improvement

    41/84

    41P. Ribeiro

    June, 2002

    Breaker

    (latt T1(1

    T1(1 module ?

    MO3

    T1(1

    6

    T1(1

    8

    T1(1

    7

    T1(1

    4

    T1(1

    C

    FA#$S +ple+entation ( $#S#

  • 8/10/2019 ppt on power quality improvement

    42/84

    4'P. Ribeiro

    June, 2002

    /am'ing

    1ircuit

    /am'ing

    1ircuit

    Breaker

    Dayenta T1(1

    T1(1 ?8 to 4@ E

    MO3

    Breaker

    MO3 MO3

    C@ E 88 E

    FA#$S +ple+entation ( $#S#

  • 8/10/2019 ppt on power quality improvement

    43/84

    4)P. Ribeiro

    June, 2002

    E1 1 E' 'I

    PJ>

    FA#$S +ple+entation ( SSS#

    P4 @ E4 0E . %in 011 / =e**

    =e** @ = ( in>/

  • 8/10/2019 ppt on power quality improvement

    44/84

    44P. Ribeiro

    June, 2002

    E1 1 E' 'IPJ>

    Reg/2ating #/s Vo2tage and In6e0ting Vo2tage

    In -eries it te Line

    Can Contro2 Poer +2o

    P4 @ E40E . %in 0

    11 / =e**

    =e** @ = ( in> /

    FA#$S +ple+entation ( 2PF#

    C4 @ E40E ( E . co% 0

    11 / =

  • 8/10/2019 ppt on power quality improvement

    45/84

    4!P. Ribeiro June, 2002

    (unt 2nverter (eries 2nverter

    Fnified Power +low 1ontroller

    (eries Transformer

    (unt

    Transformer

    FA#$S +ple+entation ( 2PF#

  • 8/10/2019 ppt on power quality improvement

    46/84

    4"P. Ribeiro June, 2002

    Reg/2ating #/s Vo2tage P2/s Energ7 -torage

    Can A88e0t Poer +2o Dire0t27 D7nami0a227

    E1 1 E' 'I

    PJ>

    P2/s Energ7 -torage

    FA#$S +ple+entation ( S$A$#)M Energ& Storage

  • 8/10/2019 ppt on power quality improvement

    47/84

    4*P. Ribeiro June, 2002

    E1 1 E' 'I

    PJ>

    FA#$S +ple+entation ( SSS# Energ& Storage

    P2/s Energ7 -torage

    Vo2tage In6e0tion in -eries P2/s Energ7 -torage

    Can A88e0t Poer +2o Dire0t27 D7nami0a227

    and s/stain operation /nder 8a/2t 0onditions

  • 8/10/2019 ppt on power quality improvement

    48/84

    4P. Ribeiro June, 2002

    E1 1 E' '

    IPJ>

    P2/s Energ7 -torage

    Reg/2ating #/s Vo2tage In6e0ted

    Vo2tage Energ7 -torage

    Can Contro2 Poer +2o Contin/o/s27,and -/pport Operation %nder -eere

    +a/2t Conditions ?enan0ed

    per8orman0e@

    FA#$S +ple+entation ( 2PF# Energ& Storage

  • 8/10/2019 ppt on power quality improvement

    49/84

    4P. Ribeiro June, 2002

    (unt

    2nverter

    (eries

    2nverter

    Fnified Power +low 1ontroller - (M%( 2nterface

    (M%( 1o''er

    and 1oil

    ?@@@G

    +

    ?@@@G

    +

    ?@@@G

    +

    ?@@@G

    +

    FA#$S +ple+entation ( 2PF# Energ& Storage

  • 8/10/2019 ppt on power quality improvement

    50/84

  • 8/10/2019 ppt on power quality improvement

    51/84

    !1P. Ribeiro June, 2002

    Reg/2ating #/s Vo2tage Energ7

    -torage Line Impedan0e Compensation

    Can Contro2 Poer +2o Contin/o/s27,

    and -/pport Operation %nder -eere

    +a/2t Conditions ?enan0ed

    per8orman0e@

    FA#$S +ple+entation ( $#S# S$A#)M Energ& Storage

  • 8/10/2019 ppt on power quality improvement

    52/84

    !'P. Ribeiro June, 2002

    E1 1 E) )

    FA#$S +ple+entation ( PF#

    P4 @ E4 0E . %in 0

    4( 11 / =

    E' '

    P4G @ E4 0E . %in 04( G11 / =

  • 8/10/2019 ppt on power quality improvement

    53/84

    !)P. Ribeiro June, 2002

    (eries 2nverter ? (eries 2nverter 6

    2nterline Power +low 1ontroller

    (eries Transformer5 Line 6

    (eries Transformer5 Line ?

    FA#$S +ple+entation ( PF#

  • 8/10/2019 ppt on power quality improvement

    54/84

    !4P. Ribeiro June, 2002

    In0reased Poer

    rans8er

    Enhanced Po-er $ran%*er and Stabilit&:

    $echnologie% Per%pective

    +ast

    Rea2 Poer In6e0tion

    and Absorption

    +ast

    Rea0tie Poer In6e0tion

    and Absorption

    +ast

    Rea0tie Poer In6e0tion and

    Absorption

    Compensation

    Dei0es

    +AC- Dei0es

    Energ7 -torage

    E2e0tri0 Grid

    E2e0tri0 Grid

    P

    >>

    P Additiona2-tabi2it7 Margin

    P--C---C%P+C

    SMES

    & &.! 1 1.! ' '.! )&

    &.!

    1

    1.!

    '

    PaseAng2e

    Po4er,rans8er

    A00e2eration

    Area

    De0e2eration

    Area

    -tabi2it7

    Margin

    -ACOM -ACOM

    --C

    ---C

    %P+C

  • 8/10/2019 ppt on power quality improvement

    55/84

    !!P. Ribeiro June, 2002

    S$A$#)M

    Reactive Po-er )nl&

    )perate% in the vertical

    a

    e Combination or Rea2 and

    Rea0tie Poer i22 t7pi0a227

    red/0e te Rating o8 te Poer

    E2e0troni0s 8ront end inter8a0e.

    Rea2 Poer ta5es 0are o8 poeros0i22ation, ereas rea0tie

    poer 0ontro2s o2tage.

    $he Role o* Energ& Storage: real

    po-er co+pen%ation can increa%e

    operating control and reduce capital

    co%t%

    P ( Active Po-erC ( Reactive Po-er

    MA Reduction

    FA#$S Energ& Storage

  • 8/10/2019 ppt on power quality improvement

    56/84

    !"P. Ribeiro June, 2002

    -ME- Poer ?M@

    Addit

    iona2Po4er,rans8e

    r?MD@

    C2oser to generation

    C2oser to 2oad 0enters

    FA#$S Energ& Storage ( ocation Sen%itivit&

  • 8/10/2019 ppt on power quality improvement

    57/84

    !*P. Ribeiro June, 2002

    S$A$#)M% 4 S$A$#)M SMES

    oltage and Stabilit& #ontrol Enhanced oltage and Stabilit& #ontrol

    -7stem

    +re;/en07

    ?CH@

    "&.

    !.'

    time ?se0@time ?se0@

    ?' 9 & MVA Inerters@ ? & MVA Inerter 1&&M6s -ME-@

    -7ste

    m

    +re;/en07

    ?CH@

    "&.

    !.'-7ste

    m

    +re;/en07

    ?CH@

    "&.

    !.'

    time ?se0@

    9o #o+pen%ation

    Enhanced Po-er $ran%*er and Stabilit&:

    ocation and #on*iguration $&pe Sen%itivit&

  • 8/10/2019 ppt on power quality improvement

    58/84

    !P. Ribeiro June, 2002

    FA#$S For )pti+iing "rid nve%t+ent%

    FA#$S Device% #an Dela& $ran%+i%%ion ine% #on%truction#7 0onsidering series 0ompensation 8rom te er7 beginning, poer transmission beteen regions 0an be

    p2anned it a minim/m o8 transmission 0ir0/its, t/s minimiHing 0osts as e22 as enironmenta2 impa0t

    8rom te start.

    $he !a& to Proceed

    8 2anners, inestors and 8inan0iers so/2d iss/e 8/n0tiona2 spe0i8i0ations 8or te transmission s7stemto ;/a2i8ied 0ontra0tors, as opposed to te pra0ti0e o8 iss/ing te0ni0a2 spe0i8i0ations, i0 are o8ten

    in82e9ib2e, and man7 times in02/de o2der te0no2ogies and te0ni;/es@ i2e initing bids 8or a

    transmission s7stem.

    8 ,/n0tiona2 spe0i8i0ations 0o/2d 2a7 don te poer 0apa0it7, distan0e, aai2abi2it7 and re2iabi2it7re;/irementsQ and 2ast b/t not 2east, te enironmenta2 0onditions.

    8 5anufacturersso/2d be a22oed to bid eiter a +AC- so2/tion or a so2/tion ino2ing teb/i2ding o8 ?a@ ne 2ine?s@ andor generationQ and te best option 0osen.

  • 8/10/2019 ppt on power quality improvement

    59/84

    !P. Ribeiro June, 2002

    Speci*ication%

    0Functional rather than $echnical 1

    $ran%*or+er #onnection%

    Higher(Pul%e )peration

    Higher(evel )peration

    P!M #onverter

    Pa& Attention to nter*ace %%ue% and #ontrol%

    #onverterncrea%e Pul%e 9u+ber

    Higher evel

    Double the 9u+ber o* Pha%e(eg% and #onnect the+ in Parallel

    #onnect #onverter "roup% in Parallel

    2%e A #o+bination o* %everal option% li%ted to achieve reuired rating and per*or+ance

  • 8/10/2019 ppt on power quality improvement

    60/84

    "&P. Ribeiro June, 2002

    e0no2og7 ransmission Line

    rans8er Enan0ement

    Cost Range Operating prin0ip2e Pro0/rement

    Aai2abi2it7Re0ond/0tor 2ines In0rease terma2 0apa0it7 !& to '&& per

    mi2eIn0reases terma2 2imit 8or 2ine Competitie

    +i9ed or -it0ed -/ntRea0tors

    Vo2tage red/0tion N LigtLoad Management

    =1' 5VAR Compensates 8or 0apa0itie ar=2oad

    Competitie

    +i9ed or -it0ed -/ntCapa0itors

    Vo2tage s/pport andstabi2it7

    =1& 5VAR Compensates 8or ind/0tie ar=2oad

    Competitie

    +i9ed or -it0ed -eriesCapa0itors

    Poer 82o 0ontro2,Vo2tage s/pport and-tabi2it7

    1'=1" 5VAR Red/0es ind/0tie 2ineimpedan0e

    Competitie

    -tati0 VAR Compensators Vo2tage s/pport andstabi2it7

    '&=4! 5VAR Compensates 8or ind/0tieandGor 0apa0itie ar=2oad

    Competitie

    7ristor Contro22ed -eriesCompensation ?C-C@

    Poer 82o 0ontro2,Vo2tage s/pport andstabi2it7

    '!=!& 5VAR Red/0es or in0reases ind/0tie2ine impedan0e

    Limited0ompetition

    -ACOM Vo2tage s/pport andstabi2it7

    &=1&& 5VAR Compensates 8or ind/0tie and0apa0itie ar=2oad

    Limited0ompetition

    -ACOM G-ME- Vo2tage s/pport andstabi2it7

    1!&=)&& 5D Compensates 8or ind/0tieandGor 0apa0itie ar=2oad p2/senerg7 storage 8or a0tie poer

    Limited

    %ni8ied Poer +2oContro22er ?%P+C@

    Poer 82o 0ontro2,Vo2tage s/pport, and-tabi2it7

    1!&='&& 5D -VC and C-C 8/n0tions p2/spase ang2e 0ontro2

    -o2e so/r0e

    %ni8ied Poer +2oContro22er ?%P+C@ G-ME-

    Poer 82o 0ontro2Vo2tage s/pport and-tabi2it7,

    '!&=)!& 5D -VC and C-C 8/n0tions p2/so2tage reg/2ator, pase ang2e0ontro22er and energ7 storage

    -o2e so/r0e

    -aded area indi0ates te0no2ogies tat are eiter permanent27 0onne0ted or sit0ed on or o88 it me0ani0a2 sit0es. ?i.e. tese arenot 0ontin/o/s27 0ontro22ab2e@

    #o%t #on%ideration%

  • 8/10/2019 ppt on power quality improvement

    61/84

    "1P. Ribeiro June, 2002

    -ardware

    7ng 8 Pro9ect 4g#t!

    Installation

    Civil or(s

    Co##issioning

    Insurance

    #o%t #on%ideration%

    #o%t %tructure

    The cost of a ,A)T installation depends on many factors& such as power rating& type of deice&system oltage&system re'uirements& enironmental conditions& regulatory re'uirements etc. 3n top of this&the ariety of options aailable for optimum design renders it impossible to gie a cost +gure

    for a ,A)T installation./t is strongly recommended that contact is ta!en with a manufacturer in order to get a +rst ideaof costs andalternaties. The manufacturers should be able to gie a budgetary price based on a briefdescription of thetransmission system along with the problem"s$ needing to be soled and the improement"s$needing to be

    attained.

  • 8/10/2019 ppt on power quality improvement

    62/84

    "'P. Ribeiro June, 2002

    $echnolog& I #o%t $rend%

    I

    I

    additiona2 0ost saings possib2e

  • 8/10/2019 ppt on power quality improvement

    63/84

    ")P. Ribeiro June, 2002

    #oncern% About FA#$S

    Cost

    LossesRe2iabi2it7

  • 8/10/2019 ppt on power quality improvement

    64/84

    "4P. Ribeiro June, 2002

    Econo+ic% o* Po-er Electronic%

    So+eti+e% a +i< o* conventional and FA#$S %&%te+% ha% the lo-e%t co%t

    o%%e% -ill increa%e -ith higher loading and FA#$S euip+ent +ore lo%%& than conventional one%

    Reliabilit& and %ecurit& i%%ue% ( -hen %&%te+ loaded be&ond the li+it% o* eect% reuired

    #o%t o* S&%te+#o%t o* S&%te+

    4 Po-er4 Po-erElectronic%Electronic%

    44

    #onventional#onventional

    Delta(PDelta(P44

    Delta(PDelta(PDelta(PDelta(PGG

    Delta(PDelta(P77

    -tig Ni2sonTs paper

  • 8/10/2019 ppt on power quality improvement

    65/84

    "!P. Ribeiro June, 2002

    )peration and Maintenance

    3peration of ,A)T in power systems is coordinated with operation of otheritems in the same system& for smooth and optimum function of the system.This is achieed in a natural way through the )entral ower ystem )ontrol&with which the ,A)T deice"s$ is "are$ communicating ia system )A4A. Thismeans that each ,A)T deice in the system can be operated from a central

    control point in the grid& where the operator will hae s!illed human resourcesaailable for the tas!. The ,A)T deice itself is normally unmanned& and thereis normally no need for local presence in conjunction with ,A)T operation&although the deice itself may be located far out in the grid.

    5aintenance is usually done in conjunction with regular system maintenance&i.e. normally once a year. /t will re'uire a planned standstill of typically a couple

    of days. Tas!s normally to be done are cleaning of structures and porcelains&e2changing of mechanical seals in pump motors& chec!ing through ofcapacitors& chec!ing of control and protectie settings& and similar. /t cannormally be done by a crew of 7-9 people with engineers s!ill.

    Soint or2d #an5 A## Poer -7stems Paper

    Improing te e88i0ien07 and ;/a2it7 o8 AC transmission s7stems

  • 8/10/2019 ppt on power quality improvement

    66/84

    ""P. Ribeiro June, 2002

    +pact o* FA#$S in interconnected net-or'%

    The bene+ts of power system interconnection are well established. /t enables the

    participating parties to share the bene+ts of large power systems& such as optimi;ation ofpower generation& utili;ation of di0erences in load pro+les and pooling of resere capacity.,rom this follows not only technical and economical bene+ts& but also enironmental& whenfor e2ample surplus of clean hydro resources from one region can help to replace pollutingfossil-fuelled generation in another.

    ,or interconnections to sere their purpose& howeer& aailable transmission lin!s must be

    powerful enough to safely transmit the amounts of power intended. /f this is not the case&from a purely technical point of iew it can always be remedied by building additional lines inparallel with the e2isting& or by uprating the e2isting system"s$ to a higher oltage. This&howeer& is e2pensie& time-consuming& and calls for elaborate procedures for gaining thenecessary permits. Also& in many cases& enironmental considerations& popular opinion orother impediments will render the building of new lines as well as uprating to ultrahighsystem oltages impossible inpractice. This is where ,A)T comes in.

    *2amples of successful implementation of ,A)T for power system interconnection can befound among others between the

  • 8/10/2019 ppt on power quality improvement

    67/84

    "*P. Ribeiro June, 2002

    Po-er Cualit& %%ue%

    4 J Bac'ground 0Po-er Cualit& J $rade Mar'1

    J $he 9eed For An ntegrated Per%pective o* PC

    G J Har+onic%

    7 J +balance

    ; J oltage Fluctuation%

    K J oltage Sag%

    6 J Standard%, i+it%, Diagno%tic%, and Reco++endation%

    Fle

  • 8/10/2019 ppt on power quality improvement

    68/84

    "P. Ribeiro June, 2002

    #o+patibilit&: $he Le& Approach

  • 8/10/2019 ppt on power quality improvement

    69/84

    "P. Ribeiro June, 2002

    ( ) ( ) ( )

    ( )

    =+ref

    +ref+,T- ,&ma9

    Relative $re%pa%% evel 0R$1

    %5 = meas/red or 0a20/2ated armoni0 o2tage

    %re8 = armoni0 o2tage 2imit ?standard or parti0/2ar e;/ipment@

    5 = armoni0 order

    ' 4 " 1& 1' 14&

    '

    4

    "

    &

    RL5

    1)' 5

    & &.&! &.1&

    '

    4

    "

    &

    RL5

    .1& %

    i Di t ti Di ti I d A 2 i + L i

  • 8/10/2019 ppt on power quality improvement

    70/84

    *&P. Ribeiro June, 2002

    Possib2e

    Prob2ems

    Ca/tion -eere

    Distortions

    Dangero/s

    Lee2s

    Norma2

    Lee2s

    A # C D E + G RL&

    1

    No

    rma

    2

    #e

    2

    o4

    No

    rma

    2

    O.e

    r

    Ceatin

    g

    Ver

    7

    Co

    t

    #e

    2o4

    No

    rma

    2a

    b

    0

    d

    e

    E;/

    ipmen

    t

    Ma2 8

    /n

    0tion

    Mag

    nit/de

    OP

    1ase

    Ang

    2e

    Indiid/a2 armoni0s ?V@E;/ipment Ma28/n0tion

    +/HH7 = Co2or Code Criteria

    No Prob2em

    Ca/tion

    Possib2e Prob2ems

    Imminent Prob2ems

    armoni0 Distortion Diagnosti0 Inde9 App27ing +/HH7 Logi0

    Comparisons

    A2ternatie Approa0

  • 8/10/2019 ppt on power quality improvement

    71/84

    *1P. Ribeiro June, 2002

    armoni0s

    De8inition o8 armoni0s

    -o/r0es o8 armoni0s

    E88e0ts o8 armoni0s

    Mitigation metods

    Considerations on te e9tra 0osts d/e to armoni0 po22/tion

    Meas/rement res/2ts

    Vo2tage 82/0t/ations+2i05er

    De8initions

    -o/r0es o8 o2tage 82/0t/ations82i05er

    E88e0ts o8 o2tage 82/0t/ations82i05erMitigation metods

    Meas/rement res/2ts

  • 8/10/2019 ppt on power quality improvement

    72/84

    *'P. Ribeiro June, 2002

    Vo2tage Dips

    De8inition

    -o/r0es o8 o2tage dipsE88e0ts o8 o2tage dips

    Mitigation metods

    Meas/rement res/2ts

    Con02/sions

    %nba2an0e

    De8inition

    -o/r0es o8 /nba2an0e

    E88e0ts o8 /nba2an0e

    Mitigation metods

    Meas/rement res/2ts

    ransient Oero2tages

  • 8/10/2019 ppt on power quality improvement

    73/84

    *)P. Ribeiro June, 2002

    Ho- $o nterpret $hi%

  • 8/10/2019 ppt on power quality improvement

    74/84

    *4P. Ribeiro June, 2002

    Ho- $o nterpret $hi%

  • 8/10/2019 ppt on power quality improvement

    75/84

    *!P. Ribeiro June, 2002

    Ho- $o nterpret $hi%

  • 8/10/2019 ppt on power quality improvement

    76/84

    *"P. Ribeiro June, 2002

    ;eneration +elivery Conversion Processing

    Central

    Station

    T8+ AC0AC

    Sulies

    4otion

    7nviron#ental 4aintaina$ility

    Availa$ility

    Sa'ety

    7''iciency

    Relia$ility

    Per'or#ance

    Price

    Power Quality

    Power Syste# &alue Chain

    Power 7lectronics Syste#s and Co#onents

    S47S

    3atteries

    FACTS

    S47S

    PQ Par(s

  • 8/10/2019 ppt on power quality improvement

    77/84

    **P. Ribeiro June, 2002

    Benefits of a Power Quality Program

    Offer o'tions to customers wit PQ concerns

    Attract new business to area :regional develo'ment;

    +acilitate load retention of current customers

    Meet canging needs of customerHs new tecnology

    /iscourage co-generation or self-generation as solutions of

    PQ Problems

    %nance and 'ublic image - as customers old utility accountable

    for bot PQ and reliability

    Add value to service

    (erve customersH best interests and save customers money

    (u''ort utility mission

  • 8/10/2019 ppt on power quality improvement

    78/84

    *P. Ribeiro June, 2002

    Sugge%ted $opic% *or nve%tigation

    FA#$S

    In02/sion o8 Energ7 -torage

    opo2og7 Combination

    Po-er Cualit&

    E88e0ts o8 Poer >/a2it7 on Re2a7ing E;/ipment

    Cost#ene8it Ana27sis o8 P>

    App2i0ation o8 Adan0ed e0ni;/es

  • 8/10/2019 ppt on power quality improvement

    79/84

    *P. Ribeiro June, 2002

    #onclu%ion%

    ( +/t/re s7stems 0an be e9pe0ted to operate at iger stress 2ee2s( +AC- 0o/2d proide means to 0ontro2 and a22eiate stress( Re2iabi2it7 o8 te e9isting s7stems minimiHe ris5s ?b/t not ris5=8ree@

    ( Intera0tion beteen +AC- dei0es needs to be st/died( E9isting Pro6e0ts = Met E9pe0tations( More Demonstrations Needed( RJD needed on aoiding se0/rit7 prob2ems ?it and o +AC-@( Energ7 storage 0an signi8i0ant27 enan0e +AC- 0ontro22ers per8orman0e

  • 8/10/2019 ppt on power quality improvement

    80/84

    &P. Ribeiro June, 2002

    #onclu%ion%

    ower supply industry is undergoing dramatic change as a result of

    deregulation and political and economical maneuers. This new mar!etenironment puts demands for e2ibility and power 'uality into focus. Also&trade between companies and countries of electric power is gainingmomentum& to the bene+t of all inoled. This calls for the right solutionsas far as power transmission facilities between countries as well asbetween regions within countries are concerned.

    ,A)T Bene+ts included:-An increase of synchronous stability of the grid?-An increased oltage stability in the grid?-4ecreased power wheeling between di0erent power systems?-/mproed load sharing between parallel circuits?

    -4ecreased oerall system transmission losses?-/mproed power 'uality in grids.

    1The choice of ,A)T deice is simple and needs to be made the subject ofdetailed system studies& ta!ing all releant re'uirements and prere'uisitesof the system into consideration& so as to arrie at the optimum technicaland economical solution. /n fact& the best solution may often be lying in acombination of deices.

  • 8/10/2019 ppt on power quality improvement

    81/84

    1P. Ribeiro June, 2002

    ,rom an economical point of iew& more power can be transmitted oere2isting or new transmission grids with unimpeded aailability at aninestment cost and time e2penditure lower& or in cases een far lowerthan it would cost to achiee the same with more e2tensie grids. Also&in many cases& money can be saed on a decrease ofpower transmission losses.

    ,rom an enironmental point of iew& ,A)T enables the transmission ofpower oer ast distances with less or much less right-of-way impactthan would otherwise be possible. ,urthermore& the saing intransmission losses may well bring a corresponding decrease in need forgeneration& with so much less toll on the enironment.

    All these things help to enable actie& useful power to reach out ingrowing 'uantities to growing populations under safe and faorableconditions all oer the world. Also& indiidual countries own border linesno longer constitute any limit to power industry. @ith ,A)T& power tradeto the bene+t of many can be established to a growing e2tent across

    borders& by ma!ing more ecient use of interconnections between

    #onclu%ion%

  • 8/10/2019 ppt on power quality improvement

    82/84

    'P. Ribeiro June, 2002

    Con02/sions

    A #a2an0ed and Ca/tio/s App2i0ation

    e a00eptan0e o8 te ne too2s and te0no2ogies i22 ta5e time, d/e to te

    0omp/tationa2 re;/irements and ed/0ationa2 barriers.

    e 82e9ibi2it7 and adaptabi2it7 o8 tese ne te0ni;/es indi0ate tat te7i22 be0ome part o8 te too2s 8or so2ing poer ;/a2it7 prob2ems in tis

    in0reasing27 0omp2e9 e2e0tri0a2 enironment.

    e imp2ementation and /se o8 tese adan0ed te0ni;/es needs to be

    done it m/0 0are and sensitiit7. e7 so/2d not rep2a0e teengineering /nderstanding o8 te e2e0tromagneti0 nat/re o8 te prob2ems

    tat need to be so2ed.

  • 8/10/2019 ppt on power quality improvement

    83/84

    )P. Ribeiro June, 2002

    Cue%tion% and )pen Di%cu%%ion%

  • 8/10/2019 ppt on power quality improvement

    84/84

    Appendi