ppp: future of tourism development - best practice ... · ppp: future of tourism development - best...

21
Moscow, 15 th March 2010 PPP: future of tourism development - Best practice examples from Austria

Upload: others

Post on 19-Aug-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

Moscow, 15th March 2010

PPP: future of tourism development -Best practice examples from Austria

Page 2: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

2

Content

• About Kohl & Partner• Public Private Partnership in tourism• Best practice examples from Austria

Page 3: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

3

About Kohl & Partner

• Independent and internationally operating consulting company specialized in the hotel and tourism industry

• Leading tourism consulting company in Austria with more than 30 years of experience

• Eight offices in six countries (Villach, Vienna, Munich, Stuttgart, South Tyrol, Sofia, Bucharest and Budapest)

• International team with more than 40 tourism experts

3

Page 4: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

4

Core business areas

HospitalityIndustry

Destination Development

TourismInfrastructure

• Feasibility Studies• Hotel Valuations• Operator Selection• Strategic Concept

Development• Technical Service

Agreements

• Destination Audits• Tourism Master Plans• Destination Assistant

Program• Hotel Master Plans• Development of

organizat. structures

• Aqua Parks/Thermal Spas

• Conference Centers• Golf Courses• Ropeways/Cable Cars• Tourism Attractions/

Sights

Page 5: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

5

Content

• About Kohl & Partner• Public Private Partnership in tourism• Best practice examples from Austria

Page 6: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

6

“A contractual agreement between a public agency (federal, state or local) and a private sector entity.

Through this agreement, the skills and assets of each sector are shared in delivering a service or facility for the use of the public.”

Definition Public Private Partnership

Page 7: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

7

Why do we need Public Private Partnership in tourism?

Page 8: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

8

Why do we need PPP in tourism?

PPP projects

Lack of budget and Know-How in many municipalities

Pressure by competitors requires new investment

Faster imple-mentation of tourism

projects is possible

Tourism Infra-structure Develop-ment is expensive but vital

Page 9: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

9

PicturePicturePicture

Potential areas for PPP in tourism

Tourism InfrastructureAqua Parks, Ropeways, Golf Courses

Leisure InfrastructureTheme Parks, Sport Complexes, Museums

Events & FestivalsSport, music and cultural events

Possible Public-Private Partnership

Page 10: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

10

Content

• About Kohl & Partner• Public Private Partnership in tourism• Best practice examples from Austria

Page 11: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

11

Four golden rules for Public Private Partnership

11

SUCCESSFUL PARTNERSHIP

1

2

3

4

„Five drunks are not a team“ – a cooperation is NOT a rescue team

The involved partners should definecommon goals

Every unit needs its own business-plan and strategy

Mature partners and a strongleadership are required

Page 12: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

12

Most common PPP models in tourism

Informal cooperationOperation model PPP models

Cooperation model

Associate model

Concession model

Sponsoring

1

2

3

4

5

6

Page 13: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

13

Cooperation model 1/2

Main characteristics Best practice example

• Public & Private Sector agree to work together (usually Public Sector share is higher than 50 %)

• Public Sector has a contract with the Joint Venture

• Ideal model if nothing is built or the contributions cannot be measured

DMC of the municipality Velden

• 600 hotels and pensions with a total room count of 7.800 beds

• More than 500.000 overnights per year

Destination Management Companies

Possible tourism example

Page 14: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

14

Destination Management Company Velden

MunicipalityVelden

34 %

CasinoAustria

5 %

Cooperation model 2/2

Tourism BoardVelden

49 %

Golf Course

5 %

Event Company

4 %

T. supportAssociat.

4 %

Page 15: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

15

Operation model 1/2

Main characteristics Best practice example

• Public Sector assigns a private company for planning, constructing, financing and/or operating

• Public Entity receives fixed annual amount of money

• An operator contract as the legal basis with detailed task description

Operating company of Schönbrunncastle in Vienna

• Consists of castle, royal garden, Sisimuseum, emperor appartments, etc.

• More than 3 million visitors annualy

Leisure or cultural facilities orconvention centres

Possible tourism example

Page 16: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

16

Operation model 2/2

Schloss Schönbrunn Kultur- und Betriebsges.m.b.H. (operating company)

Castle & Royal Garden

Emperor Appartm. & Silver Collection

Sisi Museum

Emperor furniturecollection

Republic of Austria(100 % owner)

• No public subsidies – operating company keeps operational revenue

• All investment and renovation financed by theoperational revenue

Page 17: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

17

Associate model 1/2

Main characteristics Best practice example

• Public Sector signs an equity participation for a tourisminfrastructure project

• Investment as an impulse for regional tourism development

• Public sector often covers infrastructure development costs

Development of a Spa Centre in BadHofgastein

• Surface of 32.000 square metresdivided into six different zones

• Total investment for renovation and enlargement EUR 25 million

Golf Courses, Aqua Parks, Spa Centres, Ropeways

Possible tourism example

Page 18: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

18

Construction Company Spa Centre Gastein

MunicipalityBad Hofgastein

49 %

Oberbank19 %

Associate model 2/2

Regional tourismorganisation

24 %

Brewing Union Austria

6 %

Raiffeisen Bank2 %

Page 19: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

19

Concession model 1/2

Main characteristics Best practice example

• A concessionaire (private sector) is granted the right to use an existing facility

• The facility stays in the ownership of the public sector

• The concessionaire generates the revenues through direct selling of the services to customers

Development of cable car nearInnsbruck

• Connecting Innsbruck (560 m) withNordkette (2.269 m)

• Total investment of around EUR 51 million

Golf Courses, Aqua Parks, Spa Centres, Ropeways

Possible tourism example

Page 20: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

20

Concession contract for 30 years

Investment Public share

73 %

Concession model 2/2

InvestmentPrivate share

27 %

Total investment of EUR 51 million

Page 21: PPP: future of tourism development - Best practice ... · PPP: future of tourism development - Best practice examples from Austria 15 Operation model 1/2 Main characteristics Best

PPP: future of tourism development -Best practice examples from Austria

21

www.kohl.atVIENNA • VILLACH • SOUTH TYROL • MUNICH • STUTTGART • BUCHAREST • SOFIA • BUDAPEST