powerhouse and industrial boilers
TRANSCRIPT
When millions are on the line, our customers know they can count on GRP|WEGMAN for the safe, Primavera schedule and cost driven execution of planned scope and forced outages. By integrating operations, engineering, craft management and technology, GRP|WEGMAN has developed a proven system for success with turnkey project and outage execution.
Our long-standing tradition of safety and contracting excellence has allowed us to become a major force in power generation. As the industry has changed, GRP|WEGMAN has evolved with it and is fully prepared to assist with building and maintaining the infrastructure necessary to meet today’s cleaner, and more environmentally friendly power generation facilities.
Capital Projects and Outage Execution
GRPWEGMAN.com
GRP|WEGMAN is dedicated to the safety of all our employees. Our Safety Program is the number one focus for the organization regardless of the project. A Job Safety Analysis (JSA) is performed daily prior to the start of any work and anytime the job or scope changes throughout the day. All personnel involved with a given piece of work are involved in the JSA process.
GRP|WEGMAN has an ISNetworld rating of A+
Safety
Project ManagementPlanning and Budget Development Root cause analysis - Primavera P6 Timely cost reporting on T&M scope - MS Project Component and system inspection
Quality Assurance/Quality ControlNational Board “R” StampASME “PP” and “S” StampsAll weld inspection personnel are AWS certified elding inspectorsSystems and components
Powerhouse and Industrial Boilers
Progress reporting via updated schedules Next day time sheet availability
Powerhouse and Industrial Boilers Fabrication shop supportR stamp code repairsQuality assurance / quality controlNDE ready
System and Components
Over 200 qualified welding proceduresHighly experienced with CSEF steels and Alternative Welding Method 6Fully staffed and equipped fabrication shop
Welding and Support
Experience (not all inclusive)
Boiler FabricationsBoiler Component InstallationBoiler RepairsStructural SupportInsulation and LaggingInspection Management and Reporting
Boilers
Boiler – HEP, Reheat and FeedwaterAuxiliary SteamValve RepairsTurbine PipingCirculating WaterCooling WaterAsh PipingAir PipingHot TappingInspection Management and Reporting
Piping
InstallationRepairInspection Management and Reporting
Pressure Vessels - All
Soot Blowers – Air and Steam SystemsWater Cannons
Boiler Cleaning
Air HeatersDuct WorkExpansion JointsDampersFansTest Grids
Boiler Air and Flue Gas
BurnersBall MillsB&W and C-E PulverizersStokersFeedersStorage Bunkers and SilosConveyers and Transfer Stackers and ReclaimUnloading Facilities
Boiler Fuel Management
Clinker GrindersWet BottomsSubmerged Flight ConveyersDry Flight ConveyersSluice PipingHydro-clonesBlowersAir Cannons
Ash Management and Handling
Dry and Wet PrecipitatorsSCRsWet Flue Gas DesulfurizationDry Flue Gas DesulfurizationBag HousesLimestone Mills
Environmental Controls
For more information about GRP|WEGMANPowerhouse and Industrial Boilers, contact: Mike Beall| C: 618-801-9573 | O: 618-258-92461 Mechanical Drive, Bethalto, IL 62010 [email protected] www.grpwegman.com