power plant design overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m...

37
Power Plant Power Plant Design Overview Design Overview Presentation to the US DOE 7 August 2003 Dieter Dieter Matzner Matzner

Upload: others

Post on 14-Jan-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Power PlantPower PlantDesign OverviewDesign Overview

Presentation to the US DOE

7 August 2003

DieterDieter Matzner Matzner

Page 2: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 2

Basic Safety Principles

Nuclear power production with:• No credible event that will necessitate

sheltering or evacuation of public livingat site boundary (400 m)

• No need for active engineered safetysystems

• No need for early operator intervention(>24h Design Goal; ~96 h Achieved)

Page 3: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 3

Basic Safety Principles

Safety Achieved By:• Control of heat production - Limit excess reactivity - Strong negative temperature coefficient• Control of heat removal - Large heat capacity - Passive heat removal to cavity coolers• Control of chemical attack

- RPV penetrations designed as pressurevessels- Low radioactivity allows early access

Page 4: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 4

Possible Plant Design Choices

• Coated particle fuel in block or pebble• High or medium temperature operation• Direct or indirect power conversion

cycle• Single or multi shaft power conversion

in case of direct cycle

Page 5: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 5

Selected Plant Design

• Direct cycle power conversion• Coated particle fuel in pebble• High temperature operation• Multi shaft power conversion

Page 6: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 6

Demonstration PlantSpecification

• Recuperative direct Brayton cycle with inter-cooling• Output to the Grid: 160 to 165 Mwe at 28°C CWT

165 to 170 Mwe at 18°C CWT• House electric load: < 5MWe• Ramp Up: 0% to 50% MCR within 30 minutes

50% to 100% MCR within 2 minutes• Ramp Down: 100% to 50% MCR within 2 minutes• Continuous operating power range: 20 to 100% MCR• Load rejection w/o trip: 100%

Page 7: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 7

Demonstration PlantSpecification

• Base construction cost: $1000/kWe • Construction schedule (first concrete to fuel load):

30 months• General overhauls: 30 days per 6 years• Fuel costs: 4 mills/ kWh• O&M costs: 5 mills/ kWh• Seismic: SSE 0.4 g• Aircraft: < 2.7 ton (no penetration)

Boeing 777 (penetration of outside shell and not the citadel;nuclear safety not compromised)

Page 8: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 8

Demonstration PlantSpecification

• Start from full shutdown (RSS inserted) tosynchronization within 36 hours

• Black Starting is optional• After LBE, 24 hours are allowed before operator

action is required• Availability : 95%• Efficiency: > 41% at 28°C CWT• > 42% at 18°C CWT• Spent Fuel Storage: 40 years on-site

Page 9: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 9

Module Building

SPECIFICATIONHeight total 62.9 mHeight above ground 40.9 mDepth below ground 22 mWidth 37.0 mLength 66.1 mLevels (floors) 11Material 40 MPa concreteSeismic acceleration 0.4 gAircraft crash < 2.7 ton no penetration

777 penetration outside shell; nuclear safety not compromised

Containment barrieragainst externallygenerated pressure &impact loads.

Reactor Cavity providesshielding to personnel & actsas a barrier against internallygenerated missiles

Citadel

Depressurisation shaft

Page 10: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Main Power SystemMain Power System

Page 11: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 11

SpecificationPower output: 400MWt

165 MweCoolant: HeliumCoolant pressure: 9 MpaOutlet temperature: 900°CTotal mass: ~4000 tHelium mass: 10380 kgNet cycle efficiency: 41%

Main Power System

Page 12: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 12

Reactor UnitHPT LPT

PTG

Recuperator

Pre-coolerInter-cooler

CBCS

CCS

Main Power System

Page 13: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 13

Schematic Diagram of thePBMR Main Power System

Citadel PCU

HPT LPT

PT Recuperator

Pre-coolerIntercooler

Generator

HPC

Core

RBP

LPB

HPHelium injection and removal

ICSbuffertank

GBP - Gas Cycle Bypass ValveGBPC - Gas Cycle Bypass control valveLCV - Low Pressure Coolant ValveRBP - Recuperator Bypass Valve

SBSV - Start-up Blower System Isolation ValveSIV - Start-up Blower System Inline Valve

SBP - Start-up Blower System Bypass ValveSBPC - Start-up Blower System Bypass Control Valve

LPB - Low Pressure Compressor Bypass Valve GBPC

GBP

LPHelium injection

ICSbuffertank

LCV

LPC

CRB

HV Breaker Generator BreakerNetwork

SFC

SBPC

SBP

SIV2

SIV1

SBS1

SBS2 SBSV2

SBSV1

Page 14: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 14

Reactor UnitVessel Assembly

SPECIFICATIONSPECIFICATIONTotal height RPV 30 mInside dia. RPV 6.2 mCoolant HeliumMax. helium pressure 9 MPaNormal Ops. temp. of RPV 300°CRPV vessel material SA 508

ForgingsRPV mass assembled ~1700 tRPV vessel mass 1000 t (lid

included)

Small absorber spherecontainers (RSS)

Central reflector

Fuelingtubes

Annular core

Cold gas inlet

Hot gas outlet

Control rod drives (RCS)

Side reflector

De-fueling chute

Page 15: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 15

SPECIFICATIONTotal height of core barrel 22 mOutside dia. 5.85 mCoolant HeliumMax. operating pressure 9 MPaMax gas outlet temp. 900°CBarrel material 316

StainlessBarrel structure mass 250 tGraphite mass 390 t

Core Structure Assembly

Page 16: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 16

ab

c

de

f

g

h i

j

k

l

m

o

n

Primary and Secondary CoolantFlow Paths in core Structures

Page 17: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 17

Low Pressure Turbine UnitHigh Pressure Turbine Unit

Turbine Units

Page 18: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 18

Power GeneratorPower Turbine Unit

SPECIFICATIONTotal PTG Shaft Length 20.1 mTotal PTG Shaft Mass 88 t

PG:Coolant AirHeight (Inlet to Top) 17.2 mMass PG 326 tPG Frequency output 50 HzPG Power output 180 MW , 11 kV

PF=0.85PTU:Medium HeliumHeight PT (Inlet to Outlet) 4.4 mTip Dia. (typical) 2.1 mMass PT 338 tPT speed 3000 rpmStages 10Efficiency 93.5%Mass flow 194 kg/s

Power Turbine Generator

Page 19: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 19

Pre-coolerInter-cooler

Position of Pre- andInter-coolers

Page 20: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 20

Pre-cooler Inter-cooler

Diameter: 2.7 mLength: 6.0 mMass: 50 TonnesMaterial: Carbon steel tubes/

Aluminium fins

Pre-cooler and Intercooler

Page 21: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 21

Recuperator

Diameter: 5.5 mLength: 5.0 mMass: 60 TonnesMaterial: SS 304

Page 22: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 22

Gas Cycle ValvesHP & LP Coolant and

SBS Control Valve

SBS Inline Valve

Maintenance Shut-off Disc

Gas Cycle Bypass Valve

HPC, LPC & Recuperator Bypass Valve

Page 23: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 23

SPECIFICATIONMedium HeliumDaily sphere circulation rate 2900Hourly sphere circulation rate 500/600Daily operating time 12 hoursNumber of fuel passes through core 6Operating pressure 1 – 9 MPaOperating temperature 20 - 260ºCFuel spheres in core 451555Fuel sphere feeding points 3Core defueling points 3Fresh fuel storage capacity 70 canistersFresh fuel canister capacity 1000 spheresSpent fuel storage capacity 6 000 000 spheresNumber of spent fuel tanks 10Spent fuel period 80 yrs.

Fuel Handling & StorageSystem

Page 24: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 24

Helium Inventory ControlSystem

SPECIFICATIONSPECIFICATIONICS:ICS:Medium HeliumStorage Capacity 12300 kgStorage pressure 6.2 -9.4 MPaFlow rate @ 10% inventory 13 kgsHigh pressure compressor flow rate 9 kg/minMultipurpose compressor flow rate 35 kg/hrMass of tanks 135- 200 tHPS:HPS:Bypass flow rate 0.5 µmFilters dust particles > 0.5 µmRemoves gaseous impurities:Removes gaseous impurities:

H2 < 1 ppmv00 < 1 ppmvC02 < 0.1 ppmvH20 < 0.1 ppmvCH4 < 1 ppmvN2 < 1 ppmv

HMS:HMS:Replenishes daily leakage 8 kg/dayStorage Capacity 432 kg he1iumContainment 18 packs of

16 cylinders eachCylinder capacity 1.5 kg he1ium @

220 bar

Page 25: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 25

Equipment

Page 26: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 26

Equipment at –22 m

Page 27: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 27

Equipment at –10 m

Page 28: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 28

Equipment at +7m

Page 29: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 29

Equipment at+14.4m

Page 30: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 30

Equipment at +27.9m

Page 31: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 31

Power Plant Design Overview

Purpose of the Multi Module Plant Conceptual Designand Layout

To estimate the cost of the MM Plant:• Minimum cost configuration for a base load plant• Technical reference for the Business Case• Optimal sharing of components between

modules• Demonstration Plant components integrated into

the MM Plant Layout

Page 32: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 32

Power Plant Design OverviewShared Plant - MM Plant

– Helium Inventory Storage: 1 x 200% capacity– Helium Purification: 2 systems– Helium Make-up: 2 stations– Spent Fuel Storage: 10 years capacity– Used Fuel Storage: 2 x 100% capacity tanks– Graphite Storage: 2 x 100% capacity tanks– HVAC blowers and chillers– One Remote Shutdown Room– One set of Special Tools– One Primary Loop Initial Clean-up System– Selected Equipment Handling– Fire Protection Reservoirs and Pumps– Generator Lube Oil System & Transformer (shared per 2

modules)

Page 33: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 33

Power Plant Design Overview

Non-Shared Plant - MM Plant

– Main Power System including Gas Conditioning Systems– Fuel Handling (excluding storage systems)– Reactor Cavity Cooling– Active Cooling– Control and Instrumentation (RPS, PEI, OCS,EPS)– Helium Inventory Trim Tank– Compressed Air – High & Low Pressure– HVAC air circulation– Fire Protection inside the Module– Resistor Bank

Page 34: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 34

Cut away isometric of PBMR MULTI MODULE CONCEPT

Page 35: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 35

TRU

CK

PIC

KUP

BAY

FIR

E PR

OTE

CTI

ON

WA

TER

TAN

K30

,000

gal

FIRE PROTECT.

PUMP ROOM.

Active Cooling Pump & Heat Exchanger Building( Single story prefab)108m x 30m

FIRE PROTECT.FEEDER LINES

GENERATOR BRAKING RESISTOR CABINET

SW

GR LC

BATTERY125V DC

LEVE

L+2

0,4

MLE

VEL

+14,

9MLE

VEL

+10,

9 M

LEVE

L+4

,9 M

LEVE

L0,

0 M

LEVE

L-5

,3 M

LEVE

L-9

,9 M

Active Cooling System

Ele

ctric

al

C&I

Ele

ctric

al

Layd

own

FHSS

(Ser

vice

)

TRU

CK

PIC

KUP

BAY

AA

Opening @ +14,9m

BB

C

CAS

C&I

Opening @ +14,9m

BATTERY 400V

PTG

LUBE O

ILS

YSTEM

LEV

EL-1

7,92

8 M

BATTERY 400K

C&I

LEVE

L+2

4,9

M

PTG

LUBE O

ILS

YSTEM

PTG

LUB

E O

ILS

YSTE

M

PTG

LUB

E O

ILS

YSTE

M

LC

SW

GR

BATTERY125V DC

I&C

SW

GR

SW

GR

SW

GR

SW

GR

LCLC

SW

GR

SW

GR

LCLC

SW

GR

SW

GR

LCLC

LCLC

C

RO

AD

PLA

N VI

EW

45

TON

HO

IST

10

TON

HO

IST

D

D

CO

NT

RO

LLE

D AC

CESS

UN

-CO

NT

RO

LLE

D AC

CES

S

HIC

S T

ANKS

SP

EN

T FU

EL T

ANKS

GST

2,5X

2,5H

ATCH

UFT

2,5X

2,5

GST

UFT

SP

EN

T FU

EL T

ANKS

SPE

NT F

UEL

STO

RAG

E TA

NKS

(11

- 40

YEAR

EXP

ANSI

ON)

Helium Make-up TRAILER BAY10.8m x 30m

Par

king

Lot

Mai

n Ac

cess

Fac

ility

Veh

icle

Insp

ectio

n Ba

y

Veh

icle

Insp

ectio

n Ba

y

Dou

ble

Secu

rity

Fenc

e 10

80m

x 2

FRE

SH

FUE

LS

TORA

GE

FAC

ILIT

Y

12

34

56

78

Active Cooling System

HAT

CHE

LS

TEPS

HAT

CHE

LS

TEPS

HAT

CHE

LS

TEPS

HAT

CHE

LS

TEPS

Saf

ety

Rel

ated

Die

sel

Pow

erG

ener

ator

Saf

ety

Rel

ated

Die

sel

Pow

erG

ener

ator

(FUTURE) (FUTURE)

SW

GR LCLC

SW

GR

SW

GR LCLC

SW

GR

SW

GR LCLC

SW

GR

NO

TE:

ALL

EXT

ERNA

L W

ALL

THIC

KNE

SSES

TO

BE

1000

mm

DRA

WIN

G S

HOW

S 15

00m

m

MM Plant - plan view

Page 36: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 36

MM Plant – side view

Reactor UnitHPTLPTPTG SF Tanks

Laydown area

Page 37: Power Plant Design Overviewptg lube oil system level -17,928 m battery 400k c&i level +24,9 m ptg lube oil system ptg lube oil system ptg lube oil system battery 125v dc i&c swgr swgr

Presentation: US DOE - D Matzner 37

MM Plant Shared Area- side view