potable water for villa complex

21
Potable Water For Potable Water For Villa Complex Villa Complex By By Fawaz Al-Ghamdi Fawaz Al-Ghamdi August 9, 2005 August 9, 2005 Term Project # 10 Term Project # 10

Upload: hubert

Post on 09-Jan-2016

34 views

Category:

Documents


1 download

DESCRIPTION

Term Project # 10. Potable Water For Villa Complex. By Fawaz Al-Ghamdi August 9, 2005. OUTLINE. Introduction Objective VE Job Plan Information Phase Creative Phase Judicial Phase Development Phase Implementation Phase Q&A. INTORDUCTION. Project Description - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Potable Water For Villa Complex

Potable Water For Potable Water For Villa ComplexVilla Complex

Potable Water For Potable Water For Villa ComplexVilla Complex

ByByFawaz Al-GhamdiFawaz Al-Ghamdi

August 9, 2005August 9, 2005

Term Project # 10Term Project # 10

Page 2: Potable Water For Villa Complex

OUTLINE• Introduction• Objective• VE Job Plan

– Information Phase– Creative Phase– Judicial Phase– Development Phase– Implementation Phase

• Q&A

Page 3: Potable Water For Villa Complex

INTORDUCTIONProject Description• 6 new Villas are under construction;

the owner would like to find the suitable way for getting the potable water

• The designer original proposal is to install new RO system that desalinate the raw water from water well

Page 4: Potable Water For Villa Complex
Page 5: Potable Water For Villa Complex

OBJECTIVE

• To examine the original proposal with other possible ways and recommend the most suitable system using V. E. techniques.

Page 6: Potable Water For Villa Complex

INFORMATION PHASE

Contact Tel. No. Major Points

SAMMNAN Co. 03-8681122 RO unit dealer

ZAID ALHUSSAN 03-8175204 Potable water provider

Consultation Records

Page 7: Potable Water For Villa Complex

INFORMATION PHASE

Main Required Criteria • Provide potable water flow of 9000

gpd.• Meet the minimum potable water

specification per international standard (EPA).

• TDS: below 500 ppm• pH: 6.5-8.5• Microorganism: zero

Page 8: Potable Water For Villa Complex

INFORMATION PHASE Other Features• The material to be in-kingdom• Vendor support shall be provided if needed• Spare parts to be available.• Size to be reasonable (area below 14 m sq) • Control system shall be easy.• Minimum use of hazardous chemicals

Page 9: Potable Water For Villa Complex

INFORMATION PHASE

Cost Data

Idea Unit Price (SR/100 gal)

RO Unit (water well) 4.34RO Unit (SWCC) 5.51Local Provider 1.82

Page 10: Potable Water For Villa Complex

FUNCTION PHASE • Function Worksheet

Why Function How

To get potable water that meet standard and flow requirement

Treat raw water

Install new RO skid

Page 11: Potable Water For Villa Complex

FUNCTION PHASEIdentify Present Function

• What does it now do?

verb nounDrain water

• What must it do?

verb nounTreat raw waterTransfer water

Page 12: Potable Water For Villa Complex

CREATIVE PHASE Generate Ideas

1. Install new RO skid using the raw water from SWCC2. Dig water well to search for sweet water.3. Have annual contract with potable water provider.4. Extend pipe from closest sweet water source.5. Use raw water from the water well for the new RO unit.6. Have individual RO skids for the 6 villas.7. Use multistage vaporization process.8. Wait for upgrading (SWCC)9. Provide separate potable water piping network and raw

water network.10. Use solar cells to provide electricity to the new skid.

Page 13: Potable Water For Villa Complex

JUDICAL PHASE

Feasibility Ranking

Idea # PurityProbab. of

implem. Time to Implement

Cost to Develop

Experience Total Rank

1 10 8 7 6 9 40 2

2 1 2 2 6 7 18 6

3 8 9 8 8 10 43 1

4 8 1 2 2 3 16 7

5 9 9 6 5 9 38 3

6 10 3 2 4 5 24 4

7 10 1 1 1 1 14 9

8 9 1 1 1 1 13 10

9 5 3 4 5 6 23 5

10 10 1 2 1 1 15 8

Page 14: Potable Water For Villa Complex

Idea ComparisonIdea Advantage Disadvantage Ran

k

Have annual contract with potable water provider.

•Safe operation•Does not required electricity •Requires less manpower•No need to have draining facilities as there is no rejected water•No major Maint. or spare part required

-Require continuous follow up. -Service may discontinue anytime unless backup is provided-Quality of water is not as high as RO unit production (usually higher TSS).

1

Install new RO skid using the raw water from SWCC

•Very pure water

•Service is continues •The recovery is only 80 %-· •Initial Cost is high·    •Safety is lower than the others·  •High noise    •Need regular checking

2

Use raw water from the water well for the new RO unit

•Very pure water •Service is continues

•Initial Cost is high·    •Safety is lower •The recovery is only 75 -80 %  •High noise    •Both well and RO unit required regular checking.

3

Page 15: Potable Water For Villa Complex

• Determining Criteria

Initial Cost 1-10 Low-High costSafety 1-10 Low- Highly

SafeMagnitude of saving 1-10 Small-Large

savingContinuation of service 1-10 Low-HighEfforts to monitor/operate 1-10 Low-High efforts

JUDICAL PHASE

Page 16: Potable Water For Villa Complex

Weights For Evaluation Raw Score Assigned

Weight

3 6

5 10

3 6

4 8

2 4

A Initial Cost

B Safety

C Cleanliness

D Continuation of service

E Efforts to monitor/operate

How important B C D E

3 Major PreferenceA A-B-1 A-C-1 D-2 A-E-1

2 Medium Preference

1 Minor PreferenceB B-2 B-D-1 B-1

C C-2 E-2

D D-E-1

Page 17: Potable Water For Villa Complex

Evaluation MatrixCRITERIA

Initial Cost Safety CleanlinessContinuation

of serviceEfforts to

monitor/operateTOTAL

IDEA Wt. 6 10 6 8 4 RANK

Original method: Install new RO skid using the raw water from well

  3 5 10 10 7 2

 Sub Tot.

18 50 60 80 28 236

Have annual contract with potable water provider.

 

8 9 8 5 4 1

  Sub Tot.

48 90 48 40 16 242

Use raw water from the water well for the SWCC

 

4 5 10 8 7 3

 Sub Tot.

24 50 60 64 28 226

Page 18: Potable Water For Villa Complex

DEVELOPMENT PHASE

• Savings

- Assume 10 years service life

Item Total Cost (SR) Original: New RO with water well 299, 700Proposed: Annual Contract with P. W. P. 65,000

________Total saving 234,700% Reduction 78 %

• Life Cycle Cost Results

Project Annual Amount

Original 36,048

Proposed 4,814

TOTAL SAVING 31,234

REDUCTION % 87 %

Page 19: Potable Water For Villa Complex

VALUE STUDY SUMMARY

The original design can be very well accomplished without jeopardizing basic or secondary function by install new RO units using water from well.

The selected proposed method “Annual Contract with potable water provider” will:

• Improve the safety • Eliminate or minimize the use of electricity and handling hazardous

chemicals. • Reduces the manpower required• Eliminate installing draining facilities as there is no rejected water• Reduce the consumption of spare parts and less maintenance.• Save money (total cost and LCC)

The proposed idea will meet the basic requirement and will cost mush less. The changes needed to implement the new proposal is a very minor engineering work.

Page 20: Potable Water For Villa Complex

IMPLEMENTATION PHASEHow should it be implemented? The proposed case will be negotiated with local potable water providers and

then the best offer shall be selected. The local providers normally transport the sweet water by using big trucks in weekly basis.

What should be changed and in what sequence? No major modification work is required. Just prepare the road to the storage

tank

Who should do it? The selected local potable water provider will take care.

How long should it take to start? Any deadline? Negotiation and selection take 20 days. Deadline: before the end of construction work of the Villas. Implementation cost, internal hours? 15 man hours. Total cost SR 300.

Page 21: Potable Water For Villa Complex

Thank you