pos phase 2

1
83 2.5 x 45 m visibility splay (both ways) Discharge point 6m r 6m r 6 m 15 m 4.8 m w 5.5 m w SUDS Parking Court LA Shared drive Parking Court Shared surface rd Footpath link POS POS DG 53 5 62 Ex Ex Ex Ex Ba Di Di La La Ha Ma In La Ca Ca Ga 1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 18 20 19 24 25 21 22 23 38 26 32 34 33 35 37 36 52 48 51 50 49 46 60 47 59 61 58 56 57 54 55 86 87 80 82 88 81 90 79 76 77 78 67 71 68 69 70 66 65 73 72 75 74 84 Ca Ha Ca Ke POS La Ha Ca Ga Fa Fa Ke 10 Ga Ke Ha Fa Ke Ha Ex Ex Ca Ca Ex MH Landscape Buffer Landscape Buffer SUDS SUDS 28 27 40 29 30 31 39 41 44 42 45 63 89 43 64 Ke Ca Ga 84 La La Ke Ba Ba Di Terrace A Terrace B Terrace C Ca Ca Ca In 12.5 r 12.5 r In Ma Di Ba 8 9 7 6 5 Ma Ga Ke Ma Ke Ga Ba Di Cp 44 Ke Fa Fa Ke In In Ke Fa Vp Vp Ha Ga Ba Ba Ba Ba Al Al Al Ab Ab 85 86 88 87 Vp Vp Fa Ha In Ke Ha 64 POS Reverse & turn LA Shared drive LA Shared drive Private Shared drive Vp Vp Turn Vp Ha Ma In Vp Vp Shared surface rd Shared surface rd Shared surface rd Shared surface rd Ga Ca Ke La Ma La Ma Al Al In Ha Ma Ke Fa In Ma Ha Ca Ca Ke 92 91 97 96 95 94 93 101 102 103 104 106 107 98 99 100 105 110 109 108 SUDS 2.4 x 45m vis splay PHASE 2 New crossing point 85 project title: drawing title: issue stage: date: drawn: scale @ A1: revision: drawing number: MANNINGELLIOTT P A R T N E R S H I P Chartered Architects & Designers Manelli House, Suite 1 Cowper Road, Penrith Cumbria CA11 9BN t: 01768 868 800 e: [email protected] w: manning-elliott.co.uk © COPYRIGHT MANNING ELLIOTT PARTNERSHIP 2021. THIS DRAWING IS THE PROPERTY OF MANNING ELLIOTT PARTNERSHIP. IT MUST NOT BE COPIED OR REPRODUCED OR DIVULGED TO ANYONE WITHOUT PERMISSION. DO NOT SCALE OFF THIS DRAWING. ANY DISCREPANCIES TO BE REPORTED TO MANNING ELLIOTT PARTNERSHIP. REVISIONS: Proposed Housing Development Land at Harras Dyke Farm Whitehaven Phase 1 Site Boundaries Site Layout Plan as Proposed PLANNING ISSUE MAY 21 MH/CS 1:500 1931-PL220 - 0 10 20 100 50

Upload: others

Post on 01-Mar-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

83

2.5 x 45 m visibility splay (both ways)

Discharge point

6m r

6m r

6 m

15 m

4.8 m w

5.5 m w

SUDS

Park

ing C

ourt

LA Shared drive

Parking Court

Shared surface rd

Footpath link

POS

POS

DG

53

5

62

Ex

Ex

Ex

Ex

Ba

Di

Di

La

La

Ha

Ma

In

La

Ca

Ca

Ga

1

2

3

4

6

7

8

9

10

11

12

13

14

15

16

17

18

20

19

24

25

21 22

23

38

26

3234

33

35

37

36

52

48

51

50

49

46

60

47

59

61

58

56

57

54

55

86

87

80

82

88

81

90

79

76

77

78

67

71

68

69

70

66 65

73

72

75

74

84

Ca

Ha

Ca

Ke

POS

La

Ha

Ca

Ga

Fa

Fa

Ke

10

Ga

Ke

Ha

Fa

Ke

Ha

Ex

Ex

Ca

Ca

Ex

MH Landscape BufferLandscape Buffer

SUDS

SUDS

2827

40

29

30

31

39

41

44

42

45

63

89

43

64

Ke

Ca

Ga

84

La

La

Ke

Ba

Ba

Di Terra

ce A

Terrace B

Terra

ce C

Ca

Ca

Ca

In

12.5 r 12.5 r

In

Ma

Di

Ba

8

9

7

6

5

Ma

Ga

Ke

Ma

Ke

Ga

Ba

Di

Cp44

Ke

Fa

Fa

Ke

In

In

Ke

Fa

Vp

Vp

Ha

Ga

Ba

Ba

Ba

Ba

Al

Al

Al

Ab

Ab

85

86

88

87

Vp

Vp

Fa

Ha

In

Ke

Ha

64

POS

Reverse & turn

LA Shared drive

LA S

hared drive

Private Shared drive

Vp

Vp

TurnVp

Ha

Ma

In

Vp

Vp

Shared surface rd

Shared surface rd

Shared surface rd

Shared surface rd

Ga

Ca

Ke

LaMa

La

Ma

Al

Al

In HaMa

Ke

Fa

In

Ma

Ha

CaCa

Ke

9291

97

96

95 94

93

101

102

103

104

106107

98 99 100

105

110109108

SUDS

2.4 x 45mvis splay

PHASE2

New crossing point

85

project title:

drawing title:

issue stage:

date: drawn: scale @ A1:

revision:drawing number:

MANNINGELLIOTTP A R T N E R S H I P

Chartered Architects &Designers

Manelli House, Suite 1Cowper Road, PenrithCumbria CA11 9BN

t: 01768 868 800e: [email protected]: manning-elliott.co.uk

© COPYRIGHT MANNING ELLIOTT PARTNERSHIP 2021.

THIS DRAWING IS THE PROPERTY OF MANNING ELLIOTT PARTNERSHIP.IT MUST NOT BE COPIED OR REPRODUCED OR DIVULGEDTO ANYONE WITHOUT PERMISSION.

DO NOT SCALE OFF THIS DRAWING. ANY DISCREPANCIES TO BEREPORTED TO MANNING ELLIOTT PARTNERSHIP.

REVISIONS:

Proposed Housing DevelopmentLand at Harras Dyke FarmWhitehavenPhase 1 Site Boundaries

Site Layout Plan as Proposed

PLANNING ISSUE

MAY 21 MH/CS 1:500

1931-PL220 -0 10 20 10050

AutoCAD SHX Text
Approx position/No safe access
AutoCAD SHX Text
Approx position/No safe access
AutoCAD SHX Text
Approx position/No safe access