portfolio gniewosz plucinski
DESCRIPTION
Project I have worked on.TRANSCRIPT
DG7
WG1
DG
1
WG2
WG
3
DG 9DG3 DG4
DG
6
DG5
DG11
DG
2
WG4 WG5
DG 10
DG8
TV
K
TV
KB
W
F
P
P
P
P
P
P
P
P
P
P
P
P
P
400
2,60
0
1,585552 1,922 440
1,022 552
676
450
1,21
8
1,498
1,43
6
1,26
5
1,400
1,79
5
300
1,00
0
2,100
900
1,227 1,135 1,227 1,135 1,565 1,135
4,31
5
8,432
2,915 568
6672,7102,240
9,76
7
339
327
440
max
2m
460
450
min. 300mm1,02
233
75,
052
2,01
52,
700
3,36
2
low levelradiator
Soundblockfire wall toundersideof stair.
Service zone tofull length ofparty wall.
CO positionedto manufacturer'sinstructions
Isolator forfuture shower
Shaver point
50mm service zone behindboiler for pipework
Boxing outof pipework
Door chimesat door head
height
For fence positionsee dwg no. P/06
Service zoneto party wall
RWP
Bedroom 2
Bedroom 1
FDS30
FDS30
75mm acousticquilt to allbathroom walls.
FDS30
Brick dimensions
Storage.
22
2 2
Brick dimensions
SD
Brick dimensions
P1P2
22
P2
P4
2
Refer todetail 19
GMEM
P5
GP GP
P1 EM GMBT
BT
RWP
Refer todetail 19
DW
or TD
DB
RWPSVP
SD1.2x1.2 platt
1.8x1.2 platt
RWP
Bric
k di
men
sion
s
DF5DF9
DF6D
F7D
F1
DF8 DF3 DF2
WF1
WF4
WF3
WF5WF6
DF10
WF2
DF4
W
TV
F
P
P
P
P
P
P
P
P
P
P
P
P
P
3,36
2
2,715
3,013
440 1,922 553 676 1,585 2,690
562
2,70
0
4,05
055
391
055
290
01,
135
50
1,89
5
1,135 1,227 1,135 1,2271,008 1,135 1,565
2,60
0
600
2,100
1,00
0min. 300mm
Service zone tofull length of
party wall.
Second bedroomwindow to southelevation only
Box inpipework
Service zone tofull length ofparty wall.
CO positionedto manufacturer'sinstructions
Isolator forfuture shower
50mm service zone behindboiler for pipework
Bedroom 1
Bedroom 2
RWP
SVP
Attichatch
RWP
PSVPSV
FDS30
FDS30
FDS30
75mm acousticquilt to allbathroom walls.
FDS30
P1DB P4
DW
or TD
Door bellchimes athigh level
GP GP
SD
DALLMAN JOHNSTONEARCHITECTUREPROJECT MANAGEMENTREGENERATION
Cottage flats plan - Ground Floor
Cottage flats plan - Upper Floor
FORT STREETMOTHERWELL
CAIRN HOUSINGASSOCIATION
DF3
DF5
WF3 WF4
DF2
WF2
WF1
DF7
DF6
DF4
DF8
P
P
P
P
P
P
P
P
2,934
2,663
1,190
1,585
3,1457821,002 1,360
1,135 1,453 1,1351,452
2,245450
3,29
8
1,30
54,
097
3,39
7
3,99
0
2,481
1,46
3
1,30
0
893
3,037
50
792
Shaverpoint
Sunpipe Sunpipe
Tiled shelf
75mm acoustic quiltto all bathroompartition walls
75mm acousticquilt to bedroompartition walls
FutureStair liftprovision
Intermediateswitch
Isolater forbathroomshower
Box outpipework
Bedroom 3
Bedroom 1
Bedroom 2
3
Bedroom 2
Attichatch
PSV
Attichatch
PSVPSV
PSV
SVPRWP
3
3
PSV
Brick sizing dimensions
Brick sizing dimensions
SD
Refer todetail 19
Refer todetail 19
DF1
WG3
DG4
DG
8
DG5
WG4
DG 2
WG
2
WG1
DG1
WG6DG6
WG
5
X
DG
7
DG
3
N
W
F
TD
P
P
P
P
P
TV
P
P
P
P
TV
P
P
DB
400
3001,40
1
770
252
778
400
1,810 685890 1,022 557440
1,60
3
1,009
3,037 3,145
4,15
2
1,523
1,20
01,022 445
1,452 1,360 2,128 1,022
6,182 overall size
659
4,299
4,13
1
1,85
1m
in. 3
00m
m
1,000
Provision forfuture stair lift
75mm acoustic quiltto wc partition wall 75mm acoustic quilt
to wc partition wall
MK gridplus metalclad front
plate
Door chimes atdoor head height
Service zone to innerleaf of external kitchenwall to accommodateservices. Extends to50mm behind boiler
Gas connectionfor cooker
CO positionedto manufacturer'sinstructions
For fence positionsee dwg no. P/06
2
2
PSV
2
22
3
SVP
2
2
STORAGE STORAGE
2
32
2
2 2
Brick sizing dimensions
PSV
Brick sizing dimensions
DWP1P2
P2
All pipework to beenclosed and not toperforate externalwalls or party walls.No perforationsof any kind throughparty walls.
GM
Refer todetail 19
P5
EM
Refer todetail 19,26 and 40
RWP
RE
RE
RE
Refer todetail 26
RE
D.I.C.D.I.C.immediately
inside curtilage
RE
RE
SVP
BT
SD
PSV
DALLMAN JOHNSTONEARCHITECTUREPROJECT MANAGEMENT
FORT STREETMOTHERWELL
Typical house plan - Ground Floor
Typical house plan - Upper Floor
CAIRN HOUSINGASSOCIATION
REGENERATION
The Studio, 24 New Kirk Road Bearsden Cross Glasgow G61 3SLT: 0141 942 3025 W: dallmanjohnstone.co.ukE: [email protected]: 0141 942 8777
F
F D:2
0D
:21
D:31
W:1
3W
:25
W:1
5D
:30
D:1
6
D:1
2
D:1
7
W:15
W:20
Sill 90090
01,
500
W:17 W:18 W:19W:16
W:04W:06 W:05W:07
D:0
2D
:01
D:2
6
W:2
1W
:03
W:10 W:09 W:08W:11 D:28
D:03
D:08 D:07 D:06 D:05 D:04
D:1
4
W:1
2
D:19
D:1
1
W:0
1W
:02
D:1
8
D:2
4D
:23
D:2
2
D:09
D:3
4
D:25
D:15D:13
D:10
TV
TV
15L/s
15L/s
60L/s15L/s
60L/s
144
1,0134,
950
4,73
5
1,14
7
3,00
0
1,23
5
3,4563,456
2,265 910 1,565 910 3,815 910 1,565 910 3,815 910 1,590 860 2,127
1,79
068
52,
475
910
2,91
5
min. 2000mm
4,83
7
1,01
2
2,57
868
52,
240
910
1,45
391
01,
452
1,02
21,
115
910
3,36
5
552
1,47
357
378
067
278
02,
023
2,000
1,13
5
4,70
0
1,615
1,56
0
2,430
1,27
2
4,6755,2535,695
857
2,070 1,11
5
990
4,88
5
1,34
0
1,09
5
6,85
3
866
794
300
694
694
694
300
1,500
1,50
0
1,955
1,79
61,
500
1,50
0
173
173
896
173
6,21
1
1733,430
1733,426
1733,426
1733,437
173
1,000 400 600
600 1,000 400
1,6001,600
1,84
060
0
700 600
1,84
0
600
1,84
0
800
1,60
0
7001,600
700
1,60
0
800
800
1,84
060
0
800
1,60
0
7001,600
600
1,84
0
1,600
1,84
060
0
1,600700
2.30 m22.83 m2
10.87 m2
14.87 m2
Dadotrunking
Dadotrunking
Dadotrunking
Dadotrunking
StorageSpace
18
9
10
11
27
28
29 30
2
3
2324
25
26
363534333231
E
E E
E E
E
FDS30 FDS30FDS30FDS30 FDS30
FDS30
FDS30
FDS30
FDS
30
FDS30
FDS
30
EX
IT
Area for future Extension116.30m2
(shown hatched)
34%
FDS30
18192122 20 17 16 15 14 13 12
6 7
37 38
4 5
EX
IT
FES
.
FES
.
D:2
7
MJ
MJ
MJMJ
MJ
MJ
MJ
MJ
52.47
52.54
F.F.L. 52.825
52.55
52.48
52.825
52.51
52.55
52.55
MJ
FDS
30
FDS30
Boiler roomShower room
Storage
(suspended ceiling)
2 R. @ 110 mm
1 T. @ 350 mm
MJ MJ
MJ
MJMJ
52.55 52.55
52.5552.55
D/04D/04
1800mmturning circle
1800mmturning circle
866 866 866 866
866
866
866
866
866
866
FDS
30
866
800
844
FES.
FES
.
FES
.
Position ofCWS above.
E
E
E
E
E
E
Consultants Room 1 Consultants Room 2 Consultants Room 3 Consultants Room 5Treatment Room
Disabled toilet
Disabled toilet
ManagerAdministration
comm
Staff Room
Cleaner's
StorageMeeting Room
waiting area 36 persons
Consultants Room 3
Storage
Circulation
Female T.
Male toilet
- Through careful planning circulation reduced to 12.5% (32% allowed) this allowed more space for working at records A and also a spacious meeting room B within the overall area allowed by the Health Board.
What the doctors need:- Healthy building- Low maintenance- Flexible for future change- Sustainable- Energy efficient- A functional building- Good working environment- Safe for staff & patients
What the patients need:- Easy orientation- Provision of privacy & dignity- Comfortable environment- Natural light- Calm building- Healthy materials
1 2
3
4 5
1
2
3
4
5
AllanderSurgery
ARCHITECT:Dallman Johnstone Architects
STRUCTURAL ENGINEER:Roy Easton & Company
QUANTITY SURVEYOR:Doig & Smith
CONTRACTOR:David H Allan
What does the Health Board Need:- A building that promotes good health not dis-ease- Good value for money- Low maintenance- Flexible enough to allow for change- Sustainable- Energy efficient which allows for cost savings year after year
futu
re e
xpan
sion
We can walk you through the spacewith a 3600 3D image.
doctors public staff
B
A
min
. 150
mm
Protan sealantProtan termination bar
Fastener withweatherproof washer
Protan membrane
40mm weld
Protan membraneProtan cord
Protan restraint bar & fastenerProtan cover strip
Protan vapour control layer
10mm plywood
50mm Kingspan TR21LPC/FM or Quinntherm QF
40mm weld
Protan membrane
40mm weld
Protan restraint bar & fastener
Protan cover strip40mm weld
Protan fleece
200mm rafters
150mm Kingspan K7 or Quinntherm QW
12.5mm plasterboard
timber joists, heights vary to form water fall
150mm rafter ties
10mm plywood
Gutters temporary removed for access
Tyvek sarking membrane
325mm strip of BS8747 Type 5U or equivalentUV durable underlay dressed into gutter
Marley ludlow major eaves clip
Marley Eternit 25mm over fascia strip ventilator
Marley Eternit felt support tray
Marley Eternit continuous rafer roll
Tilting fillet
18mm sarking board
F
W
Fz
DW
RE
TV
TV
TV
RE
F/Fz
SD
SD
RE15
0
150
900
±0.000
-0.300 -0.540
-0.300
-0.440-0.300A
A
AA
BB
door removed openingwidened, new glazed doors
wall infilled
window infilled & new door
wall removed
new rooflights
new rooflight
Door re-hung
new gas fire & vent throughfloor-min.10cm2 air vent size
tap repositioned
existing drainage pipescut below floor & sealed
assumed line ofexisting drainage
existing fire place opened
existing lathe & plaster removednew insulation & plasterboardfitted, see spec. point 4.2.
gas meter
new fanlight
existing stone retainedbelow worktop height
underfloor ventilation duct
under wall units lights
window removed wall infilled withstone & lime mortar to match existing
TV & power pointeye level mounted
extractor fan placedat min.1,7m height
telescopic air brick ventilators 215x65mm
50mm insulated doorwith 10mm ply facing& draught sealed
Cill to be fixed
pipe chase
new partitions
folding sliding doors see spec 10.1.
Existing hearth
telescopic air brickventilator 215x65mm
Sun room
Garage
wc
Utility
Study/bedroom 3
Kitchen
SVP
RWP
WP
activityspace
800x1100
GM
WP
new floorhatch
existingfloorhatch
removed
speaker point (ceiling height)
speaker point (floor level)
one way switch
two way switch
dimmer switch
light fittingAll new fixed light fittings installed to below energy type. Internal Kosnic 4WLED GU10 lights. 4000K Cool white.
light fitting with move detector
light wall fittinglow level double socketwith high level switch
high level double socket
pop-up 3 point power point
telephone point
TV point
rodding eye
ventilation extract fan
smoke detector
sub floor access below doors
Aga cooker mains supplyconnect point with highlevel switched fuse
RE
Broomcupboard
PIR
PIR
3x100x250
V
V
VVV
V
V
RWP
RE
existing walls removed
V
V
V
V
150
door removed, wall infilled
new walls
wall infilled
non combustible hearth min.125mm thick concrete slab
AGA Total Control complywith AGA installation guide
Gou
nd le
vel t
o be
low
ered
by
150m
m &
gra
velle
d
150
see spec. par. 6.
see spec. par. 4.
see spec. p. 3.10.
see spec. p. 3.15.
new concrete foundation
See spec. par. 6.
Single ply membranegutter & 150mm upstand
telescopic air vent
insulated wallsee spec. p.4.6.
new fanlight
timber finish
Insulated door& draught seals
see spec. p. 6.15.
UtilitySunroom Garage
House Extension, Bearsden DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN
Gniewosz Plucinski Private HousesBefore
After - visualization
Fz
RE
SVP
W
DW
V
V
F
V
V
D01
1,126
3,712
450 2,372 890
TO TURN OUT 3712
3,90
01,
180
TTO
797
1,67
891
04,
152
A62 A62
A63
existingconservatoryremoved
existing utility removed
walls removed
wall removed
new beams
existing svp removed
existing boundary
existing drainage extendedto new rodding eye
floor sockets
cupboardremoved
New rooflights
rooflights overkitchen worktops
vent grilleabove door
new boiler position
new study
hall
TV room
new sitting roomnew
diningnew kitchen
en-suite
newutility
O
newlarder
RWP
RWP
Sub floor ventilationextended by
100mm dia. duct
Sub floor ventilationextended by
100mm dia. duct
manouveringspace
manouvering space
Sub floor ventilationextended by
100mm dia. duct
Sub floor ventilationextended by
100mm dia. duct
Sub floor ventilationextended by
100mm dia. ductSub floor ventilation
extended by100mm dia. duct
Sub floor ventilationextended by
100mm dia. duct
Sub floor ventilationextended by
100mm dia. duct
brick sizes brick sizes
bric
k si
zes
activity space
O
PIR PIR
RWP
wall removed
SVP
AA
B
C C
150
14°
Refer to specificationparagraph 3.
Refer to specificationparagraph 5.
150mm lead upstand
Smooth red engineeringbullnose brick cill
Existing sub floor ventilationextended via new flat ductsthrough floating floor construction.
larder kitchen
House Extension, Bearsden DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN
Gniewosz Plucinski Private HousesBefore After
300
All new timber windows to achieve u-value of 1.8W/m2K
DPM linked to DPC
Existing door
Dwarf wall to hold beam endExisting foundation extended to incorporate dwarf wall 75mm Kingspan TF70
150mm Hardcore
75mm area for under floor heating
50mm sand blinding100mm concrete slabmin 150mm ventilated space
stone floor
beam and block floor system
Perp vents at 900ctr Floor brought to single level(existing loggia steps removed).
DPC
Break out floor to incorporatenew underfloor heating system
Code 5 lead flashing with min150mmupstand raggled into existing wall
20mm ply
tapered battens min of 50mm at low end to allow for ventilationmin 50mm ventilated space to be maintained throughout
100mm Kingspan TP10
Roof structure toengineer's recommendations
Lead (code 5) on geo textile layer to LSA's recommendations
DPC
Walls to bestrapped and lined
Lead (code 8)to gutter
New FFL to be170mm below existingliving room FFL
New plasterboard ceiling
Roof vent
Vapour control layer
Roof deck
Breather membrane
D02
D03
cavity barriers giving 30minute fire resistancewrapped in DPC
DPC
Vapour control LayerREFLEX vapour permeable membrane (with a vapourresistance of no more than0.25 MN. s/g)
Code 8 lead to gutterCode 5 lead to roof
200x75x23 PFC
220x75 timber beambolted back to steelwork
insect screen vent
25mm continuouseaves vent
Plasterboard ceiling
Painted ply panelled soffit.Primed prior to installation.
min overlap 75mm
220x47 C16 joist
Eternit grey cill 165mm
185 200
42
142
00
DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN
Gniewosz Plucinski Private Houses
Garden room, Bearsden
75
Vapour control Layer
150x50 timber
200x75x23 PFC
150x75 PFC
Code 8 lead to gutter
Plasterboard 12.5mm
insect screen vent
220x75 timber beambolted back to steelwork
Code 5 lead to roof
insect screen vent
25mm continuouseaves vent
Plasterboard ceiling
15mm painted ply panelled soffit.Primed prior to installation.
insect screen vent25mm vent
min overlap 75mm
Min overlap 75mm
Min overlap 75mm
220x47 C16 joist
195x50 timber
Fillets @ 400mm
20mm ply for painting.Primed prior to installation.
Direct glazing
Geotextile feltunderneath leadto LSA'srecommendations
Geotextile feltunderneath leadto LSA'srecommendations
Code 5 leadcladding
Code 5 leadcladding
185200
124142
00
Visualization
DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN
Gniewosz Plucinski Private Houses
Garden room, Clahan of Campsie
2,56
0
Granite setsbedded on mortar
Refer to Specification, paragraph 2.
Refer to Specification, Paragraph 5.
New timber trusses stained black
LV cable lighting
Refer to Specification, point 7.2.
Glazing to south gable
DPC injection
Wall re-built
Roughcast
Kingspan Nilvent Breathable sarking membrane.Horizontal lap between runs of breathablesarking membrane with 75mm wide doublesided acrylic adhesive tape.
Galvanized steel beam exposed
2x25mm Kingspan K7insulation inside steel beam1x25mm Kingspan K18 insulatedplasterboard to inside face of steel flanges
1x25mm Kingspan K18 insulatedplasterboard to inside face of steel columns
Before
After - visualization
F DWW
V
SD
SD
TV
V
350 350
350
350
350
150 300min.840
min
.840
150
1,00
0
6,150
3,10
0
350
new boiler
door removedwall infilled
electric meter &fusebox repositioned
door re-hung
walls removed
new beam
U-value 1.8 W/m2K
Phone socket removed& power points removed
Renew aerial
Power point removed
Stair ballustrade replaced
Existing stove & hearth repositioned. Hearth - min.125mm thick concrete slab.Non combustible solid decorative finish arround stove.New double wall flue - distance of min.25mm is required between flue inner walland any combustible material where flue penetrates roof & ceiling - see D01.Spillage test required to living/kitchen/dining after works completed by contractorto determine the internal/external pressure difference which caused spillage atvarious thermal outputs.The test to be carried out in accordance with BRE paper IP 7/94.
new beam, refer toengineer's drawing
RWP
RWP
RWP
RWP SVP
RWP
Bedroom
Bedroom
Bathroom Kitchen
Living room
Hall
Dining
Boiler
R
R
R
R
R
R
R
timber deck
WP
E
E
E
E
activ
ity s
pace
R
LED light fitting
LED wall light fitting
LED floor light fitting
1 gang 1 way switch
1 gang 2 way switch
low level double socket
high level double socket
extract fan
external lights on a solar controller time
clock with PIR & switchable over-ride
smoke detector
phone socket
TV point
outside tap
E
DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN
Gniewosz Plucinski Private Houses
House Extension, Strachur
Before
After - visualization
Min
.150
mm
Header joist
Brick tie Cullen B50/304SS with SS nails
Breather membrane/Tyvek Reflex
12mm Ply Sheathing
Skirting board
Seal
Bottom railLocator plate specified
Sole plate
12.5mm/60mmKooltherm K17
25mm air space
18mm floor decking
18mm ply decking
Floor joist
Netlon
DPM
perpend vent @ 900 crs
100 mm concrete slab
Periscope vent
110 mm KingspanThermafloor TF70
DPC
120mm TW55Kinspan Thermawall
Vapour control layer
200mm Mineral wool
Insect mesh to ventilationof timber cladding
9.5mm Ply Sheathing
DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN
Gniewosz Plucinski Private Houses
House Extension, Bearsden
WTD
L F
RE
RE
D03900
1,730
2,162 622 750 622 930
750
660
750
660
750
6,600
4,35
0
AA
E-02
E-0
8
E-0
9
Extract
Door moved
Wall removedNew steel beam
Ceramictiled floor
Ceramictiled floor
Ceramictiled floor
Durgo automaticair admittance valve
Boun
dary
line
New kitchen
New Garden Room
New utilityroom
New toilet
Existing living room
Existing hall
RWP
RWP
R
R
R
R
Ass
umed
line
of e
xist
ing
com
bine
d dr
aina
ge
Timber parquetflooring
Garagedemolished
TRAP
TRAP SVP
Sarnatherm 160mm
Flashing
Insulated rainwater\outlet
Sarnafill mechanicallyfastened
Sarnafill mechanicallyfastened
Rafters
Vapour control layer
Plywood
Kooltherm K7 75mm
Kooltherm K1820mm/12.5mm
D02
D08
D10D10
D/13
2,280
2m m
in he
adro
om
2,500
2,410
2,410
2,280
1,100
77.5mm K17 insulated plasterboard mechanically fixed.
72.5mm K17 insulatedplasterboard on dabs.
60 min FR ceilingRefer to detail D0760 min FR
partitions
60 min FR partition
60 min FR ceiling 30 min FR ceiling
Raised ties
Envirograf Intumescentnon - fibrous fire-stop60 mins blocks SIB1
60 min FR ceilingRefer to detail D08
2x100mm TW55 Kingspaninsulation on existing ties
See specificationparagraph 3.5.
30 min FR partition
Non combustiblesteel stair to bothflights.
Reopen vent to gable
Riser 167mmGoing 250mmPitch 33.8 deg.
All service perforations greater than 40mm through60min protected zone (floor or ceiling) to have 60mmfire protection with Promat Promoseal or equal andapproved.
Existing steelwork
2 layers of 12.5mm FireLine.60 mins fire resistant ceilingBritish Gypsum ref.: C106053Refer to detail D08
70mm Kingspan K7 insulationbetween existing rafters
70mm Kingspan K18 insulatedcore under rafters
50mm ventilation gap
120mm Kingspan TW55between existing studs
2x100mm KingspanTW55 insulation
See elevations forvent details
DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN
Gniewosz Plucinski Conservation
Church alterations, Stirling
Before
After - visualization
After - visualization
16
x 17
0 =
2.72
0 m
RE
D.I.C.
FESFES
V V
V
FES
SD
SD
SD
SD
SDSDSD
CO
FES
RE
RE
D01
D08D11
D18
6,000 6,000 6,000 6,000
15,7
40
24,740
12,2
50
2,500
675 910
1,790 3,835 2,240 3,835 2,240 3,835 1,115 3,835 440 910 665
1,115 910 2151,115 910 215
2,710 1,100
1,226
1,247 4,100 653 1,322 4,100 578 1,397 4,100 503 347 4,100 1,553
2,00
7
1,478
3,83
71,
920
1,91
81,
832
2,00
73,
292
7m to
ker
b
2,153
1m b
ench
14,9
40
1,50
01,
240
1,24
025
0
3,478 140 2,252
140
1,84
4
1,150
350
350 350350
220
80350 350 35035
0
300
900
350
1,41
51,
800
1,57
5
A
A12
Existing manhole
skylights
Mezzanine above
Incoming servicepop ups 4x150 o
Wheelchairplatform space
Future gas meter
Future door spaceFuture door space
Drain pop up
Future gas meter
Future gas meter
Refer to specificationparagraph 3.10.
Block partition
Bollards
Refer to specificationparagraph 3.
Future shower
Landlord's electricsupply
o100mm Spigot
New fence
Demolished building line Incoming servicepop ups 4x150 oIncoming service
pop ups 4x150 o
Air compressor
o100mmService ductair, electrics
YARD
RWP RWP
RWP RWP
Kitchen
block sizesblock sizes
block overall size
block sizes block sizes
SVP
FDS30
FDS30
steelwork sizes
exis
ting
drai
nage
/
1 2 3 4 5
A
B
C
D
1:8
1:8
1:8
1:8
New
fenc
e lin
e
Exi
stin
g bu
ildin
g de
mol
ishe
d60
0mm
thic
k ha
rdco
re
Existing ground turnedover & made good //
/
Male
Accessible/Female
Meterstore
GMGMGM GMD02
Gas meter
Wor
king
/Mai
nten
ance
Pit
from
"Pre
mie
r Pits
"ht
tp://
ww
w.p
rem
ierp
its.c
om/fu
ll_ra
nge.
php,
Tel
: 017
75 8
21 2
221,
4m d
eep
F.G.L. Varies F.G.L. Varies
DPC min 225mm above F.G.L.
Drip flashing
Kingspan KS1000 RW
100mm thick PIR board insulation used to fill gaps, if required.
DPM
Hardcore
50mm thermal insulationachieving λ-value of 0.023W/mK
50mm sand
200mm Concrete slab
DPM linked to DPCDPC min 225mm above F.G.L.
Alfas C foam seal
Internal closure flashing
Insulation
15mm Expansion joint
102
5010
014
0
134
100mm thermal insulationachieving λ-value of 0.021W/mK
50mm thermal insulationachieving λ-value of 0.021W/mK.Insulation fixed by mechanical fasteners
12.5mm plasterboard
expanding foam insulation
100mm thermal insulationachieving λ-value of 0.021W/mK
70mm thermal insulationachieving λ-value of 0.021W/mK
50mm thermal insulationachieving λ-value of 0.021W/mK
Door Rail
2mm Polyester Powdercoated steel ingo
DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN
Gniewosz Plucinski Industrial
Garage workshops, Glasgow
E5
E7
29.77 m2
5.29 m23.40 m2
26.42 m2
13.03 m2
28.30 m2
EN-SUITE
DINING/KITCHEN
UTILITY
LIVING ROOM
BEDROOM 1
HALL
TOILETUNHEATEDBUFFER ZONE
Surface waterdrainage to loch
4.27 m2
6,50
0
3,500
DALLMAN JOHNSTONEARCHITECTURE PROJECT MANAGEMENT INTERIOR DESIGN
Gniewosz Plucinski Conceptions
Innerleithen Bike Park
Low energy house, St Catherine's
BEDROOM 3
BEDROOM 1 EN-SUITEUNHEATEDBUFFERSPACE