pont oresund
TRANSCRIPT
DIJOUX Sandrine / PAYET Emmanuelle / SELAMBAYE Jessica
ORESUND BRIDGEORESUND BRIDGE
DIJOUX Sandrine
SELAMBAYE Jessica
PAYET Emmanuelle
HistoryThe bridge
The railway and the tunnel
ConclusionWebography
Denmark
Sweden
Oresund Strait
MalmoCopenhagen
16 kilometers
3,510 meter
4,055 meter
Peberholm
7,845 meters
1
2
3
17/7/95Contract tunnel & contract the artificial island
6/1/99The 20th and final tunnel element is
placed in the tunnel trench
27/11/95Øresundskonsort
iet signs a contract
16/7/97Svanen
9-12/6/2 000thousands of people who
walked, cycled or roller
1/7/2 004Oresund Bridge
Birthday’s
1/4/2002236,651
vehicles cross the bridge
29/6/2001biological
environmental demands
1/7/2 000The inauguration of the Oresund
Bridge
12/6/2 00080,000
participants/ half marathon
Suspension bridge
Main cable CablesDeck
Cable-stayed bridge, fan design
Cable-stayed bridge, harp design
Parallel system
(or harp system)
Various point on the tower
equal number on both sides
Total lenght: 7 845 m
Suspended lenght: 1 092 m
Longest span: 490 m
Total lenght: 7 845 M
Width: 23.5 m,for 4 lanes of traffic
Suspended lenght: 1 092 m
Longest span: 490 m
Total lenght: 7 845 M
Clearance below: 57 m
Pylon height: 203.5 m
Width: 23.5 m
Suspended lenght: 1 092 m
Longest span: 490 m
Total lenght: 7 845 M
vibrator
concrete
skip
frames
pipe driver
trepan
probe
Matériaux utilisés et quantités
Fabrication on-shore and transportation to the bridge line Main piers: construction insitu
80 meters
80 meters
20 meters15 meters
30 meters
9 500 N
Bridge deck section
The rail section is double track standard gauge (1435 mm) and capable of high-speeds
exceeding 200 km/h.
The island is approximately four kilometres long,
and connects the bridge and tunnel of the Øresund link
10m
38,8m
8,6m
Built: 1993 - 2000
Structural Type: Immersed
tube tunnel
Function / usage:
Railroad tunnel
Road tunnel
length of immersed tube tunnel section 3 510 m
number of tunnel units 20
tunnel unit weight 57 500 t
Quantities used in construction
concrete volume 660 000 m3
reinforcing steel 20 000 t
Heavy water-proof bulk heads
The precast reinforced concrete units were 8m high, 40m wide and 175m long and they weighed 55,000 metric tons.
Dock
The units floating in the flooded dry dock at Oresund,
prior to being towed out.
Precast reinforced concrete units
The units under tow on their way to their final placing.
The precast reinforced concrete units
The unit suspended over the dredged trench with the tugs holding the unit in position, ready for lowering to the sea bed.
www.wikipedia.frwww.technologystudent.com
www.howeweb-talktalk.comosb.oeresundsbron.dk
bridgepros.com
earthobservatory.nasa.goven.structurae.de