pomona usd plans for improvement - hmc...

6
schoolnews Pomona USD Plans for Improvement By: Dr. Thelma Melendez, Superintendent, Pomona USD (back row, fourth from left), 2008-09 Superintendent of the Year; and Dr. Glenn Massengale, HMC Architects President Barack Obama (top center) visits Pomona Unified School District’s Village Academy High School students Photo courtesy of: Kim Washburn of VMA Communications Spring/Summer 2009 T he Pomona Unified School District, like all school districts in California, is facing so many issues it’s hard to know where to begin. The District has been declining in enrollment for the past several years. The District itself, and many individual schools within the district, are identi- fied for program improvement. The District is experiencing public rela- tions issues related to campus safety, quality of instruction, and internal and external communication. Financial resources are shrinking while ex- penses are increasing. And the cam- puses themselves are aged and need repair. So, what’s so unusual about these conditions? Nothing: what is unusual is the approach to remedy them. Pomona USD has decided to consolidate the issues under a single framework and address every concern as part of a coordinated effort. The framework is aptly titled, “Master Framework to Manage, Maintain, and Program District Facilities.” Isn’t this just a fancy name for conduct- ing a facilities master plan? Actually, no—what is unique about the Pomona framework is that the facilities master plan is being used to develop and implement a complete school reform package. Although one of the primary purposes of the effort is to improve the condition and relevancy of the facilities, the planning process engages a variety of stakeholders in discussions about in- structional quality and curriculum needs; community perception and engage- ment; equity of resources; community, business, and higher education partner- ships; enrollment loss and competitive standards of performance; finances and other resources; and organizational and operational models for success. The approach itself ultimately proposes to focus resources on a consolidated effort for comprehensive school and District improvement. Advisory and high school cluster com- mittee workshops and community dialogues were held during the spring of 2008. An electronic staff survey was conducted in May 2008. As a result of these various forums, data regarding the critical issues of the District was collected, analyzed, and presented to the Governing Board in the summer of 2008. Final recommendations were presented to the District prior to its successful $235 million general obliga- tion bond election in November 2008. Pomona USD engaged HMC Architects in 2007 to begin the development of this framework. Continued on page 3 Inside: 2 Portable to Permanent— Transforming a High School 5 HMC Cost Exchange 6 Partners Seeking Solutions post consumer recycled fiber

Upload: others

Post on 20-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pomona USD Plans for Improvement - HMC Architectshmcarchitects.com/assets/ideas/markets/pre_k_12/... · 7. Provide quality facilities that support quality programs 8. Provide school

schoolnews

Pomona USD Plans for ImprovementBy: Dr. Thelma Melendez, Superintendent, Pomona USD (back row, fourth from left),

2008-09 Superintendent of the Year; and Dr. Glenn Massengale, HMC Architects

President Barack Obama (top center) visits Pomona Unified School District’s Village Academy High School students

Photo courtesy of: Kim Washburn of VMA Communications Spring/Summer 2009

The Pomona Unified School

District, like all school districts in

California, is facing so many issues

it’s hard to know where to begin.

The District has been declining in

enrollment for the past several years.

The District itself, and many individual

schools within the district, are identi-

fied for program improvement. The

District is experiencing public rela-

tions issues related to campus safety,

quality of instruction, and internal and

external communication. Financial

resources are shrinking while ex-

penses are increasing. And the cam-

puses themselves are aged and need

repair. So, what’s so unusual about

these conditions? Nothing: what is

unusual is the approach to remedy

them. Pomona USD has decided

to consolidate the issues under a

single framework and address every

concern as part of a coordinated effort.

The framework is aptly titled, “Master

Framework to Manage, Maintain, and

Program District Facilities.”

Isn’t this just a fancy name for conduct-

ing a facilities master plan? Actually,

no—what is unique about the Pomona

framework is that the facilities master

plan is being used to develop and

implement a complete school reform

package. Although one of the primary

purposes of the effort is to improve the

condition and relevancy of the facilities,

the planning process engages a variety

of stakeholders in discussions about in-

structional quality and curriculum needs;

community perception and engage-

ment; equity of resources; community,

business, and higher education partner-

ships; enrollment loss and competitive

standards of performance; finances and

other resources; and organizational and

operational models for success. The

approach itself ultimately proposes

to focus resources on a consolidated

effort for comprehensive school and

District improvement.

Advisory and high school cluster com-

mittee workshops and community

dialogues were held during the spring

of 2008. An electronic staff survey was

conducted in May 2008. As a result of

these various forums, data regarding

the critical issues of the District was

collected, analyzed, and presented to

the Governing Board in the summer

of 2008. Final recommendations were

presented to the District prior to its

successful $235 million general obliga-

tion bond election in November 2008.

Pomona USD engaged HMC

Architects in 2007 to begin the

development of this framework.

Continued on page 3

Inside:2 Portable to Permanent—

Transforming a High School

5 HMC Cost Exchange

6 Partners Seeking Solutions

post consumer recycled fiber

Page 2: Pomona USD Plans for Improvement - HMC Architectshmcarchitects.com/assets/ideas/markets/pre_k_12/... · 7. Provide quality facilities that support quality programs 8. Provide school

Portable to Permanent–Transforming a High School By: Don Lussier, Coordinator Facilities Division, Corona-Norco USD; Kevin Wilkeson

and Steve Wilkerson, Principals, HMC Irvine; and Gilbert Baez, Project Manager, HMC Irvine

The Corona-Norco Unified

School District is currently

utilizing the Overcrowding Relief

Grant (ORG) to replace portables

with permanent construction at

Centennial High School.

The campus is 20 years old with

more than 50 portable buildings

added in previous years. The

campus was

originally

designed

for roughly

1,800

students

but currently

serves almost 3,000 on a site just

shy of 40 acres. The new expansion

project includes removing 42 single-

story portables within the central

area and replacing them with a new

classroom building, multipurpose

building, and large outdoor quad.

The two-story, 40,000-SF classroom

building will house 26 standard

classrooms and a special education

component as well as a graphics

classroom partially funded through a

Career Technical Education grant. The

new 15,000-SF multipurpose building

will serve as an auxiliary gymnasium

as well as a place for students to

dine during inclement weather. Both

buildings were designed to CHPS

criteria, and both were recently DSA

approved. The expansive 75,000-SF

quad will provide the students a place

to gather, enhancing the sense of

campus community.

The Portable to Permanent Program

is an ideal avenue for the District to

convert this school from a dense

facility into a revitalized campus

with a new image. The project is

currently entering the second of

four phases: interim housing has

been constructed, and students

have moved into this temporary

location. The classroom and

multipurpose buildings will begin

construction in summer 2009,

followed by two later phases that

include the new administration

building, theater, and an additional

classroom building. The additions

and improvements will give the

campus an entirely new look and

feel and provide an effective and

dynamic learning environment that

supports education and academic

success. These changes will

transform Centennial High School

into an efficient, inviting facility that

supports the District’s goals of

learning and student achievement

well into the future.

For more information contact

Don Lussier at:

[email protected]

www.hmcarchitects.com

Central Valley1827 E. Fir Avenue, Suite 103Fresno, CA 93720559.268.0228

Imperial Valley619 Paulin Avenue, Suite 106Calexico, CA 92231760.768.5200

Irvine2601 Main Street, Suite 100Irvine, CA 92614949.567.1833

Las Vegas770 E. Warm Springs Road, Suite 120Las Vegas, NV 89119702.315.4203

Ontario3546 Concours StreetOntario, CA 91764909.989.9979

Los Angeles633 W. 5th Street, Third FloorLos Angeles, CA 90071213.542.8300

Reno50 W. Liberty Street, Suite 800Reno, NV 89501775.322.9475

Sacramento300 Capitol Mall, Suite 1230Sacramento, CA 95814916.325.1100

San Diego1010 Second AvenueStudio 810, West TowerSan Diego, CA 92101619.744.4077

San Jose1570 The Alameda, Suite 330San Jose, CA 95126408.977.9160

Advocates for Labor Compliance1906 S. Commercenter East, Ste. 211San Bernardino, CA 92408909.890.2220

School Advisors3546 Concours StreetOntario, CA 91764909.945.6890 2

“This design will meet the diverse educational needs of

our students in a 21st-Century way.”

Samuel Buenrostro, Principal, Centennial High School

L-R: Gilbert Baez, Principal

Buenrostro, and Don Lussier

Page 3: Pomona USD Plans for Improvement - HMC Architectshmcarchitects.com/assets/ideas/markets/pre_k_12/... · 7. Provide quality facilities that support quality programs 8. Provide school

www.hmcarchitects.com

GoverningBoard

Governing Board

Reinvigoration ProcessPomona Unified School District

Cluster Group Input

parentsstaff

administration

CommunityInput

community leadersindustry partnershigher education

parents

AdvisoryCommittee

schooldistrict

community

Facilitators

Pomona USD Plans for Improvement

3

Key areas of work and deliverables

for the project included:

• Conducting numerous meet-

ings and workshops with the

Governing Board, District staff,

staff from school sites, parents,

and members of the community

• Developing enrollment

projections, capacity studies,

and site analyses

• Organizing high school cluster

groups and conducting work-

shops to assess critical needs

• Developing an inventory and

feasibility study of available

unused properties

• Forming a district-wide

advisory committee and

conducting workshops to

assess critical needs

• Assisting a community outreach

consultant to conduct relevant

community dialogues

• Creating a re-invigoration

process to review the District’s

core premises

• Developing options for school

configuration and program

development

• Recommending school

reconfigurations and school

specializations

• Developing funding options

and strategies

Continued from page 1 The broad scope of the study

encouraged a thorough,

comprehensive examination of the

District’s operations and allowed

for a wide range of options to ad-

dress the identified critical issues.

Additionally, the inclusive nature of

the planning process itself served

as a model for improving commu-

nication internal and external to the

District. The protocols used for the

collection of information, analysis of

data, and development and review

of options were developed into a

model for the District to use in a

re-invigoration process perpetually.

So, in effect, this framework for

conducting a review for facilities be-

came the prototypical process for a

comprehensive review process and

served as the mechanism through

which an entire school reform

package could be implemented.

The final framework report was

delivered to District leadership in

March 2009. As part of the re-

port, key reform elements were

identified as recommendations to

the Governing Board and District

administration.

The recommendations were to:

1. Create coordination and

collaboration of resources among

schools and the community

2. Provide safety and security for

students, staff, and visitors

3. Provide parents and students

choices in curricular offerings

and types of schools

4. Achieve consistency in grade

level configurations and sizes of

schools

5. Achieve curriculum articulation

and provide career pathways

6. Stabilize student enrollment

7. Provide quality facilities that

support quality programs

8. Provide school campuses with

“curb appeal”

Each of the recommendations

was supported by detail to create

an implementation strategy for

each goal.

Specific strategies included the

reconfiguration of some school

sites within each cluster.

Developing K-8, K-12 and 7-12

specialized schools were cited

as specific strategies to accom-

plish parent/student choice while

creating signature programs and

career pathways through schools

in each cluster. Implementing

a comprehensive maintenance

program was a specific strategy

for improving the curb appeal

of each campus, making the

campuses secure and safe and

improving the perception of the

schools in the community.

The noted educational writer

and teacher, Michael Fullan,

reminded us that “problems are

our friends.” Without engaging

the difficulties and complexities

of some of the problems facing

education, we become power-

less to take on the task of solv-

ing them. The Pomona Unified

District has embraced that spirit

in addressing its problems by

developing its Master Program to

Manage, Maintain, and Program

District Facilities.

Page 4: Pomona USD Plans for Improvement - HMC Architectshmcarchitects.com/assets/ideas/markets/pre_k_12/... · 7. Provide quality facilities that support quality programs 8. Provide school

schoolnews - spring/summer 2009

Dan Benner, AIA, Principal

[email protected]

During the past 20 years, Dan

has helped more than 25 school

districts modernize and expand

their facilities. He will continue to

focus on schools, tapping his

wealth of leadership experience

involving design, oversight, and

project administration to develop

facilities that are user-focused and

responsive to client needs.

Dan is based in the

Ontario Office.

Jeff Berrios, AIA, Project Manager

[email protected]

Jeffrey Berrios, AIA, brings more

than 16 years of Pre-K-12 and higher

education experience to HMC.

He has worked with numerous

school districts in the Central Valley,

providing programming and project

management services to build new

campuses and modernize and expand

existing facilities.

Jeff is based in the

Central Valley Office.

LAUSD ES #9 Wins 2009 C.A.S.H. Leroy F. Greene Award

4

L-R: Bill Savidge, District

Engineering Officer, West Contra

Costa USD, C.A.S.H. Chair;

Ellis Kaufman, LAUSD; Guy

Mehula, LAUSD; John Nichols,

HMC Architects; David Thorman,

State Architect of California

This new elementary school

for the Los Angeles Unified

School District is one of several

new public buildings in the City

of South Gate. The campus

includes 26 classrooms in a

new, three-story building along

with a library, multipurpose

room, administrative area, and a

one-story kitchen facility. South

Region Elementary School

#9 is designed to serve as a

community resource that will

unite the neighborhood on a

state-of-the-art campus.

Sam Bouland, Senior Estimator

[email protected]

Sam Bouland has joined the firm

as a senior estimator. With more

than 40 years of experience, he

has worked with numerous school

districts throughout California,

providing construction estimating,

project management, and contract

administration services, as well as

construction claims analysis.

Sam is based in the

Ontario Office.

HMC Welcomes:

Page 5: Pomona USD Plans for Improvement - HMC Architectshmcarchitects.com/assets/ideas/markets/pre_k_12/... · 7. Provide quality facilities that support quality programs 8. Provide school

The construction industry has

been hit hard by the economic

crisis, and the construction market

provides added evidence of the

impact.

Based on information provided by

Engineering News Record (ENR),

subsequent to the first half of 2008

when steel and oil prices soared to

record levels, materials such as steel,

lumber, and cement continue to

decline in price due to the declining

demand for materials. This overall

decrease in demand has also

expressed itself within the California

construction market, although clearly

not to the level experienced by the

housing and commercial development

markets. School districts are facing

significant financial obstacles (e.g.

state funding impacts and difficulties

obtaining favorable ratings to sell local

bonds), as well as declining enrollment

or reduced need. This general

reduction in demand for construction

materials and the slowdown in the

public sector have served to lower

the underlying material costs, which

of late have begun to be reflected in

contractors’ bids.

It is anticipated that ENR’s Building

Cost Index (BCI) will post a rare

decline of 0.5% in 2009 compared

to an increase of 5.3% in 2008, as

material prices continue to spiral

downward. Another index used by

ENR, the Construction Cost Index

(CCI), is projected to increase by only

1.2% by the end of the 2009, verses

a 5.7% increase in 2008. Material

pricing will likely continue to drop as

manufacturers and suppliers struggle

to compete in this period of declining

demand. Many of the historically volatile

commodities and materials such as

steel, concrete, copper, and asphalt

paving are undergoing steep declines

in demand and pricing. For example,

steel prices are projected to decrease

10.3% in 2009. And, in most areas

of the state, cubic yardage prices for

concrete have moved back down to the

mid-50 to 60 dollars per yard compared

to the well over one hundred dollars per

yard experienced in recent years. Also,

availability is no longer an issue.

On the labor side, in spite of union

agreements with automatic increases

already negotiated and in place with

the corresponding impacts to prevailing

wage, the general economic downturn

has brought over a large influx of both

general and trade contractors to the

Pre-K-12 marketplace from the private

sector, most of which have little if any

public works experience. While it is

true that the actual placing of a given

piece of block in a building may not

differ from private to public, those of

us on the public building side have

come to understand how to quantify

the numerous added technical and

administrative burdens that exist in the

educational building market. Further,

many of these contractors are from

outside a given geographic area, which

can result in a general unfamiliarity with

local building conditions and constraints.

Interestingly, this influx of non-Pre-K-12

contractors is having a transformative

impact on those contractors with

experience in public works construction.

Districts are now receiving two to three

times the quantity of bids versus a year

ago. Increased competition is typically

a great benefit to a project, but the shift

in the contractor experience base has

increased the challenges associated

with those contractors who are not

familiar with educational construction

requirements. Given that it is unclear

to all observers how long the general

slow down in the overall construction

marketplace will last, those contractors

who have traditionally focused on

public works or schools are having to

adopt new strategies in order to remain

competitive on bid day. As mentioned

above, added competition from

outside the Pre-K-12 marketplace

and a recent decline in Pre-K-12

projects out on the street have

combined to produce incentives toward

increased labor, management, and

purchasing efficiencies. Unfortunately,

in order to remain competitive, many

contractors have had to resort to

downsizing and layoffs. As a result of the

underlying material price decreases and

this added competition in the Pre-K-12

marketplace, current bid results have

shown a significant retreat in initial

pricing from the increases that were

experienced in recent years. In many

cases “bid day” pricing has produced

results 20% to 40% lower than

current estimates.

However, as we all know, a low

initial cost is not a reliable indicator

of the final cost to build a school.

Increased contractor performance

risk and default, inferior and defective

workmanship, disruptions in labor

force due to non-payment of

prevailing wage, and an increased

interest in capturing added costs for

ambiguities in design and schedule

delays are just a few of the areas that

can impact the final cost of a project.

Although each school district should

evaluate their internal and external

resources and abilities to effectively

manage these risks, a proven

approach has been to pre-qualify

bidders based on the size, type, and

complexity of the given project.

Alternatively, school districts should

consider using a delivery method

that allows for the use of a bidder’s

experience and qualifications as part

of the selection process. Although

now may be the best time in recent

years to bid your school project,

school districts should be mindful

of the risks inherent in such a highly

competitive marketplace.

Ed Mireau can be reached at:

[email protected]

There Has Never Been a Better Time to BidBy: Ed Mierau, President, Neff Construction, President of Association of California Construction Managers (ACCM); Dana LeSher,

Vice President, Harris and Associates, Vice President of ACCM; and Sam Bouland, Senior Estimator, HMC Ontario

CostExchangeSpring/Summer 2009

5

“With severe challenges to the construction industry, this reality also

presents significant opportunities for school districts that plan to

develop projects within this economy.”

Mitch Carp, Senior Vice President, Business Services, HMC Architects

Page 6: Pomona USD Plans for Improvement - HMC Architectshmcarchitects.com/assets/ideas/markets/pre_k_12/... · 7. Provide quality facilities that support quality programs 8. Provide school

6

L-R: Ed Mireau, Anna Ferrera, Ted Rozzi, Scott Gorzeman, and Tom Cavanagh

OPINIONSpring/Summer 2009www.schooladvisors.com

In response to the current economic crisis, School Advisors hosted “Pre-K-12

Facility Funding: Partners Seeking Solutions” in both Southern and Northern

California. The workshops addressed the financial impacts of planning and

construction for school projects across the state. Open dialog focused on

ideas and solutions to explore and promote the development of sound financial

strategies to minimize the effects of the State’s financial crisis on school

construction projects.

Held on February 11th and 12th, one week prior to the finalization of the

federal economic stimulus package and two weeks before the resolution

of the California state budget crisis, educational facility directors and other

school district representatives had the opportunity to hear from a panel of

industry experts.

Southern California panelists included: Ed Mireau (Neff Construction), Ted Rozzi

(Corona-Norco Unified School District and past C.A.S.H. Chair), and Anna

Ferrera (Californians for School Facilities). Northern California panelists included:

Kevin Gordon (School Innovations and Advocacy), Terry Bradley (Clovis Unified

School District), Kathleen Moore (California Department of Education), and Dana

LeSher (Harris and Associates). Scott Gorzeman (Bank of America) and Tom

Cavanagh (School Advisors) were panelists at both workshops.

Scott Gorzeman stated that the market had been receptive in January 2009 of

local district GO bond issuances, which had not been the case in the later part

of 2008. He also presented various alternative or interim financing options for

Partners Seeking SolutionsBy: Tom Cavanagh, Senior Vice President, School Advisors

districts held up by the State’s funding

freeze that were bridge Certificates of

Participation (COPs), Bond Authorization

Notes (BANs), and Grant Anticipation

Notes (GANs). Bank letters of credit

have become increasingly more difficult

to come by and districts are finding it

difficult to enter the market. GANs are

available for those districts that have

received an apportionment but not a

fund release. Bottom-line, there are

options available to bridge this fiscal

crisis, but the market will continue to

be volatile so it is important to keep an

eye on funding thresholds and project

commitments.

Current School Facility Program (SFP)

deadlines for normal projects, joint-use,

and CTE facilities have been suspended

or extended, providing relief for districts

without access to alternative financial

mechanisms to move projects forward.

Federal stimulus monies have been

approved. California, however has yet to

determine the actual funding formula or

when the distribution might occur.

Ed and Dana stressed the many

opportunities in the bidding

environment for those projects that

can move forward. The panelists

also cautioned about the glut of

contractors from other construction

fields moving into the education

arena and their unfamiliarity with the

laws and guidelines that govern the

construction of schools.

In conclusion, both Ted Rozzi and

Terry Bradley stressed the importance

of recognizing these difficult times

and the value of understanding the

business or financial side of your

district. They cautioned against

becoming too focused on the

facilities aspects and loosing sight of

the district’s budget situation. They

suggested everyone take this time

to position themselves and their

departments for the future. Sound

advice indeed.

Tom can be reached at:

tom.cavanagh@

schooladvisors.com

L-R: Ed Mireau, Anna Ferrera, Ted Rozzi, Scott Gorzeman, and Tom Cavanagh