PMG Performance highlights (As on 30 th January 2017) Highlights of PMG’s performance since its inception in 2013 include: 1. More than 2,300 issues raised on PMG’s portal pertaining to 598 projects have been resolved (including those issues that required no further action) with anticipated investment of Rs 24,70,000 crore. (appx). 2. 453 Inter-Ministerial meetings have been convened with Union Ministries/Departments for resolving project realted clearances/issues. 3. 174 meetings have been convened with the Chief Secretaries of the States for resolution of issues pertaining to State Governments. 4. 250 projects having 623 issues with anticipated investment of Rs.10,46,000 crore (appx) are currently under consideration of PMG. (Summary Report of PMG performance dated 30.01.2017) 5. 75 Key approval granting processes in the Central Government for setting up of new projects have been taken up for digitization and integration with e-nivesh monitor portal, wherin cases pending beyond timelines can be tracked and followed up by PMG. 57 services out of 75 have already become functional and integrated with ‘e-nivesh monitor’ portal. PMG monitors the pace of disposal of business thorugh theses 57 functionally integrated services. 6. 31 Key approval granting processes in the State Government for setting up of new projects have been identified/shortlisted by PMG and State Governments are being advised to digitize all such services on priority. Digitization of all such sevices is helping States to achieve a better ranking in Ease of Doing Business (EODB) Index and attract more investment in projects. The progress achieved by States will be reflected on e-nivesh monitor.

Upload: doandang

Post on 20-May-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

PMG Performance highlights (As on 30th January 2017)

Highlights of PMG’s performance since its inception in 2013 include:

1. More than 2,300 issues raised on PMG’s portal pertaining to 598

projects have been resolved (including those issues that required no

further action) with anticipated investment of Rs 24,70,000 crore. (appx).

2. 453 Inter-Ministerial meetings have been convened with Union

Ministries/Departments for resolving project realted clearances/issues.

3. 174 meetings have been convened with the Chief Secretaries of the

States for resolution of issues pertaining to State Governments.

4. 250 projects having 623 issues with anticipated investment of

Rs.10,46,000 crore (appx) are currently under consideration of PMG.

(Summary Report of PMG performance dated 30.01.2017)

5. 75 Key approval granting processes in the Central Government for

setting up of new projects have been taken up for digitization and

integration with e-nivesh monitor portal, wherin cases pending beyond

timelines can be tracked and followed up by PMG. 57 services out of 75

have already become functional and integrated with ‘e-nivesh monitor’

portal. PMG monitors the pace of disposal of business thorugh theses 57

functionally integrated services.

6. 31 Key approval granting processes in the State Government for

setting up of new projects have been identified/shortlisted by PMG and

State Governments are being advised to digitize all such services on

priority. Digitization of all such sevices is helping States to achieve a better

ranking in Ease of Doing Business (EODB) Index and attract more

investment in projects. The progress achieved by States will be reflected

on e-nivesh monitor.

No. of

Projects

No. of

Issues Value (in Cr)

No. of

Project

No. of

Issues

Value (in

Cr)

No. of

Projects

No. of

Issues Value (in Cr)

Projects Accepted by PMG for Consideration 214 413 87,898 634 2,512 34,29,348 848 2,925 35,17,246

Projects/Issues Considered by the Sub-Groups 205 387 84,363 607 2,318 33,49,133 812 2,705 34,33,496

PMG-No Action Required 13 57 4,820 97 845 7,64,389 110 902 7,69,209

Decisions Taken- Resolved 149 267 60,515 339 1,134 16,41,150 488 1,401 17,01,665

Projects/Issues Still Under Consideration 43 63 19,027 171 340 9,43,594 214 403 9,62,622

Resolved Projects Waiting For New Issue 0 0 0 0 0 0 0

Projects/Issues to be Considered by the Sub-Groups 9 26 3,535 27 194 80,215 36 220 83,750

PMG SUMMARY REPORT AS ON 30 January 2017

Below 1000 Crore 1000 Crore and Above Total

S.no Service

Id

Service Name Ministry / Department Link

1 131 Registration for manufacture, and import of pesticides

under Insecticides Act 1968:·  Application for

registration of an insecticide under Section 9(4) for

generics

Agriculture http://pesticides-

registrationindia.nic.in/UserProfile/NewUse

rRegistration.aspx

2 130 Registration of the manufacturer to manufacture,

import pesticides under Insecticides Act 1968:

Application for registration of an insecticide under

Section 9(3) for new molecules

Agriculture http://pesticides-

registrationindia.nic.in/UserProfile/NewUse

rRegistration.aspx

3 132 Plant Quarantine (Regulation of Import into India-

Issuance of IR) Order, 2003 - import and prohibition of

import of plants and plant products into India.

Agriculture http://plantquarantineindia.nic.in/PQISMai

n/Registration/NewTraderSignUp.aspx

4 113 Civil aviation clearance for chimney /building/cooling

towers’ heights

Civil Aviation http://www.aai.aero/public_notices/nocas_

face.jsp

5 3 License for using explosives for blasting-Indian

Explosives Act-1884 (4 of 1884) (“Explosives Act”) and

The Explosives Rules, 1983 (“Explosives Rules”)

Commerce and Industry http://www.peso.gov.in/index.aspx

6 4 Gas Cylinder Rules, 2004 (“Rules”) Commerce and Industry http://www.peso.gov.in/index.aspx

7 5 The Petroleum Act, 1934 (“Petroleum Act”) read with

The Petroleum Rules, 1976 (“Petroleum Rules”)

Commerce and Industry http://www.peso.gov.in/index.aspx

8 6 Import-Export Code- Application to DGFT for import-

export code

Commerce and Industry http://164.100.78.104:8080/dgftiec/logout.

html

9 7 EPCG Licence required by Exporters Commerce and Industry http://dgft.gov.in/callmodule.asp?sch=EPC

GZERO

PROJECT MONITORING GROUPList of Central clearances-digitized and integrated with e-nivesh protal

10 256 Services Export from India Schemes(SEIS) Commerce and Industry http://dgft.gov.in/callmodule.asp?sch=EPC

GZERO

11 249 Issue of import Export Liscence of Goods for restricted

items

Commerce and Industry http://164.100.78.104:8080/dgftiec/login.ht

ml

12 38 Clearance of line rine for transmission lines as

described under PTCC Manual

Communications and

Information Technology

http://ptcc.bsnl.co.in

13 257 Siting clearance of Communication Masts Communications and

Information Technology

http://wpc.dot.gov.in/

14 121 Registration for electronic goods under BIS Rules.

(Section 16 where compulsory registration is required)

Consumer Affairs, Food and

Public Distribution

http://crsbis.in/BIS

15 122 Licence under under Section 16, BIS Rules. Consumer Affairs, Food and

Public Distribution

http://www.bis.org.in/other/online_applica

tion.asp

16 119 NOC for projects within 300 metres radius from the

declared boundary of any monument protected under

Ancient Monument Act, under the control of ASI

Culture http://nmanoc.nic.in/

17 13 Prior Environmental Clearance required under

Environment Impact Assessment Notification 2006

Environment, Forest and

Climate Change

http://forestsclearance.nic.in/registerationn

ew.aspx#

18 14 Forest Clearance required for diversion of forest land

for non-forest use under Section 2 of Forest

Conservation Act 1980

Environment, Forest and

Climate Change

http://forestsclearance.nic.in/registerationn

ew.aspx#

19 15 Clearance under Wildlife Protection Act 1972 (NBWL

clearance)

Environment, Forest and

Climate Change

http://efclearance.nic.in/

20 253 Forest Clearance - Form B Environment, Forest and

Climate Change

http://forestsclearance.nic.in/registerationn

ew.aspx#

21 254 Forest Clearance - Form C Environment, Forest and

Climate Change

http://forestsclearance.nic.in/registerationn

ew.aspx#

22 24 Allotment of PAN- Income Tax Act/Rules Finance https://tin.tin.nsdl.com/pan/index.html

23 30 Obtaining Registration No. for domestic sale/purchase

to file application for import-export permission and

apply for obtaining import/export certificate of

psychotropic substances under Narcotic Drugs and

Psychotropic Substances (NDPS) Act 1985

Finance https://tin.tin.nsdl.com/pan/index.html

24 124 Approval of Pricing for the drug under Drug price

Control Order (DPCO) 2013

Health and Family Welfare http://nppaindia.nic.in/digitalform1/Dg_For

m1.aspx

25 125 Import Of Drugs Health and Family Welfare

26 127 Licensing of food business in accordance with the

procedures laid down in FSS Regulations 2011 under

Food Safety & Standards Act 2006

Health and Family Welfare http://foodlicensing.fssai.gov.in/UserRegistr

ation.aspx

27 129 Food Import License required by Hotel Health and Family Welfare http://ics.fssai.gov.in/AOLogin.aspx?ReqID=

99887766

28 17 Registration with under Employees Provident Funds

and Miscellaneous Provisions Act, 1952

Labour and Employment http://olre.epfoservices.in/

29 19 Approval required of machinery, equipment materials

or appliances to ensure quality and standard with

regard to safety of workers

Labour and Employment http://www.dgms.gov.in/digcls/index.php/u

sers/login

30 20 Approval required under Regulation 61, OMR, 1984 for

laying, route and design of pipelines.

Labour and Employment http://www.dgms.gov.in/digcls/index.php/u

sers/login

31 21 Approval of site notification of Major Accident

Hazards(MAH) installations in port premises under Rule

7 Schedule 4 of MSIHC rules(Environmental Protection

Act)

Labour and Employment http://www.dgfasli.nic.in/dgfasli_digital/Lo

gin.aspx

32 22 Issue of Competency Certificate under rule 2(d) of Dock

Workers (Safety, Health and Welfare) Regulation 1990

Labour and Employment http://www.dgfasli.nic.in/dgfasli_digital/Lo

gin.aspx

33 23 Approval for manufacture of flame proof equipment

based on the test certificate submitted by

manufacturer under Section 37(A) of Factories Act,

1948.

Labour and Employment http://www.dgfasli.nic.in/dgfasli_digital/Lo

gin.aspx

34 117 Pre Commissioning Audit for Plants & cross country

pipelines as per decision of Safety Council, the apex

body governing OISD

Petroleum and Natural Gas http://connect.oisd.gov.in/

35 118 Consent to operate before start of operations for

offshore oil installations under P&NG (SOO) Rules,

2008.

Petroleum and Natural Gas http://coalclearances.gov.in/

36 35 Under section 8 of Electricity Act, 2003. Techno-

economic clearance and DPR approval/clearance for

Hydro Projects

Power http://ceaclearance.gov.in/hydro/

37 36 Approval Under Section 68 of Electricity Act 2003 for

laying the overhead Transmission Lines

Power http://ceaclearance.gov.in/

38 37 Final Charging Clearance approval for transmission

lines and electrical installation

Power https://tin.tin.nsdl.com/pan/index.html

39 39 Under IEGC, Approval for setting of facilities for

communication and data exchange

Power http://openaccess.powergrid.in/

40 40 Power Evacuation Clearance- Connectivity/Long Term

Open Access/Medium Term Open Access transmission

system

Power https://tin.tin.nsdl.com/pan/index.html

41 108 CERC(Terms & Condition for recognition and issuance

of REC for Renewable Energy Generation) Regulation

2010· Registration of eligible entity for renewable

projects·         Accreditation of renewable energy

projects·         Issuance of REC

Power https://www.recregistryindia.nic.in/index.p

hp/general/publics/SignUp

42 46 Permission for Rail Road Crossing (Rail Over

Bridge/Rail Under Bridge)

Railways http://ircep.gov.in/RCApproval

43 48 Permission for Pipeline/Transmission lines crossing Railways https://ircep.gov.in/WLRMS/GuestHome.jsp

?page=1

44 51 In-principle approval Railways https://ircep.gov.in/PVTSDG/GuestHome.js

p?page=1

45 53 Approval of ESP Railways https://ircep.gov.in/PVTSDG/GuestHome.js

p?page=1

46 55 Approval of SIP Railways https://ircep.gov.in/PVTSDG/GuestHome.js

p?page=1

47 62 Approval of OHE layout plan & Energisation plan Railways https://ircep.gov.in/PVTSDG/GuestHome.js

p?page=1

48 65 Approval of Detailed Project Report Railways https://ircep.gov.in/PVTSDG/GuestHome.js

p?page=149 71 Signing of Provisional Integrated Siding & Land

Licensing Agreement - Waiting for Applicant

Railways https://ircep.gov.in/PVTSDG/GuestHome.js

p?page=1

50 242 Approval of land licensing Railways https://ircep.gov.in/PVTSDG/GuestHome.js

p?page=151 246 Signing of Integrated Agreement - Part A : Private

Siding

Railways https://ircep.gov.in/PVTSDG/GuestHome.js

p?page=1

52 248 Commissioning of Siding Railways https://ircep.gov.in/PVTSDG/GuestHome.js

p?page=1

53 115 Grant of Right of Way or cutting of footpath, road,

service lane

Road Transport and Highways http://connect.oisd.gov.in/

54 241 Movement of hydrolic trailer Road Transport and Highways https://morth-

owc.nic.in/auth/users/index.asp

55 137 Project Approval for Hotel Tourism http://hotelcloud.nic.in/hoteldivision/Hotel

s/Registration.aspx

56 138 Star Category Classification of Hotel Tourism http://hotelcloud.nic.in/hoteldivision/Hotel

s/Registration.aspx

57 133 Permission/Clearance for drawing ground water for

industrial purpose

Water Resources, River

Development and Ganga

Rejuvenation

http://cgwa-

noc.gov.in/Sub/ApplicantRegi/ApplicantRegi

stration.aspx

1

Project Monitoring Group

Subject: 31 State level clearances for setting up a project requiring priority digitization.

S.

No.

Clearance to be digitized State Department(s)

generally concerned

Area of Clearance as per World

Bank Report

Land & Construction related Clearances

1) Allotment of Land in Industrial Estate Industrial Development

Authority / Industry

Department

Allotment of Land, Obtaining

Construction Permit

2) NOC for construction/building, design,

layout in Industrial Estate

Industrial Development

Authority / Industry

Department

Allotment of Land, Obtaining

Construction Permit

3) Construction Permits: Town & Country

Planning Department

Allotment of Land, Obtaining

Constrz1uction Permit (a) Conformity of project site to

development plan and grant of license

(b) Intimation to local Authority by the

owner having building permit,

specified days before starting

construction work

(c) Notice to ULB about the completion

of work upto plinth level

4) Completion cum occupation certificate

from local authority before occupation

of any building for any purpose

Municipal Authorities /

Urban Local Bodies

Allotment of Land, Obtaining

Construction Permit

5) Permission for tree cutting/felling in

Urban sites.

Tree Authority/ Urban

Local Bodies

Allotment of Land & obtaining

construction permission

6) Permission for tree cutting on acquired

Govt. /Forest Land.

Forest Department Allotment of Land & obtaining

construction permission

7) NOC before construction commencement

under Fire Protection and Prevention

Legislation.

Fire Services

Department

Allotment of Land & obtaining

construction permits

8) NOC for Fire Safety for the

building/factory before occupancy under

Fire Protection and Prevention

Legislation.

Fire Service

Department

Allotment of Land & obtaining

construction permits

Environmental clearances

9) Air (P&C) Act 1981 – Consent to

Establish

State Pollution Control

Board

Complying with Environment

Procedures

10) Air (P&C) Act 1981 – Consent to

Operate

State Pollution Control

Board

Complying with Environment

Procedures

11) Water (P&C) Act 1974 – Consent to

Establish

State Pollution Control

Board

Complying with Environment

Procedures

12) Water (P&C) Act 1974 – Consent to

Operate.

State Pollution Control

Board

Complying with Environment

Procedures

13) Authorization for generation,

transportation, collection, treatment,

disposal and sale under Hazardous Waste

Rules 2008

State Pollution Control

Board

Complying with Environment

Procedures

14) Authorization for handling biomedical

waste under Bio-Medical Waste Rules,

2011

State Pollution Control

Board

Complying with Environment

Procedures

15) Clearance under Municipal Solid Waste

(M&H) Rules, 2000 State Pollution Control

Board

Complying with Environment

Procedures

Labour Related clearances

2

16) Registration under Shops &

Establishment Act.

Labour Department Compliance with Labour Regulations

17) Registration under Indian Boilers Act,

1923 and Regulations

Labour Department Complying with Labour Regulations

18) Registration Certificate to engage

construction workers by

Contractor/Employer under Contract

Labour Act, 1970

Labour Department Complying with Labour Regulations

19) Approval for registration of the

establishment under Building & Other

Construction Workers Act, 1996

Labour Department Complying with Labour Regulations

Infrastructure related Utilities

20) Grant of Power Connection Electricity

Board/DISCOM

Obtaining Infrastructure Related

Utilities

21) Permissions related to sewage and storm

water drainage.

Urban Local Bodies Obtaining Infrastructure Related

Utilities

(a) NOC for Sewage water and

associated plumbing

(b) NOC for Storm Water and

Drainage

22) Permission for Installation of

lifts/elevators under the State Lifts Act.

Inspectorate of Lifts/

Electrical department

Obtaining Infrastructure Related

Utilities

Taxation Procedures

23) Registration for Value Added Tax (VAT) VAT Department Registering & Complying with Tax

Related Procedures

24) Registration under Central Sales Tax

(CST)

VAT Department Registering & Complying with Tax

Related Procedures

25) Registration under Professional Tax

Legislation

Commercial Tax

Department

Registering & Complying with Tax

Related Procedures

26) Registration under Entry Tax Legislation Commercial Tax

Department

Registering & Complying with Tax

Related Procedures

27) Property Registration under Indian Stamp

Act, 1899.

Department of Revenue Registering & Complying with Tax

Related Procedures

Carrying out Inspections

28) Approval for Power

transformers/Charging of lines installed

at the site and commissioning under

Electricity Act 2003 and Indian

Electricity Rules 1956

Chief Electrical

Inspector/ Electricity

department

Carrying out Inspections

29) Permission for Highway Crossing, access

road through highway/ ROW

State Highway

Department

Carrying out Inspections

30) Approval of Factory site, Plans of

Factory plant, specifications, building

designs, Grant of License, under

Factories Act 1948

Chief Inspector of

Factories/ Labour

Department

Carrying out Inspections

31) Approval of weights and measuring

instrument Under Standards of Weights

and Measures Act, 1976/Rules.

Legal Metrology

Department

Carrying out Inspections