plumbing requirements

2
Dear Sir, A. Scope of work Design, Planning and preparation of drawing & estimates in following area Detailed Project Report - DPR of PHE should contain the PHE services of Main Building and Association Building. 1) Detailed Analysis and Design Calculations of Water Supply, Sanitary, STP and Rainwater Harvesting (Hard and Soft Copies). 2) Plan, Elevation and Section AutoCAD Drawings for Tender, Working Drawings and Drawings for Construction(Hard and Soft copies). 3) DPR will contain Detailed Estimate, BOQ and Measurement Sheet. 4) Design should adopt any new Technology and Fixtures. 5) DPR will include - Fixing of Water Tanks for water, Bore well water, Drainage for rain water/Storm Water based on the counter plan. 6) The PHE - DPR will be submitted for review. DPR will be finalised and signed off with or without changes. The PHE Consultant should be able to incorporate the changes if any. DPR will contain the below. 1. Toilet layouts 2. Internal water supply 3. Internal sewerage 4. External water supply 5. External sewerage 6. Water treatment 7. Sewage treatment system - 8. Pumps & accessories 9. Rain water harvesting 10. External and Internal Drainage Plan for Storm Water 11. Fixing and Placement of Tanks Underground and Terrace and STP. B. Submittals 1. Design Basis Report 2. Drawings a. Site plan b. Basement plan c. Ground floor plan d. All Existing floor plans e. Terrace plan f. Water supply schematic g. Enlarged toilet details h. Typical details

Upload: muniswamaiah-mohan

Post on 18-Aug-2015

216 views

Category:

Documents


2 download

DESCRIPTION

Plumbing Tender Req

TRANSCRIPT

Dear Sir,A. Scope of work Design, Planning and preparation of drawing & estimates in following area Detailed Project Report - DPR of PHE should contain the PHE services of Main uilding and !ssociation uilding"#$ Detailed !nal%sis and Design &alculations of 'ater Suppl%, Sanitar%, S(P and Rainwater Harvesting)Hard and Soft &opies$"*$ Plan, Elevation and Section!uto&!D Drawings for (ender, 'or+ing Drawings and Drawings for&onstruction)Hard and Soft copies$",$ DPR will contain Detailed Estimate, -. andMeasurement Sheet"/$ Design should adopt an% new (echnolog% and 0i1tures"2$ DPR will include - 0i1ing of 'ater (an+s for water, ore well water, Drainage for rainwater3Storm'ater 4ased on the counter plan"5$ (he PHE - DPR will 4e su4mitted for review" DPR will 4e 6nalised and signed o7 with or without changes" (he PHE &onsultant should 4e a4le to incorporate the changes if an%"DPR will contain the 4elow"#" (oilet la%outs *" 8nternal water suppl% ," 8nternal sewerage /" E1ternal water suppl% 2" E1ternal sewerage 5" 'ater treatment 9" Sewage treatment s%stem - :" Pumps & accessories ;" Rain water harvesting #round ?oor plan d" !ll E1isting ?oor plans e" (errace planf" 'ater suppl% schematic g" Enlarged toilet details h" (%pical details @eep the Project ac+ground in view, please mention the timelines of the delivera4les"