PLM-TEAMCENTER

GATLA SAI RAM206731

2

INRODUCTIONHISTORYCOMPONENTS AND PRODUCTSDATA MANAGEMENT IN TEAMCENTER-EXPORTS AND IMPORTS-MIGRATION-FACTORS-DESIGN OF APPROACH-REPORTBILL OF MATERIALCUSTOMIZATIONADVANTAGESCONCLUSION

3

INTRODUCTION

4

TEAMCENTER

History• Siemens PLM system(UGS PLM System)• In mid 1980’s with technology and products from

CDC, SDRC and UGS.• Teamcenter Enterprise & Teamcenter Engineering

Its robust architecture is integrated with Microsoft windows

5

COMPONENTS AND ITS PRODUCTSCommunity Collaboration Teamcenter Community

Compliance Management Teamcenter for Compliance Management

Engineering Process Management Teamcenter Engineering

Enterprise Knowledge Management Teamcenter Enterprise

Maintenance, Repair and Overhaul Teamcenter for MRO

Manufacturing Process Management Teamcenter Manufacturing

Program and Project Management Teamcenter Project

Systems Engineering Teamcenter for Systems Engineering & Requirements

Sourcing Management Teamcenter Sourcing

Lifecycle Visualization Teamcenter Visualization

Reporting and Analytics Teamcenter for Reporting & Analytic

Simulation Process Management Teamcenter for Simulation

6

Data Managementin Teamcenter

7

Export & Import

PLM XML• Powerful tool• Flexible in defining rules• Contains admin moduleTransfer Mode Closure rule Property rule Filter rule

8

TRANSFER MODE

9

MIGRATIONAspects of data migration• Meta data• Document file• CAD data

System migration Single system Multiple system

a)multiple to single systemb)multiple system to multiple system

Preprocess migration

What data analysis mapping

10

Analysis• New system • Old system• Business process• Gap analysis –finds the functionality difference

Mapping• One to one mapping, Ex-• One to many mapping• Many to one mapping• Property mapping

Old system[property]

New system[business object]

11

FACTORS OF MIGRATIONMigration Bulk Phase

12

Bulk Data migration at once All users switch over All the process move to new Source system remain unaltered

Phase• Group wise, project wise, workflow based etc.• Set of users switch over the time.• Co-existence of old and new system for some duration (From months to a

year or so)

13

DESIGN APPROACH

14

CAD migration• Is done through third party migration tool

(UG NX tool like ug_export/ug_import and ug_clone)

15

Report in TeamcenterContain report builder moduleReports are based on query and PLMXML frame worka)Get the object through queryb)Convert to xml outputc)Xsl style sheet is applied for layout

Query Closure rule Property Report

formatStyle sheet

16

BILL OF MATERIAL

17

CUSTOMIZATION

18

CAD DATA CUSTOMIZING

19

ADVANTAGE

SecureFastSimple customizingReliableReduce translation cost

20

CONCLUSION

Enables the team to actively participateLong term business resultSmart decisions Better productSuccess

SourceManoj Tiwari http://teamcenterplm.blogspot.de/http://en.wikipedia.org/wiki/Teamcenter

21

THANK YOU