Plant Specifications Working Group. Safety Groups Structure. Plant Specifications Group – Objectives. Establish technical standards and specifications for the manufacture and operation of vehicles and mobile plant operating the UK opencast coal industry - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/1.jpg)
Plant Specifications Working Group
![Page 2: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/2.jpg)
Safety Groups Structure
![Page 3: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/3.jpg)
Plant Specifications Group – Objectives
• Establish technical standards and specifications for the manufacture and operation of vehicles and mobile plant operating the UK opencast coal industry
• Engage with plant manufacturers, the HSE and other external bodies to promote a consistent approach to plant specifications
• Consider arrangements for the inspection and maintenance of vehicles and mobile plant and develop procedures to ensure that the risk to maintenance personnel is controlled
• Liaise with other CoalPro working groups, particularly the Traffic Management Group to ensure that a consistent approach to vehicle safety is adopted
![Page 4: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/4.jpg)
Pennyvenie Fatal Accident
![Page 5: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/5.jpg)
• Largest surface mining company in UK• 3.5 million tonnes per year• 9 production sites• 900 employees• Plant fleet: -
29 prime mover excavators
122 dump trucks
172 other main plant items• Other interests – Land, Renewable Energy
![Page 6: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/6.jpg)
![Page 7: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/7.jpg)
Pennyvenie Site
• Dalmellington, East Ayrshire
• Operations commenced 1987
• 24 hour operation
• 700,000 tonnes per year
• 130 employees
• Main plant – 6 x RH120
Terex TR100
Cat 777D
![Page 8: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/8.jpg)
The Incident
• 26th February 2007 at 1pm• 2 deaths
Brian French (48) Foreman Fitter
Colin Ferguson (37) Fitter• Multiple crush injuries caused by Terex TR100
dump truck colliding with Land Rover in dig area
![Page 9: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/9.jpg)
What happened?
• Fitters were clearing loading zone for non-critical inspection on RH120
• Fitters had no radio and were using hand signals• Land Rover drove past stationary dump trucks
on off-side • Land Rover parked in Terex TR100 blind zone• Terex TR100 turned on full right lock• Operator continued to attempt to drive over
obstacle following initial collision
![Page 10: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/10.jpg)
![Page 11: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/11.jpg)
![Page 12: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/12.jpg)
![Page 13: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/13.jpg)
Post Accident
• Emergency procedures instigated• Preparations to move truck abandoned• Emergency services on site within 20 minutes• Police investigation• Scottish Coal detailed survey of area• Bodies recovered 10pm• HSE investigation • Reconstructions of incident (Scottish Coal +
HSE)
![Page 14: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/14.jpg)
Investigation Significant Factors Considered
• Land Rover entered dig area before trucks were removed – supervisors not aware
• No radio communication • Land Rover parked in blind zone • Truck driver not concentrating and reading
newspaper• Truck moved away into blind zone on full right
hand lock• Land Rover and truck same colour – no contrast• Truck driver trained but relatively inexperienced
![Page 15: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/15.jpg)
![Page 16: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/16.jpg)
![Page 17: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/17.jpg)
Land Rover roof
Cab support
Line of truck bonnet
![Page 18: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/18.jpg)
![Page 22: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/22.jpg)
System Improvements• Radios in all vehicles• Traffic management plans - new rules controlling
entry into dig areas• Supervisor’s vantage points• Segregated light vehicle routes• Buggy whips on all light vehicles• Off-side CCTV on all rigid dump trucks• Improvements to TR100 operator visibility • Training – MPQC Assessors and Instructors
![Page 23: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/23.jpg)
Terex TR100
![Page 24: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/24.jpg)
Terex TR100
![Page 25: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/25.jpg)
![Page 26: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/26.jpg)
![Page 27: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/27.jpg)
![Page 28: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/28.jpg)
![Page 29: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/29.jpg)
![Page 30: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/30.jpg)
Mirror 1
Mirror 2
Mirror 3
Mirror 4 Mirror 5
Mirror 6
Mirror 7
TEREX TR100
Off Side Camera
![Page 31: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/31.jpg)
Mirror 7
Mirror 1
Mirror 2
Mirror 3
Mirror 4
Mirror 5
Mirror 6
Off Side Camera
![Page 32: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/32.jpg)
Light vehicle segregation
![Page 33: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/33.jpg)
Supervisors Vantage Point
Radio protocol
![Page 34: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/34.jpg)
Dump Truck Markings
![Page 35: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/35.jpg)
Consequences for SRG
• 2 prohibition notices
No entry of non-production vehicles into dig area
No use of dump trucks without radios• Prosecution
Sections 3 and 33 HSWA
Fine - £400,000• Fatal Accident Inquiry – 35 days in court• Civil claims – litigation ongoing• Substantial production, management and legal costs• Loss of reputation
![Page 36: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/36.jpg)
FAI – Sheriff’s DeterminationsPrecautions which may have prevented deaths
• Radio communication• If truck driver had paid attention and not been reading a
newspaper• If truck had stopped after initial collision• Specific training/instruction to prevent full lock turn into
blind zone and when faced with obstruction• Buggy whips• Off-side CCTV• Effective segregation of light vehicles and trucks
![Page 37: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/37.jpg)
FAI – Sheriff’s DeterminationsOther relevant factors
• Failure to learn lessons from 2005 incident• Greater emphasis required to alert operators to
consequences of reading newspapers• Post-accident safety improvements were introduced
voluntarily by Scottish Coal• Scottish Coal has performed a leading role in promoting
safety within industry• Collaboration with HSE, CoalPro, QNJAC is important to
ensure safety improvements are implemented• Improvements required to training and operator
competence assessment schemes industry wide
![Page 38: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/38.jpg)
FAI – Sheriff’s DeterminationsOther relevant factors
• HSE to consider mechanisms for more efficient dissemination of best practice identified by inspectors
• HSE should enquire about radio use and traffic management during inspections
• Consider updating Quarries Regulations and ACOP to address issues - segregation, blind spots, radios
• Engage manufacturers to ensure ongoing improvements• Develop industry practice for off-side CCTV and consider
development of international standards• HSE to consider use of police crash investigators• Consider introduction of new RIDDOR Dangerous
Occurrence category for vehicle incidents
![Page 39: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/39.jpg)
Timetable of Events
Date Event
26/02/07 Accident
16/07/08 Scottish Coal charged Section 3 and 33 HSWA
26/08/08 Scottish Coal plead guilty – Fine £400,000
17/08/10 Fatal Accident Inquiry commences
15/03/11 Fatal Accident Inquiry completed – Total 35 days
24/06/11 Sheriff’s determination published
18/10/11 Civil claims – last claim settled October 2011
![Page 40: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/40.jpg)
Forum for Presentation Location Date
CoalPro Health and Safety Committee Stobswood, Northumberland 21/7/11
MPQC Training Assessors Meeting Loughborough 21/9/11
Miller Argent / Celtic Energy Fos y Fran, Wales 23/9/11
QNJAC Plant Sub-Committee Cliffe Hill, Leicester 28/9/11
HJ Banks Mining Shotton, Northumberland 11/10/11
CoalPro Workers Safety Reps Forum Potland Burn, Northumberland 11/10/11
QNJAC Main Committee Birmingham 02/11/11
CoalPro Plant Manufacturers Meeting Coventry 03/11/11
UK Coal Harworth 14/11/11
MPQC Plant User Group Shepshed 22/11/11
CoalPro Management Committee Wakefield 08/12/11
ATH Resources New Cumnock, Ayrshire
Muirdean Fife
28/11/11
29/11/11
14/12/11
Institute of Quarrying Branch Meetings All UK branches Various
![Page 41: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/41.jpg)
USA 2010
![Page 42: Plant Specifications Working Group](https://reader033.vdocuments.site/reader033/viewer/2022051419/56815bf5550346895dc9e4a7/html5/thumbnails/42.jpg)
South Africa 2011