plant manager questionnaire (rev_2)

Upload: seaworks-company

Post on 05-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 Plant Manager Questionnaire (Rev_2)

    1/1

    PO Box 23631, Doha, Qatar Tel: 4411-0455 Fax: (+974) 4411-0921 e-mail: [email protected]

    PLANT MANAGER/SUPERVISOR QUESTIONNAIRE

    Name Age Ref

    E-mail DateDD MM YYYY

    Nationality Expected Salary (QR) Notice Period (Days)Have Valid Qatari / GCC Driving License Qatar Phone

    Highest Educational Attainment & Year

    No

    DescriptionNone

    Familiar

    Average

    Good

    Excellent

    1 Develop & implement HSE plan for Maintenance Department

    2 Prepare & implement QMS & EMS Policies

    3 Planning and administering a quality assurance program

    4 Fabrication of steel structures, pressure vessels, and piping

    5 Usage of Computerized Maintenance Management Systems

    6 Usage of SAP / Oracle ERP

    7 Design & prepare MIS reports

    8 Full implementation of Total Productive Maintenance

    9 Just-In-Time Inventory planning

    10 Estimate project manpower needs based on standard productivity norms

    11 Sandblasting and coating of steel structures

    12 Rigging works and heavy lifting by cranes & rigging equipment

    13 Prepare fleet preventive maintenance schedules

    14 Establish fleet record keeping system in accordance with ISO 9001

    15 Establish and manage Job Card System for maintenance activities

    16 Estimating machine / operator production capacities for project assignments

    17 Workshop management and inventory control

    18 Mining operations management & Mine planning and development

    19 Diagnose & troubleshoot repairs of large earthmoving equipment

    20 Make modifications of equipment to improve production & efficiency

    21 Maintenance of mooring winch, windlass and rigging equipment for ships

    22 Design skills in AutoCAD with wire frame & surface modeling

    Please put a ( ) next to the subject that you have experience in:

    Road Construction Marine Construction Heavy Equipment Dealership Service Dept. Mining Industries Piling & Foundations Cement Plants Welding codes / procedures

    MAINTENANCE DEPARTMENT STUDY

    Seaworks existing fleet of 120 machines consist of hydraulic & wheel excavators ranging from 20 to 80 tons,

    graders, bulldozers, rollers, air-compressors, generators, trailers, articulated dump trucks, cranes, hydraulic

    breakers, etc. manufactured by Caterpillar, Komatsu, Hitachi, Kobelco, Volvo and Daewoo-Doosan.

    Prepare a hypothetical setup for managing & maintenance of the above fleet with the following:

    1. Make an organization chart for the whole Maintenance Department, including manpower requirements forperforming all the maintenance activities, designations, quantities, and minimum qualifications / experience.

    2. List minimum required tools & repair equipment and diagnostic instruments for the maintenance workshop.3. Sketch a general layout of the workshop facilities, identifying the main components of the facility.4. Submit sample forms for Job orders and for tracking performance and management of Maintenance Dept.5. How would you set up a mobile workshop and what is the minimum configuration for a mobile unit?6. Which software package do you recommend for Fleet Maintenance Management? Why?