Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Cost Range County District Improvement Type SR Sec MPMS # Bid Type 2/14/2019 Less than 100,000 Franklin Mid-block Traffic and Ped Signal Venango 1-0 111015 M Existing Signal Improvement 62 RLE 111015 EBS 2/14/2019 From 1,000,000 to 5,000,000 Venango Group 591 Venango 1-0 100155 Resurface 257 591 100155 EBS 2/14/2019 From 100,000 to 200,000 River Ave to Loyalsock Cr Lycoming 3-0 99033 P Resurface 2056 002 97803 EBS 2/14/2019 From 500,000 to 1,000,000 Orvis Road Alignment Chester 6-0 111176 M New Roadway 202 MTF 111176 EBS 2/28/2019 From 1,000,000 to 5,000,000 Venango Group 592 Venango 1-0 110840 Pavement Preservation 8 592 110840 EBS 2/28/2019 From 1,000,000 to 5,000,000 Crawford Group 192 Crawford 1-0 98875 Resurface 6 192 98875 EBS 2/28/2019 From 500,000 to 1,000,000 Crawford Group 192 Crawford 1-0 98875 Resurface 886 192 98818 EBS 2/28/2019 From 1,000,000 to 5,000,000 Easton Ave Corridor Imprv Northampton 5-0 102156 Corridor Safety Improvement 2020 04S 102156 EBS 2/28/2019 From 500,000 to 1,000,000 Macungie Pedestrian Streetscape Phase II Lehigh 5-0 107976 M Transportation Enhancement 100 MPS 107976 EBS 2/28/2019 From 500,000 to 1,000,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 663 MD8 111311 EBS 2/28/2019 From 1,000,000 to 5,000,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 463 MD8 109095 EBS 2/28/2019 From 1,000,000 to 5,000,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 1028 MD8 109076 EBS 2/28/2019 From 500,000 to 1,000,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 422 MD8 109070 EBS 2/28/2019 From 1,000,000 to 5,000,000 US 202/US 1 ITS Corridor Delaware 6-0 107652 Existing Signal Improvement 202 652 107652 EBS 2/28/2019 From 500,000 to 1,000,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 4005 MD8 104924 EBS 2/28/2019 From 1,000,000 to 5,000,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 363 MD8 104920 EBS 2/28/2019 From 100,000 to 200,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 113 MD8 104914 EBS 2/28/2019 From 1,000,000 to 5,000,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 29 MD8 104912 EBS 2/28/2019 From 500,000 to 1,000,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 4016 MD8 104906 EBS 2/28/2019 From 200,000 to 500,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 4018 MD8 104904 EBS 2/28/2019 From 200,000 to 500,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 332 MD8 104897 EBS 2/28/2019 From 500,000 to 1,000,000 Group 6-18-MD8 Montgomery 6-0 104920 Resurface 63 MD8 104895 EBS 2/28/2019 From 10,000,000 to 20,000,000 Jerome Street Bridge Allengheny 11-0 28345 Bridge Rehabilitation 2094 A04 28345 EBS 2/28/2019 From 20,000,000 to 30,000,000 Design activities are limited to: Concrete curb ramps Allengheny 11-0 97846 P M New Bridge 579 A10 97846 EBS 2/28/2019 From 5,000,000 to 10,000,000 Design activities are limited to: Concrete curb ramps Allengheny 11-0 91790 P Restoration 885 A45 91790 EBS 3/14/2019 From 1,000,000 to 5,000,000 Huntley Road/I-90 Erie 1-0 Bridge Replacement 3102 B00 82924 EBS 3/14/2019 From 500,000 to 1,000,000 Browns Run Road Bridge Warren 1-0 2545 Bridge Rehabilitation 2010 B00 2545 EBS 3/14/2019 From 200,000 to 500,000 SR 2008/French Ck Trib Erie 1-0 940 Bridge Rehabilitation 2008 DFB 940 EBS 3/14/2019 From 1,000,000 to 5,000,000 US 322: Pymatuning Res Br Crawford 1-0 374 Bridge Replacement 322 B03 374 EBS 3/14/2019 From 500,000 to 1,000,000 SR 1037: Federal Run Brdg Crawford 1-0 57974 Bridge Replacement 1037 B02 57974 EBS ** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Upload: phamthuy

Post on 12-Feb-2019

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 1 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

2/14/2019Less than 100,000Franklin Mid-block Traffic and Ped Signal

Venango1-0111015 M Existing Signal Improvement

62 RLE 111015 EBS

2/14/2019From 1,000,000 to 5,000,000Venango Group 591Venango1-0100155 Resurface 257 591 100155 EBS2/14/2019From 100,000 to 200,000River Ave to Loyalsock CrLycoming3-099033 P Resurface 2056 002 97803 EBS2/14/2019From 500,000 to 1,000,000Orvis Road AlignmentChester6-0111176 M New Roadway 202 MTF 111176 EBS2/28/2019From 1,000,000 to 5,000,000Venango Group 592Venango1-0110840 Pavement Preservation 8 592 110840 EBS2/28/2019From 1,000,000 to 5,000,000Crawford Group 192Crawford1-098875 Resurface 6 192 98875 EBS2/28/2019From 500,000 to 1,000,000Crawford Group 192Crawford1-098875 Resurface 886 192 98818 EBS2/28/2019From 1,000,000 to 5,000,000Easton Ave Corridor ImprvNorthampton5-0102156 Corridor Safety

Improvement

2020 04S 102156 EBS

2/28/2019From 500,000 to 1,000,000Macungie Pedestrian Streetscape Phase II

Lehigh5-0107976 M Transportation Enhancement

100 MPS 107976 EBS

2/28/2019From 500,000 to 1,000,000Group 6-18-MD8Montgomery6-0104920 Resurface 663 MD8 111311 EBS2/28/2019From 1,000,000 to 5,000,000Group 6-18-MD8Montgomery6-0104920 Resurface 463 MD8 109095 EBS2/28/2019From 1,000,000 to 5,000,000Group 6-18-MD8Montgomery6-0104920 Resurface 1028 MD8 109076 EBS2/28/2019From 500,000 to 1,000,000Group 6-18-MD8Montgomery6-0104920 Resurface 422 MD8 109070 EBS2/28/2019From 1,000,000 to 5,000,000US 202/US 1 ITS CorridorDelaware6-0107652 Existing Signal

Improvement

202 652 107652 EBS

2/28/2019From 500,000 to 1,000,000Group 6-18-MD8Montgomery6-0104920 Resurface 4005 MD8 104924 EBS2/28/2019From 1,000,000 to 5,000,000Group 6-18-MD8Montgomery6-0104920 Resurface 363 MD8 104920 EBS2/28/2019From 100,000 to 200,000Group 6-18-MD8Montgomery6-0104920 Resurface 113 MD8 104914 EBS2/28/2019From 1,000,000 to 5,000,000Group 6-18-MD8Montgomery6-0104920 Resurface 29 MD8 104912 EBS2/28/2019From 500,000 to 1,000,000Group 6-18-MD8Montgomery6-0104920 Resurface 4016 MD8 104906 EBS2/28/2019From 200,000 to 500,000Group 6-18-MD8Montgomery6-0104920 Resurface 4018 MD8 104904 EBS2/28/2019From 200,000 to 500,000Group 6-18-MD8Montgomery6-0104920 Resurface 332 MD8 104897 EBS2/28/2019From 500,000 to 1,000,000Group 6-18-MD8Montgomery6-0104920 Resurface 63 MD8 104895 EBS2/28/2019From 10,000,000 to 20,000,000Jerome Street BridgeAllengheny11-028345 Bridge Rehabilitation 2094 A04 28345 EBS2/28/2019From 20,000,000 to 30,000,000Design activities are limited to:

Concrete curb ramps

Allengheny11-097846 P M New Bridge 579 A10 97846 EBS

2/28/2019From 5,000,000 to 10,000,000Design activities are limited to: Concrete curb ramps

Allengheny11-091790 P Restoration 885 A45 91790 EBS

3/14/2019From 1,000,000 to 5,000,000Huntley Road/I-90Erie1-0 Bridge Replacement 3102 B00 82924 EBS3/14/2019From 500,000 to 1,000,000Browns Run Road BridgeWarren1-02545 Bridge Rehabilitation 2010 B00 2545 EBS3/14/2019From 200,000 to 500,000SR 2008/French Ck TribErie1-0940 Bridge Rehabilitation 2008 DFB 940 EBS3/14/2019From 1,000,000 to 5,000,000US 322: Pymatuning Res BrCrawford1-0374 Bridge Replacement 322 B03 374 EBS3/14/2019From 500,000 to 1,000,000SR 1037: Federal Run BrdgCrawford1-057974 Bridge Replacement 1037 B02 57974 EBS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 2: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 2 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

3/14/2019From 500,000 to 1,000,000SR 75 Eshs Run BridgeJuniata2-091515 Bridge Replacement 75 A12 85180 EBS3/14/2019From 1,000,000 to 5,000,000SR 3001 Kish Creek BrMifflin2-091609 Bridge Replacement 3001 A01 91609 EBS3/14/2019From 500,000 to 1,000,000SR 75 Eshs Run BridgeJuniata2-091515 Bridge Replacement 75 A08 91515 EBS3/14/2019From 1,000,000 to 5,000,000SR 120 Grass Flats Slide HazardClinton2-03807 Restoration 120 322 3807 EBS3/14/2019From 1,000,000 to 5,000,000SR 120 East Driftwood SlideCameron2-0110554 F Slides Correction 120 405 110554 EBS3/14/2019From 500,000 to 1,000,000Beech Street to Mill Lane,

"Design" activities limited to ADA

Lycoming3-099029 P Restoration 973 031 99411 EBS

3/14/2019From 1,000,000 to 5,000,000Lackawanna SR 435 Paving- Design Build Curb Ramps

Lackawanna4-0110910 P Resurface 435 M19 110910 EBS

3/14/2019Less than 100,0002018 Flood Repairs River RoadLackawanna4-0112000 Restoration 3005 18F 112000 EBS3/14/2019From 1,000,000 to 5,000,000SR 1022 Over Snake Creek

Emergency Flood

Susquehanna4-079551 Bridge Replacement 1022 551 79551 EBS

3/14/2019From 500,000 to 1,000,000SR 2055 over Hop Bottom Creek Emergency Flood

Susquehanna4-067572 Bridge Replacement 2055 F18 67572 EBS

3/14/2019From 500,000 to 1,000,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 924 M19 108786 EBS3/14/2019From 500,000 to 1,000,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 1021 M19 108775 EBS3/14/2019From 500,000 to 1,000,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 2027 M19 108772 EBS3/14/2019From 500,000 to 1,000,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 1025 M19 108768 EBS3/14/2019From 200,000 to 500,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 2029 M19 108760 EBS3/14/2019From 500,000 to 1,000,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 2025 M19 108757 EBS3/14/2019From 200,000 to 500,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 924 19M 108755 EBS3/14/2019From 500,000 to 1,000,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 1007 M19 108604 EBS3/14/2019From 200,000 to 500,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 1005 M19 108603 EBS3/14/2019From 200,000 to 500,000Lackawanna SR 435 Paving-

Design Build Curb Ramps

Lackawanna4-0110910 P Resurface 4024 M19 108592 EBS

3/14/2019From 500,000 to 1,000,000Lackawanna SR 435 Paving- Design Build Curb Ramps

Lackawanna4-0110910 P Resurface 2020 M19 108570 EBS

3/14/2019From 500,000 to 1,000,000Lackawanna SR 435 Paving- Design Build Curb Ramps

Lackawanna4-0110910 P Resurface 307 M19 108498 EBS

3/14/2019From 200,000 to 500,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 2015 M19 108350 EBS3/14/2019From 500,000 to 1,000,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 3017 M19 108349 EBS3/14/2019From 500,000 to 1,000,000Luzerne SR 924 PavingLuzerne4-0108786 P Resurface 3022 M19 108341 EBS3/14/2019From 500,000 to 1,000,000Lackawanna SR 435 Paving-

Design Build Curb Ramps

Lackawanna4-0110910 P Resurface 3011 M19 108212 EBS

3/14/2019From 500,000 to 1,000,000Lackawanna SR 435 Paving- Design Build Curb Ramps

Lackawanna4-0110910 P Resurface 1016 M19 108207 EBS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 3: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 3 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

3/14/2019From 1,000,000 to 5,000,000Burkeys BridgeBerks5-0103135 Replace/Rehab 7243 01B 103135 EBS3/14/2019From 1,000,000 to 5,000,000SR 2012 over Pocono CreekMonroe5-079179 Bridge Rehabilitation 2012 ABB 79179 EBS3/14/2019From 500,000 to 1,000,000Walnut Bottom Road Bridge-ACumberland8-074051 Bridge Replacement 174 016 74051 EBS3/14/2019From 1,000,000 to 5,000,000Mount Hope Intrscn ImprovCambria9-096506 Safety Improvement 3024 07S 96506 EBS3/14/2019From 1,000,000 to 5,000,000Carroll Road to Huber StreetCambria9-0106057 Resurface 4019 005 106057 EBS3/14/2019From 500,000 to 1,000,000Standing Stone Ck #2Huntingdon9-023036 Bridge Rehabilitation 1023 02B 23036 EBS3/14/2019From 1,000,000 to 5,000,000PA 28/US 322 Brookville

Intersection

Jefferson10-026064 Intersection Improvement 28 572 26064 EBS

3/14/2019From 1,000,000 to 5,000,000SR 2066 ResurfacingArmstrong10-091780 Resurface 2066 101 91780 EBS3/14/2019From 1,000,000 to 5,000,000Armstrong Group ResurfacingArmstrong10-0111947 Resurface 1004 104 111947 EBS3/14/2019From 500,000 to 1,000,000SR 950 MicrosurfaceJefferson10-0112513 Resurface 950 501 112513 EBS3/14/2019From 1,000,000 to 5,000,000SR 2005 & SR 2010 Rural

Commercial Route

Butler10-0111922 Resurface 2010 201 111922 EBS

3/14/2019From 1,000,000 to 5,000,000Leeper North PM and East Brady North PM

Clarion10-0106515 Resurface 68 301 106517 EBS

3/14/2019From 1,000,000 to 5,000,000Leeper North PM and East Brady North PM

Clarion10-0106515 Resurface 36 301 106515 EBS

3/14/2019From 1,000,000 to 5,000,000GRP 112-19-7135-1Beaver11-0105243 Resurface 4028 B03 105243 EBS3/14/2019From 5,000,000 to 10,000,000Design activities are limited to:

Traffic Control Plan, Temp Signal

Allengheny11-098105 P Reconstruct 837 A48 98105 EBS

3/14/2019From 1,000,000 to 5,000,000GRP 112-19-7135-1Beaver11-0105243 Resurface 4021 0 101225 EBS3/14/2019From 1,000,000 to 5,000,000McKeesport Road CulvertAllengheny11-0100656 A Bridge Rehabilitation 2001 A17 100656 EBS3/14/2019From 1,000,000 to 5,000,000SR68 Midland Road SlideBeaver11-0111759 Slides Correction 68 B41 111759 EBS3/14/2019From 1,000,000 to 5,000,000GRP 112-19-7135-1Beaver11-0105243 Resurface 4028 0 81752 EBS3/14/2019From 1,000,000 to 5,000,000CB # 24 Brickyard BridgeBeaver11-028806 M Bridge Replacement 7412 LOC 28806 EBS3/14/2019From 1,000,000 to 5,000,000CB52-McHenry Brdg #1Beaver11-028831 M Bridge Replacement 7216 BR 28831 EBS3/14/2019From 500,000 to 1,000,000Jacks Run Bridge No. 4Allengheny11-027332 M Bridge Deck Replacement 7116 BR 27332 EBS3/28/2019From 100,000 to 200,000SR 3002: McGraw Road Bridge

over Pine Creek

Warren1-02530 Bridge Replacement 3002 B02 2530 EBS

3/28/2019From 500,000 to 1,000,000US 6 Bridge over Ludlow StWarren1-057180 Bridge Rehabilitation 6 B21 57180 EBS3/28/2019From 1,000,000 to 5,000,000Thompsontown RehabilitationJuniata2-099999 Resurface 333 911 99999 EBS3/28/2019From 1,000,000 to 5,000,000T-419 Lower Georges Valley Road

over Muddy Creek

Centre2-095799 F M Bridge Improvement 7207 0 95799 EBS

3/28/2019From 1,000,000 to 5,000,000US Route 22 High Friction Surface HSIP

Mifflin2-0109871 Safety Improvement 22 HFS 109871 EBS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 4: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 4 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

3/28/2019From 1,000,000 to 5,000,000SR 3002/T307 Federal Forest Access

Elk2-0109733 Restoration 3002 FFA 109733 EBS

3/28/2019From 1,000,000 to 5,000,000Group 2-19-ST1Centre2-0108278 Resurface 64 0 108278 EBS3/28/2019From 1,000,000 to 5,000,000Group 2-19-ST1Centre2-0108278 Resurface 150 ST3 108335 EBS3/28/2019From 1,000,000 to 5,000,000Group 2-19-ST9Juniata2-0108368 Resurface 1003 ST7 108369 EBS3/28/2019From 1,000,000 to 5,000,000Group 2-19-ST9Juniata2-0108368 Resurface 2001 ST9 108368 EBS3/28/2019From 500,000 to 1,000,000PA 339 over Beaver RunColumbia3-05585 Bridge Replacement 339 015 5585 EBS3/28/2019From 100,000 to 200,000SR 1017 over Branch of Briar

Creek

Columbia3-093579 Bridge Replacement 1017 012 93579 EBS

3/28/2019From 1,000,000 to 5,000,000Susquehanna SR 11 Paving & Design Built Curb Ramps

Susquehanna4-0108376 P Resurface 11 M18 108374 EBS

3/28/2019From 500,000 to 1,000,000Pike SR 2001; 739 Paving Design Build Curb Ramps

Pike4-0110897 P Resurface 6 M19 109968 EBS

3/28/2019From 1,000,000 to 5,000,000Susquehanna SR 11 Paving & Design Built Curb Ramps

Susquehanna4-0108376 P Resurface 171 M19 108377 EBS

3/28/2019From 1,000,000 to 5,000,000Susquehanna SR 11 Paving & Design Built Curb Ramps

Susquehanna4-0108376 P Resurface 11 M19 108376 EBS

3/28/2019From 1,000,000 to 5,000,000Susquehanna SR 11 Paving & Design Built Curb Ramps

Susquehanna4-0108376 P Resurface 87 M21 108320 EBS

3/28/2019From 1,000,000 to 5,000,000Pike SR 2001; 739 Paving Design Build Curb Ramps

Pike4-0110897 P Resurface 6 M19 108246 EBS

3/28/2019From 1,000,000 to 5,000,000Pike SR 2001; 739 Paving Design Build Curb Ramps

Pike4-0110897 P Resurface 2001 M19 110897 EBS

3/28/2019From 1,000,000 to 5,000,000SR 2010 over McMichael's CreekMonroe5-079178 Bridge Rehabilitation 2010 02B 79178 EBS3/28/2019From 5,000,000 to 10,000,000MacDade Blvd Signals: South Ave

- Cherry St. Design Activity limited

Delaware6-064790 P Existing Signal Improvement

2006 DMS 64790 EBS

3/28/2019From 1,000,000 to 5,000,000Main Street over SEPTABucks6-013377 Bridge Replacement 4013 BMS 13377 EBS3/28/2019From 1,000,000 to 5,000,000Peters Mountain Rd ResurfDauphin8-0109393 Resurface 147 021 109393 EBS3/28/2019From 200,000 to 500,000Peters Mountain Rd ResurfDauphin8-0109393 Resurface 225 024 96304 EBS3/28/2019From 1,000,000 to 5,000,000SR 30 ResurfacingFranklin8-0108747 Pavement Preservation 30 139 108747 EBS3/28/2019From 10,000,000 to 20,000,000Butler BypassButler10-0105905 Resurface 422 230 105905 EBS3/28/2019From 1,000,000 to 5,000,000SR 38-PA 68 to SR 1002Butler10-091292 Resurface 38 204 91292 EBS3/28/2019From 5,000,000 to 10,000,000GRP 111-19-7135-3 CONCAllengheny11-0105241 Resurface 3048 A23 105241 EBS3/28/2019From 1,000,000 to 5,000,000GRP 111-19-7135-1Allengheny11-0105239 Resurface 3034 A13 105239 EBS3/28/2019From 500,000 to 1,000,000GRP 111-19-7135-3 CONCAllengheny11-0105241 Resurface 3037 A10 100880 EBS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 5: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 5 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

3/28/2019From 500,000 to 1,000,000SR 2023 Harrison Hollow Road Slide

Allengheny11-0100842 Slides Correction 2023 A03 100842 EBS

3/28/2019From 1,000,000 to 5,000,000Design activities are limited to: Bridge, roadway, permits, and

Allengheny11-073055 P Bridge Replacement 4017 A07 73055 EBS

3/28/2019From 1,000,000 to 5,000,000Wenzell Av/Carnahan Rd BrAllengheny11-058561 M Reconstruct 7301 LOC 58561 EBS3/28/2019From 1,000,000 to 5,000,000SIP 12-19-SI4-1Washington12-0108277 Resurface 19 19R 94729 EBS3/28/2019From 5,000,000 to 10,000,000SIP 12-19-SI4-1Washington12-0108277 Resurface 980 0 108277 EBS3/28/2019From 5,000,000 to 10,000,000I-70: Centerville to SpeersWashington12-091581 Restoration 70 22R 91581 EBS3/28/2019From 1,000,000 to 5,000,000PA 31 PRESERVATIONWestmoreland12-0110064 Pavement Preservation 31 04R 110064 EBS4/5/2019From 20,000,000 to 30,000,000SR 519 at SR 980 and I-79Washington12-057201 Intersection Improvement 519 K20 57201 EBS

4/11/2019From 5,000,000 to 10,000,000I-86 Eastbound PreservationErie1-081441 Resurface 86 A02 81441 EBS4/11/2019From 200,000 to 500,0002019 Warren Shotcrete GroupWarren1-0110411 Bridge Preservation

Activities

59 B06 110411 ECMS

4/11/2019From 200,000 to 500,000I-86 Eastbound PreservationErie1-081441 Safety Improvement 8170 S01 109997 EBS4/11/2019From 5,000,000 to 10,000,000Group 2-19-ST2Clearfield2-0108307 Resurface 2011 ST2 108307 EBS4/11/2019From 1,000,000 to 5,000,000Group 2-19-ST6Potter2-0108360 Resurface 44 ST6 108360 ECMS4/11/2019From 10,000,000 to 20,000,000Group 2-19-ST5McKean2-0108328 Resurface 346 ST5 108328 EBS4/11/2019From 1,000,000 to 5,000,000Group 2-19-ST2Clearfield2-0108307 Resurface 948 ST8 108358 EBS4/11/2019From 500,000 to 1,000,000Group 2-19-ST2Clearfield2-0108307 Resurface 120 ST4 108327 EBS4/11/2019From 1,000,000 to 5,000,000Beech Street to Mill Lane,

"Design" activities limited to ADA

Lycoming3-099029 P Resurface 1017 016 99029 ECMS

4/11/2019From 1,000,000 to 5,000,000River Ave to Loyalsock CrLycoming3-099033 P Resurface 2014 094 99033 EBS4/11/2019From 1,000,000 to 5,000,000Hamilton West Resurface 33 to 80Monroe5-096442 Resurface 209 28M 96442 ECMS4/11/2019From 1,000,000 to 5,000,000SR 4028 Old Route 22 Greenwich

Twp

Berks5-0110081 Resurface 4028 02M 110081 ECMS

4/11/2019From 1,000,000 to 5,000,000SR 901 over Mahanoy CreekSchuylkill5-012702 Bridge Preservation Activities

901 02B 12702 ECMS

4/11/2019From 5,000,000 to 10,000,000SR 22 - 25th St to Farmersville RdNorthampton5-012319 Restoration 22 04M 12319 ECMS4/11/2019Less than 100,000DISTRICT-WIDE RUMBLE

STRIPS

Berks5-0112200 Safety Improvement 23 0 112200 EBS

4/11/2019Less than 100,000Fountain Hill Pedestrian Enhancement

Lehigh5-0107758 M Transportation Enhancement

2002 FHP 107758 ECMS

4/11/2019From 1,000,000 to 5,000,000LVTS Bridge Overlay BundleNorthampton5-0110186 Bridge Preservation Activities

191 BOB 110186 ECMS

4/11/2019From 1,000,000 to 5,000,000309 Resurface-Lofty Hill to McAdoo

Schuylkill5-0110103 Resurface 309 06M 110103 EBS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 6: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 6 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

4/11/2019From 30,000,000 to 40,000,000I95 Delaware Line-Phila NB(Parent)

Delaware6-092581 P Resurface 95 PM5 103744 ECMS

4/11/2019From 50,000,000I95 Delaware Line-Phila NB(Parent)

Delaware6-092581 P Resurface 95 PM5 92581 ECMS

4/11/2019From 1,000,000 to 5,000,000Winterstown Road ResurfaceYork8-0108740 Resurface 24 027 108740 EBS4/11/2019From 10,000,000 to 20,000,000I-81 River Relief BridgeDauphin8-080696 Bridge Preservation

Activities

22 060 80696 EBS

4/11/2019From 500,000 to 1,000,000SR 4007 - PA 305 to Cold Spring Rd (SR 1009)

Huntingdon9-0110283 Resurface 1011 001 106473 ECMS

4/11/2019From 1,000,000 to 5,000,000SR 4007 - PA 305 to Cold Spring Rd (SR 1009)

Huntingdon9-0110283 Resurface 4007 001 110283 ECMS

4/11/2019From 1,000,000 to 5,000,000SR 308 Binder OverlayButler10-0111923 Resurface 308 201 111923 ECMS4/11/2019From 1,000,000 to 5,000,000Indiana Bypass SouthIndiana10-0100107 Resurface 119 402 100107 ECMS4/11/2019From 1,000,000 to 5,000,000US119WayneAveToEndBypassIndiana10-0100104 Resurface 119 401 100104 ECMS4/11/2019From 1,000,000 to 5,000,000GRP 111-19-7135-4 (DRN)Allengheny11-0111317 Resurface 837 A49 100811 ECMS4/11/2019From 1,000,000 to 5,000,000GRP 111-19-7135-4 (DRN)Allengheny11-0111317 Drainage Improvement 837 A49 111317 ECMS4/11/2019From 1,000,000 to 5,000,000GRP 111-19-7135-4 (DRN)Allengheny11-0111317 Resurface 136 A11 100802 ECMS4/11/2019From 1,000,000 to 5,000,000GRP 111-19-7135-4 (DRN)Allengheny11-0111317 Resurface 48 A42 100781 ECMS4/11/2019From 10,000,000 to 20,000,000Kenmawr Br ov NSAllengheny11-027543 A Bridge Replacement 7463 BRG 27543 ECMS4/11/2019From 200,000 to 500,000Roseytown Road RR Tunnel

Repairs

Westmoreland12-0111650 Resurface 1030 0 111650 EBS

4/11/2019From 1,000,000 to 5,000,0002019 Slide RepairsFayette12-0110090 Slides Correction 88 SLD 110090 ECMS4/11/2019From 1,000,000 to 5,000,000SR 2030 over Gorbys RunWashington12-069242 Bridge Replacement 2030 F10 69242 EBS4/15/2019From 500,000 to 1,000,000Bridge Street and Eureka Hill

Grade Crossings

Westmoreland12-0106061 Crossbuck Signs 981 RRX 106061 ECMS

4/25/2019From 500,000 to 1,000,000SR 4008 over Conneaut CkCrawford1-078857 Bridge Rehabilitation 4008 B03 78857 ECMS4/25/2019From 5,000,000 to 10,000,000US 62: Market Street ExtWarren1-0100320 Restoration 62 21M 100320 ECMS4/25/2019From 1,000,000 to 5,000,000SR 1004 over Montgomery RunClearfield2-085091 Bridge Replacement 1004 A03 85091 ECMS4/25/2019From 1,000,000 to 5,000,000SR 120-321 Slide HazardsClinton2-03808 Reconstruct 120 321 3808 EBS4/25/2019From 1,000,000 to 5,000,000SR 1023 over South CreekBradford3-05142 Bridge Rehabilitation 1023 014 5142 ECMS4/25/2019From 200,000 to 500,000Kelsey Cr to Queen StTioga3-0111756 Resurface 6 148 111756 ECMS4/25/2019From 200,000 to 500,000Beeber St to Seventh AveLycoming3-0111753 Resurface 2014 105 111753 ECMS4/25/2019From 500,000 to 1,000,000SR 4004 from SR 61 to Mile Post

Rd

Northumberland3-0106286 Resurface 4004 015 106286 ECMS

4/25/2019From 100,000 to 200,000SR 4004 from SR 61 to Mile Post Rd

Northumberland3-0106286 Resurface 4008 021 107201 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 7: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 7 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

4/25/2019Less than 100,000Mifflin Co to SR 522Snyder3-0111388 Resurface 3011 008 111386 ECMS4/25/2019From 200,000 to 500,000Mifflin Co to SR 522Snyder3-0111388 Resurface 3014 011 111388 ECMS4/25/2019From 200,000 to 500,000SR 6 Federal Aid Paving,

Design-Build Curb Cut Ramps

Wyoming4-0112493 P Resurface 1041 FP1 112495 ECMS

4/25/2019From 1,000,000 to 5,000,000SR 6 Federal Aid Paving, Design-Build Curb Cut Ramps

Wyoming4-0112493 P Resurface 6 FP4 112493 ECMS

4/25/2019From 1,000,000 to 5,000,000Districtwide Barrier RepairPhiladelphia6-0112280 Reconstruct 76 PBR 112280 ECMS4/25/2019From 1,000,000 to 5,000,000County Bridge #21: Rickert Rd o/

Morris Run

Bucks6-013296 M Bridge Replacement 7009 021 13296 ECMS

4/25/2019From 5,000,000 to 10,000,000PA 52 (Lenape Rd) over Brandywine Creek Floodplain

Chester6-0102853 Bridge Rehabilitation 52 CNB 102853 ECMS

4/25/2019From 1,000,000 to 5,000,000PA 23 TSM Improvements 2Lancaster8-0104473 Intersection Improvement 23 032 104473 ECMS4/25/2019From 500,000 to 1,000,000Evitts Creek BridgeBedford9-021464 Bridge Improvement 3003 01B 21464 EBS4/25/2019From 1,000,000 to 5,000,000US 22 to SR 4004Blair9-096403 Resurface 1001 011 96403 ECMS4/25/2019From 500,000 to 1,000,000Brthrtn Rd-Coleman Stn Rd - FDRSomerset9-096639 Resurface 2033 DF1 96639 ECMS4/25/2019From 1,000,000 to 5,000,000GRP 111-19-7135-2Allengheny11-0105240 Resurface 885 A47 100816 ECMS4/25/2019From 1,000,000 to 5,000,000SR2058 Hulton Rd SlideAllengheny11-0110380 Slides Correction 2058 A13 110380 ECMS4/25/2019From 5,000,000 to 10,000,000GRP 111-19-7135-2Allengheny11-0105240 Resurface 885 A47 105240 ECMS4/25/2019From 200,000 to 500,000GRP 111-19-7135-2Allengheny11-0105240 Resurface 2033 A03 100846 ECMS4/25/2019From 1,000,000 to 5,000,000Boston Hollow over boston hollow

Run

Allengheny11-078175 A Bridge Replacement 48 A34 78175 ECMS

4/25/2019From 1,000,000 to 5,000,000PA 366 over Pucketa CkWestmoreland12-076115 Bridge Replacement 366 D20 76115 ECMS4/25/2019From 200,000 to 500,000SIP 12-19-SI5-1Westmoreland12-0108354 Resurface 4001 0 101338 ECMS4/25/2019From 1,000,000 to 5,000,000SIP 12-19-SI5-1Westmoreland12-0108354 Resurface 3049 0 101382 ECMS4/25/2019From 1,000,000 to 5,000,000SIP 12-19-SI5-1Westmoreland12-0108354 Resurface 4081 SIP 101364 ECMS4/25/2019From 1,000,000 to 5,000,000SIP 12-19-SI5-1Westmoreland12-0108354 Resurface 4075 SIP 101361 ECMS4/25/2019From 500,000 to 1,000,000SIP 12-19-SI5-1Westmoreland12-0108354 Resurface 4007 SIP 101342 ECMS4/25/2019From 1,000,000 to 5,000,000SIP 12-19-SI5-1Westmoreland12-0108354 Resurface 130 SIP 98312 ECMS4/25/2019From 1,000,000 to 5,000,000SIP 12-19-SI5-1Westmoreland12-0108354 Resurface 819 0 108354 ECMS4/25/2019From 500,000 to 1,000,00012-19-RPMWashington12-0112609 Safety Improvement 79 0 112609 ECMS5/9/2019From 1,000,000 to 5,000,000PA 53 Drifting Highway SlideClearfield2-0112547 F Slides Correction 53 270 112547 ECMS5/9/2019From 1,000,000 to 5,000,0002020 NC Bridge PreservationMcKean2-0110669 Bridge Improvement 346 P39 110669 ECMS5/9/2019From 500,000 to 1,000,000SR 924 / I-80 Cable Median

Barrier

Luzerne4-0111043 Safety Improvement 924 391 111043 ECMS

5/9/2019From 200,000 to 500,000SR 4023 over Tributary W. Branch Lackawaxen River

Wayne4-09976 Bridge Replacement 4023 650 9976 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 8: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 8 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

5/9/2019From 1,000,000 to 5,000,000Darby Paoli O/L Darby CreekDelaware6-014891 Bridge Replacement 1015 RAD 14891 EBS5/9/2019From 1,000,000 to 5,000,000Oregon Pike #2 ResurfaceLancaster8-096324 Resurface 1029 006 107039 ECMS5/9/2019From 1,000,000 to 5,000,000Oregon Pike #2 ResurfaceLancaster8-096324 Resurface 272 045 96324 ECMS5/9/2019From 200,000 to 500,000DF - SR 4016 - US 219 to SR

4021

Cambria9-0108191 Resurface 4024 003 108193 ECMS

5/9/2019From 500,000 to 1,000,000DF - SR 4016 - US 219 to SR 4021

Cambria9-0108191 Resurface 4016 003 108191 ECMS

5/9/2019From 10,000,000 to 20,000,000Mud Pike Rd ImprovementsSomerset9-021592 Restoration 3010 004 21592 ECMS5/9/2019From 200,000 to 500,000SR 3035 Old US Rte 119S Phase

1

Indiana10-0111792 Resurface 3035 401 111792 ECMS

5/9/2019From 1,000,000 to 5,000,000SR 66 PMClarion10-099592 Resurface 66 309 99592 ECMS5/9/2019From 1,000,000 to 5,000,000MA08 - Glenwood BridgeAllengheny11-093419 M Bridge Preservation

Activities

885 LOC 93419 ECMS

5/9/2019From 1,000,000 to 5,000,0003035/WeymanBRovSawMillRunAllengheny11-073051 A Bridge Replacement 3035 A03 73051 ECMS5/9/2019From 10,000,000 to 20,000,000PA 906 ReconstructionWestmoreland12-0111658 Reconstruct 906 B10 111658 ECMS5/9/2019From 500,000 to 1,000,00012-19-GR5Westmoreland12-0112175 Guiderail Improvement 70 GDR 112175 ECMS5/9/2019From 500,000 to 1,000,00012-19-GR4Washington12-0112174 Guiderail Improvement 79 GDR 112174 ECMS5/9/2019From 200,000 to 500,00012-19-GR2Greene12-0112173 Guiderail Improvement 79 GDR 112173 ECMS5/9/2019From 100,000 to 200,00012-19-GR1Fayette12-0112172 Guiderail Improvement 21 GDR 112172 ECMS

5/23/2019From 500,000 to 1,000,000Atlantic Ave.Venango1-0109152 Restoration 4004 01M 109152 EBS5/23/2019From 1,000,000 to 5,000,000SR 2006 over French CreekErie1-088462 Bridge Rehabilitation 2006 B01 88462 ECMS5/23/2019From 200,000 to 500,000PA 58 Bridge/Faherty RunMercer1-097307 Bridge Rehabilitation 58 B10 97307 ECMS5/23/2019From 1,000,000 to 5,000,0002019 Centre Br. Preserv.Centre2-03108 Bridge Improvement 3010 P15 3108 ECMS5/23/2019From 1,000,000 to 5,000,000SR 11 Federal Design -Build Curb

Ramps

Luzerne4-0112465 P Resurface 11 CR1 112465 ECMS

5/23/2019From 1,000,000 to 5,000,000SR 11 Federal Paving- Design -Build Curb Cut Ramps

Luzerne4-0102556 P Resurface 11 FP3 102556 ECMS

5/23/2019From 1,000,000 to 5,000,000SR 11 Federal Design-Build Curb Ramps 2

Luzerne4-0112466 P Resurface 11 CR2 112466 ECMS

5/23/2019From 1,000,000 to 5,000,000RATS Bridge Overlay BundleBerks5-0112170 Bridge Preservation Activities

422 BOB 112170 ECMS

5/23/2019From 5,000,000 to 10,000,000SR 29 over Norfolk Southern RR Bridge

Lehigh5-011419 Bridge Replacement 29 07B 11419 EBS

5/23/2019From 200,000 to 500,000I-80 WayfindingMonroe5-076443 M Signing 80 WAY 76443 EBS5/23/2019From 1,000,000 to 5,000,000US 202-61N SWM Offsite

Mitigation

Montgomery6-064052 Drainage Improvement 73 6SM 64052 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 9: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 9 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

5/23/2019From 5,000,000 to 10,000,000Bridge Rehab Group WBucks6-0110664 Bridge Deck Replacement 2195 HBW 110664 EBS5/23/2019From 30,000,000 to 40,000,000I-95 Bridge RepairsPhiladelphia6-0107709 P Bridge Rehabilitation 95 MB4 107709 ECMS5/23/2019From 1,000,000 to 5,000,000Schuylkill Rvr Trail(Mont Clare

Brg) - D/B Activities limited to:

Chester6-061885 P M Bicycle Facilities/Services 29 Q42 61885 ECMS

5/23/2019From 5,000,000 to 10,000,000Armagh Bypass PMIndiana10-0106485 Resurface 22 402 106485 EBS5/23/2019From 1,000,000 to 5,000,000SR 3048, Noblestown Road Slide

Remediation

Allengheny11-0105462 Slides Correction 3048 A20 105462 ECMS

5/23/2019From 10,000,000 to 20,000,000Dooker's Hollow Br (DK01)Allengheny11-076393 M Bridge Replacement 7449 LOC 76393 ECMS5/23/2019From 1,000,000 to 5,000,0004th St. ov McCabe RunAllengheny11-078178 F Bridge Replacement 51 A98 78178 ECMS6/1/2019From 100,000 to 200,000SR 3001 / N Fork Wheeling Ck -

DFB

Greene12-090742 Bridge Replacement 3001 DFB 90742 ECMS

6/1/2019From 100,000 to 200,000SR 2003 over Chaney Run-2-DFBFayette12-090806 Bridge Replacement 2003 F10 90806 ECMS6/1/2019From 100,000 to 200,000SR 1019/ Br Breakneck Run-DFBFayette12-090647 Bridge Replacement 1019 DFB 90647 ECMS6/1/2019From 200,000 to 500,000SR 1023 over Furnace Run-DFBWestmoreland12-0107562 Bridge Replacement 1023 A10 107562 ECMS6/1/2019From 200,000 to 500,000SR 4046 over Mill Run-DFBFayette12-0105388 Bridge Replacement 4046 D20 105388 ECMS6/1/2019From 100,000 to 200,000PA 136 ov Ltl Sewickley Ck - DFBWestmoreland12-089089 Bridge Rehabilitation 136 DFB 89089 ECMS6/6/2019From 1,000,000 to 5,000,000US 62/State St IntersectionMercer1-0105775 Safety Improvement 62 S01 105775 EBS6/6/2019From 1,000,000 to 5,000,000Peach St. Safety & Mobility Imp.Erie1-0107348 Safety Improvement 19 S04 107348 ECMS6/6/2019From 1,000,000 to 5,000,000Lewistown Safety CorridorMifflin2-0101959 Safety Improvement 1005 N34 101959 ECMS6/6/2019From 200,000 to 500,000US 220 Bridge PatchingLycoming3-0112677 Bridge Deck

Rehabilitation

220 231 112677 ECMS

6/6/2019From 1,000,000 to 5,000,000SR 1010 over Lewis CreekSusquehanna4-09572 F Bridge Replacement 1010 501 9572 ECMS6/6/2019From 500,000 to 1,000,000RCR MONROE 314Monroe5-0111979 Resurface 314 RCR 111979 ECMS6/6/2019From 5,000,000 to 10,000,000FedEx Roadway ImprovemntsLehigh5-0102873 M Widen 987 FDX 102873 ECMS6/6/2019From 100,000 to 200,000Eckley Road ResurfaceCarbon5-0101527 Resurface 209 12M 83088 ECMS6/6/2019From 100,000 to 200,000Interchange Rd ResurfaceCarbon5-083088 Resurface 209 12M 83088 ECMS6/6/2019From 1,000,000 to 5,000,000222 SB Auxiliary LaneBerks5-0109788 Add Lane 222 30M 109788 ECMS6/6/2019From 5,000,000 to 10,000,000222 Slab StabilizationBerks5-0106496 Restoration 222 SLB 106496 ECMS6/6/2019From 1,000,000 to 5,000,000222 Slab StabilizationBerks5-0106496 Add Lane 222 30M 109788 ECMS6/6/2019From 1,000,000 to 5,000,000Group 6-19-ST22Philadelphia6-0111309 Resurface 1004 022 111309 ECMS6/6/2019From 5,000,000 to 10,000,000Bridge Group NChester6-0107544 Bridge Replacement 282 HBN 107544 EBS6/6/2019From 5,000,000 to 10,000,000W Girard Ave (US 30) o/ CSXPhiladelphia6-078764 Bridge Replacement 30 PGC 78764 ECMS6/6/2019From 1,000,000 to 5,000,000PA-897/Main St ResurfaceLebanon8-097965 Resurface 897 031 97965 ECMS6/6/2019From 1,000,000 to 5,000,000Anderson Ferry Rd/Marietta Ave

Resurface

Lancaster8-095194 Pedestrian Facilities 772 040 95715 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 10: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 10 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

6/6/2019From 1,000,000 to 5,000,000Anderson Ferry Rd/Marietta Ave Resurface

Lancaster8-095194 Pavement Preservation 772 037 95194 ECMS

6/6/2019From 5,000,000 to 10,000,000I-83 MPT ResurfacingYork8-0112534 Resurface 83 089 112534 ECMS6/6/2019From 1,000,000 to 5,000,000SR 0326 - Main Rd to US 30Bedford9-0110219 Resurface 326 005 110219 ECMS6/6/2019From 1,000,000 to 5,000,000Point Stadium Br RehabCambria9-096514 Bridge Rehabilitation 56 01B 96514 ECMS6/6/2019From 5,000,000 to 10,000,000Brotherton Rd to Berlin/Somerset

Interchange

Somerset9-091671 Resurface 2047 004 91671 ECMS

6/6/2019From 1,000,000 to 5,000,000SR 2025-SR 2023 to US 322Jefferson10-091380 Resurface 2025 501 91380 ECMS6/6/2019From 200,000 to 500,000SR 2002 ResurfacingIndiana10-0111924 Resurface 2002 401 111924 ECMS6/6/2019From 1,000,000 to 5,000,000W Ohio St/Ridge Ave Br's.Allengheny11-027300 M Bridge Rehabilitation 4084 0 27300 ECMS6/6/2019From 500,000 to 1,000,000Indiana Road SlideAllengheny11-0109532 Slides Correction 2070 A02 109532 ECMS6/6/2019From 500,000 to 1,000,000Piney Fork Road SlideAllengheny11-026600 Slides Correction 3014 A07 26600 ECMS6/6/2019From 1,000,000 to 5,000,000SR 3066, Steubenville Pike Slide

Remediation

Allengheny11-0105464 Slides Correction 3066 A06 105464 ECMS

6/6/2019From 500,000 to 1,000,000SR 2065, Larimer Avenue SlideAllengheny11-0105458 Slides Correction 2065 A09 105458 ECMS6/6/2019From 500,000 to 1,000,000D12 Mountain SignageFayette12-0109870 Safety Improvement 40 DEL 109870 ECMS

6/20/2019From 500,000 to 1,000,000US 322 Br/Crooked Ck TribCrawford1-078683 Bridge Replacement 322 B00 78683 ECMS6/20/2019From 1,000,000 to 5,000,000SR 315 / 2017 Inters ImpLuzerne4-0102011 Safety Improvement 2017 D51 102011 ECMS6/20/2019From 1,000,000 to 5,000,000SR 93 over Nescopeck CreekLuzerne4-09079 Bridge Replacement 93 350 9079 ECMS6/20/2019From 1,000,000 to 5,000,000NEPA Brg Preserve & Repair 5Carbon5-0105952 Bridge Preservation

Activities

93 BRM 105952 ECMS

6/20/2019From 1,000,000 to 5,000,000Sellersville Bypass Preventative Maintenance

Bucks6-086923 Bridge Rehabilitation 309 PM1 104741 ECMS

6/20/2019From 1,000,000 to 5,000,000County Bridge #45: Stone Bridge Rd o/ Deep Run

Bucks6-013249 M Bridge Replacement 7009 045 13249 ECMS

6/20/2019From 50,000,000Sellersville Bypass Preventative Maintenance

Bucks6-086923 Resurface 309 PM1 86923 ECMS

6/20/2019From 1,000,000 to 5,000,000County Bridge #237: Tribbett Ave o/ Hermesprota Ck*

Delaware6-086370 M Bridge Replacement 7023 237 86370 ECMS

6/20/2019From 40,000,000 to 50,000,000US 202 Reconstruction/Widening: Morris Rd to Hancock Rd; D/B

Montgomery6-063491 P Widen 202 65S 63491 ECMS

6/20/2019From 10,000,000 to 20,000,000PA320@HANGING ROCKMontgomery6-016599 Restoration 320 M07 16599 ECMS6/20/2019From 1,000,000 to 5,000,000North Hills Road ImprovementYork8-0110054 Intersection Improvement 2003 029 110054 ECMS6/20/2019From 10,000,000 to 20,000,000I-81 Carlisle WestCumberland8-091015 Resurface 81 079 91015 ECMS6/20/2019From 1,000,000 to 5,000,000Poplar Run Rd - Old US 22Blair9-096463 Resurface 3009 001 96463 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 11: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 11 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

6/20/2019From 500,000 to 1,000,000Mount Aloysius to Downtown Cresson Sidewalk

Cambria9-0111480 M Transportation Enhancement

2014 MAS 111480 ECMS

6/20/2019From 1,000,000 to 5,000,000SR 3011 - PA 985 to Southmont Blvd.

Cambria9-0106053 Resurface 3011 001 106053 ECMS

6/20/2019From 1,000,000 to 5,000,000Richardsville BridgeJefferson10-026022 Bridge Replacement 4005 551 26022 ECMS6/20/2019From 500,000 to 1,000,000SR 4012 Brady's Run Road #1Beaver11-0108001 Slides Correction 4012 B09 108001 ECMS6/20/2019From 1,000,000 to 5,000,000PA 48 over boston hollow runAllengheny11-093784 A Bridge Replacement 48 A33 93784 ECMS6/20/2019From 1,000,000 to 5,000,000PA 88 & SR 3004 WideningAllengheny11-0102961 A Add Turning Lane 88 A23 102961 ECMS6/20/2019From 500,000 to 1,000,000SR 4012 Brady's Run Road #1Beaver11-0108001 Slides Correction 4012 B10 107994 ECMS6/20/2019From 500,000 to 1,000,000SR 4012 Brady's Run Road #1Beaver11-0108001 Slides Correction 3005 B06 109530 ECMS6/20/2019From 500,000 to 1,000,000SR 4012 Brady's Run Road #2Beaver11-0107994 Slides Correction 4012 B10 107994 ECMS6/20/2019From 1,000,000 to 5,000,000Wash Co Bridge Preserv 2019Washington12-0110004 Bridge Preservation

Activities

40 0 110004 ECMS

6/20/2019From 200,000 to 500,000Bridge Bearing Cleaning 2019Fayette12-0111966 Bridge Improvement 40 0 111966 ECMS6/20/2019From 10,000,000 to 20,000,000Yukon & Madison InterchangesWestmoreland12-031895 Reconstruct 70 0 106414 ECMS7/11/2019From 5,000,000 to 10,000,000US 6 Br over French CkCrawford1-057940 Bridge Replacement 6 B18 57940 ECMS7/11/2019From 500,000 to 1,000,000SR 6 Lehman RunPotter2-085487 Bridge Replacement 6 A04 85487 ECMS7/11/2019From 1,000,000 to 5,000,000SR2007 Trib Penns Creek BOXCentre2-091502 Bridge Improvement 2007 A02 91502 ECMS7/11/2019From 500,000 to 1,000,000SR 449 ov Trib GeneseePotter2-085502 Bridge Replacement 449 A05 85502 ECMS7/11/2019From 1,000,000 to 5,000,000SR 449 ov Trib GeneseePotter2-085502 Bridge Replacement 449 A06 85501 ECMS7/11/2019From 1,000,000 to 5,000,000SR 449 over Pine CreekPotter2-085501 Bridge Replacement 449 A06 85501 ECMS7/11/2019From 500,000 to 1,000,000Carmalt Rd Brg T-695Susquehanna4-083013 M Replace/Rehab 0 364 83013 ECMS7/11/2019From 5,000,000 to 10,000,000SR 309 over Nescopeck CkLuzerne4-093006 F Bridge Replacement 309 355 93006 ECMS7/11/2019From 100,000 to 200,000SR 1036 Pipe ReplacementLuzerne4-0110257 Replace/Rehab 1036 MAI 110257 ECMS7/11/2019From 10,000,000 to 20,000,000SR 222_73 & Genesis DrBerks5-092414 Intersection Improvement 222 22S 92414 ECMS7/11/2019From 10,000,000 to 20,000,000PA 100 ReconstructionLehigh5-0102311 Reconstruct 100 13M 102311 ECMS7/11/2019From 10,000,000 to 20,000,000222 & Shantz & 863 ImprovLehigh5-079554 Safety Improvement 222 01S 79554 ECMS7/11/2019From 1,000,000 to 5,000,000L Valley O/Officers RunChester6-069919 Bridge Replacement 372 LVR 69919 ECMS7/11/2019From 1,000,000 to 5,000,000PA 3: Ellis to St AlbansDelaware6-0111762 M Add Lane 3 010 111762 ECMS7/11/2019From 5,000,000 to 10,000,000Plesantview & Park Rd BridgesMontgomery6-0112472 Bridge Replacement 422 MAB 112472 EBS7/11/2019From 500,000 to 1,000,000PA 563 @ Pennridge Airport

Business Park

Bucks6-0111758 M Add Turning Lane 563 PAB 111758 EBS

7/11/2019From 200,000 to 500,000Spring Grove ResurfaceYork8-097967 Transportation Enhancement

116 TAP 107046 ECMS

7/11/2019From 1,000,000 to 5,000,000Spring Grove ResurfaceYork8-097967 Resurface 116 038 97967 ECMS7/11/2019From 1,000,000 to 5,000,000Nyes/Dvnshre Hts SafetyDauphin8-047521 Intersection Improvement 2019 017 47521 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 12: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 12 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

7/11/2019From 1,000,000 to 5,000,000Ramp - Rodi Rd/Chalfont RAllengheny11-028159 Bridge Replacement 2152 A01 28159 ECMS7/11/2019From 500,000 to 1,000,000Maple St ov McClures RunLawrence11-078358 M Bridge Replacement 7405 LOC 78358 ECMS7/11/2019From 100,000 to 200,000SR 1005 over Grimes Run-DFBGreene12-090652 Bridge Replacement 1005 A10 90652 ECMS7/11/2019From 100,000 to 200,000SR 4039 ov Br Millers Run-DFBWashington12-0103065 Bridge Rehabilitation 4039 0 103065 ECMS7/11/2019From 100,000 to 200,000SR 3041 ov Kelly Run-DFBWestmoreland12-098859 Bridge Improvement 3041 0 98859 ECMS7/25/2019From 1,000,000 to 5,000,000Jacks Creek BridgeMifflin2-04719 Bridge Improvement 2004 A01 4719 ECMS7/25/2019From 30,000,000 to 40,000,000PA 287 to West Fourth StreetLycoming3-093732 Safety Improvement 220 122 93732 EBS7/25/2019From 500,000 to 1,000,000SR 191 High Friction SurfaceWayne4-0112162 Safety Improvement 191 HFS 112162 ECMS7/25/2019From 1,000,000 to 5,000,000RATS Bridge Preservation #6Berks5-0107673 Bridge Preservation

Activities

1015 BRM 107673 ECMS

7/25/2019From 1,000,000 to 5,000,000Warminster Road over Pennypack Creek

Montgomery6-016726 Bridge Replacement 2040 MWB 16726 ECMS

7/25/2019From 500,000 to 1,000,000City of Lancaster Pedestrian Signals

Lancaster8-0105717 Existing Signal Improvement

23 GLG 105717 ECMS

7/25/2019From 1,000,000 to 5,000,000US219 - Plank Rd Curve ImprvmtsCambria9-0111865 Safety Improvement 219 046 111865 ECMS7/25/2019From 1,000,000 to 5,000,000US219 Carrolltown ImproveCambria9-096488 Restoration 219 44M 96488 ECMS7/25/2019From 1,000,000 to 5,000,000SR 4023 - PA 985 to PA 601Somerset9-0108289 Resurface 4023 003 108289 ECMS7/25/2019From 1,000,000 to 5,000,000US219 Carrolltown ImproveCambria9-096488 Safety Improvement 219 046 111865 ECMS7/25/2019From 10,000,000 to 20,000,000I-376 above 2nd Avenue wall

replacement

Allengheny11-0105465 Safety Improvement 376 A61 105465 ECMS

7/25/2019From 1,000,000 to 5,000,000Falls Street BridgeLawrence11-0100756 Bridge Painting 224 L11 100756 ECMS7/25/2019From 5,000,000 to 10,000,000Rural Commercail Routes 2019Fayette12-0111867 Resurface 1051 RCR 111867 ECMS8/8/2019From 1,000,000 to 5,000,000SR 4032 Brdg/4 Mile CreekErie1-097128 Bridge Rehabilitation 4032 B00 97128 ECMS8/8/2019From 500,000 to 1,000,000SR 120 Retaining WallElk2-0110461 Restoration 120 820 110461 ECMS8/8/2019From 500,000 to 1,000,000MEC Phase 14 - Completing the

Connection

Pike4-0107968 Transportation Enhancement

6 TAP 107968 ECMS

8/8/2019From 1,000,000 to 5,000,000PA 21 Fayatte Co Corridor HSIPFayette12-0106559 Safety Improvement 21 SAC 106559 ECMS8/22/2019From 500,000 to 1,000,000SR 3017 WallWarren1-097049 Slides Correction 3017 WAL 97049 ECMS8/22/2019From 1,000,000 to 5,000,000SR 309 Safety Improvement

Project

Luzerne4-0109543 Intersection Improvement 6309 MTM 109543 ECMS

8/22/2019From 1,000,000 to 5,000,000SR 562 ovr Monocacy CreekBerks5-085668 Replace/Rehab 562 02B 85668 ECMS8/22/2019From 50,000,000I-95: Kennedy-LevickPhiladelphia6-079908 Widen 95 BS1 79908 EBS8/22/2019From 10,000,000 to 20,000,000Broad St over Reading RRPhiladelphia6-092147 Bridge Replacement 611 CRH 92147 ECMS8/22/2019Less than 100,000Rising Sun & Castor Avenue

Signal Imp.

Philadelphia6-0106994 Safety Improvement 1005 SIP 106995 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 13: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 13 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

8/22/2019From 1,000,000 to 5,000,000Pennswood Rd over AMTRAK - Design Build Limited to Retaining

Montgomery6-016216 P M Bridge Replacement 7104 BRG 16216 ECMS

8/22/2019From 100,000 to 200,000T-419 Blackburn Road BridgeCambria9-0109188 Bridge Improvement 7425 NO2 22475 ECMS8/22/2019From 200,000 to 500,000T-419 Blackburn Road BridgeCambria9-0109188 Bridge Improvement 7216 419 109188 ECMS8/22/2019From 100,000 to 200,000T-419 Blackburn Road BridgeCambria9-0109188 Bridge Improvement 7422 MAB 109198 ECMS8/22/2019From 100,000 to 200,000T-419 Blackburn Road BridgeCambria9-0109188 Bridge Improvement 7422 LAB 109197 ECMS8/22/2019From 100,000 to 200,000T-419 Blackburn Road BridgeCambria9-0109188 Bridge Improvement 7301 OAK 109195 ECMS8/22/2019From 100,000 to 200,000T-419 Blackburn Road BridgeCambria9-0109188 Bridge Improvement 7301 MPS 109194 ECMS8/22/2019From 100,000 to 200,000T-419 Blackburn Road BridgeCambria9-0109188 Bridge Improvement 7301 MCM 109193 ECMS8/22/2019From 100,000 to 200,000T-419 Blackburn Road BridgeCambria9-0109188 Bridge Improvement 7301 DST 109191 ECMS8/22/2019From 200,000 to 500,000T-419 Blackburn Road BridgeCambria9-0109188 Bridge Improvement 7301 ASH 109190 ECMS8/22/2019From 200,000 to 500,000T-419 Blackburn Road BridgeCambria9-0109188 Bridge Improvement 7204 476 109185 ECMS8/22/2019From 500,000 to 1,000,000Allegheny Circle Phase 2

Construction

Allengheny11-0107443 M Transportation Enhancement

4084 0 107443 ECMS

8/22/2019From 1,000,000 to 5,000,000PA 981 Signals - LatrobeWestmoreland12-094952 Traffic System Management

981 SIG 94952 ECMS

9/12/2019From 200,000 to 500,000Erie 2019 Bridge Shotcrete GroupErie1-0106443 Bridge Preservation Activities

2006 B04 106443 ECMS

9/12/2019From 1,000,000 to 5,000,000US 19 over Trout RunErie1-0600 Bridge Replacement 19 B02 600 ECMS9/12/2019From 1,000,000 to 5,000,000SR2010ovTbSugarRunBradford3-05084 Bridge Replacement 2010 016 5084 EBS9/12/2019From 1,000,000 to 5,000,000SR 1019 over SR 6Lackawanna4-0101498 Bridge Preservation

Activities

1019 D50 101498 ECMS

9/12/2019From 1,000,000 to 5,000,000SR 1009 over Starrucca CreekSusquehanna4-085730 Bridge Replacement 1009 572 85730 ECMS9/12/2019From 1,000,000 to 5,000,000US 422 Business ResurfaceBerks5-0110010 Restoration 3422 02M 110010 ECMS9/12/2019From 5,000,000 to 10,000,000PA 309/463 (5 Points) Intersection

Improvement

Montgomery6-063493 Intersection Improvement 309 71A 63493 ECMS

9/12/2019From 1,000,000 to 5,000,000Hulmeville Avenue over CSX/SEPTA

Bucks6-013606 Bridge Replacement 2047 01B 13606 ECMS

9/12/2019From 1,000,000 to 5,000,000SR 230/Front Street ResurfaceDauphin8-0107022 Resurface 230 040 107022 ECMS9/12/2019From 500,000 to 1,000,000PA233 over Rocky Mtn Crk-CFranklin8-0100149 Bridge Rehabilitation 233 018 100149 ECMS9/12/2019From 5,000,000 to 10,000,000McLaughlin Rn Rd@McMilliaAllengheny11-0100963 M Add Lane 3004 A13 100963 ECMS9/12/2019From 200,000 to 500,000Redgate Road SlideAllengheny11-0109534 Slides Correction 4028 A03 109534 ECMS9/12/2019From 500,000 to 1,000,000Oak Manor Road SlideAllengheny11-0109533 Slides Correction 1032 A06 109533 ECMS9/12/2019From 500,000 to 1,000,000Bocktown Road SlideBeaver11-0109531 Slides Correction 151 B09 109531 ECMS9/12/2019From 1,000,000 to 5,000,000TR 30 UpgradeBeaver11-029045 Resurface 30 B21 81652 ECMS9/12/2019From 1,000,000 to 5,000,000PA 48, Scenery Drive SlideAllengheny11-081738 Slides Correction 48 A38 81738 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 14: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 14 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

9/12/2019From 1,000,000 to 5,000,000US 30/WV State Line to PA 168Beaver11-081652 Resurface 30 B21 81652 ECMS9/12/2019From 10,000,000 to 20,000,000TR 30 UpgradeBeaver11-029045 Reconstruct 30 B07 29045 ECMS9/12/2019From 1,000,000 to 5,000,000SR 2040 over Redstone CkFayette12-093507 Bridge Replacement 2040 B10 93507 ECMS9/12/2019From 1,000,000 to 5,000,000SR 2040 ov Coal Lick RunFayette12-090993 Bridge Replacement 2040 A10 90993 ECMS9/17/2019From 1,000,000 to 5,000,000County Bridge #27: Fetters Mll Rd

o/ Pennypack Ck

Montgomery6-080052 M Bridge Replacement 7046 027 80052 ECMS

9/26/2019From 500,000 to 1,000,000Drinker St NB Exit SignalLackawanna4-095263 Safety Improvement 81 229 95263 ECMS9/26/2019From 5,000,000 to 10,000,000Wire Mill BridgeLehigh5-094682 Replace/Rehab 145 08B 94682 ECMS9/26/2019From 5,000,000 to 10,000,000River Road ExtensionBerks5-070274 M New Roadway 183 RRE 70274 ECMS9/26/2019From 1,000,000 to 5,000,000Fifth Street over ConrailPhiladelphia6-069914 Bridge Removal 2003 P5R 69914 ECMS9/26/2019From 1,000,000 to 5,000,000Erie Avenue Bridge RemovalPhiladelphia6-017407 Bridge Removal 1004 PEC 17407 ECMS9/26/2019From 1,000,000 to 5,000,000Potato Valley Rd BridgeDauphin8-019131 Bridge Replacement 7211 BRG 19131 ECMS9/26/2019From 5,000,000 to 10,000,000US222/322 Interchange ImpLancaster8-090491 Intersection Improvement 322 036 90491 ECMS9/26/2019From 500,000 to 1,000,000Herr Street ImprovementsDauphin8-0110486 Resurface 3018 004 110486 ECMS9/26/2019From 1,000,000 to 5,000,000Island Avenue BridgeAllengheny11-078176 A Bridge Removal 51 A97 78176 ECMS9/26/2019From 5,000,000 to 10,000,000Ravine Street DSI RemovalAllengheny11-074980 Drainage Improvement 28 DSI 74980 ECMS9/26/2019From 200,000 to 500,000SR 4022 ov Br Buffalo Ck-DFBWashington12-074240 Bridge Replacement 4022 0 74240 ECMS9/26/2019From 200,000 to 500,000SR 4053 ov Br Thorn Run-DFBWestmoreland12-032053 Bridge Replacement 4053 000 32053 ECMS9/26/2019From 500,000 to 1,000,000SR 3005 over Br of Long Run -

DFB

Greene12-0112420 Bridge Replacement 3005 0 112420 ECMS

9/26/2019From 1,000,000 to 5,000,000Charles Street BridgeFayette12-0107627 Bridge Rehabilitation 7402 0 107627 ECMS10/10/2019From 200,000 to 500,000SR 2007: Mill Ck BrdgMercer1-058082 Bridge Replacement 2007 B01 58082 ECMS10/10/2019From 1,000,000 to 5,000,000Kersey Run BridgeElk2-088186 Bridge Improvement 255 A03 88186 ECMS10/10/2019From 1,000,000 to 5,000,000SR 1023 over So. Equ CrkWayne4-092892 Replace/Rehab 1023 650 92892 ECMS10/10/2019From 1,000,000 to 5,000,000Post & Cable Guide RailSchuylkill5-090318 Guiderail Improvement 191 PCG 90318 ECMS10/10/2019From 40,000,000 to 50,000,000US 202 Reconstruction/Widening:

Johnson Highway to Swede Road

Montgomery6-063486 Widen 202 61S 63486 ECMS

10/10/2019From 1,000,000 to 5,000,000Rising Sun & Castor Avenue Signal Imp.

Philadelphia6-0106994 Safety Improvement 1001 SIP 106994 ECMS

10/10/2019From 1,000,000 to 5,000,000Locust Creek BridgeCumberland8-078648 Bridge Rehabilitation 944 021 78648 ECMS10/10/2019From 500,000 to 1,000,000Trib Doe Run Bridge-CYork8-087543 Bridge Replacement 74 063 87543 ECMS10/10/2019From 200,000 to 500,000Yocumtown Rd Bridge-CYork8-0102404 Bridge Replacement 392 005 102404 ECMS10/10/2019From 1,000,000 to 5,000,000PA26 over Muddy Run ClvrtHuntingdon9-092696 Bridge Improvement 26 02B 92696 ECMS10/10/2019From 500,000 to 1,000,000PA26 over Muddy Run ClvrtHuntingdon9-092696 Bridge Improvement 1009 02B 88151 ECMS10/10/2019From 1,000,000 to 5,000,000PA26 over Muddy Run ClvrtHuntingdon9-092696 Bridge Improvement 1009 01B 88150 ECMS10/10/2019From 1,000,000 to 5,000,000Stitts Run Bridge #1Armstrong10-083272 Bridge Replacement 2066 152 83272 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 15: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 15 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

10/10/2019From 1,000,000 to 5,000,000PA 108 ResurfacingButler10-0100026 Resurface 108 201 100026 ECMS10/10/2019From 1,000,000 to 5,000,000PA108-PA173toPA8ResurfaceButler10-0100020 Resurface 108 202 100020 ECMS10/10/2019From 1,000,000 to 5,000,000Jack Run BridgeClarion10-0106520 Bridge Replacement 2003 353 106520 ECMS10/10/2019From 100,000 to 200,000PA 108/173/258 Slippery Rock

Intersection

Butler10-072378 Intersection Improvement 108 291 72378 ECMS

10/10/2019From 10,000,000 to 20,000,000Freedom Rd UpgradeBeaver11-067016 Relocation/Realignment 2004 B06 67016 ECMS10/10/2019From 5,000,000 to 10,000,000AR01 - Armstrong TunnelAllengheny11-093922 M Bridge Improvement 7301 LOC 93922 ECMS10/10/2019From 1,000,000 to 5,000,000Chartiers Creek #12Washington12-095829 M Bridge Replacement 7220 C12 95829 ECMS10/24/2019From 50,000,000I-78-Rt 61 Bridge ReplaceBerks5-093494 Bridge Replacement 78 13B 93494 ECMS10/24/2019From 1,000,000 to 5,000,000Lime/Prince Street ResurfacingLancaster8-097273 Resurface 222 069 97273 ECMS10/24/2019From 1,000,000 to 5,000,000Broadway Street ResurfaceYork8-0108742 Resurface 74 066 108742 ECMS10/24/2019From 1,000,000 to 5,000,000Little Paint Ck BrCambria9-022635 Bridge Improvement 3015 01B 22635 ECMS10/24/2019From 1,000,000 to 5,000,000T-763 West Hills BridgeArmstrong10-024211 Bridge Preservation

Activities

7207 150 24211 EBS

10/24/2019From 1,000,000 to 5,000,000Philadelphia St Bridges GrpIndiana10-0106058 Bridge Replacement 286 463 106058 ECMS10/24/2019From 1,000,000 to 5,000,000South Leatherwood BridgeClarion10-074288 Bridge Replacement 861 350 74288 ECMS10/24/2019From 1,000,000 to 5,000,000PA 268 over Lowrey RunButler10-024755 Bridge Replacement 268 252 24755 ECMS10/24/2019From 1,000,000 to 5,000,000PA 68 over Buffalo CreekButler10-024740 Bridge Replacement 68 256 24740 ECMS10/24/2019From 1,000,000 to 5,000,000Pine Creek Br. #6 (PS06)Allengheny11-027159 Bridge Replacement 7118 LOC 27159 ECMS10/24/2019From 1,000,000 to 5,000,0003009/South Park @Logan RdAllengheny11-0100970 Intersection Improvement 3009 A20 100970 ECMS11/7/2019From 1,000,000 to 5,000,000Crawford Co. SR 2034 & SR 2040Crawford1-098950 Resurface 2034 01M 98950 ECMS11/7/2019From 500,000 to 1,000,000Fredonia Rd Br over I-79Mercer1-088481 Bridge Rehabilitation 1004 B01 88481 ECMS11/7/2019From 1,000,000 to 5,000,000PA 426 Br/Brokenstraw Ck.Warren1-02523 Bridge Rehabilitation 426 B02 2523 ECMS11/7/2019From 200,000 to 500,000PA 158 Bridge/Brandy RunMercer1-01687 Bridge Rehabilitation 158 B03 1687 EBS11/7/2019From 1,000,000 to 5,000,000Kinzua Creek BridgeMcKean2-04460 Bridge Replacement 3006 A01 4460 ECMS11/7/2019From 500,000 to 1,000,000SR 4007 Toad Hollw STAMcKean2-085251 Bridge Replacement 4007 A01 85251 ECMS11/7/2019From 1,000,000 to 5,000,000PA 45 ResurfacingCentre2-0101509 Restoration 45 162 101509 ECMS11/7/2019From 500,000 to 1,000,000SR 3034 over Nescopeck CreekLuzerne4-08434 Bridge Rehabilitation 3034 351 8434 ECMS11/7/2019From 500,000 to 1,000,000New Falls Rd HSIPBucks6-0104365 Miscellaneous 2006 SIP 104365 ECMS11/7/2019From 1,000,000 to 5,000,000Baltimore Pike Rsf 3Adams8-0105336 Resurface 97 011 105336 ECMS11/7/2019From 1,000,000 to 5,000,000Winterstown Road ResurfacYork8-0100224 Resurface 24 030 100224 ECMS11/7/2019From 500,000 to 1,000,000Marsh Run RoadFranklin8-090813 Bridge Replacement 16 046 90813 EBS11/7/2019From 500,000 to 1,000,000Lincoln Highway Bridge 2-CYork8-091356 Bridge Replacement 462 045 91356 ECMS11/7/2019From 5,000,000 to 10,000,000PA 272 Intersection ImpvtLancaster8-090490 Intersection Improvement 272 037 90490 ECMS11/7/2019From 500,000 to 1,000,000East Prospect Bridge-CYork8-087546 Bridge Replacement 124 014 87546 ECMS11/7/2019From 500,000 to 1,000,000Baltimore Pike Rsf 3Adams8-0105336 Resurface 194 024 109323 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 16: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 16 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

11/7/2019From 500,000 to 1,000,000Dunnings Creek Trib BridgBedford9-074411 Bridge Improvement 4009 02B 88133 ECMS11/7/2019From 1,000,000 to 5,000,000Dunnings Creek Trib BridgBedford9-074411 Bridge Replacement 4009 01B 74411 ECMS11/7/2019From 500,000 to 1,000,000Hodil Run BridgeClarion10-083218 Bridge Replacement 58 359 83218 ECMS11/7/2019From 1,000,000 to 5,000,000Craggs Run Bridge #3Clarion10-0109635 Bridge Replacement 68 361 109635 ECMS11/7/2019From 1,000,000 to 5,000,000Smicksburg Bridge #3Indiana10-0107288 Bridge Rehabilitation 4026 453 107288 ECMS11/7/2019From 100,000 to 200,000Upgrades to the PA 38 Crash

Avoidance Systems

Butler10-0110827 Safety Improvement 38 0 110827 ECMS

11/7/2019From 5,000,000 to 10,000,000Almono - TIIFAllengheny11-0104228 P Reconstruct 376 A60 104228 ECMS11/7/2019From 1,000,000 to 5,000,000Ardmore Boulevard BridgeAllengheny11-0100604 Bridge Replacement 30 A32 100604 ECMS11/7/2019From 1,000,000 to 5,000,000Ardmore Blvd BridgeAllengheny11-028155 Bridge Replacement 30 A31 28155 ECMS12/5/2019From 200,000 to 500,0002019 Crawford & Forest Shotcrete

Group

Crawford1-0106580 Bridge Preservation Activities

2016 B14 106580 ECMS

12/5/2019From 1,000,000 to 5,000,000US 20: Cumberland Rd to Davison Rd

Erie1-099015 Resurface 20 17M 99015 ECMS

12/5/2019From 1,000,000 to 5,000,000SR 1003/Woodcock Ck TribCrawford1-093169 Bridge Rehabilitation 1003 B00 93169 ECMS12/5/2019From 1,000,000 to 5,000,000SR 2035: PA 27 to Devour RdCrawford1-098956 Resurface 2035 01M 98956 ECMS12/5/2019From 1,000,000 to 5,000,000I-80 MM27 to MM34Venango1-0109821 Surface Treatment

Micro-surfacing

80 A11 109821 ECMS

12/5/2019From 100,000 to 200,000PA 27 over Browns RunWarren1-074612 Bridge Replacement 27 B03 74612 ECMS12/5/2019From 1,000,000 to 5,000,000SR 1059 over Mingo CreekWashington12-083445 Bridge Replacement 1059 B10 83445 ECMS12/5/2019From 1,000,000 to 5,000,000US 30 Bypass UpgradesWestmoreland12-088436 Safety Improvement 30 SAC 88436 EBS12/5/2019From 1,000,000 to 5,000,000Bridge over Conrail RRWestmoreland12-031550 Bridge Replacement 4019 C11 31550 ECMS

12/12/2019From 200,000 to 500,000SR 3025 Trib Bell Hollow BOXCentre2-0104206 Bridge Improvement 3025 A02 104206 ECMS12/12/2019From 200,000 to 500,000SR 246 over Baker Run BOXMcKean2-085229 Bridge Improvement 246 A04 85229 ECMS12/12/2019From 200,000 to 500,000Little Plum Run BOXClinton2-093272 Bridge Improvement 1004 A02 93272 ECMS12/12/2019From 200,000 to 500,000SR 4016 over Orebed Crk BOXPotter2-085400 Bridge Improvement 4016 A01 85400 ECMS12/12/2019From 200,000 to 500,000SR 35 Trib Markee Ck BOXJuniata2-085169 Bridge Replacement 35 A16 85169 ECMS12/12/2019From 200,000 to 500,000SR 3017 Markee Crk BOXJuniata2-085205 Bridge Improvement 3017 A01 85205 ECMS12/12/2019From 200,000 to 500,000Branch Moshannon Crk BOXClearfield2-03616 Bridge Improvement 2021 A01 3616 ECMS12/12/2019From 1,000,000 to 5,000,000SR 1033 over Tributary

Susquehanna River

Susquehanna4-09707 Bridge Replacement 1033 553 9707 ECMS

12/12/2019From 1,000,000 to 5,000,000SR 8008 over I-84 / I-380Lackawanna4-08257 Bridge Preservation Activities

8008 D50 8257 ECMS

12/12/2019From 500,000 to 1,000,000SR 438 over South Branch Tunkhannock Creek

Lackawanna4-08245 Bridge Preservation Activities

438 251 8245 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 17: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 17 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

12/12/2019From 1,000,000 to 5,000,000SR 438 over South Branch Tunkhannock Creek

Lackawanna4-08245 Bridge Preservation Activities

11 271 68754 ECMS

12/12/2019From 500,000 to 1,000,000SR 438 over South Branch Tunkhannock Creek

Lackawanna4-08245 Bridge Preservation Activities

11 270 68746 ECMS

12/12/2019From 1,000,000 to 5,000,000Gordon Street BridgeLehigh5-072773 Bridge Replacement 7301 01B 72773 ECMS12/12/2019From 50,000,000I-95: Betsy Ross Rmps A&BPhiladelphia6-079904 Widen 95 BR2 79904 ECMS12/12/2019From 500,000 to 1,000,000Holland Street BR RemovalLancaster8-020053 M Bridge Removal 7214 BR 20053 ECMS12/12/2019From 1,000,000 to 5,000,000Harrisburg Pike ResurfCumberland8-0105340 Resurface 11 106 105340 ECMS12/12/2019From 500,000 to 1,000,000Hellam Street ResurfaceYork8-0108674 Resurface 462 050 108674 ECMS12/12/2019From 100,000 to 200,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Improvement 7217 353 109136 ECMS12/12/2019From 200,000 to 500,000PA869 Trib L Conemaugh RvCambria9-092694 Bridge Improvement 869 04B 94470 ECMS12/12/2019Less than 100,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Rehabilitation 7202 609 96030 ECMS12/12/2019From 200,000 to 500,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Rehabilitation 7217 386 96035 ECMS12/12/2019From 200,000 to 500,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Rehabilitation 7217 386 96035 ECMS12/12/2019From 100,000 to 200,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Rehabilitation 7204 357 96031 ECMS12/12/2019From 100,000 to 200,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Rehabilitation 7204 357 96031 ECMS12/12/2019Less than 100,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Rehabilitation 7202 609 96030 ECMS12/12/2019From 500,000 to 1,000,000PA869 Trib L Conemaugh RvCambria9-092694 Bridge Replacement 869 02B 92694 ECMS12/12/2019From 10,000,000 to 20,000,000Turnpike to Sproul/ClaysburgBedford9-0109816 Resurface 99 012 109816 ECMS12/12/2019From 100,000 to 200,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Improvement 7206 358 109205 ECMS12/12/2019From 100,000 to 200,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Improvement 7206 358 109205 ECMS12/12/2019From 200,000 to 500,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Improvement 7210 366 109204 ECMS12/12/2019From 200,000 to 500,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Improvement 7210 366 109204 ECMS12/12/2019From 200,000 to 500,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Improvement 7208 331 109203 ECMS12/12/2019From 200,000 to 500,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Improvement 7208 331 109203 ECMS12/12/2019From 100,000 to 200,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Improvement 7206 404 109202 ECMS12/12/2019From 100,000 to 200,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Improvement 7206 404 109202 ECMS12/12/2019From 100,000 to 200,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Improvement 7201 372 109201 ECMS12/12/2019From 100,000 to 200,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Improvement 7201 372 109201 ECMS12/12/2019From 200,000 to 500,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Improvement 7201 338 109200 ECMS12/12/2019From 200,000 to 500,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Improvement 7201 338 109200 ECMS12/12/2019From 100,000 to 200,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Improvement 7212 613 109135 ECMS12/12/2019From 100,000 to 200,000T-331 East Pittman Road BridgeFulton9-0109203 Bridge Improvement 7217 353 109136 ECMS12/12/2019From 100,000 to 200,000T-358 Covered Bridge Road BridgeHuntingdon9-0109205 Bridge Improvement 7212 613 109135 ECMS12/12/2019From 200,000 to 500,000Oppenheimer Road BridgeBedford9-022045 Bridge Rehabilitation 7207 545 22045 ECMS12/12/2019From 500,000 to 1,000,000T-310 Friesville BridgeBlair9-021908 M Bridge Improvement 7207 310 21908 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 18: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 18 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

12/12/2019From 5,000,000 to 10,000,000US 422 Cunningham CulvertsIndiana10-025696 Bridge Replacement 422 45A 25696 ECMS12/12/2019From 1,000,000 to 5,000,000SR 4005 Mack Park BridgeIndiana10-0105300 Bridge Replacement 4005 451 105300 ECMS12/12/2019From 1,000,000 to 5,000,000SR 4030 Carter Avenue BridgeIndiana10-078122 Bridge Replacement 4030 450 78122 ECMS12/12/2019From 1,000,000 to 5,000,000Curllsville Bridge #2Clarion10-025005 Bridge Replacement 2007 350 25005 ECMS12/12/2019From 1,000,000 to 5,000,000Mayview Road BridgeAllengheny11-028520 A Bridge Replacement 3005 A05 28520 ECMS12/12/2019From 1,000,000 to 5,000,000Deer Creek Br #9 (DE09)Allengheny11-079895 M Bridge Replacement 7209 LOC 79895 ECMS12/12/2019From 1,000,000 to 5,000,000Wildwood Rd over Buffalo Pgh RRAllengheny11-078427 A M Bridge Preservation

Activities

4070 A19 78427 ECMS

12/12/2019From 50,000,000Neville Island BridgeAllengheny11-087756 Bridge Preservation Activities

79 A61 87756 ECMS

12/12/2019From 10,000,000 to 20,000,000Tarentum BR Ramp 'B'Allengheny11-063307 Bridge Preservation Activities

366 A06 63307 ECMS

12/12/2019From 100,000 to 200,000SR 1055 over Ferguson Run-DFBFayette12-088075 Bridge Replacement 1055 M10 88075 ECMS12/12/2019From 1,000,000 to 5,000,000FACO Signals-1Fayette12-094953 Traffic System

Management

21 SIG 94953 ECMS

12/12/2019From 10,000,000 to 20,000,000PA 356 Safety ImprovementWestmoreland12-096654 Safety Improvement 356 F10 96654 EBS12/12/2019From 1,000,000 to 5,000,000SR 2053 ov Br Daniels RunWashington12-089035 Bridge Replacement 2053 DFB 89035 ECMS12/12/2019From 200,000 to 500,000SR 1015 over Hypocrite Ck-DFBWestmoreland12-031634 Bridge Improvement 1015 0 31634 ECMS12/26/2019From 1,000,000 to 5,000,000SR 3001 over Wheeling CkGreene12-030134 Bridge Rehabilitation 3001 01A 30134 ECMS

1/1/2020From 100,000 to 200,000SR154 ov Kings CreekSullivan3-06963 Bridge Replacement 154 066 6963 ECMS1/1/2020From 200,000 to 500,000Sportsman Rd to MacFee RdBradford3-0111786 Drainage Improvement 1050 002 111786 ECMS1/1/2020From 1,000,000 to 5,000,000Fairfield CrossingLycoming3-098166 M Intersection Improvement 2045 03L 98166 ECMS1/1/2020From 1,000,000 to 5,000,000WaterTowerRdtoSR287Tioga3-099169 Reconstruct 49 066 99169 ECMS1/1/2020From 1,000,000 to 5,000,0006 TH AVE. BRG.,CARBONDALELackawanna4-08040 M Bridge Replacement 7301 BRG 8040 ECMS1/9/2020From 200,000 to 500,000SR 3018 ov 1stFrkLarrysCrLycoming3-06106 Bridge Improvement 3018 012 6106 ECMS1/9/2020From 1,000,000 to 5,000,000Raccoon Val Rd over JuniPerry8-0100167 Bridge Preservation

Activities

17 016 100167 ECMS

1/15/2020From 1,000,000 to 5,000,000PA 663 o/Ministers CrkMontgomery6-016741 Bridge Deck Replacement 663 S02 16741 ECMS1/15/2020From 1,000,000 to 5,000,000Fitzwatertown Road @ Moreland

Road (PA 63)

Montgomery6-048181 Intersection Improvement 2038 04C 48181 ECMS

1/15/2020From 1,000,000 to 5,000,000Briar Hill OverpassArmstrong10-023890 Bridge Rehabilitation 3017 151 23890 EBS1/16/2020From 1,000,000 to 5,000,000PA 18: PA 358 - Mill Hill Rd.Mercer1-0109773 Restoration 18 23M 109773 EBS1/16/2020From 100,000 to 200,000US 62 Bridge/Sage Run #9Venango1-097397 Bridge Rehabilitation 62 B15 97397 ECMS1/16/2020From 500,000 to 1,000,000PA 18/SR 4006 IntersectionMercer1-0110234 Safety Improvement 18 S01 110234 EBS1/16/2020From 20,000,000 to 30,000,000I-80 ov SR 970 InterchangeClearfield2-087729 Reconstruct 80 B41 87729 ECMS1/16/2020From 1,000,000 to 5,000,000SR 414 Slide Morris TwpTioga3-087879 Slides Correction 414 30M 87879 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 19: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 19 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

1/16/2020From 100,000 to 200,000SR 2006 over Tributary to Chapman Creek

Snyder3-093606 Bridge Replacement 2006 013 93606 ECMS

1/16/2020From 5,000,000 to 10,000,000SR 4001 ov Lt Pine CreekLycoming3-06209 Bridge Rehabilitation 4001 020 6209 ECMS1/16/2020From 100,000 to 200,000SR 2010 over Tributary to Middle

Creek

Snyder3-098577 Bridge Replacement 2010 015 98577 ECMS

1/16/2020From 100,000 to 200,000SR 3013 ov Tb Towanda CkBradford3-068004 Bridge Replacement 3013 001 68004 ECMS1/16/2020From 1,000,000 to 5,000,000Butler Twp. Park & RideLuzerne4-064481 Park and Ride Lot 309 393 64481 ECMS1/16/2020From 20,000,000 to 30,000,000I-81 NB Grinding LuzLuzerne4-081910 Restoration 81 313 81910 ECMS1/16/2020From 1,000,000 to 5,000,000SR 3010 over Pohopoco CrkMonroe5-085818 Bridge Rehabilitation 3010 01B 85818 ECMS1/16/2020From 500,000 to 1,000,000Blue Church Rd Bridge (SR 2024)Lehigh5-0112024 Bridge Replacement 2024 02B 112024 ECMS1/16/2020From 5,000,000 to 10,000,000SR 2024 Ridgeway StreetMonroe5-067265 Bridge Replacement 2024 01B 67265 ECMS1/16/2020From 1,000,000 to 5,000,000Kedron Avenue (PA 420) at

Franklin Avenue

Delaware6-064791 Intersection Improvement 420 DFA 64791 ECMS

1/16/2020From 1,000,000 to 5,000,000Tabor Road over Tacony Creek (City of Phila. Bid No. ____ECMS)

Philadelphia6-098230 M Bridge Rehabilitation 7301 255 98230 ECMS

1/16/2020From 500,000 to 1,000,000Whitemarsh Street ImprvMontgomery6-074816 M Reconstruct 3053 WS2 74937 EBS1/16/2020From 1,000,000 to 5,000,000Portzer & Old Bethlehem Rd

Intersection Improvement

Bucks6-049315 M Intersection Improvement 4063 BU1 49315 ECMS

1/16/2020From 1,000,000 to 5,000,000TwpRd #801 (EChurch Rd) o/ SEPTA (D-B activities limited to:

Montgomery6-016396 P M Bridge Replacement 7220 MCR 16396 ECMS

1/16/2020From 10,000,000 to 20,000,000PA 611 (Old York Rd) over SEPTA's W Trenton Ln - D/B

Montgomery6-016214 Bridge Replacement 611 MBR 16214 ECMS

1/16/2020From 200,000 to 500,000Main Street-ScotlandFranklin8-079700 Pedestrian Facilities 1006 TAP 107986 EBS1/16/2020From 1,000,000 to 5,000,000Main Street-ScotlandFranklin8-079700 Reconstruct 1006 005 79700 EBS1/16/2020From 200,000 to 500,000Newport Road BridgeLancaster8-087712 Bridge Replacement 4030 002 87712 ECMS1/16/2020From 500,000 to 1,000,000Pierceville Run Tributary-CYork8-090321 Bridge Replacement 216 020 90321 ECMS1/16/2020From 1,000,000 to 5,000,000Heildersburg Bridge-CAdams8-087426 Bridge Replacement 234 023 90693 ECMS1/16/2020From 500,000 to 1,000,000Seven Valleys Road Bridge-CYork8-087698 Bridge Replacement 616 009 87698 ECMS1/16/2020From 500,000 to 1,000,000Heildersburg Bridge-CAdams8-087426 Bridge Replacement 234 022 87426 ECMS1/16/2020From 1,000,000 to 5,000,000Chambersburg Signal Imp.Franklin8-0102384 Existing Signal

Improvement

11 100 102384 ECMS

1/16/2020From 1,000,000 to 5,000,000US-15 Safety & Resurfacing - York Spings to Dillsburg

York8-094950 Safety Improvement 15 037 92920 EBS

1/16/2020From 5,000,000 to 10,000,000US 322 Ramp ExtDauphin8-096198 Reconstruct 322 045 96198 ECMS1/16/2020From 1,000,000 to 5,000,000US-15 Safety & Resurfacing -

York Spings to Dillsburg

York8-094950 Resurface 15 034 94950 EBS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 20: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 20 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

1/16/2020From 1,000,000 to 5,000,000US-15 Safety & Resurfacing - York Spings to Dillsburg

York8-094950 Safety Improvement 15 038 102333 EBS

1/16/2020From 500,000 to 1,000,000SR 1042 Halter Crk BridgeBedford9-098778 Bridge Improvement 1042 01B 98778 ECMS1/16/2020From 500,000 to 1,000,000SR4005 Blacklick Crk BrCambria9-091717 Bridge Improvement 4005 01B 91717 ECMS1/16/2020From 200,000 to 500,000Zelienople Revitalize/Econ. Dev.

Project Phase 2

Butler10-0107823 Transportation Enhancement

19 0 107823 ECMS

1/16/2020From 1,000,000 to 5,000,000Jackson Twp. Transp. Improvement TIIF

Butler10-0104233 M Intersection Improvement 19 29C 104233 ECMS

1/16/2020From 5,000,000 to 10,000,000SR 56 Apollo Group BridgesArmstrong10-0103146 Bridge Replacement 56 156 103146 EBS1/16/2020From 1,000,000 to 5,000,000Spaces Corners ResurfacingArmstrong10-0109610 Resurface 28 104 109610 ECMS1/16/2020From 1,000,000 to 5,000,000SR 4011, Rochester Slide

Remediation

Allengheny11-0105461 Slides Correction 4011 A16 105461 ECMS

1/16/2020From 5,000,000 to 10,000,000WECO Signal Upgrades-CMAQWestmoreland12-094893 Existing Signal Improvement

3026 190 94893 ECMS

1/17/2020From 1,000,000 to 5,000,000SR 2002 SlidePike4-096806 F Restoration 2002 SLD 96806 EBS1/17/2020From 5,000,000 to 10,000,000PA 73: GREENWOOD AVE -

RICES MILL ROAD

Montgomery6-016334 Existing Signal Improvement

73 04N 16334 ECMS

1/18/2020From 1,000,000 to 5,000,000County Bridge #7 (Crozierville Bridge): New Rd o/ Chester Ck

Delaware6-047992 M Bridge Rehabilitation 7023 007 47992 ECMS

1/23/2020From 5,000,000 to 10,000,000E King Street (PA 663) o/ Manatawney Creek

Montgomery6-078736 Bridge Replacement 663 MKM 78736 ECMS

1/30/2020From 1,000,000 to 5,000,0002019 N. Central Bridge Preservation

Cameron2-04354 Bridge Preservation Activities

120 P23 4354 ECMS

1/30/2020From 1,000,000 to 5,000,000Bridge over NS RailroadJuniata2-04190 Bridge Improvement 75 A03 4190 EBS1/30/2020From 200,000 to 500,000SR 1049 over Cold BrookBradford3-05241 Bridge Replacement 1049 022 5241 ECMS1/30/2020From 500,000 to 1,000,000Broad Street to Interstate 180Lycoming3-0109037 Resurface 2075 004 109037 ECMS1/30/2020From 500,000 to 1,000,000Fox St to Lyc Cr Rd. "Design"

limited to ADA Curb Ramps.

Lycoming3-0104614 Resurface 2075 004 109037 ECMS

1/30/2020From 200,000 to 500,000Fox St to Lyc Cr Rd. "Design" limited to ADA Curb Ramps.

Lycoming3-0104614 Resurface 3014 008 104614 ECMS

1/30/2020From 100,000 to 200,000SR 254 over Tributary to Mud Creek

Montour3-098438 Bridge Replacement 254 043 98438 ECMS

1/30/2020From 100,000 to 200,000SR4027ovTrbCrookedCrkTioga3-0102033 Bridge Replacement 4027 005 102033 ECMS1/30/2020From 5,000,000 to 10,000,000SR 924 & SR 54 ResurfaceSchuylkill5-093710 Resurface 924 06M 93710 ECMS1/30/2020From 500,000 to 1,000,000SR 4004 Over Pocono CreekMonroe5-011802 Bridge Rehabilitation 4004 01B 11802 ECMS1/30/2020From 1,000,000 to 5,000,000SR61/209 IntersectionSchuylkill5-072466 Safety Improvement 61 18S 72466 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 21: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 21 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

1/30/2020From 10,000,000 to 20,000,000PA 12 ResurfacingBerks5-089215 Resurface 12 02M 89215 ECMS1/30/2020From 5,000,000 to 10,000,000Boot Road o/ AmtrakChester6-090612 Bridge Replacement 2020 CBA 90612 ECMS1/30/2020From 1,000,000 to 5,000,000County Bridge #9: Mount Alverno

Rd o/ Chester Ck*

Delaware6-086368 M Bridge Replacement 7023 009 86368 ECMS

1/30/2020From 500,000 to 1,000,000County Bridge #244: Hadfield Rd o/ Beaver Ck

Chester6-086064 M Bridge Replacement 7015 244 86064 ECMS

1/30/2020From 1,000,000 to 5,000,000Limekiln Pike o/SEPTA RRMontgomery6-083643 F Bridge Rehabilitation 152 LPS 83643 EBS1/30/2020From 1,000,000 to 5,000,000Niantic Rd o/Perkiomen CrMontgomery6-098037 Bridge Replacement 1035 MB1 98037 ECMS1/30/2020From 10,000,000 to 20,000,000MACDADE BOULEVARD @ I-476Delaware6-070228 Intersection Improvement 2006 476 70228 EBS1/30/2020From 1,000,000 to 5,000,000University Av/CSX RailPhiladelphia6-075804 Bridge Replacement 3003 UAR 75804 ECMS1/30/2020From 5,000,000 to 10,000,000CountyLine Rd: Kulp Rd to PA

611

Bucks6-050634 Widen/Resurfacing (no additional lanes)

2038 M04 50634 ECMS

1/30/2020From 1,000,000 to 5,000,000Main Street (PA 29) Bridge Removal

Montgomery6-057849 Bridge Replacement 29 BRR 57849 ECMS

1/30/2020From 10,000,000 to 20,000,000Island Ave: Woodland Ave to Bartram Ave

Philadelphia6-017697 M Existing Signal Improvement

3013 TF2 17697 ECMS

1/30/2020From 200,000 to 500,000GMU Access & SafetyMontgomery6-0111169 M Safety Improvement 2016 MTF 111169 ECMS1/30/2020From 1,000,000 to 5,000,000PA82&US30BusinessChester6-0111761 M Add Turning Lane 82 DCA 111761 ECMS1/30/2020From 5,000,000 to 10,000,000Barbadoes St Connector RoadMontgomery6-0106068 New Roadway 3020 530 106068 ECMS1/30/2020From 5,000,000 to 10,000,000SELLERS AVE over AMTRAKDelaware6-015306 Bridge Replacement 2031 DBR 15306 ECMS1/30/2020From 5,000,000 to 10,000,000W Bridge Street over AmtrakChester6-014134 M Bridge Replacement 7410 BRG 14134 ECMS1/30/2020From 5,000,000 to 10,000,000US1 PARTNERSHIP PH 2Chester6-014541 Add Lane 1 H02 14541 ECMS1/30/2020From 1,000,000 to 5,000,000Little Washington Road over

Culbertson Run

Chester6-014236 Bridge Replacement 4006 CWB 14236 ECMS

1/30/2020From 1,000,000 to 5,000,000US 30 over Campbell Run-AFranklin8-0100046 Reconstruct 30 134 107589 ECMS1/30/2020From 1,000,000 to 5,000,000PA 34 & PA 850 Intersect.Perry8-085655 Safety Improvement 34 035 85655 ECMS1/30/2020From 1,000,000 to 5,000,000US 30 over Campbell Run-AFranklin8-0100046 Bridge Rehabilitation 30 121 90324 ECMS1/30/2020From 200,000 to 500,000US 30 over Campbell Run-AFranklin8-0100046 Bridge Rehabilitation 30 120 90323 ECMS1/30/2020From 200,000 to 500,000US 30 over Campbell Run-AFranklin8-0100046 Bridge Rehabilitation 30 119 90322 ECMS1/30/2020From 1,000,000 to 5,000,000US 30 over Campbell Run-AFranklin8-0100046 Bridge Replacement 30 117 100051 ECMS1/30/2020From 1,000,000 to 5,000,000US 30 over Campbell Run-AFranklin8-0100046 Bridge Replacement 30 116 100046 ECMS1/30/2020From 500,000 to 1,000,000Rhoads Creek BridgeSomerset9-074476 Bridge Improvement 2016 01B 74476 ECMS1/30/2020From 1,000,000 to 5,000,000Cambria Local Bridge PreservationCambria9-0106748 Bridge Deck Replacement 7210 352 106748 ECMS1/30/2020From 1,000,000 to 5,000,000SR 1002 - PA 764 to US 22Blair9-0106041 Resurface 1002 001 106041 EBS1/30/2020From 500,000 to 1,000,000Tannery Road BridgeFulton9-0106419 M Bridge Replacement 7205 457 106419 EBS1/30/2020From 500,000 to 1,000,000Rhoads Creek BridgeSomerset9-074476 Bridge Improvement 3015 03B 105998 ECMS

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.

Page 22: Planned 12-Month Letting Schedule · Planned 12-Month Letting Schedule February 06, 2019 ECMS # Project Description Anticipated Let Date** From 2/6/2019 to 2/6/2020 Page 1 of 22 Excludes

Planned 12-Month Letting Schedule

February 06, 2019

ECMS # Project DescriptionAnticipated

Let Date**

From 2/6/2019 to 2/6/2020

Page 22 of 22

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #.

Cost RangeCountyDistrict Improvement TypeSR SecMPMS # Bid Type

1/30/2020From 500,000 to 1,000,000Rhoads Creek BridgeSomerset9-074476 Bridge Improvement 3015 02B 105997 ECMS1/30/2020From 10,000,000 to 20,000,000PA 286: US 422 Interchange EastIndiana10-0104459 New Interchange 286 49A 104459 ECMS1/30/2020From 10,000,000 to 20,000,000I-80 Brookville East PMJefferson10-0106224 Resurface 80 54F 106224 ECMS1/30/2020From 10,000,000 to 20,000,000I-80 Brookville West PMJefferson10-0106212 Resurface 80 54E 106212 ECMS1/30/2020From 500,000 to 1,000,000Bull Creek Br No 7 (BF07)Allengheny11-057074 M Bridge Replacement 7202 LOC 79252 ECMS1/30/2020From 1,000,000 to 5,000,000Bull Creek Br No 7 (BF07)Allengheny11-057074 M Bridge Replacement 7202 LOC 57074 ECMS1/30/2020From 20,000,000 to 30,000,000I-70 Gap ReconstructionWestmoreland12-032015 Reconstruct 70 L20 32015 ECMS1/30/2020From 50,000,000Yukon & Madison InterchangesWestmoreland12-031895 Interchange Improvement 70 L10 31895 ECMS