  • 7/27/2019 Plan for Venice Island Reconstruction Project

    1/20

    Manayunk Sewer Basin

    Construction Project

    Venice Island Recreation Center

    Reconstruction Project

    January 2009

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    2/20

    AgendaAgenda

    Zoning VariancesZoning Variances

    1.1. Setback and landscape BuffersSetback and landscape Buffers

    2.2. Building HeightBuilding Height

    3.3. Building SignageBuilding Signage

    4.4. CC--7 Zoning Restriction7 Zoning Restriction--No RecreationalNo Recreational

    UseUse

    InIn--depth Look at the Exterior Design of thedepth Look at the Exterior Design of the

    Performing Arts CenterPerforming Arts Center

    River AnalysisRiver Analysis

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    3/20

    Zoning Setback & BufferZoning Setback & Buffer

    Why theWhy theExceptionException--

    is there anis there an

    Alternative?Alternative?

    ExistingExisting

    RiverbankRiverbank

    BufferBuffer-- NoNoChangesChanges

    PlannedPlanned

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    4/20

    Building SetbackBuilding Setback--WhatWhats the Challengess the Challenges

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    5/20

    New Plan Includes Landscape BufferNew Plan Includes Landscape Buffer--No VarianceNo Variance

    ExistingExisting

    New PlanNew Plan

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    6/20

    No Changes to RiverbankNo Changes to Riverbank--Existing BufferExisting Buffer

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    7/20

    Building HeightBuilding Height

    Why so Tall ? WhatWhy so Tall ? Whats inside?s inside?

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    8/20

    Seating for 250Seating for 250

    Why Stacked Construction ?Why Stacked Construction ?

    GREY WATER TANKS

    LIGHTING CATWALK

    NATURAL FINISH

    MAPLE PANELING

    PERFORMANCECHAMBER

    AIR HANDLING UNIT

    STAGE AND FLY

    PROFESSIONAL QUALITY

    THEATRICAL EQUIPMENT

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    9/20

    Floor Plan MultiFloor Plan Multi--purpose Use + Auditoriumpurpose Use + Auditorium

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    10/20

    BuildingBuilding SignageSignage

    MManayunkanayunk ElevationElevation

    ICONOGRAPHIC

    SIGNAGE

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    11/20

    BBuilding Signageuilding Signage

    River ElevationRiver Elevation

    SIGNAGE VISIBLE

    FROM EXPRESSWAY

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    12/20

    Zoning RestrictionsZoning Restrictions--ZBA Hearing (Feb 24ZBA Hearing (Feb 24

    thth

    )) CodesCodes

    1.1. 1414--306.2(2)306.2(2)

    No Recreational UseNo Recreational Use

    permitted within Cpermitted within C--77ZoningZoning

    2.2. 1414--306.2(8)306.2(8)

    Multiple Signs NotMultiple Signs NotPermittedPermitted

    3.3. 1414--306.2(5)306.2(5)

    Building HeightBuilding HeightRestrictionRestriction

    4.4. 1414--1615(9)1615(9)

    Landscape BufferLandscape Buffer

    ProvisionsProvisions

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    13/20

    InIn--depth look at the PACdepth look at the PACs Exterior Designs Exterior DesignMaterial PaletteMaterial Palette

    Department of RecreationDepartment of Recreationss RationalRational

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    14/20

    PACPACs Material Palettes Material Palette(continued)(continued)

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    15/20

    Performing Arts CenterPerforming Arts Center

    View from Parking Lot w/MaterialsView from Parking Lot w/Materials

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    16/20

    View from River SideView from River Side

    PrecasPrecastt WallWall

    PanelPanel

    UUse ofse of

    ShadowingShadowing

    Use of ExteriorUse of Exterior

    lightinglighting

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    17/20

    River AnalysisRiver AnalysisHydraulic ReportHydraulic Report

    PerparedPerpared by Jerry Snyder, Professionalby Jerry Snyder, Professional

    Engineer w/ 30+ years experienceEngineer w/ 30+ years experience Industry Standards & Protocol followedIndustry Standards & Protocol followed

    Same process used by US ACOE for FEMASame process used by US ACOE for FEMA

    Utilized HECUtilized HEC--RAS (update of HEC II)RAS (update of HEC II)Computer ModelComputer Model

    Cross Sections taken from FloodCross Sections taken from FloodInsurance Study (FIS) developed by FEMA.Insurance Study (FIS) developed by FEMA.

    Additional cross sections were added toAdditional cross sections were added toprovide more detail to the project area.provide more detail to the project area.

    Model was calibrated to the 100Model was calibrated to the 100--year wateryear water

    surface elevations established in 1996 FIS.surface elevations established in 1996 FIS.

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    18/20

    What was Evaluated?What was Evaluated?

    Future Conditions were modeled by modifyingFuture Conditions were modeled by modifyingcrosscross--sections to represent proposedsections to represent proposed

    conditionsconditions Performing Arts Center & Head HousePerforming Arts Center & Head House

    Key concepts:Key concepts:

    Volume of r iver channel along siteVolume of r iver channel along site The amount ofThe amount of fillfill between existing gradebetween existing grade

    and the regulatory f lood (100and the regulatory f lood (100--year floodyear flood

    flow)flow) The volume of buildings above flood lineThe volume of buildings above flood line

    has no impact. The fill is offset by otherhas no impact. The fill is offset by otherareas that are the same grade.areas that are the same grade.

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    19/20

    Hydrologic/Hydraulic AnalysisHydrologic/Hydraulic Analysis

    WhatWhats it all mean?s it all mean?

    No impact to flooding of the Schuylkil l RiverNo impact to flooding of the Schuylkil l River

    during 100during 100--year flood flow with proposedyear flood flow with proposedimprovements. This is a result of:improvements. This is a result of:

    Minimal fi ll when compared toMinimal fi ll when compared to

    volume of river channel along sitevolume of river channel along site

    volume of the river channel along itsvolume of the river channel along its

    entire lengthentire length

  • 7/27/2019 Plan for Venice Island Reconstruction Project

    20/20

    Hydraulic ReportHydraulic Report

    Reviewed by the following AgenciesReviewed by the following Agencies

    City of Philadelphia Planning CommissionCity of Philadelphia Planning Commission

    Delaware River Basin CommissionDelaware River Basin Commission Army Corps of Engineers (part of Joint Application)Army Corps of Engineers (part of Joint Application)

    PADEP (Part of Joint Application)PADEP (Part of Joint Application)