plan for venice island reconstruction project
TRANSCRIPT
-
7/27/2019 Plan for Venice Island Reconstruction Project
1/20
Manayunk Sewer Basin
Construction Project
Venice Island Recreation Center
Reconstruction Project
January 2009
-
7/27/2019 Plan for Venice Island Reconstruction Project
2/20
AgendaAgenda
Zoning VariancesZoning Variances
1.1. Setback and landscape BuffersSetback and landscape Buffers
2.2. Building HeightBuilding Height
3.3. Building SignageBuilding Signage
4.4. CC--7 Zoning Restriction7 Zoning Restriction--No RecreationalNo Recreational
UseUse
InIn--depth Look at the Exterior Design of thedepth Look at the Exterior Design of the
Performing Arts CenterPerforming Arts Center
River AnalysisRiver Analysis
-
7/27/2019 Plan for Venice Island Reconstruction Project
3/20
Zoning Setback & BufferZoning Setback & Buffer
Why theWhy theExceptionException--
is there anis there an
Alternative?Alternative?
ExistingExisting
RiverbankRiverbank
BufferBuffer-- NoNoChangesChanges
PlannedPlanned
-
7/27/2019 Plan for Venice Island Reconstruction Project
4/20
Building SetbackBuilding Setback--WhatWhats the Challengess the Challenges
-
7/27/2019 Plan for Venice Island Reconstruction Project
5/20
New Plan Includes Landscape BufferNew Plan Includes Landscape Buffer--No VarianceNo Variance
ExistingExisting
New PlanNew Plan
-
7/27/2019 Plan for Venice Island Reconstruction Project
6/20
No Changes to RiverbankNo Changes to Riverbank--Existing BufferExisting Buffer
-
7/27/2019 Plan for Venice Island Reconstruction Project
7/20
Building HeightBuilding Height
Why so Tall ? WhatWhy so Tall ? Whats inside?s inside?
-
7/27/2019 Plan for Venice Island Reconstruction Project
8/20
Seating for 250Seating for 250
Why Stacked Construction ?Why Stacked Construction ?
GREY WATER TANKS
LIGHTING CATWALK
NATURAL FINISH
MAPLE PANELING
PERFORMANCECHAMBER
AIR HANDLING UNIT
STAGE AND FLY
PROFESSIONAL QUALITY
THEATRICAL EQUIPMENT
-
7/27/2019 Plan for Venice Island Reconstruction Project
9/20
Floor Plan MultiFloor Plan Multi--purpose Use + Auditoriumpurpose Use + Auditorium
-
7/27/2019 Plan for Venice Island Reconstruction Project
10/20
BuildingBuilding SignageSignage
MManayunkanayunk ElevationElevation
ICONOGRAPHIC
SIGNAGE
-
7/27/2019 Plan for Venice Island Reconstruction Project
11/20
BBuilding Signageuilding Signage
River ElevationRiver Elevation
SIGNAGE VISIBLE
FROM EXPRESSWAY
-
7/27/2019 Plan for Venice Island Reconstruction Project
12/20
Zoning RestrictionsZoning Restrictions--ZBA Hearing (Feb 24ZBA Hearing (Feb 24
thth
)) CodesCodes
1.1. 1414--306.2(2)306.2(2)
No Recreational UseNo Recreational Use
permitted within Cpermitted within C--77ZoningZoning
2.2. 1414--306.2(8)306.2(8)
Multiple Signs NotMultiple Signs NotPermittedPermitted
3.3. 1414--306.2(5)306.2(5)
Building HeightBuilding HeightRestrictionRestriction
4.4. 1414--1615(9)1615(9)
Landscape BufferLandscape Buffer
ProvisionsProvisions
-
7/27/2019 Plan for Venice Island Reconstruction Project
13/20
InIn--depth look at the PACdepth look at the PACs Exterior Designs Exterior DesignMaterial PaletteMaterial Palette
Department of RecreationDepartment of Recreationss RationalRational
-
7/27/2019 Plan for Venice Island Reconstruction Project
14/20
PACPACs Material Palettes Material Palette(continued)(continued)
-
7/27/2019 Plan for Venice Island Reconstruction Project
15/20
Performing Arts CenterPerforming Arts Center
View from Parking Lot w/MaterialsView from Parking Lot w/Materials
-
7/27/2019 Plan for Venice Island Reconstruction Project
16/20
View from River SideView from River Side
PrecasPrecastt WallWall
PanelPanel
UUse ofse of
ShadowingShadowing
Use of ExteriorUse of Exterior
lightinglighting
-
7/27/2019 Plan for Venice Island Reconstruction Project
17/20
River AnalysisRiver AnalysisHydraulic ReportHydraulic Report
PerparedPerpared by Jerry Snyder, Professionalby Jerry Snyder, Professional
Engineer w/ 30+ years experienceEngineer w/ 30+ years experience Industry Standards & Protocol followedIndustry Standards & Protocol followed
Same process used by US ACOE for FEMASame process used by US ACOE for FEMA
Utilized HECUtilized HEC--RAS (update of HEC II)RAS (update of HEC II)Computer ModelComputer Model
Cross Sections taken from FloodCross Sections taken from FloodInsurance Study (FIS) developed by FEMA.Insurance Study (FIS) developed by FEMA.
Additional cross sections were added toAdditional cross sections were added toprovide more detail to the project area.provide more detail to the project area.
Model was calibrated to the 100Model was calibrated to the 100--year wateryear water
surface elevations established in 1996 FIS.surface elevations established in 1996 FIS.
-
7/27/2019 Plan for Venice Island Reconstruction Project
18/20
What was Evaluated?What was Evaluated?
Future Conditions were modeled by modifyingFuture Conditions were modeled by modifyingcrosscross--sections to represent proposedsections to represent proposed
conditionsconditions Performing Arts Center & Head HousePerforming Arts Center & Head House
Key concepts:Key concepts:
Volume of r iver channel along siteVolume of r iver channel along site The amount ofThe amount of fillfill between existing gradebetween existing grade
and the regulatory f lood (100and the regulatory f lood (100--year floodyear flood
flow)flow) The volume of buildings above flood lineThe volume of buildings above flood line
has no impact. The fill is offset by otherhas no impact. The fill is offset by otherareas that are the same grade.areas that are the same grade.
-
7/27/2019 Plan for Venice Island Reconstruction Project
19/20
Hydrologic/Hydraulic AnalysisHydrologic/Hydraulic Analysis
WhatWhats it all mean?s it all mean?
No impact to flooding of the Schuylkil l RiverNo impact to flooding of the Schuylkil l River
during 100during 100--year flood flow with proposedyear flood flow with proposedimprovements. This is a result of:improvements. This is a result of:
Minimal fi ll when compared toMinimal fi ll when compared to
volume of river channel along sitevolume of river channel along site
volume of the river channel along itsvolume of the river channel along its
entire lengthentire length
-
7/27/2019 Plan for Venice Island Reconstruction Project
20/20
Hydraulic ReportHydraulic Report
Reviewed by the following AgenciesReviewed by the following Agencies
City of Philadelphia Planning CommissionCity of Philadelphia Planning Commission
Delaware River Basin CommissionDelaware River Basin Commission Army Corps of Engineers (part of Joint Application)Army Corps of Engineers (part of Joint Application)
PADEP (Part of Joint Application)PADEP (Part of Joint Application)