PILOT Manual for Sustainable Urban Transport Planning. Regional Meeting on Sustainable Transport Policies in South Eastern Europe - 21/22 June Budapest Hungary Ivo Cré, Polis Project Manager. Setting the context: 5 Steps from the EU to the EU citizen. 5 Steps between the EU and the EU citizen. - PowerPoint PPT Presentation

TRANSCRIPT

PILOT Manual for Sustainable Urban Transport Planning

Regional Meeting on Sustainable Transport Policies in South Eastern Europe - 21/22 June Budapest Hungary

Ivo Cré, Polis Project Manager

Setting the context: 5 Steps from the EU to the EU citizen

5 Steps between the EU and the EU citizen

Step 1: 6th Environment Action Programme

Step 2: The Thematic Strategy on the Urban Environment

Step 3: The Pilot Project

Step 4: Your city uses Pilot results

Step 5: Citizens and the SUTP

STEP1. EU context

6th Environment Action Programme

The EU committed itself to publish a Thematic strategy on the urban environment addressing an integrated approach to environmental problems in a urban areas.

STEP2. EU context

The Thematic Strategy for the Urban Environment

• Initial vision: obligation for +100.000 local authorities to prepare a Urban Environmental Management Plan and a Sustainable Urban Transport Plan

• Final version: EU to provide local authorities with guidance on these topics

STEP3. Pilot Project

EU launches 2 projects to investigate UMP and SUTP

• Liveable Cities: Urban Management Plans

• Pilot:

Main strategic objective

Promoting sustainable urban transport planning

STEP3. Pilot Project (CTD)

Main objectives

• Identify strengths and weaknesses regarding the transferability of methods and tools for SUTP preparation;

• Provide guidance and recommendations for the European Commission and the Member States;

• address the specific requirements of the EU Accession countries and new member states;

• Establish a durable platform for the exchange of experiences and good practice between stakeholders from across Europe.

STEP4: Your city uses Pilot results

SUTP Tools available

• Pilot Manual (guidance for stakeholders)

• Pilot Manual (full version)

• Support material per Task

• Support material per Mission

• Background document on integration of Transport and Land Use Planning

• Background document on Public Involvement

• Self-assessment questionnaire tools

STEP5: Citizens and the SUTP

The citizens involvement is fourfold:

• A creative public involvement programme brings citizens closer to the planning process.

• A communication plan informs citizens about the progress in the planning process and the implementation of the SUTP.

• Citizens see the result of implemented measures originating from the SUTP.

• Citizens adopt their mobility behaviour.

What is Sustainable Urban Transport Planning

Kicking off the process…

To get things moving in the right direction ...

...synchronized action is needed.

The need for SUTP

• Urban transport policy and mobility planning imply choices that strongly affect society as a whole shaping environment, social and cultural future of our cities;

• Integrated planning processes still hampered by organisational division between transport modes, government agencies and services;

• Transport planning tends to be seen as technical task, lacking stakeholder participation and delivering only piecemeal measures.

Need for…

Multifaceted policy response, based on long term strategy;

Consultation with other authorities and civil society;

Concrete and achievable targets

What is SUTP ?

Defining Sustainable Urban Transport Planning: A new approach to transport planning with distinctive aim, subject and qualities:

• The aim of SUTP: achieving sustainable urban transport system by considering a serie of objectives;

• Adress movement of goods and persons comprehensively

A new planning approach that needs to grow from and within local authorities and existing practices.

A new planning approach

SUTP…

• Is not an additional layer (danger of misconception);

• Builds on existing practices and regulatory frameworks in the Member States. Aims to combine and complete these, applying a number of commonly agreed principles;

• Represents the direction into which current planning practices should be moving continuously in order to enhance sustainable urban transport development;

An innovative process for transport planning

• A participatory approach;

• A pledge for sustainability;

• An integrated approach;

• A focus on the achievement of measurable targets;

• A move towards costs internalisation;

• A cycle of policy-making and implementation

Running the SUTP process

5 key Tasks – well-structured strategic planning process

1: Status analysis and scenario development

1.1: Inventarisation of existing plans and policies1.2: Status analysis1.3: Scenario development

2: Vision, objectives and targets

2.1: Common vision of stakeholders2.2: Definition of objectives2.3: Targets for outcome indicators

3: Action and budget plan

4: Assigning responsibilities and resources

5: Monitoring and evaluation

5 tasks to run the SUTP process

Running the SUTP process

Requirements & conditions

Priorities & choices

Data availability& measurement

Data needsTask 1Status analysis & scenario development

Task 2Vision, objectives & targets

Task 3Action& budget plan

Ta

sk

5

Mo

nit

ori

ng

and

eva

luat

ion

Task 4Assigning responsibilities & resources

Strategies & measures

Problems & policy options

(for implementation)

Pla

n a

do

pti

on

& a

pp

rova

l

Running the SUTP process

Requirements & conditions

Priorities & choices

Data availability& measurement

Data needsTask 1Status analysis & scenario development

Task 2Vision, objectives & targets

Task 3Action& budget plan

Ta

sk

5

Mo

nit

ori

ng

and

eva

luat

ion

Task 4Assigning responsibilities & resources

Strategies & measures

Problems & policy options

(for implementation)

Running the SUTP process

Requirements & conditions

Priorities & choices

Data availability& measurement

Data needsTask 1Status analysis & scenario development

Task 2Vision, objectives & targets

Task 3Action& budget plan

Ta

sk

5

Mo

nit

ori

ng

and

eva

luat

ion

Task 4Assigning responsibilities & resources

Strategies & measures

Problems & policy options

(for implementation)

Pla

n a

do

pti

on

& a

pp

rova

l

Detailed interaction of tasks

Running the SUTP process

Task 3Action& budget plan

Requirements & conditions

Priorities& choices

Strategies& measures

Data availability& measurement

Data needs

Task 5 Monitoring and evaluation

Task 1.2Status analysis

Task 1.3Scenario development

Task 2.1Common vision of stakeholders

Task 2.3Targets for outcome indicators

Priorities& choices

Alternativescenarios

Selected scenario (refined)

Task 1

Task 2

(for implementation)Task 4

Assigning responsibilities & resources

Do-nothing /Business-as-usual

scenario

Task 2.2Definition of objectives

Task 1.1Inventarisation of plans & policies

Pla

n a

do

pti

on

& a

pp

rova

l

Running the SUTP process

Task 3Action& budget plan

Requirements & conditions

Priorities& choices

Strategies& measures

Data availability& measurement

Data needs

Task 5 Monitoring and evaluation

Task 1.2Status analysis

Task 1.3Scenario development

Task 2.1Common vision of stakeholders

Task 2.3Targets for outcome indicators

Priorities& choices

Alternativescenarios

Selected scenario (refined)

Task 1

Task 2

(for implementation)Task 4

Assigning responsibilities & resources

Do-nothing /Business-as-usual

scenario

Task 2.2Definition of objectives

Task 1.1Inventarisation of plans & policies

Pla

n a

do

pti

on

& a

pp

rova

l

SUTP strategic and operative framework

10 “Missions”

1. Timing of the planning process

2. Strategic coordination and actor relations

3. Responsibility and geographical coverage

4. Citizen participation

5. Stakeholder involvement

6. Integration of policies for SUTP

7. Social inclusion and gender equity

8. Skill management

9. Information and public relations

10. Management and organisation

A complex task…

“Sustainable Urban Transport Planning promotes strategic thinking and encourages integration. Partners across a range of sectors sign up to the understanding that in order to progress, a holistic approach is required.”

Helen Holland, Bristol County Council

“Sustainable Urban Transport Plans should be innovative but not utopian. The challenge is of course to implement them”

Rudolf Schicker – Councillor for Urban Development, Traffic and Transport of Vienna

…that’s worth the effort

“Although the efforts for SUTP are considerable, the benefit of widespread acceptance and the many positive effects of an integrated policy exceed the costs by far.”

Ingeborg Junge-Reyer, Senator for Urban Development Berlin

“Our concern for the long-term benefits for health, the environment and the lives of people in our city offers us no alternative to a comprehensive approach addressing the issue of mobility.”

Danica Simsic, Mayor of Ljubljana

Experiences from the PILOT demonstrator and expert cities

PILOT demonstrator cities

Braila (Romania) Evora (Portugal)

Lancaster (UK) Tallinn (Estonia)

Diversity in land use planning in Tallinn

Tallinn contrasts

Land use development opportunity zones in relation to the transport infrastructure network

(The Hague, NL)

30.000 new housesFinish the ringroad

New light-rail Randstadrail

Add quality to water and landscape

Land use development with transport impacts (The Hague, NL)

Regional cooperation

Joint Local Transport Plan for Bath and North East Somerset, Bristol City, North Somerset and South Gloucestershire Councils.

SUTP relates to PT regulatory framework

• SUTP provides framework for service contracts and subsidies.

• SUTP sets targets for specific target groups and justifies fare policy and discounts.

• SUTP maps hierarchy of PT lines and sets the framework for rolling stock investments.

• e.g. Flanders Region