    No Contents

    1

    Update, translate, explain/interpret the local rules and/or standards

    applicable to the project (Refer to JGCSs current list for possible government

    applications as Attachment-5)

    2Identify the appropriate governmental organization from which JGCS needs

    to obtain the permits.

    3

    Review the deliverables/designs and keep communication with government

    authority and get all necessary acceptance/approval for the equipment

    installation.

    4

    Prepare and get acceptance from government authority complete procedure,

    time frame, list of equipment. And arrange the inspection before and during

    and after equipment installation, which require to get the final approval for

    operation. Including but not limited to:

    - Identify the equipment which needs to be inspected and registered. Clarify

    the necessity for Field/Shop inspection related to authority permitting and

    Vietnamese. (Refer to the equipment list as Attachment-7)- Standards/Statutory Regulations. Identify the extent of the requirement and

    the required deliverables from each inspection.

    - Support for preparation of the application documents.

    - Review JGCSs deliverables and products against the applicable

    Vietnamese Standard/Statutory Regulation before inspection.

    - Arrange the inspection for the equipment when/where required.

    - Communicate and coordinate with the applicable governmental

    organization/s to obtain the permit/s on behalf of JGCS if required, or issue

    the certificate after the inspection completed if possible.

    - Coordinate between the governmental authorities and JGCS to facilitate

    answers to any comments regarding JGCSs application/s for permit/s, until

    the permit/s will be issued, if required.

    5Consult and support for preparation of application to each authority for

    clarification in order to obtain the Authorities clarification/approval.

    6Translate applications or answers to comments, etc., to local language to

    communicate to Authority, if required.

    7

    All other work associated with government application & obtaining final

    acceptance of government for the statutory equipment design,

    manufacturing, installation, commissioning and operation.

    CONSULTANT about Statutory

    Equipment (High pressure vessel, loading arm, boi

    The following descriptions shall be the scope of work for CONSULTANT about Statut

    Note: The interpretation of the Vietnamese Standards/Statutory Regulations

    that can be agreed wi

  • 8/14/2019 Pham vi cong viec

    2/5

    Done by Co-ordination by Note

    SGS Sub-Consultant Hire a law consultancy to update

    and interpreteSGS

    SGS Sub-Consultant

    Sub-Consultant has resposible

    for reviewing

    dliverables/designs by JGCS

    Sub-Consultant SGS

    SGS support for clearifying

    equipment , related process

    conditions

    Sub-Consultant SGS

    SGS support for clearifying

    equipment , related process

    conditions

    SGS

    JGCS prepare all application

    document following SGS

    instructions

    SGS Sub-Consultant

    Sub-Consultant has resposible

    for reviewing

    dliverables/designs by JGCS in

    accordance with Vietnamese

    statutory regulations

    SGS Sub-Consultant

    Sub-Consultant SGS

    SGS Sub-ConsultantSub-Consultant to consult JGCS

    to revise application for permit/s

    Sub-Consultant SGS

    SGSHire a law consultancy to

    translates document if required

    SGS Sub-Consultant

    ler, piping, etc).

    ory Equipment (High pressure vessel, loading arm, boiler, piping, etc).

    shall be from the point of view of a refinery and petrochemical industry application

    ith the relevant authorities.

  • 8/14/2019 Pham vi cong viec

    3/5

    No Contents

    1

    Update, translate, explain/interpret the local rules and/or standards

    applicable to the project (Refer to JGCSs current list for possible government

    applications as Attachment-5)2

    Identify the appropriate governmental organization from which JGCS needs

    to obtain the permit/s

    3

    Review the deliverables/designs and keep communication with the

    governmental authorities and getting all necessary acceptance/approval for

    Fire Fighting design. (Refer to the list for fire fighting documents as

    Attachment-7)

    4

    Prepare and get acceptance from the governmental authorities complete

    procedure, time frame, list of Fire Fighting equipment. And arrange the

    inspection before and during Fire Fighting equipment installation as well as

    Fire Fighting systems, which require handover tests.So that to get the final

    approval for operation. Including but not limited to:

    - Identify the equipment which needs to be inspected and registered. Clarifythe necessity for Field/Shop inspection related to authority permitting and

    Vietnamese

    - Standards/Statutory Regulations. Identify the extent of the requirement and

    the required deliverables from each inspection.

    - Support for preparation of the application documents.

    - Review JGCSs deliverables and products against the applicable

    Vietnamese Standard/Statutory Regulation before inspection.

    - Arrange inspection for the equipment when/where required.

    - Communicate and coordinate with the applicable governmental

    organization/s to obtain the permit/s on behalf of JGCS, if required.

    - Coordinate between the governmental authorities and JGCS to facilitate

    answers to any comments regarding JGCSs application/s for permit/s, until

    the permit/s will be issued, if required.

    5Consult and support for preparation of application to each authority for

    clarification in order to obtain the Authorities clarification/approval.

    6Translate applications or answers to comments, etc., to local language to

    communicate to Authority, if required.

    7

    All other work associated with government application & obtaining final

    acceptance of government for Fire Fighting design, equipment

    manufacturing, installation, commissioning, and operation.

    CONSULTANT about Fire Fighting

    The following descriptions shall be the scope of work for CONSULTANT about Fire F

    Note: The interpretation of the Vietnamese Standards/Statutory Regulations

    that can be agreed wi

  • 8/14/2019 Pham vi cong viec

    4/5

    Done by Co-ordination by Note

    SGS Sub-Consultant Hire a law consultancy to update

    and interpreteSGS

    SGS Sub-Consultant

    Sub-Consultant has resposible

    for reviewing

    dliverables/designs by JGCS

    Sub-Consultant SGS SGS support for clearifyingequipment , related process

    conditions

    Sub-Consultant SGS

    SGS support for clearifying

    equipment , related process

    conditions

    SGS

    JGCS prepare all application

    document following SGS

    instructions

    SGS Sub-Consultant

    Sub-Consultant has resposible

    for reviewing

    dliverables/designs by JGCS in

    accordance with Vietnamese

    statutory regulations

    SGS Sub-Consultant

    Sub-Consultant SGS

    SGS Sub-ConsultantSub-Consultant to consult JGCS

    to revise application for permit/s

    Sub-Consultant SGS

    SGSHire a law consultancy to

    translate documentsif required

    SGS Sub-Consultant

    ighting.

    shall be from the point of view of a refinery and petrochemical industry application

    ith the relevant authorities.

  • 8/14/2019 Pham vi cong viec

    5/5

    coordinator

    suppervisor

    1 engineer + 1 suppervisor

    suppervisor

    consultant

    engineer

    1 engineer + 1 suppervisor

    coordinator

    coordinator

    coordinator

    consultant

    coordinator

    coordinator