No Contents
1
Update, translate, explain/interpret the local rules and/or standards
applicable to the project (Refer to JGCSs current list for possible government
applications as Attachment-5)
2Identify the appropriate governmental organization from which JGCS needs
to obtain the permits.
3
Review the deliverables/designs and keep communication with government
authority and get all necessary acceptance/approval for the equipment
installation.
4
Prepare and get acceptance from government authority complete procedure,
time frame, list of equipment. And arrange the inspection before and during
and after equipment installation, which require to get the final approval for
operation. Including but not limited to:
- Identify the equipment which needs to be inspected and registered. Clarify
the necessity for Field/Shop inspection related to authority permitting and
Vietnamese. (Refer to the equipment list as Attachment-7)- Standards/Statutory Regulations. Identify the extent of the requirement and
the required deliverables from each inspection.
- Support for preparation of the application documents.
- Review JGCSs deliverables and products against the applicable
Vietnamese Standard/Statutory Regulation before inspection.
- Arrange the inspection for the equipment when/where required.
- Communicate and coordinate with the applicable governmental
organization/s to obtain the permit/s on behalf of JGCS if required, or issue
the certificate after the inspection completed if possible.
- Coordinate between the governmental authorities and JGCS to facilitate
answers to any comments regarding JGCSs application/s for permit/s, until
the permit/s will be issued, if required.
5Consult and support for preparation of application to each authority for
clarification in order to obtain the Authorities clarification/approval.
6Translate applications or answers to comments, etc., to local language to
communicate to Authority, if required.
7
All other work associated with government application & obtaining final
acceptance of government for the statutory equipment design,
manufacturing, installation, commissioning and operation.
CONSULTANT about Statutory
Equipment (High pressure vessel, loading arm, boi
The following descriptions shall be the scope of work for CONSULTANT about Statut
Note: The interpretation of the Vietnamese Standards/Statutory Regulations
that can be agreed wi
-
8/14/2019 Pham vi cong viec
2/5
Done by Co-ordination by Note
SGS Sub-Consultant Hire a law consultancy to update
and interpreteSGS
SGS Sub-Consultant
Sub-Consultant has resposible
for reviewing
dliverables/designs by JGCS
Sub-Consultant SGS
SGS support for clearifying
equipment , related process
conditions
Sub-Consultant SGS
SGS support for clearifying
equipment , related process
conditions
SGS
JGCS prepare all application
document following SGS
instructions
SGS Sub-Consultant
Sub-Consultant has resposible
for reviewing
dliverables/designs by JGCS in
accordance with Vietnamese
statutory regulations
SGS Sub-Consultant
Sub-Consultant SGS
SGS Sub-ConsultantSub-Consultant to consult JGCS
to revise application for permit/s
Sub-Consultant SGS
SGSHire a law consultancy to
translates document if required
SGS Sub-Consultant
ler, piping, etc).
ory Equipment (High pressure vessel, loading arm, boiler, piping, etc).
shall be from the point of view of a refinery and petrochemical industry application
ith the relevant authorities.
-
8/14/2019 Pham vi cong viec
3/5
No Contents
1
Update, translate, explain/interpret the local rules and/or standards
applicable to the project (Refer to JGCSs current list for possible government
applications as Attachment-5)2
Identify the appropriate governmental organization from which JGCS needs
to obtain the permit/s
3
Review the deliverables/designs and keep communication with the
governmental authorities and getting all necessary acceptance/approval for
Fire Fighting design. (Refer to the list for fire fighting documents as
Attachment-7)
4
Prepare and get acceptance from the governmental authorities complete
procedure, time frame, list of Fire Fighting equipment. And arrange the
inspection before and during Fire Fighting equipment installation as well as
Fire Fighting systems, which require handover tests.So that to get the final
approval for operation. Including but not limited to:
- Identify the equipment which needs to be inspected and registered. Clarifythe necessity for Field/Shop inspection related to authority permitting and
Vietnamese
- Standards/Statutory Regulations. Identify the extent of the requirement and
the required deliverables from each inspection.
- Support for preparation of the application documents.
- Review JGCSs deliverables and products against the applicable
Vietnamese Standard/Statutory Regulation before inspection.
- Arrange inspection for the equipment when/where required.
- Communicate and coordinate with the applicable governmental
organization/s to obtain the permit/s on behalf of JGCS, if required.
- Coordinate between the governmental authorities and JGCS to facilitate
answers to any comments regarding JGCSs application/s for permit/s, until
the permit/s will be issued, if required.
5Consult and support for preparation of application to each authority for
clarification in order to obtain the Authorities clarification/approval.
6Translate applications or answers to comments, etc., to local language to
communicate to Authority, if required.
7
All other work associated with government application & obtaining final
acceptance of government for Fire Fighting design, equipment
manufacturing, installation, commissioning, and operation.
CONSULTANT about Fire Fighting
The following descriptions shall be the scope of work for CONSULTANT about Fire F
Note: The interpretation of the Vietnamese Standards/Statutory Regulations
that can be agreed wi
-
8/14/2019 Pham vi cong viec
4/5
Done by Co-ordination by Note
SGS Sub-Consultant Hire a law consultancy to update
and interpreteSGS
SGS Sub-Consultant
Sub-Consultant has resposible
for reviewing
dliverables/designs by JGCS
Sub-Consultant SGS SGS support for clearifyingequipment , related process
conditions
Sub-Consultant SGS
SGS support for clearifying
equipment , related process
conditions
SGS
JGCS prepare all application
document following SGS
instructions
SGS Sub-Consultant
Sub-Consultant has resposible
for reviewing
dliverables/designs by JGCS in
accordance with Vietnamese
statutory regulations
SGS Sub-Consultant
Sub-Consultant SGS
SGS Sub-ConsultantSub-Consultant to consult JGCS
to revise application for permit/s
Sub-Consultant SGS
SGSHire a law consultancy to
translate documentsif required
SGS Sub-Consultant
ighting.
shall be from the point of view of a refinery and petrochemical industry application
ith the relevant authorities.
-
8/14/2019 Pham vi cong viec
5/5
coordinator
suppervisor
1 engineer + 1 suppervisor
suppervisor
consultant
engineer
1 engineer + 1 suppervisor
coordinator
coordinator
coordinator
consultant
coordinator
coordinator