D:\Burn\Projects\2479.07\DOCS\SEPTICQUESTIONS\Septicanalysis.docx
460YarmouthRoad,HyannisMA-SepticSystemAnalysisAccordingtotheTitle5InspectiondatedJuly13&14,2006byBortolottiConstruction,therearetwoonsitesepticsystems,oneforthefrontbuildingandonefortherearbuilding. Botharereportedtobeconstructedwith1,000gallonseptictanks,adistributionbox,andOrangebergpipelaidina6deepstonebeddinginafieldconfigurationasfollows:
FrontBuilding:54LFx3ftwidex6in.deepwithasinglepipe. (162sfofleachingarea) RearBuilding:16ftwidex35ftlongx6in.deepwiththreepipes.(560sfofleachingarea)
ExistingSepticSystemLoading
ThesiteismappedasaCarverLoamyCoarseSand(259A,seeattached),whichisasoilwithrapidpermeability. Thesystemsappeartohavebeenbuildbeforethe1978Title5CodesoananalysisofthesystemsunderthecurrentTitle5codeandthe1978Title5Codeisprovidedbelow:AssumingClassIsoilswitha2minuteperinchpercolationrate
FrontBuildingo 1978Code: 1gpd/sfx162sf=162gpdo 2006Code: 0.74gpd/sfx162sf=119gpd
RearBuildingo 1978Code: 1gpd/sfx560sf=560gpdo 2006Code: 0.74gpd/sfx560sf=414gpd
ExistingSewageGenerationEstimate
BasedontheexistingbuildingasbuiltplansentitledBuildingFootprintPlanof460YarmouthRoad,HyannisMassachusetts,02601anddatedMarch6,2008,thefollowingestimateofexistingsewagedischargefordesignpurposesisprovidedbelow:
FrontBuildingo 12ServiceBays@150gpd/bay=1,800gpd(450gpdmin.)o 3,840sfofRetail@50gpd/1000sf=192gpd(200gpdmin.)
RearBuildingo 7ServiceBays@150gpd/bay=1,050gpd(450min.)o 3,473sfofretail@50gpd/1000sf=174gpd(200gpdmin.)
Thereissomedoublecountingintheaboveanalysis(someoftheretailareaisinusebypeopleusingtheservicebayareas),thenumberswouldbereducedbyanapproximatingwhatportionofeachbuildingsbusinessisretail(automobileandpartssales),andwhatportionisserviceoriented. MostDealershipsareservicedriven,thatisthemajorityofthebusinessistheServiceandPartsdepartment.Letsassumethebusinessis60%PartsandServiceand40%SalessowereducetheRetailnumbersto40%ofthedesignflow(assumingtheminimumdesignflowisnotimposed):
2009For this project, I was asked to analyze the existing septic system and proposedupgrades to an Auto Sales facility and make a recommendation on the system.
-
8/13/2019 PE APP Atlantic
2/15
D:\Burn\Projects\2479.07\DOCS\SEPTICQUESTIONS\Septicanalysis.docx
FrontBuilding: 1,800gpd(Bays)+192gpdx40%(Retail)=1,877gpd RearBuilding: 1,050gpd(Bays)+174gpdx40%(Retail)=1,120gpd
ProposedSewageGenerationEstimate
Architecturalplanstoscalearerequiredtodeterminetheretailareasandcompletethisanaylsis. Thefollowingestimateofproposedsewagedischargefordesignpurposesisprovidedbelow:
FrontBuildingo 12ServiceBays@150gpd/bay=1,800gpd(450gpdmin.)o xxxsfofRetail@50gpd/1000sf=xxxgpd(200gpdmin.)
RearBuildingo 6ServiceBays@150gpd/bay=900gpd(450min.)o xxxsfofretail@50gpd/1000sf=xxxgpd(200gpdmin.)
Analysis
Itappears
that
there
will
be
no
increase
in
proposed
flows
over
the
existing
use.
However,
it
should
be
notedthattheexistingflowsaregreaterthanthedesignestimateasshownbelow:
FrontBuildingo 162gpd(1978)systemsize,1,877gpddesignflowo 119gpd(2006)systemsize,1,877gpddesignflow
RearBuildingo 560gpd(1978)systemsize,1,120gpddesignflowo 414gpd(2006)systemsize,1,120gpddesignflow
DependingonhowtheBoardofHealthAgentdecidestolookatthis,asystemupgradecouldberequested. TheBoardofHealthhasnotgottenbacktomesowearentsurewhatheislookingfor. Itsoundedlikeheaskedthecontractortohaveanengineerestimatetheexistingsepticsystemdesignforexistingflowsandcomparewiththeproposeddesignflow. IftheBoardofHealthislookingforananalysisorestimateofwhattheexistingsystemcanhandle,therecouldbeissues.FromaTitle5Perspective(IfNewConstructionStandardsareImposed)
InaJune22,2006ZoningReviewletter,AtlanticDesignEngineers(ADE)indicatedthesitelieswithintheWellheadProtectionOverlayDistrict(WP)andGroundwaterProtectionOverlayDistrict(GP)forHyannisaswellasamappedDEPZoneII. Assuch,underTitle5forNewConstruction,thesiteislimitedto440gpdper40,000sf(nitrogenloadingrate)withouttheuseofInnovative/Alternative(I/A)technologies.Also,anyflows2,000gpdandaboverequireanI/Atechnologyregardlessofthe440gpdper40,000sfloadingratelimit. Thesiteis180,178sf,resultinginanallowableflowof1,981gpdfornewconstruction. ItwasalsoindicatedinthesameletterthatwashingofvehiclesisnotallowedwithoutsomeadditionalprovisionsrequiringapprovalbybothMassDEPandtheTown.Ifweassumetheproposeddesignflowsareequaltotheexistingestimatesandourassumptionsarecorrect,thetotalflowforthesiteis1,877gpd(FrontBuilding)+1,120gpd(RearBuilding)=2,997gpd
-
8/13/2019 PE APP Atlantic
3/15
D:\Burn\Projects\2479.07\DOCS\SEPTICQUESTIONS\Septicanalysis.docx
totalflow. Asmentionedabove,thetotalallowableflowforthesiteis1,981gpdfornewconstruction.Also,anyflows2,000gpdandoverarerequiredtouseanI/Asystemanddonotgetadditionalnitrogenloadingcredit. Inordertodesignthissystemwiththeassumedflows,agroundwaterdischargepermitwouldlikelyberequired,ortheprojectwouldhavetobedownsized. TheuseofwaterflowmeterdatacouldbeusedtoproveaMaximumDailyFlowlowerthanthe1,981gpdloadinglimitiftheBoardofHealthworkswiththeclient.FromaTitle5Perspective(IfRepairStandardsareImposed)
Thenitrogenloadingrateisonlyimposedonnewconstruction. ShouldtheBoardofHealthrequireasystemupgradebutdoesntconsideritnewconstruction,theloadingrateissuegoesaway. Thisisthemostlikelyscenario. However,withthesitebeinginsideTownwaterprotectionoverlaydistricts,itisalsolikelytheBoardofHealthwouldrequireanadvancednitrogenremovingsysteminstalledunderaGeneralPermitApproval(localapproval,notMassDEP). Basedontheassumedflows,asystemcouldbesizedapproximatelyasfollows:
2,997gpd(bothbuildings).74gpd/sf=4,050sf Using6deepfield,an81ftx50ftwouldberequired.Withventing,thismaybeallowedunder
pavementsurfaces. Existing1,000septictankswouldbereplacedwithasingle10,000gallontank(3xdailyflow) Apumpchamberwithduplexpumpsandcontrolswouldberequiredtopressuredosethefield
sinceitisover2,000gpd. AnI/AsystemsuchasAdvantex,MicroFast,Bioclere,etc.wouldlikelyberequired. Depending
onthechoiceofsystem,thismaybeabovegradeorbelowgrade.
-
8/13/2019 PE APP Atlantic
4/15
Isuggested
movingthe
proposedseptic
locationdueto
utilitylinesfound
intheproposed
location.
-
8/13/2019 PE APP Atlantic
5/15
DESIGN ENGINEERS, LLC. ENGINEERS & ENVIRONMENTAL SCIENTISTS
D:\Burn\Projects\2477.04\DOCS\Field report 11-11-09.doc
Page 1 of 1FIELD INSPECTION REPORT
TO: Rich Tabaczynski DATE:11/11/09 JOB NO:2477.04
CC: Bruce Durkee, George McCarron PROJECT NAME: Parking Lot Expansion
PRESENT AT SITE: LOCATION: 251 Locke Drive Marlborough
Scott Schluter ADE CONTRACTOR:
Excavator Operator OWNER:
Compactor Operator WEATHER: overcast TEMP: 40s
The following was noted:
Preparation for final excavations ongoing in area of retaining wall and parking lot expansion in the front of the site.
Excavation and compaction for the eastern corner of the site was ongoing. The foundation base for the retaining wall in this
corner was also underway. Additional fill for the rear parking lot expansion was in place. Pipes and fittings for the front
detention area were onsite. Earth was being removed from the front area of the site and being placed in the eastern corner
of the site and then it was being compacted. It should be noted that in the eastern corner of the site where the bottom of the
retaining wall will be, there was standing water. The contractor said he found soft ground and over excavated to compact
backfill this area and water came into the excavation overnight.
Follow up activities required:
Additional fieldwork was requested as follows:
Layout the new parking islands.
Layout retaining wall bottom location and elevations where we can get to.
Check benchmark at rear of site on generator pad, appears to be a few feet off.
Inspection By:
Scott Schluter November 11, 2009
Date
2009
My work on this project involved construction inspections andassisting the contractor with some field modifications to thedrainage systems and parking layout.
-
8/13/2019 PE APP Atlantic
6/15
This is one of
the field
modifications tothe drainagesystem.
-
8/13/2019 PE APP Atlantic
7/15
PineValleyMobileHomeParkSepticSystemReviewbyScottSchluter Groundwaterelevationisindicatedat959.50thoughitappearstobe958.2makingthemound
~1.3feethigherthanitmayneedtobe.
Thedesignisfor33mobilehomes,only28areshowntoconnect. Thelateralsizechosenis11/2,designcoulduse11/4. Pods14areendmanifolddesign,whilepod5iscentermanifold. Canbedone,butcouldbe
rezonedto5centermanifoldzones.
Themanifoldsizeisoff,theyarelongerthanthemaximumlengthforthedesigneddiameter,4diameterisneededforwhatisshown.
Thedosingpumpswouldoperatehigherthanindicated. Design:[email protected]:[email protected]
Thenumberofpumpscouldbereducedto2byusingactuatorvalves. Nogroundwatermoundingcalculations? Thedosevolumeis380.6gallons. One6manholehasthevolumeinthedesign,whatisthe
purposeof
the
second
manhole.
In
fact,
it
alters
the
dose
volume
to
twice
the
design.
DotheInfiltratorsstilluseloadingforTitle5systemsfordesign? Design:0.74gpd/sf. Allowed:3gpd/sf(notsureonthis,Infiltratorpeoplecouldanswer).
Istheimperviousbarrierneeded? Youcangradeelevation965.5(topofchambersasdesigned)at15fromthesystemthen3:1downtoexistinggrade.
Theequalizationtankisoversized. Design:15,000gallonspumpand10,000gallonseptic.Allowed:5,000gallons.
ThesetbackdistancesappeartobebasedonTitle5. GWDPregulationshavesomedifferentsetbackdistances. Bigonesarepublicwatersupplysetbackswhicharenotmetinthedesign.
Minoronescanbeadjustedliketheseptictankcanbemoved5feettomeetpropertyline
setbacks.
Allpipeswithin10feetofanybuildingaresubjecttotheMassStatePlumbingCodewhichrequiresinstallationbyalicensedplumber. Afewplacesitcannotbeavoided,oneSMHcanbe
movedslightlytomeetthe10setback.
Moregradinginformationisneededovertheleachingarea. Itdoesnotappeartomeetcoverandminimumsloperequirementsandthereisntenoughinformationforthecontractorto
constructiteasily.
Theprofileinthedosingareadoesntappeartowork,theinvertsneedtoberevised. Also,Title5requiresseptictankoutletstobe1abovegroundwaterelevation;thisisnotmetatthe
10,000gallon
tank.
Moredetailisneededontheprofile,rimsandinvertsandsomeofwhatisdrawndoesnotmatchthedesign.
Imperviousbarrierdesignisoff. Thebarriershouldgofromtopofchamberto12belowexistinggrade.
2009I was given a set of plans and comment letter from MassDEP for a groundwaterdischarge permit for a mobile home park. I was asked to review the plans,calculations and the comment letter. These are my notes from my review.
-
8/13/2019 PE APP Atlantic
8/15
Theoverdig areaappearstobeoff. Coarsesandwasthematerialpercolated. Thisisapproximately4down. Anythingabovethismaterialshouldberemovedunlesstheupper
materialisalso2mpi. MassDEPmayallowthedesignasshown,isthereabackstory?
Needa10,000gallontankdetail. Needacombinedsewertrenchdetail(FMandgravityinthesametrench). Theinteriorbottomsofthepumpchambersshouldbeslopedtowardsthepumps. (Thismay
serveasantifloatationweight.) Shouldnotethatantifloatationwillonlyworkwhenthetanks
arebackfilledforthosethatutilizesoilascounterweight.
Needavalvepitdetail. Isthereaweephole? Whyisaportablepumpconnectionrequired? Noemergencyprovisions? Canbesimplifiedif
required.
Iftwopumpchambersarestillrequired,thereshouldbeasump. Connectingpipecanbebelowthepumpoffelevation.
Nolegendontheplans.
Are
the
utility
poles
private?
If
not,
are
we
allowed
to
mount
control
panels
on
them?
Itappearsthereneedstobesomedrainageprovisionsneartheexistingpostofficebuilding.Swale?
-
8/13/2019 PE APP Atlantic
9/15
PineValleyMobileHomeParkSepticSystemRevisionsbyScottSchluter Thepressuredosedsystemlateralssizeswerereducedfrom11/2to11/4. Leachingzoneswereredesignedtocentermanifoldfed. Thedosingpumpsystemwasredesignedfromaquintuplexsystemtoaduplexsystemusing
electronicactuated
valves
to
direct
flows
to
the
appropriate
leaching
area
zone.
As
aresult
of
theleachingarearevisions,smallerpumpswereselected.
Theleachingareamoundgradingwasrevisedtoeliminatetheneedforanimperviousbarrier. Someofthegravitysewerlineswereshiftedtoprovide10separationfromexistingmobile
homesasrequiredbytheMassStatePlumbingCode.
Moredetailwasaddedtothesystemprofiletomakeitclearerforconstruction. Additionalmaterialremovalisproposed. TheAandBsoilhorizonsshouldberemovedto
provideadequatepercolationthroughthesubsoil.
Someadditionaldetailswereaddedforclarity. Including,butnotlimitedto:o Sewerconnectiono Valvevaulto Actuatorvalveso Combinedtrench
Variousdetailswererevisedtoclarifyconstruction. Notesanddetailsindicatingthattheinteriorbottomsofthepumpchambersshouldbesloped
towardsthepumpswereadded.
Additionalnotesthattheantifloatationwillonlyworkwhenthetanksarebackfilledforthosethatutilizesoilascounterweightwasadded.
Additionalnoteswereaddedexplainingtheoperationofthesystem.
Upon review, these were the revisions I made to the design
based on my review and the MassDEP comment letter.
-
8/13/2019 PE APP Atlantic
10/15
FIRSTA
VENUE
DUBLINROAD
POD
5
POD
4
POD
3
POD
1
POD
2
ss
owste
revisedplans.
Mostofthe
changeswereto
thegrading,
layout,andpump
configuration.
-
8/13/2019 PE APP Atlantic
11/15
PlantListForClusterandScatteredPlantings
(2-3gallonplantings)
ScientificName
C
ommonName
Vacciniuma
ngustifolium
LowbushBlueberry
Vacciniumc
orymbosum
Hig
hbushBlueberry
Cornusflorida
Flo
weringDogwood
Ilexopaca
AmericanHolly
Kalmialatifolia
M
ountainLaurel
Viburnumc
assinoides
WitherodViburnum
VariousSpecies
Ferns
Vacciniums
p.
Huckleberry
Ilexverticillata
Winterberry
Clethraalnifolia
Sw
eetPepperBush
Buddleiadavidii
ButterflyBush
Spiraealatifolia
Broad-L
eavedMeadowsweet
2009
IsubmittedthisplanforaNotice
ofIntentforthisresid
entialproject.
Itinvolvedvistapruin
gand
landscapemitigation
inthebuffer
areatooffsetproposed
improvementstothe
decksonthe
rearofthehouse.
-
8/13/2019 PE APP Atlantic
12/15
D:\Burn\Projects\2651.00\DOC\2651-city visit memo-10-27-09.docx
Atlantic Design
MemoTo: Rich Tabaczynski
From: Scott Schluter
CC:
Date: 9/4/2012
Re: 2651-Simonds
On October 27, 2009, I visited the City of Fitchburg Conservation Commission (Michael OHara), theBoard of Health (Steve Curry), the Engineering Department (Gary Bevilacqua), the Water Department(Dave Berger), and the Assessors office. I also visited the project site. Below is a summary of theinformation that I obtained.
Conservation Commission
I obtained the Wetlands Protection Ordinance Rules and Regulations. There were no recent plans available for this site. There was a fuel leak Michael remembered and he produced a report by Golder Associates
Semi Annual Monitoring Forge Shop Release MassDEP RTN 2-13597 #155-404 for a Tier1C W023657.
Michael suggested I go to the Board of Health to see if there was a site assignment for thislocus. Meetings are last Tuesday of the month. Submissions are due 2 weeks prior, this includes the
Town department review. Michael thought that the 125 permanent easement on the Nashua River may be an Army
Corps of Engineers easement from when the Bemis Road bridge and dam was washed out.
Board of Health
There is a site assignment for the locus. In the file there is an Actiivity and Use Limitation filed November 2007. Recorded Book 7005
and Page 250 and Book 7005 and Page 257.
Engineering Department
Gary gave me several plans showing utilities around the site. Infiltration is very important to them for drainage prior to connecting to city drainage. Sewer fees are based on water consumption so if there are losses due to processes they may
want to install a meter instead. Gary is tracking down the information on the 30-foot wide easement over the sewer and drain. Unitel is the contact point for gas and electric utilities.
2009This project involved the site design and permitting for a
Bio Fuel facility in Fitchburg within an existingmanufacturing facility parking lot. This is a researchmemorandum after I visited various City departments.
-
8/13/2019 PE APP Atlantic
13/15
D:\Burn\Projects\2651.00\DOC\2651-city visit memo-10-27-09.docx
Tom Szocik would have any plans for the access road. Tom was out sick Tuesday. Gary indicated there were no sewer or drain issues in the area. There is a CSO located near the proposed cul-de-sac, CSO 033. The structures to the north
of the property are not a CSO, just close manholes.
Water Department
Dave gave me several plans showing utilities around the site as well as on the site. Fire and domestic services must be separate. Dave gave me a water service fee schedule-
they are VERY HIGH and vary by line size, make sure the appropriate size is chosen! It is important to understand that the property owner will be billed, not a leasor. Dave mentioned a potential desire to loop the water from the proposed access road through
the site up to Intervale Road. He asked if we had any offsite improvement plans. I indicated we didnt then he mentioned a
desire to see a portion of the watermain near Intervale be replaced. Pressure in the area is 95 PSI, if we need to do a hydrant test it is $100, they operate the
hydrants, we perform the test.
Assessors Office
I picked up a request for information form for Abbuter Notification. We do the notifications City does the advertising, the fee is included in the overall fee.
After the City visits, I met with Ken Myer and Charles Reitz of Simonds International. I then did a sitewalk and took pictures. The following is a summary of what I learned.
Ken Myers and Charles Reitz
We can talk with David Witman of Simonds about the Activity and Use Limitation as well as theutility and railroad easements. He can also assist us in the landfill cap area plans.
The landfill cap is a cover of debris from the factory, mostly metal objects. The BioMass plant will get water from one of the onsite wells, mostly likely the one in the
northeastern corner of the site. I took a picture of this well and we have it located on our plans. Discharge from the plant would go through the existing Simonds discharge to the Nashua
River, requiring a modification to their current permit. Simonds will be leasing to the BioMass plant for 20 years, they will buy their electricity from the
plant. Currently they are partners in the project but may not be eventually. There may be an issue with the airport. Gale Associates is working on a proposal to expand
the airport with a new runway that may interfere with constructing smoke stacks in our area.Dan Curley of the Economic Development Commission may be able to answer our questionsabout this impact, it sounds like the airport is being directed to modify their plans since it wouldalso affect the proposed lots off the access drive.
Ken indicated that the driveway would be gravel. Ken indicated that the portion of the site containing the landfill cap will be given to the City of
Fitchburg.
Photos
Photos can be found at "X:\2501 - 3000\2651.00\Photos\10-27-09"
-
8/13/2019 PE APP Atlantic
14/15
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED
BY
AN
AU
TODESK
EDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED
BY
AN
AUTODESK
EDUC
ATIONALPRODUCT
s
ste
ayoutpan
orteproe
ct.
hadtofitthevariousBioFuelPlan
t
appurtenancesandsafeand
maneuverablevehiclepathswithin
the
confinesoftheleasedarea
-
8/13/2019 PE APP Atlantic
15/15
PRODUCED
BY
AN
AU
TODESK
EDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED
BY
AN
AUTODESK
EDUC
ATIONALPRODUCT
Inadditiontovehiclepathsandfa
cility
components,
thenumerousrequired
utilitieshadtobelaidout.Ihadtoavoid
themanyexistingutilitiesalready
onsite
includingsomelargeCityutilities.