  • 8/13/2019 PE APP Atlantic

    1/15

    D:\Burn\Projects\2479.07\DOCS\SEPTICQUESTIONS\Septicanalysis.docx

    460YarmouthRoad,HyannisMA-SepticSystemAnalysisAccordingtotheTitle5InspectiondatedJuly13&14,2006byBortolottiConstruction,therearetwoonsitesepticsystems,oneforthefrontbuildingandonefortherearbuilding. Botharereportedtobeconstructedwith1,000gallonseptictanks,adistributionbox,andOrangebergpipelaidina6deepstonebeddinginafieldconfigurationasfollows:

    FrontBuilding:54LFx3ftwidex6in.deepwithasinglepipe. (162sfofleachingarea) RearBuilding:16ftwidex35ftlongx6in.deepwiththreepipes.(560sfofleachingarea)

    ExistingSepticSystemLoading

    ThesiteismappedasaCarverLoamyCoarseSand(259A,seeattached),whichisasoilwithrapidpermeability. Thesystemsappeartohavebeenbuildbeforethe1978Title5CodesoananalysisofthesystemsunderthecurrentTitle5codeandthe1978Title5Codeisprovidedbelow:AssumingClassIsoilswitha2minuteperinchpercolationrate

    FrontBuildingo 1978Code: 1gpd/sfx162sf=162gpdo 2006Code: 0.74gpd/sfx162sf=119gpd

    RearBuildingo 1978Code: 1gpd/sfx560sf=560gpdo 2006Code: 0.74gpd/sfx560sf=414gpd

    ExistingSewageGenerationEstimate

    BasedontheexistingbuildingasbuiltplansentitledBuildingFootprintPlanof460YarmouthRoad,HyannisMassachusetts,02601anddatedMarch6,2008,thefollowingestimateofexistingsewagedischargefordesignpurposesisprovidedbelow:

    FrontBuildingo 12ServiceBays@150gpd/bay=1,800gpd(450gpdmin.)o 3,840sfofRetail@50gpd/1000sf=192gpd(200gpdmin.)

    RearBuildingo 7ServiceBays@150gpd/bay=1,050gpd(450min.)o 3,473sfofretail@50gpd/1000sf=174gpd(200gpdmin.)

    Thereissomedoublecountingintheaboveanalysis(someoftheretailareaisinusebypeopleusingtheservicebayareas),thenumberswouldbereducedbyanapproximatingwhatportionofeachbuildingsbusinessisretail(automobileandpartssales),andwhatportionisserviceoriented. MostDealershipsareservicedriven,thatisthemajorityofthebusinessistheServiceandPartsdepartment.Letsassumethebusinessis60%PartsandServiceand40%SalessowereducetheRetailnumbersto40%ofthedesignflow(assumingtheminimumdesignflowisnotimposed):

    2009For this project, I was asked to analyze the existing septic system and proposedupgrades to an Auto Sales facility and make a recommendation on the system.

  • 8/13/2019 PE APP Atlantic

    2/15

    D:\Burn\Projects\2479.07\DOCS\SEPTICQUESTIONS\Septicanalysis.docx

    FrontBuilding: 1,800gpd(Bays)+192gpdx40%(Retail)=1,877gpd RearBuilding: 1,050gpd(Bays)+174gpdx40%(Retail)=1,120gpd

    ProposedSewageGenerationEstimate

    Architecturalplanstoscalearerequiredtodeterminetheretailareasandcompletethisanaylsis. Thefollowingestimateofproposedsewagedischargefordesignpurposesisprovidedbelow:

    FrontBuildingo 12ServiceBays@150gpd/bay=1,800gpd(450gpdmin.)o xxxsfofRetail@50gpd/1000sf=xxxgpd(200gpdmin.)

    RearBuildingo 6ServiceBays@150gpd/bay=900gpd(450min.)o xxxsfofretail@50gpd/1000sf=xxxgpd(200gpdmin.)

    Analysis

    Itappears

    that

    there

    will

    be

    no

    increase

    in

    proposed

    flows

    over

    the

    existing

    use.

    However,

    it

    should

    be

    notedthattheexistingflowsaregreaterthanthedesignestimateasshownbelow:

    FrontBuildingo 162gpd(1978)systemsize,1,877gpddesignflowo 119gpd(2006)systemsize,1,877gpddesignflow

    RearBuildingo 560gpd(1978)systemsize,1,120gpddesignflowo 414gpd(2006)systemsize,1,120gpddesignflow

    DependingonhowtheBoardofHealthAgentdecidestolookatthis,asystemupgradecouldberequested. TheBoardofHealthhasnotgottenbacktomesowearentsurewhatheislookingfor. Itsoundedlikeheaskedthecontractortohaveanengineerestimatetheexistingsepticsystemdesignforexistingflowsandcomparewiththeproposeddesignflow. IftheBoardofHealthislookingforananalysisorestimateofwhattheexistingsystemcanhandle,therecouldbeissues.FromaTitle5Perspective(IfNewConstructionStandardsareImposed)

    InaJune22,2006ZoningReviewletter,AtlanticDesignEngineers(ADE)indicatedthesitelieswithintheWellheadProtectionOverlayDistrict(WP)andGroundwaterProtectionOverlayDistrict(GP)forHyannisaswellasamappedDEPZoneII. Assuch,underTitle5forNewConstruction,thesiteislimitedto440gpdper40,000sf(nitrogenloadingrate)withouttheuseofInnovative/Alternative(I/A)technologies.Also,anyflows2,000gpdandaboverequireanI/Atechnologyregardlessofthe440gpdper40,000sfloadingratelimit. Thesiteis180,178sf,resultinginanallowableflowof1,981gpdfornewconstruction. ItwasalsoindicatedinthesameletterthatwashingofvehiclesisnotallowedwithoutsomeadditionalprovisionsrequiringapprovalbybothMassDEPandtheTown.Ifweassumetheproposeddesignflowsareequaltotheexistingestimatesandourassumptionsarecorrect,thetotalflowforthesiteis1,877gpd(FrontBuilding)+1,120gpd(RearBuilding)=2,997gpd

  • 8/13/2019 PE APP Atlantic

    3/15

    D:\Burn\Projects\2479.07\DOCS\SEPTICQUESTIONS\Septicanalysis.docx

    totalflow. Asmentionedabove,thetotalallowableflowforthesiteis1,981gpdfornewconstruction.Also,anyflows2,000gpdandoverarerequiredtouseanI/Asystemanddonotgetadditionalnitrogenloadingcredit. Inordertodesignthissystemwiththeassumedflows,agroundwaterdischargepermitwouldlikelyberequired,ortheprojectwouldhavetobedownsized. TheuseofwaterflowmeterdatacouldbeusedtoproveaMaximumDailyFlowlowerthanthe1,981gpdloadinglimitiftheBoardofHealthworkswiththeclient.FromaTitle5Perspective(IfRepairStandardsareImposed)

    Thenitrogenloadingrateisonlyimposedonnewconstruction. ShouldtheBoardofHealthrequireasystemupgradebutdoesntconsideritnewconstruction,theloadingrateissuegoesaway. Thisisthemostlikelyscenario. However,withthesitebeinginsideTownwaterprotectionoverlaydistricts,itisalsolikelytheBoardofHealthwouldrequireanadvancednitrogenremovingsysteminstalledunderaGeneralPermitApproval(localapproval,notMassDEP). Basedontheassumedflows,asystemcouldbesizedapproximatelyasfollows:

    2,997gpd(bothbuildings).74gpd/sf=4,050sf Using6deepfield,an81ftx50ftwouldberequired.Withventing,thismaybeallowedunder

    pavementsurfaces. Existing1,000septictankswouldbereplacedwithasingle10,000gallontank(3xdailyflow) Apumpchamberwithduplexpumpsandcontrolswouldberequiredtopressuredosethefield

    sinceitisover2,000gpd. AnI/AsystemsuchasAdvantex,MicroFast,Bioclere,etc.wouldlikelyberequired. Depending

    onthechoiceofsystem,thismaybeabovegradeorbelowgrade.

  • 8/13/2019 PE APP Atlantic

    4/15

    Isuggested

    movingthe

    proposedseptic

    locationdueto

    utilitylinesfound

    intheproposed

    location.

  • 8/13/2019 PE APP Atlantic

    5/15

    DESIGN ENGINEERS, LLC. ENGINEERS & ENVIRONMENTAL SCIENTISTS

    D:\Burn\Projects\2477.04\DOCS\Field report 11-11-09.doc

    Page 1 of 1FIELD INSPECTION REPORT

    TO: Rich Tabaczynski DATE:11/11/09 JOB NO:2477.04

    CC: Bruce Durkee, George McCarron PROJECT NAME: Parking Lot Expansion

    PRESENT AT SITE: LOCATION: 251 Locke Drive Marlborough

    Scott Schluter ADE CONTRACTOR:

    Excavator Operator OWNER:

    Compactor Operator WEATHER: overcast TEMP: 40s

    The following was noted:

    Preparation for final excavations ongoing in area of retaining wall and parking lot expansion in the front of the site.

    Excavation and compaction for the eastern corner of the site was ongoing. The foundation base for the retaining wall in this

    corner was also underway. Additional fill for the rear parking lot expansion was in place. Pipes and fittings for the front

    detention area were onsite. Earth was being removed from the front area of the site and being placed in the eastern corner

    of the site and then it was being compacted. It should be noted that in the eastern corner of the site where the bottom of the

    retaining wall will be, there was standing water. The contractor said he found soft ground and over excavated to compact

    backfill this area and water came into the excavation overnight.

    Follow up activities required:

    Additional fieldwork was requested as follows:

    Layout the new parking islands.

    Layout retaining wall bottom location and elevations where we can get to.

    Check benchmark at rear of site on generator pad, appears to be a few feet off.

    Inspection By:

    Scott Schluter November 11, 2009

    Date

    2009

    My work on this project involved construction inspections andassisting the contractor with some field modifications to thedrainage systems and parking layout.

  • 8/13/2019 PE APP Atlantic

    6/15

    This is one of

    the field

    modifications tothe drainagesystem.

  • 8/13/2019 PE APP Atlantic

    7/15

    PineValleyMobileHomeParkSepticSystemReviewbyScottSchluter Groundwaterelevationisindicatedat959.50thoughitappearstobe958.2makingthemound

    ~1.3feethigherthanitmayneedtobe.

    Thedesignisfor33mobilehomes,only28areshowntoconnect. Thelateralsizechosenis11/2,designcoulduse11/4. Pods14areendmanifolddesign,whilepod5iscentermanifold. Canbedone,butcouldbe

    rezonedto5centermanifoldzones.

    Themanifoldsizeisoff,theyarelongerthanthemaximumlengthforthedesigneddiameter,4diameterisneededforwhatisshown.

    Thedosingpumpswouldoperatehigherthanindicated. Design:[email protected]:[email protected]

    Thenumberofpumpscouldbereducedto2byusingactuatorvalves. Nogroundwatermoundingcalculations? Thedosevolumeis380.6gallons. One6manholehasthevolumeinthedesign,whatisthe

    purposeof

    the

    second

    manhole.

    In

    fact,

    it

    alters

    the

    dose

    volume

    to

    twice

    the

    design.

    DotheInfiltratorsstilluseloadingforTitle5systemsfordesign? Design:0.74gpd/sf. Allowed:3gpd/sf(notsureonthis,Infiltratorpeoplecouldanswer).

    Istheimperviousbarrierneeded? Youcangradeelevation965.5(topofchambersasdesigned)at15fromthesystemthen3:1downtoexistinggrade.

    Theequalizationtankisoversized. Design:15,000gallonspumpand10,000gallonseptic.Allowed:5,000gallons.

    ThesetbackdistancesappeartobebasedonTitle5. GWDPregulationshavesomedifferentsetbackdistances. Bigonesarepublicwatersupplysetbackswhicharenotmetinthedesign.

    Minoronescanbeadjustedliketheseptictankcanbemoved5feettomeetpropertyline

    setbacks.

    Allpipeswithin10feetofanybuildingaresubjecttotheMassStatePlumbingCodewhichrequiresinstallationbyalicensedplumber. Afewplacesitcannotbeavoided,oneSMHcanbe

    movedslightlytomeetthe10setback.

    Moregradinginformationisneededovertheleachingarea. Itdoesnotappeartomeetcoverandminimumsloperequirementsandthereisntenoughinformationforthecontractorto

    constructiteasily.

    Theprofileinthedosingareadoesntappeartowork,theinvertsneedtoberevised. Also,Title5requiresseptictankoutletstobe1abovegroundwaterelevation;thisisnotmetatthe

    10,000gallon

    tank.

    Moredetailisneededontheprofile,rimsandinvertsandsomeofwhatisdrawndoesnotmatchthedesign.

    Imperviousbarrierdesignisoff. Thebarriershouldgofromtopofchamberto12belowexistinggrade.

    2009I was given a set of plans and comment letter from MassDEP for a groundwaterdischarge permit for a mobile home park. I was asked to review the plans,calculations and the comment letter. These are my notes from my review.

  • 8/13/2019 PE APP Atlantic

    8/15

    Theoverdig areaappearstobeoff. Coarsesandwasthematerialpercolated. Thisisapproximately4down. Anythingabovethismaterialshouldberemovedunlesstheupper

    materialisalso2mpi. MassDEPmayallowthedesignasshown,isthereabackstory?

    Needa10,000gallontankdetail. Needacombinedsewertrenchdetail(FMandgravityinthesametrench). Theinteriorbottomsofthepumpchambersshouldbeslopedtowardsthepumps. (Thismay

    serveasantifloatationweight.) Shouldnotethatantifloatationwillonlyworkwhenthetanks

    arebackfilledforthosethatutilizesoilascounterweight.

    Needavalvepitdetail. Isthereaweephole? Whyisaportablepumpconnectionrequired? Noemergencyprovisions? Canbesimplifiedif

    required.

    Iftwopumpchambersarestillrequired,thereshouldbeasump. Connectingpipecanbebelowthepumpoffelevation.

    Nolegendontheplans.

    Are

    the

    utility

    poles

    private?

    If

    not,

    are

    we

    allowed

    to

    mount

    control

    panels

    on

    them?

    Itappearsthereneedstobesomedrainageprovisionsneartheexistingpostofficebuilding.Swale?

  • 8/13/2019 PE APP Atlantic

    9/15

    PineValleyMobileHomeParkSepticSystemRevisionsbyScottSchluter Thepressuredosedsystemlateralssizeswerereducedfrom11/2to11/4. Leachingzoneswereredesignedtocentermanifoldfed. Thedosingpumpsystemwasredesignedfromaquintuplexsystemtoaduplexsystemusing

    electronicactuated

    valves

    to

    direct

    flows

    to

    the

    appropriate

    leaching

    area

    zone.

    As

    aresult

    of

    theleachingarearevisions,smallerpumpswereselected.

    Theleachingareamoundgradingwasrevisedtoeliminatetheneedforanimperviousbarrier. Someofthegravitysewerlineswereshiftedtoprovide10separationfromexistingmobile

    homesasrequiredbytheMassStatePlumbingCode.

    Moredetailwasaddedtothesystemprofiletomakeitclearerforconstruction. Additionalmaterialremovalisproposed. TheAandBsoilhorizonsshouldberemovedto

    provideadequatepercolationthroughthesubsoil.

    Someadditionaldetailswereaddedforclarity. Including,butnotlimitedto:o Sewerconnectiono Valvevaulto Actuatorvalveso Combinedtrench

    Variousdetailswererevisedtoclarifyconstruction. Notesanddetailsindicatingthattheinteriorbottomsofthepumpchambersshouldbesloped

    towardsthepumpswereadded.

    Additionalnotesthattheantifloatationwillonlyworkwhenthetanksarebackfilledforthosethatutilizesoilascounterweightwasadded.

    Additionalnoteswereaddedexplainingtheoperationofthesystem.

    Upon review, these were the revisions I made to the design

    based on my review and the MassDEP comment letter.

  • 8/13/2019 PE APP Atlantic

    10/15

    FIRSTA

    VENUE

    DUBLINROAD

    POD

    5

    POD

    4

    POD

    3

    POD

    1

    POD

    2

    ss

    owste

    revisedplans.

    Mostofthe

    changeswereto

    thegrading,

    layout,andpump

    configuration.

  • 8/13/2019 PE APP Atlantic

    11/15

    PlantListForClusterandScatteredPlantings

    (2-3gallonplantings)

    ScientificName

    C

    ommonName

    Vacciniuma

    ngustifolium

    LowbushBlueberry

    Vacciniumc

    orymbosum

    Hig

    hbushBlueberry

    Cornusflorida

    Flo

    weringDogwood

    Ilexopaca

    AmericanHolly

    Kalmialatifolia

    M

    ountainLaurel

    Viburnumc

    assinoides

    WitherodViburnum

    VariousSpecies

    Ferns

    Vacciniums

    p.

    Huckleberry

    Ilexverticillata

    Winterberry

    Clethraalnifolia

    Sw

    eetPepperBush

    Buddleiadavidii

    ButterflyBush

    Spiraealatifolia

    Broad-L

    eavedMeadowsweet

    2009

    IsubmittedthisplanforaNotice

    ofIntentforthisresid

    entialproject.

    Itinvolvedvistapruin

    gand

    landscapemitigation

    inthebuffer

    areatooffsetproposed

    improvementstothe

    decksonthe

    rearofthehouse.

  • 8/13/2019 PE APP Atlantic

    12/15

    D:\Burn\Projects\2651.00\DOC\2651-city visit memo-10-27-09.docx

    Atlantic Design

    MemoTo: Rich Tabaczynski

    From: Scott Schluter

    CC:

    Date: 9/4/2012

    Re: 2651-Simonds

    On October 27, 2009, I visited the City of Fitchburg Conservation Commission (Michael OHara), theBoard of Health (Steve Curry), the Engineering Department (Gary Bevilacqua), the Water Department(Dave Berger), and the Assessors office. I also visited the project site. Below is a summary of theinformation that I obtained.

    Conservation Commission

    I obtained the Wetlands Protection Ordinance Rules and Regulations. There were no recent plans available for this site. There was a fuel leak Michael remembered and he produced a report by Golder Associates

    Semi Annual Monitoring Forge Shop Release MassDEP RTN 2-13597 #155-404 for a Tier1C W023657.

    Michael suggested I go to the Board of Health to see if there was a site assignment for thislocus. Meetings are last Tuesday of the month. Submissions are due 2 weeks prior, this includes the

    Town department review. Michael thought that the 125 permanent easement on the Nashua River may be an Army

    Corps of Engineers easement from when the Bemis Road bridge and dam was washed out.

    Board of Health

    There is a site assignment for the locus. In the file there is an Actiivity and Use Limitation filed November 2007. Recorded Book 7005

    and Page 250 and Book 7005 and Page 257.

    Engineering Department

    Gary gave me several plans showing utilities around the site. Infiltration is very important to them for drainage prior to connecting to city drainage. Sewer fees are based on water consumption so if there are losses due to processes they may

    want to install a meter instead. Gary is tracking down the information on the 30-foot wide easement over the sewer and drain. Unitel is the contact point for gas and electric utilities.

    2009This project involved the site design and permitting for a

    Bio Fuel facility in Fitchburg within an existingmanufacturing facility parking lot. This is a researchmemorandum after I visited various City departments.

  • 8/13/2019 PE APP Atlantic

    13/15

    D:\Burn\Projects\2651.00\DOC\2651-city visit memo-10-27-09.docx

    Tom Szocik would have any plans for the access road. Tom was out sick Tuesday. Gary indicated there were no sewer or drain issues in the area. There is a CSO located near the proposed cul-de-sac, CSO 033. The structures to the north

    of the property are not a CSO, just close manholes.

    Water Department

    Dave gave me several plans showing utilities around the site as well as on the site. Fire and domestic services must be separate. Dave gave me a water service fee schedule-

    they are VERY HIGH and vary by line size, make sure the appropriate size is chosen! It is important to understand that the property owner will be billed, not a leasor. Dave mentioned a potential desire to loop the water from the proposed access road through

    the site up to Intervale Road. He asked if we had any offsite improvement plans. I indicated we didnt then he mentioned a

    desire to see a portion of the watermain near Intervale be replaced. Pressure in the area is 95 PSI, if we need to do a hydrant test it is $100, they operate the

    hydrants, we perform the test.

    Assessors Office

    I picked up a request for information form for Abbuter Notification. We do the notifications City does the advertising, the fee is included in the overall fee.

    After the City visits, I met with Ken Myer and Charles Reitz of Simonds International. I then did a sitewalk and took pictures. The following is a summary of what I learned.

    Ken Myers and Charles Reitz

    We can talk with David Witman of Simonds about the Activity and Use Limitation as well as theutility and railroad easements. He can also assist us in the landfill cap area plans.

    The landfill cap is a cover of debris from the factory, mostly metal objects. The BioMass plant will get water from one of the onsite wells, mostly likely the one in the

    northeastern corner of the site. I took a picture of this well and we have it located on our plans. Discharge from the plant would go through the existing Simonds discharge to the Nashua

    River, requiring a modification to their current permit. Simonds will be leasing to the BioMass plant for 20 years, they will buy their electricity from the

    plant. Currently they are partners in the project but may not be eventually. There may be an issue with the airport. Gale Associates is working on a proposal to expand

    the airport with a new runway that may interfere with constructing smoke stacks in our area.Dan Curley of the Economic Development Commission may be able to answer our questionsabout this impact, it sounds like the airport is being directed to modify their plans since it wouldalso affect the proposed lots off the access drive.

    Ken indicated that the driveway would be gravel. Ken indicated that the portion of the site containing the landfill cap will be given to the City of

    Fitchburg.

    Photos

    Photos can be found at "X:\2501 - 3000\2651.00\Photos\10-27-09"

  • 8/13/2019 PE APP Atlantic

    14/15

    PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT

    PRODUCED

    BY

    AN

    AU

    TODESK

    EDUCATIONALPRODUCT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED

    BY

    AN

    AUTODESK

    EDUC

    ATIONALPRODUCT

    s

    ste

    ayoutpan

    orteproe

    ct.

    hadtofitthevariousBioFuelPlan

    t

    appurtenancesandsafeand

    maneuverablevehiclepathswithin

    the

    confinesoftheleasedarea

  • 8/13/2019 PE APP Atlantic

    15/15

    PRODUCED

    BY

    AN

    AU

    TODESK

    EDUCATIONALPRODUCT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED

    BY

    AN

    AUTODESK

    EDUC

    ATIONALPRODUCT

    Inadditiontovehiclepathsandfa

    cility

    components,

    thenumerousrequired

    utilitieshadtobelaidout.Ihadtoavoid

    themanyexistingutilitiesalready

    onsite

    includingsomelargeCityutilities.