dbia mid-atlantic meeting october 16, 2015 shailendra patel, pe, dbia director, alternate project...

16
DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

Upload: roland-hubbard

Post on 13-Dec-2015

223 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

DBIA MID-ATLANTIC MEETING

October 16, 2015

Shailendra Patel, PE, DBIA

Director, Alternate Project Delivery Office

Page 2: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

2

Zion Crossroads Interchange Improvements Corman Construction Co./Parsons Transportation

Page 3: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

3

VDOT DESIGN-BUILD PROGRAM

Status as of October 1, 2015

Number of Contracts

Total Value in Millions

Completed Contracts 34 $570.1

Active Contracts 37 $1247.3

Active Proposals 5 $350.8

Candidate Projects 3 $211.0

Page 4: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

4

Rte 277/244 InterchangeShirley Contracting / Dewberry

Page 5: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

5

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015$0

$100,000,000

$200,000,000

$300,000,000

$400,000,000

$500,000,000

$600,000,000

$700,000,000

0

10

20

30

40

50

60

70

Summary of D-B Contracts Advertised

Total DB Estimated Value # of DB Contracts Advertised

Year

To

tal

Est

imat

ed C

on

trac

t V

alu

e

No

. o

f C

on

trac

ts A

dve

rtis

ed

* I-564 Intermodal Connector advertised by EFLHD

*

Page 6: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

6

Rte 60 Bridge Replacement in the Town of Clifton ForgeOrders Construction/Clark-Nexsen

Page 7: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

7

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015$0

$200,000,000

$400,000,000

$600,000,000

$800,000,000

$1,000,000,000

$1,200,000,000

$1,400,000,000

$1,600,000,000

$1,800,000,000

$2,000,000,000

DB vs. DBB Contracts Advertised

Total DBB Estimated Value Total DB Estimated Value

Year

To

tal

Est

imat

ed C

on

trac

t V

alu

e

Page 8: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

8

Route 460 Connector (Phase I)Bizzack Construction/AMT / ENTRAN / Janssen & Spaans

Page 9: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

9

RECENT INITIATIVES

Use of incentives

Use of options for additional work

Responsible Charge Engineer for complex DB projects

Use of ATCs

Page 10: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

10

I-581 & Elm Avenue InterchangeAmerican Infrastructure/RDA

Page 11: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

11

DESIGN-BUILD LESSONS LEARNED

Environmental Wetland Delineation

Threaten & Endangered Spices – Long-Eared Bats

HAZMAT studies – Phase I & II

Survey – Type of survey and accuracy

SUE Survey – Level B designation for all underground utilities

Geotechnical Data Report – appropriate investigation of ground water elevation to determine feasibility of preliminary type and location of storm water facilities

Utilities – Advance communication with the Owners, expecting owner to provide prior rights determination, and advance relocations where appropriate

Right-of-Way – Advance acquisitions for total takes where appropriate

Page 12: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

12

DESIGN-BUILD CONCERNS

Design submittal quality

Post-award interpretation of standards and specifications

Construction quality

DBB mindset

Partnering

Page 13: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

13

DESIGN-BUILD PROJECTS - ADVERTISED CY 2015

Three (3) DB projects Advertised Valued at - $236M

I – 64 Peninsula Widening (Segment II) - $185M

GRTC Pulse: Bus Rapid Transit (BRT) - $38M

I-81 over Rte. 808 (Halls Bottom Rd) and Sinking Creek - $13M

Page 14: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

14

DESIGN-BUILD PROJECTS TO BE ADVERTISED

Three (3) DB projects to be Advertised Valued at - $211MRoute 630 (Courthouse Road) and Interstate 95

Interchange Reconstruction - Fredericksburg District, UPC 13558 (RFQ release late 2015) - $102.5M

Route 606 Bridge Replacement over I-95 with 606 Improvements - Fredericksburg District, UPC 105463 and 100829 (RFQ Release Late 2015) - $23.5M

Route 220 Corridor Safety Improvements, Salem District - UPCs 105543 and 105544 (RFQ release Summer 2016) - $85M

Page 15: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

15

POTENTIAL DESIGN-BUILD PROJECTS*

I-64 Peninsula Widening Segment III, Hampton Roads District, UPC 106689

Bridge Replacement: I-81 over Reed Creek and Rte. 697 (Formato Lane), Bristol District, UPC 104936

Bridge Replacement: I-81 over Rte. 686 (Mulberry Lane), Bristol District, UPC 107117

I-64 Widening from I-295 to Exit 205, Richmond District, UPC 107458*It is anticipated that the projects listed above will be advertised using the Design-Build project

delivery method.  The list is subject to change.

Page 16: DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office

16

SHAILENDRA PATEL, PE, DBIAPHONE: 804-692-0476EMAIL: [email protected]