    PUBLIC BIDDING

    CHECKLIST FOR

    PROCUREMENT OF

    INFRASTRUCTURE

    PROJECTS

  • 7/28/2019 PBC Infra_1

    2/22

  • 7/28/2019 PBC Infra_1

    3/22

    Public Bidding Checklist for Infrastructure Projects

    3

    PUBLIC BIDDING CHECKLIST

    For Procurement of Infrastructure Projects through Competitive Public Bidding

    PROCEDURE ACTIVITY OBSERVATION

    Pre-procurementConference (IRR

    Section 20)

    For Approved Budget for the Contract(ABC) costing more than five million

    pesos:

    Did the BAC call for a pre-procurement conference?

    Is the procurement in accordancewith the project and annual

    procurement plan?

    Except for design and buildschemes, was a detailed engineeringcarried out in accordance with the

    standards and specifications

    prescribed by the head of the

    procuring entity concerned or his

    duly authorized representative?

    Is the procurement ready in termsof availability of ROW, if required,

    appropriations and programmed

    budget for the contract, adherence

    of bidding documents, technicalplans, specifications, among others?

    Are the criteria for eligibilityscreening of the pass/fail type?

    Did the BAC finalize and approvethe criteria for evaluation of bids?

    (eg. number and type of equipment

    required, personnel and years of

    experience required)

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    Advertising andContents of the

    Invitation to bid

    (IRR Section 21)

    Completeness of advertisement

    1. Name and location of contract tobe bid, project background

    including brief description of the

    type, size, major items of the

    works, among others

    list deficiencies, ifany

    YES / NO

  • 7/28/2019 PBC Infra_1

    4/22

    Public Bidding Checklist for Infrastructure Projects

    4

    2. General statement on the criteriafor eligibility check,

    examination and evaluation of

    bids, and post-qualification

    3. Date, time, and place of thedeadline for the submission andreceipt of eligibility

    requirements and Letter of

    Intent, the pre-bid conference,

    the submission and receipt of

    bids, and the opening of bids

    4. The Approved Budget for theContract (ABC)

    5. Source of funding

    6. Period of availability of biddingdocuments, place where they

    may be secured, and price of

    bidding documents, where

    applicable

    7. Contract duration

    8.Name, address, telephonenumber, fax number, e-mail and

    website addresses as well as

    designated contact persons

    For ABC costing more than five

    million pesos:

    Was the advertisement publishedtwice within a maximum period of

    fourteen (14) calendar days with aminimum period of six (6) calendar

    days between publications?

    Was it published in a newspaper ofgeneral nationwide circulation in

    existence for at least 2 years?

    Was it continuously posted in the

    YES / NO

    YES / NO(indicate date, time and

    place)

    YES / NO(indicate amount)

    YES / NO(indicate source of

    funds)

    YES / NO(indicate period, place

    and price)

    YES / NO(indicate contract duration)

    YES / NO(indicate details)

    YES / NO(indicate dates of

    publication)

    YES / NO(indicate newspaper)

    YES / NO

  • 7/28/2019 PBC Infra_1

    5/22

    Public Bidding Checklist for Infrastructure Projects

    5

    website of procuring entity, if

    available, during the same period of

    advertisement in the newspaper?

    Was it continuously posted in theG-EPS during the same period of

    advertisement in the newspaper?

    Was it continuously posted in aconspicuous place in the premises

    of the procuring entity, as certified

    by the Head of the BAC Secretariat

    of the procuring entity concerned,

    during the same period of

    advertisement in the newspaper?

    For ABC costing five million pesos

    and below:

    Was it continuously posted in thewebsite of procuring entity, if

    available, for a maximum period of

    fourteen (14) calendar days?

    Was it continuously posted in theG-EPS for a maximum period of

    fourteen (14) calendar days?

    Was it continuously posted in aconspicuous place in the premisesof the procuring entity, as certified

    by the Head of BAC Secretariat of

    the procuring entity concerned, for

    a maximum period of fourteen (14)

    calendar days?

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    Letter of Intentfor the

    Procurement of

    Infrastructure

    Projects (IRRSection 21.3)

    Is there a registry of contractors inthe procuring entity?

    If the answer above is YES, is theprospective bidder registered withthe procuring entity?

    If the answer above is YES, is theprospective bidders registration

    current and updated in the G-EPS

    electronic registry, or the procuring

    entitys electronic registry already

    YES / NO

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    6/22

    Public Bidding Checklist for Infrastructure Projects

    6

    existing upon the effectivity of the

    Act and that allows electronic

    submission and/or recording/entry

    of eligibility requirements

    simultaneously with registration?

    If the prospective biddersregistration is not updated, did the

    bidder submit its updated

    documents?

    After the BAC verified propersubmission of all registration

    requirements, did the BAC issue a

    certification of official registration?

    Was the above-mentionedcertification submitted to the

    procuring entity in lieu of the Class

    A documents? (IRR Section 23.6.1)

    Did the prospective bidder submita Letter of Intent (LOI) to

    participate in the bidding?

    If the answer above is YES, was theLOI received not later than seven

    (7) calendar days after the last day

    of the period for advertising and/or

    posting of the Invitation to Applyfor Eligibility and to Bid?

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    EligibilityRequirements

    for the

    Procurement of

    Infrastructure

    Projects (IRR

    Section 23)

    Did the procuring entity usestandard forms/checklist of

    necessary documents for eligibility

    as prescribed by the Government

    Procurement Policy Board?

    Were the eligibility requirements orstatements submitted to the BAC in

    the form prescribed in the IRRSection 23.6 and in the Instruction

    to Bidders? (Class A & B

    Documents)

    Did the procuring entity use thenon-discretionary pass/fail criteria

    for determining eligibility, based on

    YES / NO

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    7/22

    Public Bidding Checklist for Infrastructure Projects

    7

    the submission of the required

    documents? (IRR Section 23.6)

    Eligible Participants for Procurement of

    Infrastructure:

    In case of sole proprietorships,are the bidders duly licensed

    and Filipino citizens?

    In case of partnerships, are theyduly organized under the laws

    of the Philippines and of which

    at least seventy-five percent

    (75%) of the interest belongs to

    Filipino citizens?

    In case of corporations, are theyduly organized under laws of

    the Philippines and of which at

    least seventy-five percent (75%)

    of the outstanding capital stock

    belongs to Filipino citizens?

    In case of entities formingthemselves into a joint venture,

    is the interest of the Filipino

    partner in the joint venture

    concerned at least seventy-five

    percent (75%) Filipino-owned?

    Where the structures to be builtrequire the application of

    techniques and/or technologies,

    which are not adequately

    possessed by a person/entity

    meeting the seventy-five

    percent (75%) Filipino

    ownership requirement, is the

    Filipino ownership or interestnot less than twenty- five

    percent (25%)?

    In case of cooperatives, are theyduly registered with the

    Cooperatives Development

    Authority (CDA)?

    Was the person/entity issued alicense by the Philippine

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    8/22

    Public Bidding Checklist for Infrastructure Projects

    8

    Contractors Accreditation

    Board (PCAB) to engage in the

    construction business?

    In the case of foreigncontractors, did they substitute

    the eligibility requirementsunder Class A Documents with

    the appropriate equivalent

    documents issued by the

    country of the foreign

    contractor concerned? (IRR

    Section 23.7)

    Did the Philippine Consulateduly acknowledge or

    authenticate the above-

    mentioned documents?

    Is the value of the prospectivebidders largest single completed

    contract, adjusted to current prices

    using the National Statistics Office

    consumer price indices, and similar

    to the contract to be bid, at least

    fifty percent (50%) of the approved

    budget?

    Is the Contractors PerformanceEvaluation System (CPES) rating,and/or certificate of completion and

    owners acceptance of the contract

    satisfactory? (IRR Section

    23.11.2.4)

    Did the prospective bidder presentany of the following:

    1. A commitment from a licensedbank to extend to it a credit lineof at least ten percent (10%) of

    the ABC, if awarded thecontract;

    2. Cash deposit certificate in anamount not lower than that set

    by the procuring entity in the

    bidding documents, which shall

    be at least equal to ten percent

    (10%) of the ABC;

    3. Net Financial Contracting

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO(indicate form and

    amount)

  • 7/28/2019 PBC Infra_1

    9/22

    Public Bidding Checklist for Infrastructure Projects

    9

    Capacity (NFCC), which must

    at least be equal to the ABC

    Did the prospective bidder or itsduly authorized representative

    certify under oath that each of the

    documents submitted is an originalcopy or a true and faithful

    reproduction or copy of the original

    and that all information contained

    therein is true and correct?

    Did the prospective bidders submittheir eligibility envelopes on or

    before the deadline and at the place

    specified in the Invitation to Apply

    for Eligibility and to Bid?

    Were there prospective bidders whosubmitted their eligibility envelopes

    after the deadline?

    If the answer above is YES, did theBAC reject the said submission?

    Did the BAC open the eligibilityenvelopes on the date, time and

    place specified in the Invitation to

    apply for Eligibility and to Bid?

    Did the BAC use the non-discretionary pass/fail criteria for

    the eligibility check of prospective

    bidders?

    In case one or more of the requireddocuments for the eligibility

    envelope of a prospective bidder is

    missing, incomplete, or patently

    insufficient, did the BAC declare

    said prospective bidder as

    ineligible?

    If a prospective bidder is ratedpassed for all the eligibility

    requirements, is he immediately

    considered eligible to participate in

    the bidding?

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO(indicate date, time and

    place)

    YES / NO

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    10/22

    Public Bidding Checklist for Infrastructure Projects

    10

    Did the BAC declare whichprospective bidders are eligible and

    which are ineligible?

    Did the procuring entity inform inwriting the prospective bidders of

    their eligibility or ineligibility?

    If a prospective bidder is foundineligible, were the grounds for its

    ineligibility stated in the written

    notice above?

    In case a prospective bidderdetermined as ineligible wishes to

    file a request for reconsideration

    with the BAC, either verbally

    during the time of the eligibility

    check or in writing within seven (7)

    calendar days upon written notice,

    was the request for reconsiderationdue to the fault of the bidder?

    If the answer above is YES, did theBAC consider the request for

    reconsideration?

    Upon receipt of the request forreconsideration, did the BACresolve the matter within seven (7)

    calendar days from receipt thereof?

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    Pre-bidConference (IRR

    Section 22)

    Is the ABC one million pesos ormore?

    If the answer above is YES, did theprocuring entity hold at least one

    (1) pre-bid conference?

    If the answer above is YES, was thepre-bid conference held at least

    twelve (12) calendar days before

    the deadline for the submission and

    receipt of bids?

    Were the minutes of the pre-bidconference recorded and made

    YES / NO(indicate amount)

    YES / NO

    YES / NO(indicate date)

    YES / NO

  • 7/28/2019 PBC Infra_1

    11/22

    Public Bidding Checklist for Infrastructure Projects

    11

    available to all participants not later

    than three (3) calendar days after

    the pre-bid conference?

    Did an eligible bidder submit awritten request for an interpretation

    or clarification to the BAC?

    If the answer above is YES, was itsubmitted at least ten (10) calendar

    days before the deadline set for the

    submission and receipt of bids?

    Were there any statements in thepre-bid conference, which modified

    the terms of the bidding

    documents?

    If the answer above is YES, werethese specifically identified in

    writing and issued as a

    Supplemental/Bid Bulletin to thebid documents and sent to all

    parties who have secured the bid

    documents? (IRR Section 22.5)

    Did the BAC respond throughSupplemental/Bid Bulletin issued at

    least seven (7) calendar days before

    the deadline for the submission andreceipt of bids?

    Were the Supplemental/BidBulletins posted in the website of

    the procuring entity as well as in the

    G-EPS? (IRR Section 22.5.3)

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO(indicate dates)

    YES / NO(indicate date)

    Submission andReceipt of Bids

    (IRR Section 25)

    Did the bidder submit their bidenvelopes, sealed and duly marked,

    on or before the deadline and at the

    places specified in the Invitation toApply for Eligibility and to Bid and

    the Bidding Documents?

    Were there bidders who submittedtheir bid envelopes after the

    deadline?

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    12/22

    Public Bidding Checklist for Infrastructure Projects

    12

    If the answer above is YES, did theBAC reject the said submission?

    Were the technical and financialbids submitted in two (2) separate

    sealed bid envelopes, and containedin one outer envelope?

    YES / NO

    YES / NO

    Modificationand Withdrawal

    of Bids (IRR

    Section 26)

    In case a bidder modified its bid,was the modification done before

    the deadline for the submission and

    receipt of bids?

    In case a bidder modified its bid,did the BAC allow the bidder to

    retrieve its original bid?

    In case a bidder modified its bid,was the bid envelope marked

    modification to distinguish it

    from its original bid?

    In case a bidder withdrew its bid,was the letter of withdrawal

    submitted before the deadline for

    the submission and receipt of bids?

    In case the bidder withdrew its bid,did the BAC allow the bidder tosubmit another bid, directly or

    indirectly for the same contract?

    In case a bidder did not participatein the bidding, was such non-

    participation done in writing and

    before the deadline for the receipt

    of bids?

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    Bid Opening(IRR Section

    29)

    Did the BAC open the bids at thedate, time and place specified in the

    Invitation to Apply for Eligibility

    and to Bid and as stated in the

    bidding documents?

    Did all the bidders or their dulyauthorized representatives attend

    YES / NO(indicate date, time, and

    place)

    YES / NO

  • 7/28/2019 PBC Infra_1

    13/22

    Public Bidding Checklist for Infrastructure Projects

    13

    the opening of bids?

    Were all pages of the original copyof all bids received and opened

    required to be initialed by all

    members of the BAC or their duly

    authorized representatives presentduring bid opening?

    Were the minutes of the bidopening prepared and made

    available to the public upon written

    request and payment of specified

    fee?

    YES / NO

    YES / NO

    PreliminaryExamination of

    Bids (IRR

    Section 30)

    Were the first envelopes opened inpublic for the purpose of

    determining the bidders

    compliance with the requisites

    therefor?

    Was a checklist of the requireddocuments specified in the IRR

    Section 25.3 prepared by the

    procuring entity, and were the

    submitted documents checked

    against said checklist to ascertain if

    they are all present in the first bid

    envelope?

    Did the bids include a bid securityin the form prescribed by the

    procuring entity as stated in IRR

    Section 27?

    If the answer above is YES, is theamount of the bid security at least

    equal to the specified amount as

    stated in IRR Section 27.2?

    Were the bids and bid securitiesvalid for a maximum period of 120

    calendar days from the opening of

    bids?

    In case of failure to enclose the bidsecurity, was the bidder

    automatically disqualified?

    YES / NO

    YES / NO

    YES / NO(indicate form)

    YES / NO(indicate amount)

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    14/22

    Public Bidding Checklist for Infrastructure Projects

    14

    In case one or more of the requireddocuments in the first envelope is

    missing, incomplete or patently

    insufficient, did the BAC disqualify

    the concerned bidder outright and

    immediately return to him thesecond bid envelope unopened?

    Did the BAC open only the secondenvelopes of the bidders who

    complied with the requirements for

    the first envelopes?

    Did the BAC check whether or notthe second envelopes contained all

    the information/documents

    specified in the IRR Section 25.4?

    In case one or more of the requireddocuments in the second envelope

    is missing, incomplete or patentlyinsufficient and/or the submitted

    total bid price exceeds the approved

    budget for the contract, did the

    BAC disqualify the concerned

    bidder outright and rated the bid as

    failed?

    Was there any written noticerequesting for reconsideration withthe BAC from a bidder whose bid

    was rated as failed?

    In case a bidder determined asfailed wishes to file a request for

    reconsideration with the BAC,

    either verbally during the time of

    the bid opening or in writing within

    seven (7) calendar days of bid

    opening, was the request for

    reconsideration due to the fault ofthe bidder?

    If the answer above is YES, did theBAC consider the request for

    reconsideration?

    Upon receipt of the request for

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    15/22

    Public Bidding Checklist for Infrastructure Projects

    15

    reconsideration, did the BAC

    resolve the matter within seven (7)

    calendar days from receipt thereof?

    In case a bidder that failed tocomply with any of the

    requirements for the first bidenvelope filed a motion for

    reconsideration, did the BAC hold

    its second bid envelope sealed and

    unopened until such time the matter

    is resolved?

    YES / NO

    Bid Evaluationfor the

    Procurement of

    Infrastructure

    (IRR Section 32)

    The procuring entity determines theLowest Calculated Bid (LCB)

    through the following 2-step

    procedure:

    1. Did the BAC conduct a detailedevaluation of the financial

    component of the bids to establish

    the correct calculated prices of the

    bids?

    2. Was the ranking of the total bid

    prices calculated from the lowest

    to the highest in order to

    determine the LCB?

    Was the evaluation of bidscompleted not later than fifteen (15)

    calendar days from the date of

    opening of bids?

    Did the BAC prepare thecorresponding Abstract of Bids,

    which contains the following:

    1. Name of the contract and itslocation, if applicable;

    2. Time, date and place of bidopening; and3. Names of bidders and their

    corresponding calculated bid

    prices, arranged from lowest to

    highest, the amount of bid

    security and the name of the

    issuing entity. (IRR Section

    32.5)

    YES / NO

    YES / NO

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    16/22

    Public Bidding Checklist for Infrastructure Projects

    16

    Were the Abstract of Bids signedby all BAC members?

    YES / NO

    Post-Qualification

    (IRR Section 34)

    Through post-qualification, did theprocuring entity ascertain, within

    seven (7) calendar days from the

    determination of the LCB, whether

    the bidder with the LCB complies

    with and is responsive to all

    requirements and conditions for

    eligibility and the bidding contract

    as specified in the biddingdocuments?

    With respect to the legalrequirements, did the BAC

    undertake verification, validation,

    and ascertainment of the licenses

    and agreements, among others,

    submitted by the bidder with the

    LCB?

    Did the BAC also undertakeverification, validation, andascertainment that the bidder with

    the LCB is not included in any

    Government blacklist?

    With respect to the technicalrequirements, did the BAC

    undertake verification and

    validation of the following:

    1. Competence and experience ofthe bidder and its key personnel

    assigned to the project;

    2. Availability and commitmentand/or inspection and testing of

    equipment to be used for the

    duration of the project;

    3. Performance of the bidder in itson-going contracts, government

    and/or private; and

    YES / NO

    YES / NO

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    17/22

    Public Bidding Checklist for Infrastructure Projects

    17

    4. Sufficiency of the bid securityas to type, form, amount,

    wording and validity period.

    o With respect to the financialrequirements, did the BAC

    undertake the verification andvalidation of the following:

    1. Bid price proposal;2. Bank commitment to

    provide credit line to the bidder,

    if applicable;

    3. Bidders stated net worth andliquid assets;

    4. Bidders net working capital;5. Value of outstanding or

    unfinished works; and

    6. Bidders NFCC, wheneverapplicable

    Did the bidder with the LCB passall of the post-qualification

    criteria/requirements?

    If the answer above is YES, did theBAC consider him post-qualified

    and his bid as the Lowest

    Calculated Responsive Bid

    (LCRB)?

    If the bidder with the LCB failedany of the post-qualification

    criteria/requirements, did the BAC

    consider him post-disqualified?

    If the answer above is YES, did theBAC immediately notify him in

    writing that he is post-disqualified

    and inform him in the same notice

    of the grounds for his post-

    disqualification?

    In case of post-disqualification, wasthe post-disqualified bidder given

    seven (7) calendar days from

    receipt of the notice of post-

    disqualification to request for a

    reconsideration of the decision from

    the BAC?

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    18/22

    Public Bidding Checklist for Infrastructure Projects

    18

    In case of any such request forreconsideration, did the BAC

    evaluate the request using the same

    non-discretionary criteria?

    If the answer above is YES, did theBAC issue its final determination of

    the said request within seven (7)

    calendar days from receipt thereof?

    After the BAC notified the saidbidder with the LCB of its post-

    disqualification, not withstanding

    any pending request for

    reconsideration, did the BAC

    initiate and complete the post-

    qualification on the bidder with the

    second LCB?

    Did the second LCB pass post-qualification?

    If the answer above is YES, and inthe event that the request for

    reconsideration of the bidder of the

    LCB is denied, did the BAC post-

    qualify the second LCB as the

    bidder with the LCRB?

    In case the second bidder failed thepost-qualification, did the BAC

    repeat the procedure for post-

    qualification with the next lowest

    calculated bid and so on, until the

    LCRB is determined?

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    Notice andExecution of

    Award (IRR

    Section 37)

    Was the award of contract madeusing the submitted bid price of the

    bidder with the LCRB or the

    calculated bid price, whichever islower?

    In the case of a Single CalculatedResponsive Bid as provided in IRR

    Section 36, was the bidder with the

    Single Calculated Responsive Bid

    awarded the contract?

    YES / NO(indicate contract price)

    YES / NO

  • 7/28/2019 PBC Infra_1

    19/22

    Public Bidding Checklist for Infrastructure Projects

    19

    Was the decision whether or not toaward the contract made within

    fifteen (15) calendar days from the

    determination and declaration by

    the BAC of the LCRB?

    In the case of GOCCs and GFIs,was the decision whether or not to

    award the contract made within

    thirty (30) calendar days from the

    determination and declaration by

    the BAC of the LCRB?

    Within the same period, did theBAC notify all losing bidders of

    their decision?

    Was the contract awarded withinthe bid validity period?

    Did it become necessary to extendthe validity of bids?

    Did the winning bidder or its dulyauthorized representative enter into

    contract with the procuring entity

    within ten (10) calendar days from

    receipt of the notice of award?

    Was the Notice of Awardimmediately posted in a

    conspicuous place within the

    premises of the procuring entity and

    in the website of the procuring

    entity and/or the G-EPS?

    Did the contract awardee post aperformance security, in the form

    and amount prescribed in IRR

    Section 39, in favor of the

    Government within the timespecified by the procuring entity

    after contract signing?

    Was the performance security inany of the following forms and in

    accordance with the following

    schedule:

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO(indicate form and

    amount)

  • 7/28/2019 PBC Infra_1

    20/22

    Public Bidding Checklist for Infrastructure Projects

    20

    1. Cash, certified check, cashierscheck, managers check, bank

    draft, or irrevocable letter of

    credit 5% of the total contract

    price

    2. Bank guarantee 10% of thetotal contract price3. Surety bond, callable on

    demand issued by surety or

    insurance companies 30% of

    the total contract price

    4. Any combination thereof5. Foreign government guarantee

    100% of the total contract price

    In the event of refusal, failure orinability of the bidder with the

    LCRB to enter into contract withthe Government and/or post the

    required performance security

    within the time provided, did the

    procuring entity impose the

    appropriate sanctions provided for

    under IRR Section 65.3?

    In case of refusal, failure orinability of the bidder with the

    LCRB to enter into contract with

    the Government and/or post therequired performance security

    within the time provided therefore,

    did the procuring entity exercise its

    option to consider for award the

    bidder with the second LCRB at his

    submitted bid if the same does not

    exceed the approved budget of the

    contract awarded?

    In case of a subsequent refusal,failure or inability, was the same

    procedure above followed by theprocuring entity until an award was

    made?

    When further approval of higherauthority is required, did the

    approving authority for the contract

    or his duly authorized

    representative approve or

    YES / NO

    YES / NO

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    21/22

    Public Bidding Checklist for Infrastructure Projects

    21

    disapprove the contract, within

    twenty (20) calendar days from the

    receipt thereof?

    In the case of GOCCs, did theapproving authority for the contract

    or his duly authorizedrepresentative approve or

    disapprove the contract, within

    thirty (30) calendar days from the

    receipt thereof?

    Did the procuring entity issue theNotice to Proceed together with the

    copy of the approved contract to the

    successful bidder, within seven (7)

    calendar days from the date of

    approval of the contract?

    Did the procuring entity review thequalifications of the bidder at any

    stage of the procurement process

    and find any grounds for

    misrepresentation or change in the

    prospective bidders capability to

    undertake the project?

    If the answer above is YES, did itresult to the bidders ineligibility/

    disqualification from submitting abid or obtaining an award?

    Was the procurement process fromopening of bids up to the award of

    contract completed within three (3)

    months or a shorter period as

    determined by the procuring entity?

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    YES / NO

    Protests onDecisions of the

    BAC (IRRSection 55)

    Was there a protest on the decisionsof the BAC with respect to the

    conduct of the bidding?

    Was a prior motion forreconsideration filed by the bidder

    within the reglementary period and

    the same has been resolved?

    Was the protest filed within seven

    YES / NO

    YES / NO

    YES / NO

  • 7/28/2019 PBC Infra_1

    22/22

    Public Bidding Checklist for Infrastructure Projects

    (7) calendar days from receipt by

    the bidder of the resolution of the

    BAC denying its motion for

    reconsideration?

    Was the protest in the form of averified position paper and filedwith the head of the procuring

    entity together with a non-

    refundable protest fee in an amount

    equivalent to no less than one

    percent (1%) of the ABC?

    Was the protest resolved by thehead of the procuring entity within

    seven (7) calendar days from

    receipt thereof?

    YES / NO(indicate issue(s) and

    amount)

    YES / NO

    Failure ofBidding (IRR

    Section 35)

    Did the BAC declare the biddinga failure in any of the followingconditions:

    1. No prospective bidder submitsan LOI or no bids are received;

    2. All prospective bidders aredeclared ineligible;

    3. All bids fail to comply with allthe bid requirements or fails

    post-qualification4. The bidder with the LCRBrefuses, without justifiable

    cause, to accept the award of

    contract and no award is made

    in accordance with IRR Section

    40

    YES / NO(indicate which condition)