page 4 of environmental engg i, 3rd, ci · water supply rate 160 ipcd, the maximum (ittily demand...

4
Scanned by CamScanner NagpurStudents.Org

Upload: others

Post on 18-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Page 4 of environmental engg I, 3rd, ci · water supply rate 160 Ipcd, The maximum (Ittily demand is 1.5 times average daily demand. Find the power required to drive the pumps if

Scanned by CamScanner

NagpurStudents.Org

Page 2: Page 4 of environmental engg I, 3rd, ci · water supply rate 160 Ipcd, The maximum (Ittily demand is 1.5 times average daily demand. Find the power required to drive the pumps if

Scanned by CamScanner

NagpurStudents.Org

Page 3: Page 4 of environmental engg I, 3rd, ci · water supply rate 160 Ipcd, The maximum (Ittily demand is 1.5 times average daily demand. Find the power required to drive the pumps if

Scanned by CamScanner

NagpurStudents.Org

Page 4: Page 4 of environmental engg I, 3rd, ci · water supply rate 160 Ipcd, The maximum (Ittily demand is 1.5 times average daily demand. Find the power required to drive the pumps if

Scanned by CamScanner

NagpurStudents.Org