Page 1: Page 4 of environmental engg I, 3rd, ci · water supply rate 160 Ipcd, The maximum (Ittily demand is 1.5 times average daily demand. Find the power required to drive the pumps if

Scanned by CamScanner

NagpurStudents.Org

Page 2: Page 4 of environmental engg I, 3rd, ci · water supply rate 160 Ipcd, The maximum (Ittily demand is 1.5 times average daily demand. Find the power required to drive the pumps if

Scanned by CamScanner

NagpurStudents.Org

Page 3: Page 4 of environmental engg I, 3rd, ci · water supply rate 160 Ipcd, The maximum (Ittily demand is 1.5 times average daily demand. Find the power required to drive the pumps if

Scanned by CamScanner

NagpurStudents.Org

Page 4: Page 4 of environmental engg I, 3rd, ci · water supply rate 160 Ipcd, The maximum (Ittily demand is 1.5 times average daily demand. Find the power required to drive the pumps if

Scanned by CamScanner