page 1 march 2007 checksource 2.3 portable power phantom load

19
Page 1 March 2007 CheckSource 2.3 Portable Power Phantom Load

Upload: henry-miles

Post on 30-Dec-2015

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1March 2007

CheckSource 2.3Portable Power Phantom Load

Page 2March 2007

1 mA ... 6 A / 8 VA / Phase Phase shifter -180° ... +180° Stability better than

0.03 % (30 min)0.1 % (1 h)

Single phase supply 50 VA (typical) 65 VA (maximum)

Options: CALSOFT Software

Advantages / Benefits

Page 3March 2007

Connections

[1] Current outputs I1, I2, I3 [5] Voltage Connection N (internal connected)

[2] Current inputs I1*, I2*, I3* [6] Supply from measuring voltage [3] Fuses for current connection [7] Supply mains socket[4] Voltage Connection U1, U2, U3

Page 4March 2007

Connections

[8] Fuse for supply voltage [12] Cursor keys[9] RS232 serial line interface [13] Enter key [10] LCD display [14] Alphanumeric keypad [11] Menu card keys

Page 5March 2007

ConnectionsSupply voltage connection

Supply frommains socket

Supply frommeasuring voltagein 4-wire network

Supply frommeasuring voltagein 3-wire network

88min … 264max VAC,

45 … 65 Hz

U(R-N) = U(U1-N):88min … 264max VAC

U(R-T) = U(U1-U3):88min … 264max VAC

Page 6March 2007

Operation Concept

Symbols Display Control Keys

Page 7March 2007

Operation of the Source

1

2

Page 8March 2007

Operation of the SourceLoad Point Activation

ON / OFF Current Source

Load Point Definition

Definition of reference

values Imax, In

Load / save load point

Back to Menu Source

Page 9March 2007

Operation of the SourceSwitch ON / OFF Current Source

Page 10March 2007

Operation of the SourceLoad Point Definition

Page 11March 2007

Operation of the SourceDefinition of reference values Imax, In

Page 12March 2007

Operation of the SourceLoad / save load point

Page 13March 2007

Installation of the Instrument

1

2

Page 14March 2007

Installation of the InstrumentBasic settings of the instrument

Display contrast

Input of clock time

Input of date

RS232 baud rate

Back to Menu Installation

Page 15March 2007

Connection Examples3-phase 4-wire network

Page 16March 2007

Connection Examples3-phase 3-wire network

Page 17March 2007

Connection Examples1-phase 2-wire network

Page 18March 2007

Connection Examples3-phase 4-wire Instrument transformer installation

Page 19March 2007

Connection Examples3-phase 3-wire Instrument transformer installation