System Engineering 1
PACS IHDR MPE 12/13 November 2003
PACS IHDR
Model Philosophy, Budgets, Interfaces and
IID-B
Reinhard Katterloher
System Engineering 2
PACS IHDR MPE 12/13 November 2003
Configuration and Development of PACS Instrument Models
• Flight Instrument consists of 1 cryogenic FPU, 4 electronics boxes (units) at ambient temperature, 1 set of WIH
• CQM+AVM Instrument consists of 1 cryogenic FPU, 4 electronics boxes (units) at ambient temperature, 1 set of WIH
• Flight Spare philosophy demands 1 cryogenic FPU (which is the refurbished CQM unit), and electronics spare kits
• Development program, performance verification and environmental qualification of Units is taken care by the individual manufacturers
• For each Unit a dedicated Development and Test Plan (covering all AIV activities on Unit level) is issued and enforced
• AIV of the different models on instrument level starts after delivery of the Units to MPE
System Engineering 3
PACS IHDR MPE 12/13 November 2003
Model Philosophy (deliverables to ESA are marked in blue)
Models/ Units
AVM CQM PFM FS QM
FPU STM CQM PFM CQM
refurb. -
DPU AVM AVM PFM spare
kit QM
SPU AVM AVM PFM spare
kit EM
DECMEC AVM EM PFM spare
kit QM+
BOLC BOLCSIM QM1 PFM spare
kit QM2
WIH AVM AVM PFM - QM
EGSE AVM AVM FM FM -
System Engineering 4
PACS IHDR MPE 12/13 November 2003
CQM-FPU and AVM-WE characteristics compared to PFM
• FPU CQM is a nearly FM representative FPU Unit Complete optics, all mechanisms, all sensors Blue spectrometer array: 12 modules instead of 25 Red spectrometer array: 11 modules instead of 25 Blue photometer array: 8 sub-arrays (2 near perfo.) of 8 Red photometer array: 2 sub-arrays (1 near perfo.) of 2• AVM electronics is built with commercial grade components, no
redundancy, DECMEC, BOLC and SPU are not form fit with FM
• CQM wavelength calibration program cannot be executed to the same accuracy as planned for FM due to schedule limitations
• EMC tests during CQM ILT and on system level (EQM) planned
System Engineering 5
PACS IHDR MPE 12/13 November 2003
Functional Properties of Units (deliverables to MPE)
Unit Model status
FPU STM (mass, size, thermal, ext. alignm.)CQM (full repres. of FM, 50% Ge-arrays)PFM (full flight representative)
delivered
DPU AVM (functional repres. of FM, FFF)PFM (nom and red part)QM (functional repres. of FM, for ILT FS)
delivered
SPU AVM (functional repres. of FM)EM (functional repres. of FM, for ILT FS)PFM (2 identical boxes nom/red)
delivered
DECMEC
AVM Simulator (supports electrical + S/W performance verification)EM (1MEC+2DEC)QM (1MEC+1DEC, upgrd. requ. for ILT FS)PFM (2MEC+2DEC in 1 unit)
delivered
BOLC BOLC Simulator (supports electr.+S/W ver.)QM1 (supports FPU ILT performance verif.)QM2 (full QM, for initial FM, for ILT FS)PFM (full flight representative)
delivered
System Engineering 6
PACS IHDR MPE 12/13 November 2003
Combination of Units during ILT Phases
ILT phase
AVM CQM PFM FS
FPU STM CQM PFM CQM refurb.
DPU AVM AVM PFM QM
SPU AVM AVM PFM EM
DECMEC AVM EM PFM QM+
BOLC BOLCSIM QM1 QM2
(PFM) QM2
WIH AVM AVM PFM QM
EGSE ILT ILT ILT ILT
System Engineering 7
PACS IHDR MPE 12/13 November 2003
FPU Schematic and Interfaces
2 bolometer arrays at 0.3K
Electrical I/F
optics
structure
int. harness
FPU
\m soffice\grafiken\IID R \PAC S-FPU -schem e-IH D R .cdr
Optical I/F to Telescope Beam
ThermaI I/F toCooling Syst.S/C
Mechanical I/Fto Optical Bench
temperaturesensors
1.7K Level 0
2 filter wheeldrives and
position sensors
chopper drive and
position sensor
2 calibrationsources
heater/sensor
distributionboards
connectors
2 photoconductor arrays
CRE
grating drive,grating position sensor,
launch lock device
3He sorption cooler and
cryo electronics
Electrical I/F
Optical I/F Alignment Cubeto outside CVVAlignment Tool
InstrumentWarm
Electronics
Spacecraft
Mechanical I/FSVM Panel
2 bolometer arrays at 0.3K
Electrical I/F
optics
structure
int. harness
FPU
\m soffice\grafiken\IID R \PAC S-FPU -schem e-IH D R .cdr
Optical I/F to Telescope Beam
ThermaI I/F toCooling Syst.S/C
Mechanical I/Fto Optical Bench
temperaturesensors
1.7K Level 0
2 filter wheeldrives and
position sensors
chopper drive and
position sensor
2 calibrationsources
heater/sensor
distributionboards
connectors
2 photoconductor arrays
CRE
grating drive,grating position sensor,
launch lock device
3He sorption cooler and
cryo electronics
Electrical I/F
Optical I/F Alignment Cubeto outside CVVAlignment Tool
InstrumentWarm
Electronics
Spacecraft
System Engineering 8
PACS IHDR MPE 12/13 November 2003
Mechanical interfaces of FPU – OB and WE – SVM
• The PACS FPU is mounted on the OB with 3 CFRP feet• The mechanical Interface is fully described in the drawing “PACS-KT-ICD-0000W1 issue 27 draft dated 04-07-2003”• The FPU ICD drawing is annex to IID-B
• The bolting scheme of BOLC QM to SVM is not identical with FM
• The mechanical interfaces of other WE FM boxes to SVM are given in the relevant PACS Interface Control Drawings
• WE FM ICDs are annex to IID-B• Change requests are issued for WE AVM boxes
System Engineering 9
PACS IHDR MPE 12/13 November 2003
Thermal Budget and Interface FPU - S/C cryostat
• FPU requires two temperature levels- level 0 at nominal 1.7K (max. 1.75 K accepted)- level 1 around 4K (max. 5.0 K accepted)
• Other temperatures inside the FPU are produced autonomously (2.2K blue array/ 0.3K bolometers)
• Thermal coupling to cooling level 0 via 4 heat straps• Thermal coupling to cooling level 1 via 3 heat straps• FPU is thermally decoupled from OB by CFRP feet• Thermal loads and final heat fluxes are calculated
using the PACS TMM combined with the cryostat TMM
System Engineering 10
PACS IHDR MPE 12/13 November 2003
Steady State Heat Dissipation (table from PACS TMM)
System Engineering 11
PACS IHDR MPE 12/13 November 2003
Harness Interface FPU–WE–S/C and Electrical Budget
• Harness is specified in PACS-MA-SP-001-V3.2, annex to IID-B It consists of
- total inside CVV: 1060 wires + 255 shields
- total outside CVV: 1060 wires + 255 shields + 15 overshields
- Warm Interconnect Harness (specs. given in PACS-CL-RS-010)
• Power consumption of WE see separate table
• Science data rate in PACS prime mode is 130 kbps max (120 kbps average per day)
System Engineering 12
PACS IHDR MPE 12/13 November 2003
Power Consumption on SVM (present allocation is 120 W, CR-0033_V3 pending, demand for LCL class
III)
Table of maximum average power and short and long peak power demand is provided in IID-B CR-0033_V3
System Engineering 13
PACS IHDR MPE 12/13 November 2003
Mass and Size of Instrument Units
Project code Instrument unit Dimensions (mm)length x width x
height
Nominal mass (kg)
FPFPU Cold focal plane unit See configuration drawings annex IID-B
73.6
FPDECMEC Detector control and mechanism control unit
EM 560x318x304FM 560x318x305
TBC23 (TBC)
FPBOLC Bolometer and cooler control unit
QM 328.5x300.2x314.3FM 382.5x289x333.5incl. connect. backshell 499.5x289x376.9
TBC15.35
FPDPU Digital processing unit 274x258x197 including fixation feet240x258x197 exclud.f.f.
6.62
FPSPUnom.+redu. stacked
Signal processing unit AVM 280x240.5x350FM 270x221x186
TBC7.0
FPWIH Warm interconnect harness
Length AVM 2000Length FM 1300/1500
1.5TBC
Total mass FM (allocation 130 kg) 127
System Engineering 14
PACS IHDR MPE 12/13 November 2003
Current IID-B Status
• Status of open CRs submitted or still to be written will be given under topic PA/QA
• Status of open RFWs submitted or still to be written will be given under topic PA/QA
• Lot of figures and few tables need to be replaced according to progress in instrument development and have to be included in the very next version of IID-B (many of the figures are ready for submission)
• Missing figures, drawings and all text additions can be expected from PACS within the next two weeks
System Engineering 15
PACS IHDR MPE 12/13 November 2003
Urgent Pending Activities w.r.t. Documentation
• Update of IID-B has highest priority• Next issues of AIV Plan and Test Plan are due (PCD draft 7 up to date)• Definition of the optimized ILT test sequence and consolidation of
test steps need further technical discussions• Definition of detailed test procedure for the CQM+AVM ILT in
progress already, issueing of the document Test Plan will be started immediately after AIV Plan is completed
• Selection of „building blocks“ out of the ILT program for the EQM test program has to be started soon (test steps adapted to EQM constraints)
• Approval of RFW0003 expected soon, qualification program of black paint needs to be finished because manufacture of FM structure has started