Pacakge -I Part-IV AC Works IMGEOS and NDEM S.No. Quantity Item Description Unit Rate (In Figure & In Words) Amount 3.1 ONE CENTRIFUGAL WATER COOLED PACKAGE WATER CHILLER Providing, installing and commissioning of chillers Each 250 Tr size , each factory fitted with centrifugal compressors/ condensers and chillers - refrigerant shall be R134A and usable by codes in the equipment for the life span of the equipment each chiller shall be equipped with atleast the following:- chiller to be min 10 0 F TD – i.e. flow rate of 2.4 US gpm / Tr (say 6.4 0 C / 12 0 C) 3.1.1 1 Providing and installing compressor – centrifugal type complete to specifications - 250 Tr Each 3.1.2 1 Providing and installing compressor motor- TEFC squirrel cage induction type 1450 rpm / 2900 rpm - enclosure to suit compressor requirements - 250 hp Each 3.1.3 1 Providing and installing soft start starters for the above Each 3.1.4 1 Providing, installing and commissioning of shell and tube water cooled condensers complete with all standard accessories as called for (250 Tr) Each 3.1.5 1 Providing and installing shell and tube chillers complete with all accessories as specified – 250 Tr Each 3.1.6 * 1 Providing and installing intercoolers suction liquid heat exchangers etc., etc. Lot 3.1.7 1 Providing, installing and commissioning of refrigerant piping out of heavy duty steel including nitrile rubber suction line insulation-chiller insulation complete with water proof finish Lot The contractors scope of work shall consist of providing airconditioning to the spaces to the specified standards indicated herein and his scope of supply shall include for but not be restricted to the following: All data and quantities, etc. given here in this annexure take precedence over quantities; etc. mentioned elsewhere. Contractors shall however bring out any discrepancy clearly. IMPORTANT: The project is being put up for a green building rating by LEED certification hence equipment of high efficiency is desirable. Page 1 of 27

Upload: krmcharigdc

Post on 16-Apr-2015

27 views

Category:

Documents


0 download

DESCRIPTION

Package - I Part IV AC WORKS.

TRANSCRIPT

Page 1: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.1 ONE CENTRIFUGAL WATER COOLED PACKAGEWATER CHILLER

Providing, installing and commissioning of chillersEach 250 Tr size, each factory fitted with centrifugalcompressors/ condensers and chillers - refrigerantshall be R134A and usable by codes in the equipmentfor the life span of the equipment each chiller shall beequipped with atleast the following:- chiller to be min100F TD – i.e. flow rate of 2.4 US gpm / Tr (say 6.40 C/ 120C)

3.1.1 1 Providing and installingcompressor – centrifugal type -complete to specifications - 250 Tr

Each

3.1.2 1 Providing and installing compressor motor- TEFCsquirrel cage induction type 1450 rpm / 2900 rpm -enclosure to suit compressor requirements -250 hp

Each

3.1.3 1 Providing and installing soft start starters for the above Each

3.1.4 1 Providing, installing and commissioning of shell andtube water cooled condensers complete with allstandard accessories as called for (250 Tr)

Each

3.1.5 1 Providing and installing shell and tube chillerscomplete with all accessories as specified – 250 Tr

Each

3.1.6 * 1 Providing and installing intercoolers suction liquid heatexchangers etc., etc.

Lot

3.1.7 1 Providing, installing and commissioning of refrigerantpiping out of heavy duty steel including nitrile rubbersuction line insulation-chiller insulation complete withwater proof finish

Lot

The contractors scope of work shall consist of providing airconditioning to the spaces to the specified standards indicated herein and his scope of supply shall include for but not be restricted to the following:

All data and quantities, etc. given here in this annexure take precedence over quantities; etc. mentioned elsewhere. Contractors shall however bring out any discrepancy clearly.

IMPORTANT:

The project is being put up for a green building rating by LEED certification hence equipment of high efficiency is desirable.

Page 1 of 27

Page 2: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.1.8 1 Providing and installing refrigerant flow andtemperature controls and all cut outs and associatedinstrumentation, etc. including a central gauge panel(set) – BMS compatable complete with CVT ifrequired. The control panel shall be complete withmain power isolater to meet local codes.

Lot

3.1.9 1 Providing and installing MS base plate for the aboveequipment –complete with A.V. mounts, withhorizontal and vertical limit stops suitable for seismicapplications nuts, bolts etc., etc.

Lot

3.1.10 1 Providing and installing miscellaneous items likenosing frames for foundation blocks, charge of gas, oilin the refrigeration and electrical circuits andpainting(chillers shall be factory painted).

Lot

3.1.11 1 Plant room exhaust – GE or equal 24''Ø exhaust fans(minimum 6500 m3 / H at free flow)

Each

TOTAL PRICE FOR THE ABOVE CHILLER ANDANCILLARIES AS ABOVE

* Item 3.1.6.may be omitted where condensers have a discrete Ref. sub cooling - circuit

In case the contractor is not able to offer sinlge circuit 250 Tr chillers he may offer two circuit models – giving reasons. – Chiller offers must be accompanied by a factory printed cataloge clearly indicating selected model / operating point / noise levels and gauranteed conditions markedout etc. (xerox will not be accepted; offers without this basic need will not be considered).

PRICE 3.1: - Please indicate a L.S works contract price for the above chiller and ancillaries

IMPORTANT:

supplied, installed commissioned and handed over at site.

Page 2 of 27

Page 3: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.2 TWO SCREW AIR COOLED PACKAGE WATERCHILLERS

Providing, installing and commissioning of chillersEach 125 Tr size, each with dual circuit factory fittedwith screw compressors/ condensers and chillers -refrigerant shall be R134A and usable by codes in theequipment for the life span of the equipment eachchiller shall be equipped with atleast the following:-chiller to be min 100F TD – i.e. flow rate of 2.4 USgpm / Tr (say 6.40C / 120C)

3.2.1 2 Compressor- R134a screw type – complete tospecifications – 62.5 Tr

Each

3.2.2 2 Compressor motor- TEFC squirrel cage induction type1450 rpm- enclosure to suit compressor requirements– 75 hp (built into the above)

Each

3.2.3 2 Soft start starters for the above – power panel to becomplete with main isolator

Each

3.2.4 2 Air cooled condensers complete with all accessoriesand fans as specified – 62.5 TR (fins to havecorrosion resist coating)

Each

3.2.5 2 Shell and tube chillers complete with all accessoriesas specified – 62.5 Tr

Each

3.2.6 * 2 Suction liquid heat exchangers Each

3.2.7 2 Refrigerant piping out of heavy duty hard drawncopper includingsuction line insulation-chillerinsulationcomplete with finish - sets

Each

3.2.8 1 Refrigerant flow and temperature controls and all cutouts and associated instrumentation, etc. including aweather proof central gauge panel (set) – BMScompatible complete with CVT if required

Each

3.2.9 1 MS base plate for the above equipment –completewith nuts, bolts, etc, etc. including PC weld meshfactory fitted panels as protection on air inlet side ofthe aircooled condenser.

Each

3.2.10 1 Miscellaneous items like nosing frames for foundationblocks,(folding rain canopy over control panel) chargeof gas, oil in the refrigeration and electrical circuits andpainting, etc, etc. for the a.c. roof top equipment incfactory made AV mounts with horizontal and verticallimit stops suitable for seismic applications

L.S.

Page 3 of 27

Page 4: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.2.11 PRICE FOR EACH Chiller (125 Tr)3.2.12 TOTAL PRICE FOR THE TWO SCREW CHILLER

(TOTAL 250 Tr only) 3.2a 1 Chiller manager to operate the 1 x 250 TR water

cooled centrifugal chiller + 2 x 125 TR air cooled screwchillers efficiently ( If required)

Each

* Item 3.1.6.may be omitted where condensers have adiscrete Ref. sub cooling - circuit

3.3 PLANT ANCILLARIES3.3.1 Horizontal double skin – insulated (Min 25mm PUF) GI

precoated sheet AHUs for the cooling circuits asspecified to match duty conditions complete withPLUG fan,fan motor, direct drive, gaurd and VSDstarter with incoming TP& N Isolator, coil and filter(including MERV 13filters) - AHU to be as in table 3.1at the end of Annexure.LOT (as in table 3.1)

L.S.

(AHUs to be sized for the desired SHF and (40 mmSP minimum) carefully and full data furnished, (AHUshall have minimum 4 row coils) and be complete withfire retardent double layer plastic coated canvas –AHU access doors shall have electrical interlocks withfan – i.e. fan to operate only when door is shut. AllAHU will have discharge dampers on them. AHU's ofstandard make i.e Blue star,ETA,Caryaire,Bhoopathi,Citizen,ABB withnicotra,Kruger,Comfri,Greenheckfans.

3.3.2 Sheet metal duct work of GI complete with SpongeNeoprene / Rubber gaskets - etc.,etc,(SAIL/TISCO/JINDAL).

1525 24 gauge sq.m

1230 22 gauge sq.m

325 20 gauge sq.m

3.3.3 SA air outlets of extruded aluminium with powdercoating (Air master, Ravi Star, Caryaire)

6 2 slot SA slot diffusers r.m.t

PRICE 3.2: - Please indicate a L.S works contract price for the above chiller and ancillaries

IMPORTANT:

supplied, installed commissioned and handed over at site.

Chiller offers must be accompanied by a factory printed cataloge clearly indicating selected model / operating point / noise levels and gauranteed conditions marked out etc. (xerox will not be accepted; offers without this basic need will not be considered).

Page 4 of 27

Page 5: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

110 3 slot SA slot diffusers r.m.t

6 4 slot SA slot diffusers r.m.t

25 5 slot SA slot diffusers r.m.t

150 6 Slot SA slot diffusers r.m.t

6 8 Slot SA slot diffusers r.m.t

50 10 Slot SA slot diffusers r.m.t

2 2' x 2' SA slot diffusers - Hollow are with dampers

Each

4 SA Grilles sq.m

3.3.4 RA air outlets of extruded aluminium with powdercoating (Air master Ravi Star, Caryaire)

6 2 slot RA slot diffusers r.m.t

110 3 slot RA slot diffusers r.m.t

6 4 slot RA slot diffusers r.m.t

25 5 slot RA slot diffusers r.m.t

150 6 Slot RA slot diffusers r.m.t

6 8 Slot RA slot diffusers r.m.t

50 10 Slot RA slot diffusers r.m.t

6 RA Grilles sq.m

3.3.5 195 Acoustical insulation of ducts with 25 mm thickfibreglass crown 300 and perforated aluminium facing– 24 gauge thick - sq.m

sq.m

3.3.6 1 Miscellaneous items like supports, mounts, baseplates, etc., nosing frames for AHU foundations wherefoundations are called for etc., as also painting, etc.,etc.

L.S

3.3.7 690 Ducting insulation (Thermal) with 25 mm resinbonded -(Crown 150 aluminium) fibreglass factory prefacedwith aluminium foil (sq.m) and tied down with chickenwire mesh and duly banded with nylon bale strapingetc.

sq.m

Page 5 of 27

Page 6: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.3.8 Grundfoss, Armstrong close coupled end suctionpumps and matching squirrel cage – SPDP motorschilled water pump sets – complete with insulationanddrip tray- pump to be complete with insulation mechanical

seals and VSD starters 2 75 hp primary (1R + 1S) Each

4 40 hp primary (2R + 2S) Each

2 7.5 hp secondary (1R + 1S) Each

2 15 hp secondary (1R + 1S) Each

2 40 hp secondary (1R + 1S) Each

2 40 hp secondary (1R + 1S) Each

3.3.9 14 FRP coated channel iron bases for the above chilledwater pumps

Each

3.3.10 Grundfoss, Armstrong close coupled end suctionpumps and matching squirrel cage – SPDP motorsCondenser pumps sets - pump to be complete with mechanical seals

2 25 hp (1R + 1S) Each

3.3.11 2 YD starters for the above pumps sets Each

3.3.12 2 FRP coated channel iron bases for the above chilledwater pumps

Each

3.3.13 Providing and installingFRP - Bottle shaped ID coolingtower complete with fan, motor, starter on GIstructural and all SS fasteners.( The C/T shall be ofPaherpur,Advance,Mihir make)

2 125 Tr Each

3.3.14 1 Closed expansion tank with dual pumps 1R + 1S toform an expansion detail for minimal loss of water

Each

3.3.15 1 Insulation for the above tank with 50 mm EPS(TF)insulation on TW frame and aluminium clading (set)

Set

3.3.16 Horizontal - hide away type FCU's with all accessoriescalled for elsewhere – FCUs to be complete and ofsize as below: -

2 1.0 Tr FCU Each

2 2.0 Tr FCU Each

Page 6 of 27

Page 7: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

2 3.0 Tr FCU Each

12 1 Tr CHW Hydronic cassete Each

15 2 Tr CHW Hydronic Cassette Each

17 3 Tr CHW Hydronic Cassette Each

The FCUs include all standard accessories as calledfor elsewhere- including drain pumps.

3.3.17 20 Duct dampers for putting into the SA duct branches –dampers to be sturdy 18# min and suitable for fandischarge fitment duty (sq.m). (makeCaryaire,Ravistar,Airmaster)

sq.m

3.3.18* Nil 1 hour Fire dampers for SA and RA ducts - (ULRated) sq.m – These shall be of the specified makeduly UL certified.(makeCaryaire,Ravistar,Airmaster,George Rao& Co.)

sq.m

3.3.19 Fresh air intake system3.3.19.1 Papst / Nadi – VSD driven propeller fans of size as

under @ ½'' SP fans to be complete with mountingring and finger grand etc.

9 a) - 500 m3 / H @ 12mm SP Each

13 b) - 1000 m3 / H @ 12mm SP Each

3 c) - 2000 m3 / H @ 12mm SP Each

3.3.19.2 250 24 gauge gi duct as called for Each

3.3.19.3 25 Factory made – 22# gi fan cowl at fan intake with birdscrew / SS mesh etc., etc. ( comit to be 300 x 300mm - 450 type)

Each

3.3.19.4 ** BMS compatable CO2 sensor for control of the aboveFA fan to permit demand ventilation usage based onspace CO2

-

3.3.19.5 25 Single leaf type – 1 hour fire damper – feasible linkoperated with 300 x 300 mm face area – to fit in AHURoom wall

Each

*

** This item has been set out in the BOQ for BMS items later as well – the price for this must be included only under the head BMS (not duplicated).

Price 3.3: Please indicate a L.S. works contract price for the above handed over at site.The fire dampers may be assumed to be on an average 1sqm in size with each such sqm, damper operately by an independent motor - damper, will need UL certification and the actuator shall be BMS compatible - though actuated by signals from the fire panels - thro' the BMS – the damper motor shall be operatable – on and off by commands from the BMS.

Page 7 of 27

Page 8: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

NOTE:1.

2.

3

4

5

6 Pump duty conditions may be taken as: Condenser pump 250 Tr 1000 Igpm 50' head (25 hp)Chiller Py. pump 250 Tr 600 Igpm 230' head (75 hp)Chiller Py. pump 125 Tr 300 Igpm 230' head (40 hp)Chiller Sy. pump BlockA 195 Igpm 80' head (7.5 hp)Chiller Sy. pump BlockB 220 Igpm 130' head (15 hp)Chiller Sy. pump BlockC 460 Igpm 150' head (40 hp)Chiller Sy. pump BlockB 400 Igpm 175' head (40 hp)

3.4 PRECISION AIR HANDLING UNITS FOR SELECTDATA PROCESSING AREAS

3 2 Tr FCU 0.2 0.3

1 1 Tr FCU 0.1 0.15 Sl .no FCU Size SA Grill (Sq.m) RA Grill (Sq.m)

The AHUs offered above should cover complete sets of factory made equipment - made available in knocked down condition for easy transport to location.

All duct work / pipe supports shall be fastened into the masonary work with good mechanical fasteners fixed with suitable Rods - the contractor’s scope of work shall include for the minor civil works associated with this work. Fasteners shall be Hilti / Fischer, only.

All duct work done at site will have to be out of panels which will not have any joints in them; i.e. no panel smaller than 2400 X 900 (size of a full GI sheet) will be permitted to have any joints in it.

The hide away FCU where called for shall be complete with coil and casing, fan and filter with filtebox, chasis, suspension rods, A.V. mounts, canvas, duct plenums and collars and SA/RA grilles (Extruded Aluminium Air Master make) the FCUs shall also have 3 speed fan switch and remote controller – valves & RA sensors are to be set out in the BMS costing..

The FCUs price of various size shall have SA/ RA grilles / diffusers to quantities as below respectively

4 3 Tr FCU 0.3 0.4

2 1½ Tr FCU 0.15 0.25

Hydronic cassette type FCUs are complete with casing, fan, coil, fan motor, drain pan, drin pump and FA intake. A face plate with SA / RA grille and auto grille movement must be included. FCUs shall be suitable for remote unit controler (controls are listed and to be quoted under BMS)(FCU make: Voltas,Blue star,Carrier,Hitachi)

Page 8 of 27

Page 9: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.4.1 13 PAHU – 15 Tr actual capacity working with chilledwater from the main plant (70C / 120C) with a roomtemperature of 200C and air quantity – evaporator –min 700 cfm / Tr unit to be complete with: -

Digital type scroll compressors; MERV 8 filters MERV13 filters, chilled water cooling coil, water and ref flowcontrols – BMS compatable auto controls – directdriven fans – down discharge – discharge dampers,RH control reheat heaters / pan type humidifiers allhoused in a PC gi sheet enclosure as called for AHUs.

Each

3.4.2 13 Steel stands out of angle iron to keep the PAHU andits discharge damper just off the FF

Each

3.4.3 13 GI sheet duct connector from unit to false floor Each

3.4.4 200 Supply air grills with damper each 600 mm x 600 mmeach the full size of a typical false floor tile – of provenand acceptable design and preferably Aluminium diecast (with damper) (each 1000 cfm @ 250 fpm)

Each

3.4.5 100 Return air grilles generally 590 mm x 590 mm to befitted into a standard false ceiling grid

Each

3.4.6 50 * Fire dampers as called for elsewhere to the same sizeconstraints etc., on SA and RA grilles of the totalsystem.

Each

3.4.7 5 Fresh air intake with the fire damper, volume controldamper and SS mesh each 600 x 600

Each

* Important

3.5 CHILLED WATER PIPING Work and its insulation; pipes to be as per IS 1239

Price 3.4: Please indicate a L.S. works contract price for the above handed over at site.

The average size of fire damper may be only 0.5 sq.m. in this case hence the no of fire damper motor will be larger – in other words for the above quantity of dampers a total of 24 damper motors need to be provided for. ( Make: Emersion/StulZ/Bluestar/Batliboi)

Page 9 of 27

Page 10: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.5.1 Providing, installing and commissioning of a chilledwater system comprising of components generally asper item 3.5.1 to 3.5.9 - pipes to be MS B class ofTATA make / JINDAL / SAIL. Insulation shall be pre-insulated on pipe with 50mm PUF (36 kg/m3 density)for 150mm dia and above and 40mm PUF for 150mmdia below (36 kg/m3 density) and 24# gi jacketslength in (m) - Pipes of larger dia (beyond the TATArange) may be non – TATA make and min 8 mm wallthickness

3.5.1.1 Nil 450 mm dia NB pre-insulated pipe with 40 mm PUFinsulation

rmt

3.5.1.2 Nil 400 mm " " rmt

3.5.1.3 Nil 350 mm " " rmt

3.5.1.4 Nil 300 mm " " rmt

3.5.1.5 44 250 mm " " rmt

3.5.1.6 1700 200 mm " " rmt

3.5.1.7 600 150 mm " " rmt

3.5.1.8 470 125 mm " " rmt

3.5.1.9 1050 100 mm " " rmt

3.5.1.10 160 80 mm " " rmt

3.5.1.11 320 65 mm " " rmt

3.5.1.12 580 50 mm " " rmt

3.5.1.13 180 40 mm " " rmt

3.5.1.14 12 32 mm " " rmt

Page 10 of 27

Page 11: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.5.1.15 600 25 mm " " rmt

3.5.1.16 500 25 mm dia NB but with 20mm PUF insulation - (fordrain piping) - gi jacketting etc to be as above

rmt

3.5.2 Shut-off Valves50 mm dia and above shall be of Audco Aqua sealand smaller ones shall be Audco or Advance type -Valves will be complete with 40/50mm PUF insulationand finish as for pipes (24 gauge gi)

3.5.2.1 Nil 400 mm dia valve with insulation Each

3.5.2.2 1 250 mm dia valve with insulation Each

3.5.2.3 4 200 mm dia valve with insulation Each

3.5.2.4 6 150 mm " " Each

3.5.2.5 Nil 125 mm " " Each

3.5.2.6 12 100 mm " " Each

3.5.2.7 Nil 80 mm " " Each

3.5.2.8 Nil 65 mm " " Each

3.5.2.9 27 50 mm " " Each

3.5.2.10 11 40 mm " " Each

3.5.2.11 Nil 32 mm " " Each

3.5.2.12 19 25 mm " " Each

3.5.2.13 32 20 mm " " Each

Page 11 of 27

Page 12: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.5.3 Double Plate Check Valves - These shall be ofAdvance/Kirloskar with 40/50mm PUF – insulation

3.5.3.1 8 100 mm dia double plate check valve Each

3.5.3.2 4 150 mm dia double plate check valve Each

3.5.3.3 2 200 mm dia double plate check valve Each

3.5.4 Flow straightener cum strainer

(Anergy make) – complete with 40mm PUF insulation– to suit the pump

3.5.4.1 8 100 mm dia insulated strainer / straightener Each

3.5.4.2 4 150 mm dia insulated strainer / straightener Each

3.5.4.3 2 200 mm dia insulated strainer / straightener Each

3.5.5 Manual Measuring/Balancing valves - of Tour &Anderson/Advancemake complete with valved probes– valves will be complete with 40mm PUF insulationand finish as for pipes (24# gauge gi) The pricedindicated below will include for the supply of one, handheld, computer device for the balancing work (this is tobe furnished along with the BMS).

3.5.5.1 Nil 400 mm dia valve with insulation Each

3.5.5.2 1 250 mm dia valve with insulation Each

3.5.5.3 4 200 mm dia valve with insulation Each

3.5.5.4 6 150 mm " " Each

3.5.5.5 Nil 125 mm " " Each

Page 12 of 27

Page 13: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.5.5.6 12 100 mm " " Each

3.5.5.7 Nil 80 mm " " Each

3.5.5.8 Nil 65 mm " " Each

3.5.5.9 27 50 mm " " Each

3.5.5.10 11 40 mm " " Each

3.5.5.11 Nil 32 mm " " Each

3.5.5.12 19 25 mm " " Each

3.5.5.13 32 20 mm " " Each

3.5.6 34 Water pressure gauge complete with gauge valve,mounting, fitting and copper tubing extension whererequired

Each

3.5.7 34 Thermometers of in glass type in copper separablewell complete with gaurd, etc., mounted on waterlines, etc.

Each

3.5.8 4 Differential water pressure switches in the lines justoutside the chillers (For condensers / Chillers)

Each

3.5.9 150 Pressure test points (two service gauges with needlesare to be free supply)

Each

Note:1)

2)

3)

Price 3.5: Please indicate a L.S. works contract price for the above handed over at site.

Prices quoted against each item shall include for its finish painting to code.

All pipe supports will have to be on regulation pipe hangers with spring/acceptable isolation in each.

Service flanges, descaling tees, special imported manual air vent valves as marketed by anergy drain valves, etc, etc. required to make the circuits fully operational will be included in the contractor’s price (as given above) (all the above are 12 mm f or less and included in the LS project cost).

Page 13 of 27

Page 14: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

4)

3.6 CONDENSER WATER PIPING WORK3.6.1 Supplying and laying as also commissioning and

handing over a condenser water cooling systemcomprising of components generally as per item 3.6.1to 3.6.7 pipe to be GI B class of TATA make / JINDAL/ SAIL. (length in m) – pipes of larger diameter(beyond the TATA range) may be non TATA make butminimum 8mm wall thickness.

3.6.1.1 70 200 mm N.B. diameter pipes (NB) Rmt

3.6.1.2 Nil 150 mm " " Rmt

3.6.1.3 20 125 mm " " Rmt

3.6.1.4 Nil 100 mm " " Rmt

3.6.1.5 Nil 75 mm " " Rmt

3.6.1.6 20 50 mm " " Rmt

3.6.1.7 12 25 mm " " Rmt

3.6.1.8 Nil 20 mm " " Rmt

3.6.2 Butterfly valves of Audco Aquaseal make to quantitiesas below (valves 38 and below may be Audco or equaball type)

3.6.2.1 3 200 mm N.B. diameter size Each

3.6.2.2 Nil 150 mm " " Each

3.6.2.3 3 125 mm " " Each

Installation basket strainers at the inlet of all equipment like chiller, condensers, coils, etc., etc., shall be put in by the contractor as part of his project cost - He will remove these after the regulation trial runs. He may take these away as these are his property (not paid for by the owners).

Page 14 of 27

Page 15: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.6.2.4 Nil 100 mm " " Each

3.6.2.5 Nil 75 mm " " Each

3.6.2.6 2 50 mm " " Each

3.6.2.7 2 25 mm " " Each

3.6.2.7 Nil 20 mm " " Each

3.6.3 Non – return valves of Advance /Kirloskar make (dualplate type)

3.6.3.1 2 200 mm N.B. diameter Each

3.6.3.2 Nil 125 mm N.B. diameter size Each

3.6.4 Y type strainers / Staraightener (mesh V=1m/sec)

3.6.4.1 2 200 mm N.B. diameter strainer / Staraightener Each

3.6.4.2 Nil 125 mm N.B. diameter strainer / Staraightener Each

3.6.5 Manual – Tour & Anderson measuring / balancingvalve – as called for under chilled water head.

3.6.5.1 3 200 mm N.B. diameter strainer Each

3.6.5.2 Nil 150 mm N.B. diameter valves Each

3.6.5.3 2 125 mm " " Each

3.6.5.4 Nil 100 mm " " Each

3.6.5.5 Nil 75 mm " " Each

3.6.5.6 Nil 50 mm " " Each

Page 15 of 27

Page 16: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.6.6 9 Pressure gauges as in 3.5.6 Each

3.6.7 9 Thermometers as in 3.5.7 Each

1)

2)

3)4)

3.7 ELECTRICAL WORK3.7.1 Supplying, installing, testing, commissioning and

handing over - following switch boards of cubicle typecomplete with MCCB; alluminum bus bars andinstrumentation, etc., with Emerson make energymeter as set out in the drawings and specifications–compressor motors - must start from an integeralpanel of the chiller unit which will have a single feederfrom the in the SB - The chiller panel shall also havean isolator (The starters shown in the switch boarddrawing are not to be included SB price. These will besupplied to match the motors – However the switchboard contractor’s cost will include for mounting andconnecting them into the switch board).

3.7.1a 1 Supplying, installing, testing, commissioning andhandling over – chiller panel as in 3.7.1. above (wiringdiagram – 1) for 250 Tr chiller, condenser and pumpsetc., as in drawing

Each

3.7.1b 1 Supplying, installing, testing, commissioning andhandling over – chiller panel as in 3.7.1. above (wiringdiagram – 2) for 2 x 125 Tr chiller, and pumps etc., asin drawing

Each

3.7.1c 1 Supplying, installing, testing, commissioning andhandling over – Central AHU panel as in 3.7.1 above(wiring diagram – 3) for AHU sub panels and Sy.pumps., as in drawing

Each

3.7.1d 1 Supplying, installing, testing, commissioning andhandling over – Central PAHU panel as in 3.7.1 above(wiring diagram –4) for PAHUs as in drawing.

Each

Prices quoted against each item shall include for its finish painting to code.Installation basket strainers at the inlet of all equipment like chiller, condensers, coils, etc., etc., shall be put in at installation time and to be removed after trials – These will be the property of the contractor.

All pipe supports will have to be on regulation pipe hangers with spring/acceptable isolation in each.

Service flanges, descaling tees, air vent valves, drain valves, etc, etc. required to make thecircuits fully operational will be included in the contractor’s L.S. cost.

PRICE 3.6: Please indicate a L.S works contract price for the above delivered and handed over at site.

Page 16 of 27

Page 17: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.7.2a 1 Supplying, installting, testing, commissioning andhandlingover – AHU sub panel (wiring diagram –5) forAHUs as in drawing for Block A(same as 3.7.1 abovebut without energy meter).

Each

3.7.2b 1 Supplying, installting, testing, commissioning andhandlingover – AHU sub panel (wiring diagram –6) forAHUs as in drawing for Block B (same as 3.7.1 abovebut without energy meter).

Each

3.7.2c 1 Supplying, installting, testing, commissioning andhandlingover – AHU sub panel (wiring diagram –7) forAHUs as in drawing for Block C(same as 3.7.1 abovebut without energy meter).

Each

3.7.2d 1 Supplying, installting, testing, commissioning andhandlingover – AHU sub panel (wiring diagram –8) forAHUs as in drawing for Block D (same as 3.7.1 abovebut without energy meter).

Each

3.7.2e 1 Supplying, installting, testing, commissioning andhandling over – PAHU sub panel (wiring diagram –9)for AHUs as in drawing for Block D PAHUs (same as3.7.1 above but without energy meter).

Each

3.7.3 Supplying and installing TP & N isolators in weatherprof. enclosures (Cooling owers, fans, etc.,)

4 16 A Each3.7.4 Supplying and installing TP & N isolator for AHU fans,

pumps, etc., 27 16 A Each

2 32 A Each

2 63 A Each

23 125 A Each

3.7.5 7 Supplying and installing rotary isolator forMiscellaneous equipment like toilet exhaust fans etc.,etc each 16 Amp / single phase

Each

3.7.6 Supplying and laying electrical power wiring betweencontrol panel and equipment with PVCA insulated andarmoured cable to quantities as below:-

400 Compressor - 3½ C X 300 sq.mm rmt

350 AHU panel, etc - 3½ C X 180 sq.mm rmt

2000 CH pumps/SSB - 3½ C X 120 sq.mm rmt

Page 17 of 27

Page 18: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

100 MCB DB etc - 3½ C X100 sq.mm rmt

1200 CH /Sy.pumps/PAHU - 4C X 70 sq.mm rmt

300 MCB DB - 4C X50 sq.mm rmt

150 CD. Pumps - 4 C X 35 sq.mm rmt

400 CDs/Sy. pumps - 4 C X 25 sq.mm rmt

300 AHUs - 4 C X 16 sq.mm rmt

1500 AHU / Sy. Pump / C.Tr / Heater - 4 C X 10 sq.mm

rmt

2000 AHU / Heaters - 4 C X 6 sq.mm rmt

1600 AHU etc - 4 C X 4 sq.mm rmt

2500 Miscellaneous items - 4 C X 2.5 sq.mm rmt

1000 Miscellaneous items - 4 C X 1.5 sq.mm rmt

3.7.7 3 Supplying and laying control wiring in metal conduits16 gauge and each wire to be of minimum 3 strandsand 5 Amps current capacity the work to includehooking up three sets of controls for the “a.c. plantroom” including interlocks between pumps andcompressor, etc. in the board (set per each chiller)

Sets

3.7.8 A Supplying and laying earthing work to IE regulation forthe above power wiring. (Main double earth will beterminated.Quantities to be as under: (rmt)

1200 25 mm X 3 mm Copper flats rmt

Page 18 of 27

Page 19: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

600 8 SWG bare copper rmt

600 10 SWG bare copper rmt

1200 16 SWG bare copper rmt

3.7.8 B 2 Providing standard pipe earth to earth stations with2.5m long, 38mm dia GI pipe earth stations confirmingto IS : 3043 with latest amendments and as perstandard dwg., and including supply of all materialsand providing chamber complete as per standarddrawing as required.

Each

3.7.9 1 Supplying and laying suitable terminations for theelectrical cable works with suitable glands, nuts, etc.,as in layout

Lot

3.7.10 1 Supplying and laying 2 nos, 50 KVAR, 4 nos 30 KVAR(for compressors) and 2 x 30 KVAR, 8 nos, 15KVAR,2 nos, 10 KVAR, 2 nos 5 KVAR and 2 nos 3KVAR (for pumps) power factor improvementcapacitors on custom made brackets close to motors(capacitors to be connected across motor terminals)

Lot

3.7.11 2 Same as above but 3 KVAR size for the (BIG) AHUetc,.

Each

3.7.12 4 Supplying and laying emergency AHU off stations Each

3.7.13 4 Supplying and laying multiplying contactors for theabove each to be able to switch off all AHU of (a floor)a zone (4 way)

Each

3.7.14 2000 Supplying and laying in ¾" dia metal cond\uits for 3core copper insulated wires for interconnectingcontrols like geysers thermostats/remote on-off points,emergency off stations etc., etc,. & FCU

rmt

3.7.15 Nil Supplying and laying geyser/ winding thermostat forAHU motor

Each

3.7.16 Supplyingand laying GI perforated cable trays – out offactory made material complete with supports etc.

600 a) 300 wide rmt

1200 b) 600 wide rmt

Page 19 of 27

Page 20: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

600 c) 900 wide rmt

3.7.17 Supplying and laying Control Cabling for BMS

6000 i) 2 core PVC sheath copper signal cable rmt

1500 ii) Communication cable rmt

1800 iii) M/S conduit (16#) ¾"f rmt

6000 iv) 10 core PVC sheath copper signal cable rmt

3.7.18 5 Supplying, installing and commissioning of GE orequal 1f 8way 16A way MCB db complete with 63Aincomer rotary isolator for miscellaneous items likeexhaust fans – FCUs etc.

Each

3.7.19 4 Supplying, installing and commissioning of GE orequal 1f 12way 16A MCB db complete with 100Aincomer isolator for miscellaneous items like exhaustfans – FCUs etc.

Each

3.7.20 4 Supplying, installing and commissioning of GE orequal 3f 8 way 16A MCB db complete with 100Aincomer isolator for heaters etc.

Each

3.8 TOILET VENTILATIONEach set of toilets (combined ladies and gents

module) will be ventilated by a simple system ofexhaust; small capacity centrifugal fans will draw outair thro' ducts and exhaust valves from each enclosureand expel it out of the building thro' small wall cowlsapproximately 9" x 9" in section and faced with SSmesh – All duct work will be measured as a/c ductwork and paid for at actuals – other special itemscalled for are as below:-

3.8.1 7 Providing, installing and commissioning - centrifugalexhauster with single phase external rotor motor(direct coupled) 1700 cfm – ½" SP for the toilets

Each

3.8.2 7 Providing and installing 24 # gi sheet (90º bend wallcowl 9" x 9" in size with SS fly proof mesh on thedischarge end

Each

3.8.3 35 Providing and installing - 200 mm diameter exhaustvalves of air master or RaviStar make

Each

3.8.4a) 35 Providing and installing - 100 mm diameter exhaustvalves of air master or RaviStar make

Each

PRICE 3.7: - Please indicate a L.S works contract price for the above delivered and handed over at site.

Page 20 of 27

Page 21: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.8.4 Ducting: - Supplying, installation, testing andcommissioning of GI sheet metal ducting of followingthickness including necessary supports, adjustabledampers, vanes etc complete as per specifications.

GI sheet metal ducting (Rectangular)80 0.63 mm thick (24 gauge) Sq.m.

3.8.5 Providing and installing flexible duct out of Al forconnecting the valve into the rectangular duct size asbelow: -

35 a) 200 mm Ø (m) Rmt

35 b) 100 mm Ø (m) Rmt

3.8.6 1 Providing and installing miscellaneous items like nuts,C clips – etc bolts fasteners etc., to complete the job

L.S.

3.9 BUILDING MANAGEMENT SYSTEM INCLUDING

IMPORTANT:

3.9 BMS

e) Two way motorized valves on chiller by pass line to operate the chiller on need based strategy

The above will be complete with a PC based CPU/colour monitor and a A3 ink jet printer – all controllers for AHU, pumps etc., shall have extra points to the extent to min 50% redundancy for additional inputs at a future date.

For a detailed BOQ for the above see sheets attached, to quote accordingly.

h) 7 nos exhaust fans for toilet ventilation / 1 no. exhaust fan for plant room ventilation / 2 nos exhaust fans for copier room ventilation.

a) Auto “on”/“off” on timers on all equipment by “clock”/calendar

PRICE 3.8: - Please indicate a total works contract price inclusive of all items and duties for the above handed over at site.

The contractor shall offer a basic “Building Management System” for the HVAC system with the minimum capability of:

1) All the above equipment by way of hardware/software shall confirm to “Bacnet” recommendations, and be Bacnet compatable.

f) Controllers for bringing on pumps/chillers, fans based on a need based strategy

g) 38 AHU controls and 51 FCU controls with 2 way Motorized modulating valves of 50mm dia for 15/20 Tr AHUs, 40 mm Ø for 5 / 10 Tr AHUs with sensors for SA / RA / etc, and for FCUs (1/2 Tr) 20Ø mm / for 3 Tr 25 mmØ with RA sensors etc..

b) Auto “on”/ “off” of pumps/chillers, based on temperature of return water

c) Auto selective switching “on”/ “off” of equipment for even wear and tear and to equalize hours of running

d) Auto temperature control of all AHUs – based on RA temperature and time of day and

Page 21 of 27

Page 22: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.9.1 1 Providing, installing and commissioning of centralComputer System comprising minimum Intel core 2duo 2.4 GHz or greater, 1GB DDR, 1.44MB floppydisk, DVD writer, DVD Drive, V.G.A. Card, 256 MBGraphics card, 160 GB HDD, Network Interface10/100 MBNIC, Scroll Mouse & Software, WindowsXP Professional (build service pack 3), 2 Serial Ports,1 Parallel port, 2 USB Ports, 17" Colour Monitor withGraphical interface software, Gateway card, A3 sizeDeskjet colour printer of HP make, real time clock with battery back-up, connecting card, communication cardetc.,.

Set

3.9.2 1 Providing, installing and commissioning of interfacesoftware for down loading the data from MicroProcessor panel of the aircooled chillers to BASsystem to facilitate monitoring of the chiller throughBAS system (Bacnet compatable), system softwarefor configuration & communication with DDCcontrollers

Set

3.9.3 Providing, installing and commissioning ofmicroprocessor Controllers for operating andcontrolling AC plant and AHUs. The controllers shallbe as per I/O Summary and schematic. The controllershall be stand – alone type with key pad for operatorinterface, terminal to plug hand held display unit,housed in sheet metal enclosure of Rittal make. (thecontroller shall be big enough to accept another 50%of the IO – called for presently)

3.9.3 a) 1 For 250 Tr water cooled Chiller and cooling tower -DDC Controllers (controller for chiller & C.Tr pumpsincluded)

Each

3.9.3b) 2 For 125 Tr Air cooled chiller DDC Controllers(controller for chiller pumps included)

Each

3.9.3 c) 1 For Sy. Pumps (8 nos) - DDC controllers Nos

3.9.3 d) 25 For AHUs (one controler for one AHU) Each

3.9.3 e) 8 For FCU/Toilet exfans etc - once controller for 10FCUs)

Each

Page 22 of 27

Page 23: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.9.4 1 Providing and installing operator Terminal or Module(Portable) for Display of measured values, set pointsand parameters, Adjustment of set points andparameters, setting the time and data. The operatorTerminal shall be suitable for plugging to any requiredcontroller. The operator Terminal shall be completewith Key pad, connecting card / cable, etc., Allnecessary accessories including drive, interface card,etc., to be included in this item.

Nos

3.9.5 8 Providing & installing temperature Sensors withmounting accessories of PTC 1000/EQ of requiredrange and accuracy to measure chilled watertemperature.

Nos

3.9.6 127 Providing and installing Temperature sensors ofrequired range and accurancy to maintain / display thetemperature conditions. Sensors shall be ductmounting type (for SA / Room) - 38 AHU and RA for51 FCUs.

Nos.

3.9.7a) 1 Providing and installing Temperature sensors ofrequired range and accuracy to display / indicate theoutside design conditions.

Nos.

3.9.7b) 1 Providing and installing RH sensor of required rangeand accuracy to display / indicate the outside designconditions.

No.

3.9.7c) 1 Providing and installingCO2 sensor to indicate outsideCO2 level

Nos.

3.9.8 Nil Providing and installing Fan discharge damper motoron AHU

Nos.

3.9.9 Providing and installing2 way motorized control valvesfor AHUs and FCUs For AHUs

27 50 mm Ø Nos.

11 40 mm Ø Nos.

For FCUs

19 25 mm Ø Nos.

32 20 mm Ø Nos.

3.9.10a) Nil Providing and installing Fresh air damper actuator(one each in each AHU room)

Nos.

Page 23 of 27

Page 24: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.9.10b) Nil Providing and installing AHU outlet damper actuator(motor)

Nos.

3.9.11 76 Providing and installingDPS filter status (for MERV 8 /MERV 13 filters 38 AHUs, 2 per AHU)

Nos.

3.9.12 Nil Providing and installing DPS For VSD control of AHUfan

Nos.

3.9.13 Nil Providing and installing 150 mm motorized by passvalve (water quantity equal to one chillers) – Two way

No.

3.9.14 Nil Providing and installing Flow meter (for full returnwater flow) and one differential pressure sensor torecord flow and pressure differential in the return watermain line – set

Set

3.9.15 25 Providing and installingCO2 sensor one each for eachAHU.

Nos.

3.9.16 Providing and installing Cables suitable for DDCsystem, complete with termination, junction boxesetc.,

3.9.16a) 1500 Providing and installing 10core 1 sqmm unarmouredATC conductor multistranded twisted, overall PVCsheated mylar taped signal cable (for actuators)

RMT

3.9.16b) 1500 Providing and installing 3 core 1 sqmm unarmouredATC conductor multistranded twisted, overall PVCsheated mylar taped signal cable (for actuators)

RMT

3.9.16 c) 600 Providing and installing 2 core1 sqmm unarmouredATC conductor multistranded twisted, overall PVCsheated mylar taped signal cable (for temperature /RH sensors)

RMT

3.9.16d) Providing and installing 2 core 1 sqmm unarmouredATC conductor multistranded twisted, overall PVCcable

600 (for On/OFF, status to MC) RMT

3.9.16e) 600 Providing and installing 1.0 sqmm twisted pairsheilded cable for Bus

RMT

3.9.16f) R.O Providing and installing4 core 1 sqmm armoured ATCconductor multi – stranded twisted, overall PVCsheated Mylar taped signal cable

RMT

3.9.16g) R.O Providing and installing2 core 1 sqmm armoured ATCconductor multi – stranded twisted, overall PVCsheated Mylar taped signal cable

RMT

Page 24 of 27

Page 25: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.9.16 h) R.O Providing and installing Excavation & Refilling (SoftSoil) for laying armoured cables

RMT

3.9.16 i) R.O Providing and installingExcavation& Refilling (MediumSoil) for laying armoured cables

RMT

3.9.16 j) R.O Providing and installing Excavation & Refilling (HardSoil) for laying armoured cables

RMT

3.9.17 Providing and installingSupply and providing 16 gaugeMS conduits complete with all fitting and accessories.

1500 a) 19 mm dia RMT

1500 b) 25 mm dia RMT

PRICE 3.9: - Please indicate a total works contractprice inclusive of all items and

Price 3.9: -

3.10 ACCOUSTICAL LINING WORK FOR AHU ROOMS,ETC., ETC.

3.10.1 Providing, installing A/c Plant Room Lining

All AHU rooms and critical areas around the roof topplant will need lining –the work will essential compriseof lining the walls / and roof of the rooms withfibreglass (crown 150) after creating an air gapbetween it and the wall – the work will be carried out tospec sheet 29006 attached for the purpose of theBOQ. The areas in sq.m. to be lined may be taken asunder.

800 Walls sq.m.

400 Ceiling sq.m.

Please indicate a L.S. works contract price for the above work including for the IO listing, shown for chillers / AHUs / pumps toilet exhaust fans. DDC controllers suitable Bacnet software and all related panels etc., required to complete the sequence of auto operation of the system. (Actual payment for cabling work above will be at the unit rates set out in the quote).

duties for the above handed over at site.

1) 7 nos toilet exhaust fans 1 nos plant room exhaust fans and 2 nos copier room exhaust fans, are not reflected fully in the above but controls for these are part of the L.S price given below.

Page 25 of 27

Page 26: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.11 FLUSHING1 Flushing of a/c space prior to full occupancy.

To dilute building material polution the AHUs will berun for two weeks before occupation - Power for therun will be provided by the owners - the a/c contractorshall operate these on all outside air - as if fullyopertioned - each AHU will have only MERV 8 filters inplace during flushing - these will be discarded at theend of the flushing operation and a new set of filtersintroduced along with the MERV 13 grade onesbasically - the MERV 8 filters are the material costcomponent of this head of the BOQ.

L.S.

3.12 COPIER ROOM COOLING: -

3.12.1 1 Chilled water (Hydronic type) cassette type a/c unit of2 Tr capacity complete as called for earlier in thespec.

Each

3.12.2 2 EBM Nadi / Krugger / Cata make – propeller type –wall mounting 50 m3 Hr at 100 mm SP exhaust fan assuitable for toilet exhaust duty – complete with wallring ductable fitting etc (one for FA intake and one forexhaust)

Each

3.12.3 12 PVC heavy duty 6''Ø pipe with bends and fitting to beused as exhaust duct for the above fan

rmt

3.12.4 1 SS mesh / cowl on 6''Ø PVS elbow of the above pipefor insect / vermin protection.

Each

3.12.5 1 Miscellenous items like supports mounts and fixingframes for the above

L.S.

duties for the above handed over at site.

- They will have a separate cooling system.

PRICE 3.12: - Please indicate a total works contract price inclusive of all items and

Areas like the copier rooms etc where there is a risk of higher pollution, will be segregated from f / f

PRICE 3.10: - Please indicate a total works contract price for the above completely, designed delivered, installed, commissioned and handed over at site.

— An area of about 100 sq.ft with 5 kw internal load is being ear – marked for this a/c items desired will be: -

— They will have a small exhaust fan to exhaust about 50% of the FA intake from the a/c

PRICE 3.11: - Please indicate a total works contract price for the above completely, designed delivered, installed, commissioned and handed over at site.

Page 26 of 27

Page 27: Package - I Part IV AC WORKS

Pacakge -I Part-IV AC Works IMGEOS and NDEM

S.No. Quantity Item Description Unit Rate (In Figure & In Words)

Amount

3.13 HUMIDITY CONTROL3.13.1 For all areas cooled by AHUs - it is desirable to add

some minimal reheat for RH control to compensatefor lack of internal load at part load conditions. Eachset of heaters will be complete on a factory madeepoxy painted MS angle iron frame (to be mounted inthe AHU) – each set will be powered thro' a 3Ø / 4wire 16A contractor. The heaters will be activated by astand alone thermostate and humidistate will have a"geyserstat" for fire protection. The heating system forall the AHU will consist of 25 sets as above - eachcomplete with components as below.

3.13.2 Providing, installing and commissioning - electric stripheater banks on BB insulators and expoxy painted MSangle iron frame connected with copper wires inporclean beads terminating on stud connections in aproper terminal box to capacities as below: -

11 3 x 1 kw bank Each

14 3 x 2 kw bank Each

Nil 3 x 3 kw bank Each

3.13.2 25 Providing and installing - Seimens / LT / LK Powercontactors (32A – 4 wire – 415V - 3Ø – 50 Hertz)each complete with a thermostate and a humidistate.

Each

3.13.3 25 Providing and installing - Miscellaneous items like -protective geyserstat power flexibles, trap doors inplenums, glazed inspection ports in the plenums,required to complete the work (sets)

Each

duties for the above handed over at site.PRICE: 3.13 Please indicate a total works contract price inclusive of all items and

Note: - The thermostate and humidistate (Honeywell) for activating the above may be of the stand alone type not linked to the BMS as desscribed earlier.