p001 plumbing schedules & gener - cochise tech...

9
PLUMBING SCHEDULES & GENERAL NOTES DO NOT SCALE DRAWING P001 THIS DRAWING IS CLASSIFIED AS PART OF AN UNPUBLISHED COLLECTION OF VISUAL ART. UNDER THE 1978 COPYRIGHT ACT, IT IS AN EXCLUSIVE ORIGINAL WORK OF AUTHORSHIP. NONE OF THE PICTORIAL, GRAPHIC OR TECHNICAL CHARTS OR DRAWINGS DEPICTED ON THIS SHEET MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS WITHOUT THE EXPRESS PRIOR WRITTEN PERMISSION OF THE ARCHITECT. THIS PLAN IS PRODUCED ONLY FOR THIS PROJECT ON THIS SITE AND MAY NOT BE USED AT OTHER LOCATIONS. SHEET TITLE: ORIGINAL ISSUE: 2-08-16 SEAL: REV DATE DESCRIPTION SHEET NUMBER: PROJECT: AC489 PROJECT: BAPTIST CHURCH SIERRA VISTA, AZ VILLAGE MEADOWS ORIGINAL ISSUE 2-8-2016 0 DANIEL COOK ARCHITECTʔ2909 WASHINGTON BLVD - OGDEN, UT 84401ʔPH: 800-552-7137ʔwww.BGWSERVICES.com SIERRA VISTA, ARIZONA 85635 1407 S EL CAMINO REAL 2-28-2017 OWNER REVISIONS 1 GENERAL PLUMBING NOTES 1. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO CONSTRUCT A COMPLETE, OPERATIONAL PLUMBING SYSTEM FOR THE ENTIRE PROJECT AS SHOWN ON THESE DRAWINGS, INCLUDING ALL NECESSARY FEES AND PERMITS. 2. THE ENTIRE INSTALLATION SHALL CONFORM TO THE MOST RECENTLY ADOPTED REQUIREMENTS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL PLUMBING CODE, INTERNATIONAL BUILDING CODE, AND ALL OTHER APPLICABLE CITY, COUNTY, AND STATE CODES AND REGULATIONS IN EFFECT AT THE DATE OF THE PERMITTING. 3. PRIOR TO FABRICATION AND INSTALLATION THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL PLUMBING PIPING, DUCTWORK, AND EQUIPMENT WITH PLUMBING PIPING, PLUMBING EQUIPMENT, ALL DUCTWORK, AND ALL OTHER TRADES INCLUDING BUT NOT LIMITED TO THE MECHANICAL CONTRACTOR, ELECTRICAL CONTRACTOR, GENERAL CONTRACTOR, AND ANY CONTRACTOR HIRED DIRECTLY BY THE OWNER. WHERE CONFLICTS MAY OCCUR, THEY SHALL BE RESOLVED PRIOR TO INSTALLATION. 4. THE DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENTS AND THE EXTENT OF THE SYSTEM. IT SHALL BE THE WORK OF THE CONTRACTOR TO MAKE SUCH SLIGHT ALTERATIONS AS MAY BE NECESSARY TO MAKE THE SYSTEM COMPLETE AND OPERATIONAL IN ACCORDANCE WITH THE DESIGN INTENT. MAJOR DEVIATIONS SUCH AS CHANGES IN COMPONENT SIZES, WEIGHTS, QUANTITIES, OR MATERIAL REQUIRE PRIOR APPROVAL BY THE CONSULTING ENGINEER. 5. ALL PLUMBING INFORMATION IS NOT SHOWN ON THE PLUMBING DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING INFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTS INCLUDING ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS. 6. THE WORKING DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, THEY DO NOT SHOW EVERY OFFSET, BEND OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FOR PLUMBING EQUIPMENT AND PIPING SHALL BE CHECKED AND COORDINATED WITH THE ARCHITECTURAL, MECHANICAL, STRUCTURAL AND ELECTRICAL DRAWINGS. 7. EXACT ROUTING OF WASTE, GAS, AND WATER SERVICE IS DEPENDENT ON LOCAL SITE CONDITIONS AND MODIFICATIONS IN EQUIPMENT CONNECTIONS. EXACT LOCATION OF EQUIPMENT MAY VARY DEPENDING ON LOCAL CODE, HEALTH DEPARTMENT AND CITY REQUIREMENTS. 8. DETAILS: THE CONTRACTOR IS RESPONSIBLE TO REVIEW AND USE WHERE APPROPRIATE ALL OF THE PLUMBING DETAILS SHOWN ON THE DRAWINGS. DETAILS MAY OR MAY NOT BE CALLED OUT ON THE DRAWINGS WITH SYMBOLS OR KEYED NOTES. ANY CHANGES RESULTING FROM FAILURE TO INSTALL THE PLUMBING SYSTEM WITHOUT USING THE INCLUDED DETAILS IS THE RESPONSIBILITY OF THE CONTRACTOR. 9. THE DRAWINGS AND SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT EACH OTHER AND THEY SHALL BE INTERPRETED AS AN INTEGRAL UNIT WITH THE ITEMS SHOWN ON ONE AND NOT THE OTHER BEING FURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLED OUT IN BOTH. 10. PREPARE 6 COPIES OF SUBMITTALS IN AN INDEXED, LABELED FOLDER CONTAINING FULL PERFORMANCE, MATERIAL AND INSTALLATION INFORMATION ABOUT ALL EQUIPMENT, PIPING, COMPONENTS AND ACCESSORIES TO BE USED. 11. THE STRUCTURE SHOWN ON ALL DETAILS MAY OR MAY NOT PERTAIN TO A PORTION OR ANY PORTION OF THE BUILDING. COORDINATE MOUNTING REQUIREMENTS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS. 12. ANY PART OF THIS INSTALLATION THAT FAILS, IS UNFIT, OR BECOMES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 13. ALL EQUIPMENT SHALL PROVIDE THE SCHEDULED PERFORMANCE AT THE SITE ALTITUDE. 14. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL FITTINGS, TRANSITIONS, VALVES, AND OTHER DEVICES AND ACCESSORIES REQUIRED FOR A COMPLETE, WORKABLE INSTALLATION. 15. ALL MOTORS REQUIRED SHALL BE BY THE DIVISION 15 CONTRACTOR. ALL MOTOR STARTING EQUIPMENT, IF NOT A PART OF THE EQUIPMENT, IS FURNISHED BY THE ELECTRICAL CONTRACTOR. 16. THE CONTRACTOR IS RESPONSIBLE FOR PLUMBING EQUIPMENT CHECK-IN, SAFEKEEPING, AND DAMAGE. 17. INVERTS SHOWN ON PLUMBING DRAWINGS MAY BE REFERENCED FROM THE FINISHED FLOOR ELEVATION. COORDINATE ALL INVERTS WITH CIVIL DRAWINGS PRIOR TO INSTALLATION. 18. PROVIDE WALL CLEANOUTS IN ALL VENTS FOR COMBINATION WASTE AND VENT SYSTEMS AS REQUIRED BY LOCAL AND NATIONAL CODES. 19. ALL VENT FITTINGS FOR WASTE SYSTEMS BELOW OVERFLOWS OF FIXTURES SHALL BE DRAINAGE TYPE. 20. CONTRACTOR TO COMPLY WITH THE LATEST ADOPTED IPC WHEN SIZING TRAP ARMS ON COMBINATION WASTE AND VENT SYSTEMS. THE DRAWINGS INDICATE THE WASTE LINE SIZE AND THE SIZE OF THE TRAP REQUIRED. 21. PROVIDE CLEANOUTS IN ACCORDANCE WITH THE REQUIREMENTS OF APPLICABLE CODES. FLOOR CLEANOUTS SHALL BE LOCATED OUT OF TRAFFIC AREAS. 22. LOCATE ALL PLUMBING VENTS AT LEAST 3 FEET ABOVE OR 10 FEET AWAY FROM ALL OUTSIDE AIR INTAKES INTO THE BUILDING. 23. SEE "PLUMBING FIXTURE SCHEDULE" FOR FIXTURE MAKE AND TYPE, AND SIZE OF INDIVIDUAL WASTE, VENT, AND DOMESTIC WATER PIPING TO FIXTURES. 24. ALL PLUMBING EQUIPMENT SHALL BE LISTED AND LABELED BY AN APPROVED TESTING AGENCY. 25. EQUIPMENT AND INSTALLATION SHALL MEET NATIONAL SANITATION FOUNDATION (NSF) STANDARDS, OR EQUIVALENT. 26. PROVIDE PROPER PROVISIONS FOR EXPANSION OR MOVEMENT OF ALL PIPING. 27. ALL PIPE SHALL BE SECURED BY DOUBLE NUTTING AT THE HANGER ROD ATTACHMENT TO THE STRUCTURE, AND AT THE PIPE HANGER. 28. PROVIDE WATER HAMMER ARRESTORS (SHOCK ABSORBERS) AT ALL PIPE LOCATIONS WHERE VALVE CLOSURES (SUCH AS FLUSH VALVES) MAY CAUSE WATER HAMMER OR RESULT IN EXCESSIVE PIPE VIBRATION OR MOVEMENT. 29. PROPERLY LUBRICATE ALL PIECES OF EQUIPMENT BEFORE TURNING THE SYSTEM OVER TO THE OWNER. 30. TWO OPERATING AND MAINTENANCE MANUALS SHALL BE PROVIDED IN HARD BACK LOOSE LEAF BINDERS. MANUALS SHALL CONTAIN PRODUCT CUT SHEETS AND OPERATING AND MAINTENANCE INSTRUCTIONS ON ALL EQUIPMENT, ACCESSORIES, FIXTURES, VALVES, ETC., PROVIDED FOR THE PROJECT. 31. UPON COMPLETION OF THE WORK, REMOVE ALL SURPLUS MATERIALS AND RUBBISH. MAKE ALL REQUIRED PATCHING AND REPAIRS OF OTHER TRADES' WORK DAMAGED BY THIS CONTRACTOR, AND LEAVE THE PREMISES IN A CLEAN, ORDERLY CONDITION. 32. THE CONTRACTOR SHALL OPERATE THE SYSTEM AND DEMONSTRATE ALL ASPECTS TO THE ENGINEER AND/OR OWNER, TO PROVE ITS OPERATION. 33. THE CONTRACTOR SHALL GUARANTEE THE PLUMBING SYSTEM FOR A PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. 34. THE CONTRACTOR SHALL, DURING CONSTRUCTION, MAINTAIN A SET OF AS-BUILT REDLINED RECORD DRAWINGS AT THE PROJECT SITE. ALL CHANGES IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, AND ACCESSORIES SHALL BE RECORDED. THESE REDLINES SHALL BE GIVEN TO THE ARCHITECT/ENGINEER AFTER THE FINAL INSPECTION. SHUT OFF (BALL VALVE TYPE) PRESSURE REDUCING VALVE (GAS OR WATER) LIQUEFIED PETROLEUM GAS LP PLUMBING LEGEND POINT OF CONNECTION KEYED NOTE CALLOUT POINT OF DEMOLITION FIXTURE CALLOUT SECTION CALLOUT TITLE SECTION SHEET # FLOOR DRAIN FLOOR SINK TEE ROOF DRAIN OVERFLOW ROOF DRAIN BOTTOM CONNECTION TOP CONNECTION CAP OR PLUG PIPE BREAK DIRECTION OF FLOW DIRECTION OF PIPE SLOPE CW HW POTABLE HOT WATER PIPE POTABLE COLD WATER PIPE SS SANITARY SEWER PIPE POTABLE HOT WATER RETURN PIPE HWR GW GW GREASE WASTE LINE ABOVE GRADE GREASE WASTE LINE V VTR VTR RD ORD RD ORD OVERFLOW ROOF DRAIN LINE ROOF DRAIN LINE VENT THROUGH THE ROOF VENT LINE SANITARY SEWER PIPE BELOW GRADE SS RD G NATURAL GAS LINE ROOF DRAIN LINE BELOW GRADE FIRE SPRINKLER RISER HAMMER ARRESTOR FIRE DEPARTMENT CONNECTION HOSE BIBB WITH SHUT OFF TRAP PRIMER TWO WAY CLEAN OUT TO GRADE 2-WAY COTG FCO CO WCO FLOOR CLEANOUT WALL CLEANOUT EXPOSED CLEANOUT COTG CLEANOUT TO GRADE INT. WASTE PLUMBING FIXTURE SCHEDULE WC-1 SYMBOL WATER CLOSET 1" --- FIXTURE WATER COLD WATER HOT 4" 2" FLOOR MOUNTED, FLUSH VALVE VENT ACCESSORIES AND REMARKS TRAP FLOOR MOUNTED, FLUSH VALVE 2" 4" --- 1" WATER CLOSET (ADA COMPLIANT) WC-2 INT. 2" 3" --- U-1 INT. 2" 3" --- U-2 INT. 1-1/2" S-1 SINK - SINGLE COMPARTMENT 1/2" 1/2" 1-1/2" 1-1/2" COUNTER MOUNTED SINGLE COMPARTMENT HB-1 3" SS-1 SERVICE SINK 1/2" 1/2" 3" 2" FLOOR MOUNTED WITH DEEP SEAL TRAP DF-2 WATER COOLER (BI-LEVEL ADA COMPLIANT) 1-1/2" 1-1/2" 1/2" 1-1/2" 2" FD-2 FLOOR DRAIN --- --- 2" 2" WITH DEEP SEAL TRAP --- ELECTRIC WATER COOLER, WALL HUNG, BI-LEVEL, 8 GPH, ADA COMPLIANT FREEZELESS --- --- --- 3/4" HOSE BIBB (ENCASED) --- --- WATER HAMMER ARRESTOR 1" --- --- --- 33-60 FIXTURE UNITS HA-1 --- IM-1 ICE MAKER CONNECTION 1/2" --- --- --- WITH DEEP SEAL TRAP 2" 2" --- --- FLOOR SINK FS-2 2" FCO WCO CO COTG COTG 2-WAY PIPE RISE PIPE DROP ORD RD FD FS ENLARGED PLUMBING DETAIL CALLOUT DETAIL # SHEET # EQUIPMENT CALLOUT BACK FLOW PREVENTER 3" FD-3 FLOOR DRAIN --- --- 3" 2" WITH DEEP SEAL TRAP 1-1/4" L-6 LAVATORY (ADA COMPLIANT) 1/2" 1/2" 1-1/4" 1-1/4" WALL MOUNTED, ADA COMPLIANT SENSOR OPERATED FAUCET PROVIDE WATTS LFUSG-B THERMOSTATIC TEMPERING VALVE UNDER COUNTER TO EACH LAV. ELECTRIC WATER COOLER, WALL HUNG, 8 GPH, ADA COMPLIANT 1-1/2" 1-1/2" --- 1/2" WATER COOLER (ADA COMPLIANT) DF-1 1-1/2" --- HA-1/2 WATER HAMMER ARRESTOR 1/2" --- --- --- 1-11 FIXTURE UNITS 1-1/2" S-2 SINK - TWO COMPARTMENT 1/2" 1/2" 1-1/2" 1-1/2" COUNTER MOUNTED, DOUBLE COMPARTMENT PSI 19.1 PSI 25.0 PSI 20.9 PSI 12.0 PSI 2 PSI 6.4 65 PSI 105 0 0 GPM GPM GPM 105 BUILDING WATER SUPPLY CALCULATIONS TOTAL FIXTURE UNITS: ESTIMATED DEMAND: IRRIGATION DEMAND: HVAC DEMAND: TOTAL DEMAND: PRESSURE AVAILABLE AT STREET MAIN: PRESSURE LOSS DUE TO HEIGHT ( FT. x 0.434): PRESSURE LOSS THROUGH METER: PRESSURE LOSS THROUGH OTHER DEVICES: (i.e. Water Softener, Filters, Backflow Preventer) TOTAL PRESSURE LOSS (Add lines 2 thru 4): PRESSURE REQUIRED AT HIGHEST FIXTURE: PRESSURE AVAILABLE FOR FRICTION LOSS: (Subtract lines 5 & 6 from line 1) 1. 2. 3. 4. 5. 6. 7. HORIZONTAL PIPE LENGTH: VERTICAL PIPE LENGTH: EQUIVALENT FITTING LENGTH: TOTAL DEVELOPED LENGTH: FRICTION LOSS CALCULATION: (Line 7 / Line 11) x 100 DOMESTIC WATER SERVICE SIZE: WATER METER SIZE: BUILDING SEWER SIZE: 8. 9. 10. 11. 12. DEMANDS PRESSURE LOSSES FRICTION LOSS SUMMARY WATER SUPPLY: WASTE: 187 GPM 16 FT 400 FT 80 FT 20 300 283 FT (/100 FT) 4.8 2 1/2" DIA. DIA. 2" DIA. 6" SPECIFICATION SECTION 224000, 221119, 221319, 221423 RECIRCULATION PUMP --- TS --- --- --- --- JAY R SMITH QUAD CLOSE TRAP SEAL TRAP SEAL --- WATER HAMMER ARRESTOR 3/4' --- --- --- 12-32 FIXTURE UNITS HA-3/4 3/4" --- HOSE BIBB (ENCASED) --- --- --- FREEZE PROOF POST HYDRANT, ROOF MOUNTED HB-2 URINAL (WATERLESS, ADA COMPLIANT) WATERLESS, WALL HUNG URINAL (WATERLESS) WATERLESS, WALL HUNG --- --- INT. WC-3 WATER CLOSET (CHILDS' 10" HIGH) 1" --- 4" 2" FLOOR MOUNTED, FLUSH VALVE HOT WATER RECIRCULATING PUMP SCHEDULE CP-1 SYMBOL SERVICE BELL AND GOSSET NBF-22 LOCATION RM 178 FT. WATER CAPACITY BLDG. WEST SIDE 5.0 GPM 12.0 HEAD 3/4" FLANGE CONNECTION, AQUA STAT AND TIMER SPECIFICATION SECTION 221123 ACCESSORIES AND REMARKS WEIGHT (LBS.) 9.5 OPERATING 120 VOLT ELECTRICAL MOTOR H.P. 92w 2940 RPM 1 PHASE 60 Hz. MANUFACTURER AND MODEL NO. L-1 L-2 1-1/2" 1/2" 1/2" 1-1/2" 1-1/2" STAINLESS STEEL HANDWASH SINK 1-1/4" LAVATORY (ADA COMPLIANT) 1/2" 1/2" 1-1/4" 1-1/4" COUNTER MOUNTED, ADA COMPLIANT SENSOR OPERATED FAUCET LAVATORY (ADA COMPLIANT) --- --- --- PROVIDE WITH 4" DAM ORD-3 OVERFLOW ROOF DRAIN 3" --- --- --- --- --- 3" ROOF DRAIN RD-3 TOTAL (CFH) = BTU/CUBIC FT. = 231123 SECTION SPECIFICATION TOTAL INPUT EQUIPMENT LOCATION EQUIP. NO. TOTAL (BTUH) = GAS PRESSURE IN BUILDING PIPE SIZE AT METER QTY. MBH INPUT NATURAL GAS REQUIREMENTS RTU-1 1 1 1 1 1 1 1 1 1 ROOF ROOF ROOF ROOF ROOF ROOF ROOF ROOF ROOF ROOFTOP UNIT 360 RTU-2 RTU-3 RTU-4 RTU-5 RTU-6 RTU-7 RTU-8 RTU-9 ROOFTOP UNIT ROOFTOP UNIT ROOFTOP UNIT ROOFTOP UNIT ROOFTOP UNIT ROOFTOP UNIT ROOFTOP UNIT ROOFTOP UNIT DESIGN LENGTH 350' 2 PSIG 1 1/2" 2,313,000 1000 2,313 360 360 260 260 240 108 65 70 1 RM 141 WH-1 WATER HEATER 150 80 1 RM 119 WH-2 WATER HEATER 223400 SECTION SPECIFICATION AND REMARKS ACCESSORIES AND MODEL NO. MANUFACTURER 5 GALLON EXPANSION TANK, CONCENTRIC KIT SIZE 3" CONNECTION OVERALL SIZE 28 1/4"Ø x 57" TEMP. IN/OUT 40° - 140° WATER STACK 120/1/60 (MBH) 150.0 VOLTS/Ø/HZ. (GPH) RATE 169 60 CAPACITY RECOVERY INPUT OPERATING 1070 WEIGHT (LBS.) PRESSURE 4 OZ. NG TYPE/ TYPE STORAGE FUEL BRADFORD WHITE EF-60T-150-3N SYMBOL WH-1 STORAGE CAPACITY (GAL.) GAS FIRED WATER HEATER SCHEDULE WH-2 BRADFORD WHITE LG2PDV75H803N 4 OZ. NG 890 60 77 80.0 120/1/60 40° - 140° 26"Ø x 72" 3" 5 GALLON EXPANSION TANK, CONCENTRIC KIT STORAGE 360 360 260 260 240 108 65 70 150 80 360 GW 3 RD RD ORD 1 HB-1 1 1 WH ID 1 A301 2 SCALE: 1/4" = 1' - 0" A301 2 BP BALANCING VALVES TEMPERING VALVE

Upload: vuongliem

Post on 17-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: P001 PLUMBING SCHEDULES & GENER - Cochise Tech …cochisetech.net/wp-content/VMBC/Plans/Mechanical Plumbing Plan.pdf · prior to fabrication and installation the contractor shall

PLU

MB

ING

SCHED

ULE

S &

GENER

AL

NOTES

DO NOT SCALE DRAWING

P001

THIS

DR

AWIN

G IS C

LASSIFIE

D A

SP

AR

T O

F A

N U

NP

UB

LISHED

COLL

ECTIO

N O

F V

ISUAL

AR

T.

UND

ER

THE 1978

COP

YR

IGHT

ACT, IT IS A

N E

XCLU

SIV

EOR

IGIN

AL

WOR

K O

F A

UTHOR

SHIP

.NONE O

F T

HE P

ICTOR

IAL,

GR

AP

HIC

OR

TECHNIC

AL

CHAR

TS O

R D

RAWIN

GS

DEP

ICTED

ON T

HIS

SHEET M

AY

BE R

EP

ROD

UCED

OR

TR

ANSM

ITTED

IN A

NY F

OR

M O

RB

Y A

NY M

EANS W

ITHOUT T

HE

EXP

RESS P

RIO

R W

RITTEN

PER

MIS

SIO

N O

F T

HE A

RCHITECT.

THIS

PLA

N IS P

ROD

UCED

ONLY

FOR

THIS

PR

OJE

CT O

N T

HIS

SITE

AND

MAY N

OT B

E U

SED

AT

OTHER

LOCATIO

NS.

SHEET T

ITLE

:

OR

IGIN

AL

ISSUE: 2

-08-1

6

SEAL:

REV

DATE

DESCR

IPTIO

N

SHEET NUMBER:

PR

OJE

CT: A

C489

PR

OJE

CT:

BAP

TIS

T C

HUR

CH

SIE

RR

A V

ISTA, AZ

VILLA

GE M

EAD

OWS

OR

IGIN

AL

ISSUE

2-8-2

016

0

DANIE

L COOK

AR

CHITECT

290

9 W

ASHIN

GTO

N B

LVD

- O

GD

EN, UT

8440

1P

H: 80

0-5

52-

7137

www.B

GWSER

VIC

ES.c

om

SIE

RR

A V

ISTA, AR

IZONA 8

5635

140

7 S E

L CAM

INO R

EAL

2-28

-20

17OWNER

REVIS

IONS

1

GENERAL PLUMBING NOTES

1. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO CONSTRUCT A COMPLETE, OPERATIONALPLUMBING SYSTEM FOR THE ENTIRE PROJECT AS SHOWN ON THESE DRAWINGS, INCLUDING ALL NECESSARYFEES AND PERMITS.

2. THE ENTIRE INSTALLATION SHALL CONFORM TO THE MOST RECENTLY ADOPTED REQUIREMENTS OF THEINTERNATIONAL MECHANICAL CODE, INTERNATIONAL PLUMBING CODE, INTERNATIONAL BUILDING CODE, AND ALLOTHER APPLICABLE CITY, COUNTY, AND STATE CODES AND REGULATIONS IN EFFECT AT THE DATEOF THE PERMITTING.

3. PRIOR TO FABRICATION AND INSTALLATION THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALLPLUMBING PIPING, DUCTWORK, AND EQUIPMENT WITH PLUMBING PIPING, PLUMBING EQUIPMENT, ALLDUCTWORK, AND ALL OTHER TRADES INCLUDING BUT NOT LIMITED TO THE MECHANICAL CONTRACTOR,ELECTRICAL CONTRACTOR, GENERAL CONTRACTOR, AND ANY CONTRACTOR HIRED DIRECTLY BY THE OWNER.WHERE CONFLICTS MAY OCCUR, THEY SHALL BE RESOLVED PRIOR TO INSTALLATION.

4. THE DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENTS AND THE EXTENT OF THE SYSTEM. ITSHALL BE THE WORK OF THE CONTRACTOR TO MAKE SUCH SLIGHT ALTERATIONS AS MAY BE NECESSARY TOMAKE THE SYSTEM COMPLETE AND OPERATIONAL IN ACCORDANCE WITH THE DESIGN INTENT. MAJORDEVIATIONS SUCH AS CHANGES IN COMPONENT SIZES, WEIGHTS, QUANTITIES, OR MATERIAL REQUIRE PRIORAPPROVAL BY THE CONSULTING ENGINEER.

5. ALL PLUMBING INFORMATION IS NOT SHOWN ON THE PLUMBING DRAWINGS. THE CONTRACTOR SHALL BERESPONSIBLE FOR COORDINATING INFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTS INCLUDINGARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.

6. THE WORKING DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, THEYDO NOT SHOW EVERY OFFSET, BEND OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION IN THESPACE PROVIDED. ALL LOCATIONS FOR PLUMBING EQUIPMENT AND PIPING SHALL BE CHECKED ANDCOORDINATED WITH THE ARCHITECTURAL, MECHANICAL, STRUCTURAL AND ELECTRICAL DRAWINGS.

7. EXACT ROUTING OF WASTE, GAS, AND WATER SERVICE IS DEPENDENT ON LOCAL SITE CONDITIONS ANDMODIFICATIONS IN EQUIPMENT CONNECTIONS. EXACT LOCATION OF EQUIPMENT MAY VARY DEPENDING ONLOCAL CODE, HEALTH DEPARTMENT AND CITY REQUIREMENTS.

8. DETAILS: THE CONTRACTOR IS RESPONSIBLE TO REVIEW AND USE WHERE APPROPRIATE ALL OF THEPLUMBING DETAILS SHOWN ON THE DRAWINGS. DETAILS MAY OR MAY NOT BE CALLED OUT ON THEDRAWINGS WITH SYMBOLS OR KEYED NOTES. ANY CHANGES RESULTING FROM FAILURE TO INSTALL THEPLUMBING SYSTEM WITHOUT USING THE INCLUDED DETAILS IS THE RESPONSIBILITY OF THE CONTRACTOR.

9. THE DRAWINGS AND SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT EACH OTHER AND THEY SHALLBE INTERPRETED AS AN INTEGRAL UNIT WITH THE ITEMS SHOWN ON ONE AND NOT THE OTHER BEINGFURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLED OUT IN BOTH.

10. PREPARE 6 COPIES OF SUBMITTALS IN AN INDEXED, LABELED FOLDER CONTAINING FULL PERFORMANCE,MATERIAL AND INSTALLATION INFORMATION ABOUT ALL EQUIPMENT, PIPING, COMPONENTS AND ACCESSORIESTO BE USED.

11. THE STRUCTURE SHOWN ON ALL DETAILS MAY OR MAY NOT PERTAIN TO A PORTION OR ANY PORTIONOF THE BUILDING. COORDINATE MOUNTING REQUIREMENTS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.

12. ANY PART OF THIS INSTALLATION THAT FAILS, IS UNFIT, OR BECOMES DAMAGED DURING CONSTRUCTIONSHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

13. ALL EQUIPMENT SHALL PROVIDE THE SCHEDULED PERFORMANCE AT THE SITE ALTITUDE.

14. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'SRECOMMENDATIONS. PROVIDE ALL FITTINGS, TRANSITIONS, VALVES, AND OTHER DEVICES AND ACCESSORIESREQUIRED FOR A COMPLETE, WORKABLE INSTALLATION.

15. ALL MOTORS REQUIRED SHALL BE BY THE DIVISION 15 CONTRACTOR. ALL MOTOR STARTING EQUIPMENT,IF NOT A PART OF THE EQUIPMENT, IS FURNISHED BY THE ELECTRICAL CONTRACTOR.

16. THE CONTRACTOR IS RESPONSIBLE FOR PLUMBING EQUIPMENT CHECK-IN, SAFEKEEPING, AND DAMAGE.

17. INVERTS SHOWN ON PLUMBING DRAWINGS MAY BE REFERENCED FROM THE FINISHED FLOOR ELEVATION.COORDINATE ALL INVERTS WITH CIVIL DRAWINGS PRIOR TO INSTALLATION.

18. PROVIDE WALL CLEANOUTS IN ALL VENTS FOR COMBINATION WASTE AND VENT SYSTEMS AS REQUIRED BYLOCAL AND NATIONAL CODES.

19. ALL VENT FITTINGS FOR WASTE SYSTEMS BELOW OVERFLOWS OF FIXTURES SHALL BE DRAINAGE TYPE.

20. CONTRACTOR TO COMPLY WITH THE LATEST ADOPTED IPC WHEN SIZING TRAP ARMS ON COMBINATIONWASTE AND VENT SYSTEMS. THE DRAWINGS INDICATE THE WASTE LINE SIZE AND THE SIZE OF THE TRAPREQUIRED.

21. PROVIDE CLEANOUTS IN ACCORDANCE WITH THE REQUIREMENTS OF APPLICABLE CODES. FLOORCLEANOUTS SHALL BE LOCATED OUT OF TRAFFIC AREAS.

22. LOCATE ALL PLUMBING VENTS AT LEAST 3 FEET ABOVE OR 10 FEET AWAY FROM ALL OUTSIDE AIRINTAKES INTO THE BUILDING.

23. SEE "PLUMBING FIXTURE SCHEDULE" FOR FIXTURE MAKE AND TYPE, AND SIZE OF INDIVIDUAL WASTE,VENT, AND DOMESTIC WATER PIPING TO FIXTURES.

24. ALL PLUMBING EQUIPMENT SHALL BE LISTED AND LABELED BY AN APPROVED TESTING AGENCY.

25. EQUIPMENT AND INSTALLATION SHALL MEET NATIONAL SANITATION FOUNDATION (NSF) STANDARDS, OREQUIVALENT.

26. PROVIDE PROPER PROVISIONS FOR EXPANSION OR MOVEMENT OF ALL PIPING.

27. ALL PIPE SHALL BE SECURED BY DOUBLE NUTTING AT THE HANGER ROD ATTACHMENT TO THESTRUCTURE, AND AT THE PIPE HANGER.

28. PROVIDE WATER HAMMER ARRESTORS (SHOCK ABSORBERS) AT ALL PIPE LOCATIONS WHERE VALVECLOSURES (SUCH AS FLUSH VALVES) MAY CAUSE WATER HAMMER OR RESULT IN EXCESSIVE PIPE VIBRATIONOR MOVEMENT.

29. PROPERLY LUBRICATE ALL PIECES OF EQUIPMENT BEFORE TURNING THE SYSTEM OVER TO THE OWNER.

30. TWO OPERATING AND MAINTENANCE MANUALS SHALL BE PROVIDED IN HARD BACK LOOSE LEAF BINDERS.MANUALS SHALL CONTAIN PRODUCT CUT SHEETS AND OPERATING AND MAINTENANCE INSTRUCTIONS ON ALLEQUIPMENT, ACCESSORIES, FIXTURES, VALVES, ETC., PROVIDED FOR THE PROJECT.

31. UPON COMPLETION OF THE WORK, REMOVE ALL SURPLUS MATERIALS AND RUBBISH. MAKE ALLREQUIRED PATCHING AND REPAIRS OF OTHER TRADES' WORK DAMAGED BY THIS CONTRACTOR, AND LEAVETHE PREMISES IN A CLEAN, ORDERLY CONDITION.

32. THE CONTRACTOR SHALL OPERATE THE SYSTEM AND DEMONSTRATE ALL ASPECTS TO THE ENGINEERAND/OR OWNER, TO PROVE ITS OPERATION.

33. THE CONTRACTOR SHALL GUARANTEE THE PLUMBING SYSTEM FOR A PERIOD OF ONE YEAR FROM THEDATE OF SUBSTANTIAL COMPLETION.

34. THE CONTRACTOR SHALL, DURING CONSTRUCTION, MAINTAIN A SET OF AS-BUILT REDLINED RECORDDRAWINGS AT THE PROJECT SITE. ALL CHANGES IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, ANDACCESSORIES SHALL BE RECORDED. THESE REDLINES SHALL BE GIVEN TO THE ARCHITECT/ENGINEER AFTERTHE FINAL INSPECTION.

SHUT OFF (BALL VALVE TYPE)

PRESSURE REDUCING VALVE (GAS OR WATER)

LIQUEFIED PETROLEUM GASLP

PLUMBING LEGEND

POINT OF CONNECTION

KEYED NOTE CALLOUT

POINT OF DEMOLITION

FIXTURE CALLOUT

SECTION CALLOUT

TITLE

SECTION

SHEET #

FLOOR DRAIN

FLOOR SINK

TEE

ROOF DRAIN

OVERFLOW ROOF DRAIN

BOTTOM CONNECTION

TOP CONNECTION

CAP OR PLUG

PIPE BREAK

DIRECTION OF FLOW

DIRECTION OF PIPE SLOPE

CW

HW POTABLE HOT WATER PIPE

POTABLE COLD WATER PIPE

SS SANITARY SEWER PIPE

POTABLE HOT WATER RETURN PIPEHWR

GW

GW

GREASE WASTE LINE ABOVE GRADE

GREASE WASTE LINE

V

VTRVTR

RD

ORD

RD

ORD OVERFLOW ROOF DRAIN LINE

ROOF DRAIN LINE

VENT THROUGH THE ROOF

VENT LINE

SANITARY SEWER PIPE BELOW GRADESS

RD

G NATURAL GAS LINE

ROOF DRAIN LINE BELOW GRADE

FIRE SPRINKLER RISER

HAMMER ARRESTOR

FIRE DEPARTMENT CONNECTION

HOSE BIBB WITH SHUT OFF

TRAP PRIMER

TWO WAY CLEAN OUT TO GRADE2-WAY COTG

FCO

CO

WCO

FLOOR CLEANOUT

WALL CLEANOUT

EXPOSED CLEANOUT

COTG CLEANOUT TO GRADE

INT.

WASTE

PLUMBING FIXTURE SCHEDULE

WC-1

SYMBOL

WATER CLOSET 1" ---

FIXTUREWATER

COLDWATER

HOT

4" 2" FLOOR MOUNTED, FLUSH VALVE

VENTACCESSORIESAND REMARKS

TRAP

FLOOR MOUNTED, FLUSH VALVE2"4"---1"WATER CLOSET (ADA COMPLIANT)WC-2 INT.

2"3"---U-1 INT.

2"3"---U-2 INT.

1-1/2"S-1 SINK - SINGLE COMPARTMENT 1/2" 1/2" 1-1/2" 1-1/2" COUNTER MOUNTED SINGLE COMPARTMENT

HB-1

3"SS-1 SERVICE SINK 1/2" 1/2" 3" 2" FLOOR MOUNTED WITH DEEP SEAL TRAP

DF-2 WATER COOLER (BI-LEVEL ADA COMPLIANT) 1-1/2"1-1/2"1/2" 1-1/2"

2"FD-2 FLOOR DRAIN --- --- 2" 2" WITH DEEP SEAL TRAP

--- ELECTRIC WATER COOLER, WALL HUNG, BI-LEVEL, 8 GPH, ADA COMPLIANT

FREEZELESS---------3/4"HOSE BIBB (ENCASED) ---

---WATER HAMMER ARRESTOR 1" --- --- --- 33-60 FIXTURE UNITSHA-1

---IM-1 ICE MAKER CONNECTION 1/2" --- --- ---

WITH DEEP SEAL TRAP2"2"------FLOOR SINKFS-2 2"

FCO

WCO

CO

COTG

COTG2-WAY

PIPE RISE

PIPE DROP

ORD

RD

FD

FS

ENLARGED PLUMBING

DETAIL CALLOUTDETAIL #

SHEET #

EQUIPMENT CALLOUT

BACK FLOW PREVENTER

3"FD-3 FLOOR DRAIN --- --- 3" 2" WITH DEEP SEAL TRAP

1-1/4"L-6 LAVATORY (ADA COMPLIANT) 1/2" 1/2" 1-1/4" 1-1/4" WALL MOUNTED, ADA COMPLIANT SENSOR OPERATED FAUCET

PROVIDE WATTS LFUSG-B THERMOSTATIC TEMPERING VALVE UNDER COUNTER TO EACH LAV.

ELECTRIC WATER COOLER, WALL HUNG, 8 GPH, ADA COMPLIANT1-1/2"1-1/2"---1/2"WATER COOLER (ADA COMPLIANT)DF-1 1-1/2"

---HA-1/2 WATER HAMMER ARRESTOR 1/2" --- --- --- 1-11 FIXTURE UNITS

1-1/2"S-2 SINK - TWO COMPARTMENT 1/2" 1/2" 1-1/2" 1-1/2" COUNTER MOUNTED, DOUBLE COMPARTMENT

PSI19.1

PSI25.0

PSI20.9

PSI12.0

PSI2

PSI6.4

65 PSI

105

0

0

GPM

GPM

GPM

105

BUILDING WATER SUPPLY CALCULATIONSTOTAL FIXTURE UNITS:

ESTIMATED DEMAND:

IRRIGATION DEMAND:

HVAC DEMAND:

TOTAL DEMAND:PRESSURE AVAILABLE AT STREET MAIN:

PRESSURE LOSS DUE TO HEIGHT ( FT. x 0.434):

PRESSURE LOSS THROUGH METER:

PRESSURE LOSS THROUGH OTHER DEVICES:(i.e. Water Softener, Filters, Backflow Preventer)

TOTAL PRESSURE LOSS (Add lines 2 thru 4):

PRESSURE REQUIRED AT HIGHEST FIXTURE:

PRESSURE AVAILABLE FOR FRICTION LOSS:(Subtract lines 5 & 6 from line 1)

1.

2.

3.

4.

5.

6.

7.

HORIZONTAL PIPE LENGTH:

VERTICAL PIPE LENGTH:

EQUIVALENT FITTING LENGTH:

TOTAL DEVELOPED LENGTH:

FRICTION LOSS CALCULATION:(Line 7 / Line 11) x 100

DOMESTIC WATER SERVICE SIZE:

WATER METER SIZE:

BUILDING SEWER SIZE:

8.

9.

10.11.

12.DE

MAND

SPR

ESSU

RE LO

SSES

FRIC

TION

LOSS

SUMM

ARY

WATER SUPPLY:WASTE: 187

GPM

16

FT400

FT80

FT20

300

283FT

(/100 FT)4.8

2 1/2"DIA.

DIA.2"

DIA.6"

SPECIFICATIONSECTION 224000,

221119, 221319, 221423

RECIRCULATION PUMP

---TS --- --- ------ JAY R SMITH QUAD CLOSE TRAP SEALTRAP SEAL

---WATER HAMMER ARRESTOR 3/4' --- --- --- 12-32 FIXTURE UNITSHA-3/4

3/4" ---HOSE BIBB (ENCASED) --- --- --- FREEZE PROOF POST HYDRANT, ROOF MOUNTEDHB-2

URINAL (WATERLESS, ADA COMPLIANT) WATERLESS, WALL HUNG

URINAL (WATERLESS) WATERLESS, WALL HUNG

---

---

INT.WC-3 WATER CLOSET (CHILDS' 10" HIGH) 1" --- 4" 2" FLOOR MOUNTED, FLUSH VALVE

HOT WATER RECIRCULATING PUMP SCHEDULE

CP-1

SYMBOL SERVICE

BELL AND GOSSET NBF-22

LOCATION

RM 178

FT. WATER

CAPACITY

BLDG. WEST SIDE 5.0

GPM

12.0

HEAD

3/4" FLANGE CONNECTION, AQUA STAT AND TIMER

SPECIFICATIONSECTION

221123

ACCESSORIESAND REMARKS

WEIGHT(LBS.)

9.5

OPERATING

120

VOLT

ELECTRICAL

MOTOR

H.P.

92w 2940

RPM

1

PHASE

60

Hz.

MANUFACTURERAND MODEL NO.

L-1

L-2 1-1/2"1/2" 1/2" 1-1/2" 1-1/2" STAINLESS STEEL HANDWASH SINK

1-1/4"LAVATORY (ADA COMPLIANT) 1/2" 1/2" 1-1/4" 1-1/4" COUNTER MOUNTED, ADA COMPLIANT SENSOR OPERATED FAUCET

LAVATORY (ADA COMPLIANT)

--- --- ---

PROVIDE WITH 4" DAMORD-3 OVERFLOW ROOF DRAIN 3"------ --- ---

--- 3"ROOF DRAINRD-3

TOTAL (CFH) =

BTU/CUBIC FT. =

231123SECTION

SPECIFICATION

TOTALINPUTEQUIPMENTLOCATIONEQUIP.

NO.

TOTAL (BTUH) =

GAS PRESSURE IN BUILDING

PIPE SIZE AT METER

QTY. MBHINPUT

NATURAL GAS REQUIREMENTS

RTU-1

1

1

1

1

1

1

1

1

1 ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOF

ROOFTOP UNIT 360

RTU-2

RTU-3

RTU-4

RTU-5

RTU-6

RTU-7

RTU-8

RTU-9

ROOFTOP UNIT

ROOFTOP UNIT

ROOFTOP UNIT

ROOFTOP UNIT

ROOFTOP UNIT

ROOFTOP UNIT

ROOFTOP UNIT

ROOFTOP UNIT

DESIGN LENGTH 350'

2 PSIG

1 1/2"

2,313,000

1000

2,313

360

360

260

260

240

108

65

70

1 RM 141WH-1 WATER HEATER 150

801 RM 119WH-2 WATER HEATER

223400SECTION

SPECIFICATION

AND REMARKSACCESSORIES

AND MODEL NO.MANUFACTURER

5 GALLON EXPANSION TANK, CONCENTRIC KIT

SIZE

3"

CONNECTIONOVERALL

SIZE

28 1/4"Ø x 57"

TEMP.IN/OUT

40° - 140°

WATER STACK

120/1/60

(MBH)

150.0

VOLTS/Ø/HZ.(GPH)RATE

16960

CAPACITYRECOVERY INPUT OPERATING

1070

WEIGHT(LBS.)PRESSURE

4 OZ. NG

TYPE/TYPE

STORAGE

FUEL

BRADFORD WHITE EF-60T-150-3N

SYMBOL

WH-1

STORAGECAPACITY

(GAL.)

GAS FIRED WATER HEATER SCHEDULE

WH-2 BRADFORD WHITE LG2PDV75H803N 4 OZ. NG 89060 77 80.0 120/1/60 40° - 140° 26"Ø x 72" 3" 5 GALLON EXPANSION TANK, CONCENTRIC KITSTORAGE

360

360

260

260

240

108

65

70

150

80

360GW

3

RD

RD

ORD

1

HB-1

1

1

WHID

1

A3012

SCALE: 1/4" = 1' - 0"

A3012

BP

BALANCING VALVES

TEMPERING VALVE

aben
Cochise Tech & Development
Page 2: P001 PLUMBING SCHEDULES & GENER - Cochise Tech …cochisetech.net/wp-content/VMBC/Plans/Mechanical Plumbing Plan.pdf · prior to fabrication and installation the contractor shall

PLU

MB

ING

FLO

OR

PLA

N

DO NOT SCALE DRAWING

P101

THIS

DR

AWIN

G IS C

LASSIFIE

D A

SP

AR

T O

F A

N U

NP

UB

LISHED

COLL

ECTIO

N O

F V

ISUAL

AR

T.

UND

ER

THE 1978

COP

YR

IGHT

ACT, IT IS A

N E

XCLU

SIV

EOR

IGIN

AL

WOR

K O

F A

UTHOR

SHIP

.NONE O

F T

HE P

ICTOR

IAL,

GR

AP

HIC

OR

TECHNIC

AL

CHAR

TS O

R D

RAWIN

GS

DEP

ICTED

ON T

HIS

SHEET M

AY

BE R

EP

ROD

UCED

OR

TR

ANSM

ITTED

IN A

NY F

OR

M O

RB

Y A

NY M

EANS W

ITHOUT T

HE

EXP

RESS P

RIO

R W

RITTEN

PER

MIS

SIO

N O

F T

HE A

RCHITECT.

THIS

PLA

N IS P

ROD

UCED

ONLY

FOR

THIS

PR

OJE

CT O

N T

HIS

SITE

AND

MAY N

OT B

E U

SED

AT

OTHER

LOCATIO

NS.

SHEET T

ITLE

:

OR

IGIN

AL

ISSUE: 2

-08-1

6

SEAL:

REV

DATE

DESCR

IPTIO

N

SHEET NUMBER:

PR

OJE

CT: A

C489

PR

OJE

CT:

BAP

TIS

T C

HUR

CH

SIE

RR

A V

ISTA, AZ

VILLA

GE M

EAD

OWS

OR

IGIN

AL

ISSUE

2-8-2

016

0

DANIE

L COOK

AR

CHITECT

290

9 W

ASHIN

GTO

N B

LVD

- O

GD

EN, UT

8440

1P

H: 80

0-5

52-

7137

www.B

GWSER

VIC

ES.c

om

SIE

RR

A V

ISTA, AR

IZONA 8

5635

140

7 S E

L CAM

INO R

EAL

2-28

-20

17OWNER

REVIS

IONS

1

FOR CONTINUATION OF WATER SERVICE PIPING SEESITE PLAN.

FOR CONTINUATION OF WASTE LINE SEE SITE PLAN.

FIRE SERVICE, FOR CONTINUATION SEE SITE PLAN.

FIRE DEPARTMENT CONNECTION.

FOR CONTINUATION OF PIPING SEE PLUMBINGENLARGEMENTS, SHEET P401.

RISE 3/4" LINE TO ROOF FOR HOSE BIBB.

RUN PIPING ABOVE CEILING.

FOR CONTINUATION OF PIPING SEE PLUMBING FLOORPLAN, SHEET P101.

ROOF DRAIN LINE TO DAYLIGHT WITH DOWNSPOUTNOZZLE AT 12" ABOVE GRADE.

FOR CONTINUATION OF ROOF DRAIN LINE SEE CIVILPLAN.

FOR CONTINUATION OF GAS LINE SEE SITE PLAN.

DROP A 3/4" GAS LINE DOWN AND TIE INTO WATERHEATER. PROVIDE SHUT-OFF VALVE IN AN ACCESSIBLELOCATION AND AS CLOSE TO WATER HEATER ASPOSSIBLE ON OUTSIDE OF WATER HEATER CABINET.

GAS METER SIZE FOR 2313 CFH AT 2 PSIG. METER ANDYARD LINE BY GAS COMPANY.

RISE GAS LINE UP TO ROOF. FOR CONTINUATION OFPIPING SEE PLUMBING ROOF PLAN, SHEET P102.

DROP 1/2" GAS LINE DOWN AND TIE INTO WATERHEATER. PROVIDE SHUT-OFF VALVE IN AN ACCESSIBLELOCATION AND AS CLOSE TO WATER HEATER ASPOSSIBLE ON OUTSIDE OF WATER HEATER CABINET.

PROVIDE PRESSURE REDUCING VALVE IN GAS LINE.VENT TO OUTSIDE AS REQUIRED.

EXTEND 3" PLENUM RATED CVPC EXHAUST ANDINTAKE PIPES FROM WATER HEATER TO ROOF.TERMINATE THRU ROOF WITH CONCENTRIC KIT.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

17

16

KEYED NOTES

NOTE:FOR BRANCH SIZES TO INDIVIDUAL FIXTURES NOTSHOWN ON PLANS, SEE PLUMBING FIXTURESCHEDULE, SHEET P001.

DW

B.9

4P401

5P401

6P401

7P401

2P401

8P401

9P401

10P401

11P401

1P401

3P401

12P401

14

d d

5

55 5

5

5

5

5

5

5

3

2

55

555

5

5

5

5

5

5 5

5

5

5

5

5

5

5 5 5

5

5

5

5

5 5

5

5

5

5

1

5

7

5 5

7

4

7

7

7

6

6

10

9

8

810

9

1311

15

12

14

14

14

14

14

14

14

1414

16

17

1617

5

5

5

5

5

5

5

55

5

S-1

DF-1

DF-2

TX-A2

SES2

CHAPEL101

FOYER102

CATERING103

USHER104

VESTIBULE106

PLAY ROOM107

CLASSROOM A108

R.R.109

CLASSROOM B110

R.R.111

CLASSROOM C112

CRAWLERS113

CHECK-IN114 R.R.

115

INFANTS116

OFFICE117

MEN'S118

JAN.119

CORRIDOR120

stg.121

R.R.122

STG.123

TACTILE124

MOTOR SKILLS125

SENSORY126

MINISTRY127

COUNS.128

FAM. R.R.129

BACKSTAGE/STORAGE130

MASTER CONTROL131

BACK STAGE132

RACK ROOM133

GREEN ROOM134

R.R.135

MAN CAVE136

R.R.137

COUNS.138

BRIDE'S ROOM139

CORRIDOR140

JAN.141

WOMEN'S142

SPRK.143

STORAGE144

HOSPITALITY145

PLATFORM148

CAFE150

san.149

MDP143.1

CHANGING146.1

u u

1

18

187

A A

B B

r r

j

15

15 17

n n

C C

165

5

2

3 9 10 1211

f

l

o o

q

t

6

e

h

4 8 13

p

s

m

k

G

6.1 6.9

h.9

FD-3TS

INVERT ELEVATION 91.80'

4"

4"

4"

1/2"

1/2"

3/4"

1 1/4"

1 1/4"

1/2"

1 1/4"

1"

4"

2"

1/2"

3/4"1 1/2"

1 1/2"

2"

3/4"

3/4"

1/2"

1"

3"

4"

3/4"

1/2"

1/2"

3/4"

2" VTR

1 1/2" VTR

HB-1

1 1/4"

1 1/4"

2"

1/2"

2 1/2"

2"

2 1/2"

2"

1"

3/4"

2 1/2"

2 1/2"2 1/2"

2 1/2"2 1/2"

2"

1 1/4"

4"4"

RD-3

ORD-3

RD-3

ORD-3

3"

3"

1 1/2"

1 1/4"

1 1/4"

1 1/4"1/2"

3/4"

1"

1 1/4"

1/2"

1"

1"

3/4"

3/4"

1/2"

3/4"

3/4"

1/2"

1 1/4"

1 1/4"

1 1/4"1" 3/4" 1"

3/4"3/4"

3/4"

FCO

WCO

FCO

3"

3"

4"

4" INVERT ELEVATION 92.33'

4"

4"

BP

3RD PLACE105

SANCTUARY147

BAPTISTRY146

1

1 PLUMBING FLOOR PLANSCALE: 1/8" = 1'-0"

aben
Cochise Tech & Development
Page 3: P001 PLUMBING SCHEDULES & GENER - Cochise Tech …cochisetech.net/wp-content/VMBC/Plans/Mechanical Plumbing Plan.pdf · prior to fabrication and installation the contractor shall

PLU

MB

ING

ROOF P

LAN

DO NOT SCALE DRAWING

P102

THIS

DR

AWIN

G IS C

LASSIFIE

D A

SP

AR

T O

F A

N U

NP

UB

LISHED

COLL

ECTIO

N O

F V

ISUAL

AR

T.

UND

ER

THE 1978

COP

YR

IGHT

ACT, IT IS A

N E

XCLU

SIV

EOR

IGIN

AL

WOR

K O

F A

UTHOR

SHIP

.NONE O

F T

HE P

ICTOR

IAL,

GR

AP

HIC

OR

TECHNIC

AL

CHAR

TS O

R D

RAWIN

GS

DEP

ICTED

ON T

HIS

SHEET M

AY

BE R

EP

ROD

UCED

OR

TR

ANSM

ITTED

IN A

NY F

OR

M O

RB

Y A

NY M

EANS W

ITHOUT T

HE

EXP

RESS P

RIO

R W

RITTEN

PER

MIS

SIO

N O

F T

HE A

RCHITECT.

THIS

PLA

N IS P

ROD

UCED

ONLY

FOR

THIS

PR

OJE

CT O

N T

HIS

SITE

AND

MAY N

OT B

E U

SED

AT

OTHER

LOCATIO

NS.

SHEET T

ITLE

:

OR

IGIN

AL

ISSUE: 2

-08-1

6

SEAL:

REV

DATE

DESCR

IPTIO

N

SHEET NUMBER:

PR

OJE

CT: A

C489

PR

OJE

CT:

BAP

TIS

T C

HUR

CH

SIE

RR

A V

ISTA, AZ

VILLA

GE M

EAD

OWS

OR

IGIN

AL

ISSUE

2-8-2

016

0

DANIE

L COOK

AR

CHITECT

290

9 W

ASHIN

GTO

N B

LVD

- O

GD

EN, UT

8440

1P

H: 80

0-5

52-

7137

www.B

GWSER

VIC

ES.c

om

SIE

RR

A V

ISTA, AR

IZONA 8

5635

140

7 S E

L CAM

INO R

EAL

2-28

-20

17OWNER

REVIS

IONS

1

PROVIDE P-TRAP AT CONDENSATE DRAIN AND RUNDRAIN TO NEAREST SCUPPER.

PENETRATE SIDE OF UNIT AT KNOCKOUT WITH GASPIPE, PROVIDE AND INSTALL GAS PRESSUREREDUCING VALVE TO REDUCE GAS PRESSUREFROM 2 PSIG TO 4 OZ. PROVIDE AND INSTALL A GASSHUT-OFF VALVE AND DIRT LEG AS CLOSE TO THEUNIT INLET AS POSSIBLE ON OUTSIDE OF CABINET.

1

2

KEYED NOTES

NOTE:FOR BRANCH SIZES TO INDIVIDUAL FIXTURES NOTSHOWN ON PLANS, SEE PLUMBING FIXTURESCHEDULE, SHEET P001.

DO

DO

B.9

14

d d

1

1

1

1

1

1

1

1

HB-2

HB-2

2

2

22

2

2

2

2

2

1

HP1

HP2

RTU6RTU

4

RTU5

RTU3

RTU1

RTU7

RTU9

RTU8

RTU2

3868 SQFT 3818 SQFT

6549 SQFT

591 SQFT

718 SQFT 8788 SQFT 5573 SQFT

u u

1

18

187

A A

B B

r r

j

15

15 17

n n

C C

165

5

2

3 9 10 1211

f

l

o o

q

t

6

e

h

4 8 13

p

s

m

k

G

6.1 6.9

h.9

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

1 1/2" VTR

2" VTR2" VTR

2" VTR

4" VTR

1 1/2" VTR

4" VTR

2" VTR

RD-3

ORD-3

RD-3

ORD-3

EF4

EF5

EF10

EF3

EF1

EF6

EF9

EF7

EF8

1 PLUMBING ROOF PLANSCALE: 1/8" = 1'-0"

aben
Cochise Tech & Development
Page 4: P001 PLUMBING SCHEDULES & GENER - Cochise Tech …cochisetech.net/wp-content/VMBC/Plans/Mechanical Plumbing Plan.pdf · prior to fabrication and installation the contractor shall

PLU

MB

ING

ENLA

RG

ED

PLA

N

DO NOT SCALE DRAWING

P401

THIS

DR

AWIN

G IS C

LASSIFIE

D A

SP

AR

T O

F A

N U

NP

UB

LISHED

COLL

ECTIO

N O

F V

ISUAL

AR

T.

UND

ER

THE 1978

COP

YR

IGHT

ACT, IT IS A

N E

XCLU

SIV

EOR

IGIN

AL

WOR

K O

F A

UTHOR

SHIP

.NONE O

F T

HE P

ICTOR

IAL,

GR

AP

HIC

OR

TECHNIC

AL

CHAR

TS O

R D

RAWIN

GS

DEP

ICTED

ON T

HIS

SHEET M

AY

BE R

EP

ROD

UCED

OR

TR

ANSM

ITTED

IN A

NY F

OR

M O

RB

Y A

NY M

EANS W

ITHOUT T

HE

EXP

RESS P

RIO

R W

RITTEN

PER

MIS

SIO

N O

F T

HE A

RCHITECT.

THIS

PLA

N IS P

ROD

UCED

ONLY

FOR

THIS

PR

OJE

CT O

N T

HIS

SITE

AND

MAY N

OT B

E U

SED

AT

OTHER

LOCATIO

NS.

SHEET T

ITLE

:

OR

IGIN

AL

ISSUE: 2

-08-1

6

SEAL:

REV

DATE

DESCR

IPTIO

N

SHEET NUMBER:

PR

OJE

CT: A

C489

PR

OJE

CT:

BAP

TIS

T C

HUR

CH

SIE

RR

A V

ISTA, AZ

VILLA

GE M

EAD

OWS

OR

IGIN

AL

ISSUE

2-8-2

016

0

DANIE

L COOK

AR

CHITECT

290

9 W

ASHIN

GTO

N B

LVD

- O

GD

EN, UT

8440

1P

H: 80

0-5

52-

7137

www.B

GWSER

VIC

ES.c

om

SIE

RR

A V

ISTA, AR

IZONA 8

5635

140

7 S E

L CAM

INO R

EAL

2-28

-20

17OWNER

REVIS

IONS

1

FOR CONTINUATION OF PIPING SEE PLUMBING FLOORPLAN, SHEET P101.

DROP 3" WATER LINE FROM EACH URINAL DIRECTLY INTO3" WASTE LINE BELOW FLOOR.

BALANCING VALVES, BALACE TO 1.2 GPM.

PROVIDE 2" DRAIN WITH TRIP LEVER DRAIN STOP ANDOVERFLOW. TRAP AND VENT DRAIN.

BAPTISTRY PUMP AND HEATER LOCATION. 11KW HEATERWITH CIRCULATING PUMP.

PROVIDE MIXING VALVES IN WALL. SEE DETAIL 11 ONSHEET P501. PROVIDE 3/4" CONNECTION TUB SPOUT 3"ABOVE BAPTISTRY (ALFI BRAND AB3301). PROVIDEACCESS DOOR IN WALL FOR VALVES AND SPOUT.

RUN PIPING ABOVE CEILING.

INSTALL BAPTISTRY PIPING BEFORE CONCRETE WALLSAND FLOOR ARE POURED.

1

2

3

4

5

6

7

8

KEYED NOTES

NOTE:FOR BRANCH SIZES TO INDIVIDUAL FIXTURES NOTSHOWN ON PLANS, SEE PLUMBING FIXTURESCHEDULE, SHEET P001.

1

1

1

7

L-6

WC-3

S-1

R.R.109

FD-2TS

1 1/4"

4"

1"

1/2"1/2"

3/4"

2" VTR

1 1/2"

1 1/4"

HB-1

3/4"

HA-1/2

1

1

1

1

1

L-6

WC-3

S-1

R.R.111

FD-2TS

1 1/4" 1 1/4"

2"

4"

4"

4"

2" VTR

2"

1 1/2"1 1/2"

3/4"

1 1/4"HA-1/2

WCO

DW

1

1

11

1

1 S-2

san.149

3/4"

IM-1

3"

1

11

1

1

1

1L-6

WC-3S-1

R.R.115

FD-2TS

2"

2" VTR

3/4"

1/2"

4"

1 1/2"

2"

2"1 1/4"

1/2"

1 1/2"

1 1/4"

HA-1/2

L-1

L-1

11

1 11

2

3

7

1

1

1

1

WC-2

WC-2

U-2

U-1

U-1

U-1

U-1

SS-1

L-1

L-1

WC-1

WC-1

WH-2

S-1

MEN'S118

JAN.119

FD-2TS

FD-2TS

FD-2TS

3/4"

1/2"

1 1/2"

2"

3"

2"

FD-2TS

1 1/4"

4"

1 1/2"

2"

3"

2"

4" VTR

2"

3/4"

1"

1"

2"

2"

2"

2 1/2"

1 1/4"

1 1/4"1 1/2"

2"

2"

1/2"

WCO

HA-1

HA-1

4"

1 1

1

1

1

7

1

L-6

WC-2

DF-1

R.R.122

FD-2TS

1/2"

3/4"

1/2"

1/2"

2" VTR

3/4"

1/2"

1 1/4"

1/2"HA-1/2

1

1

1

1

1

L-6

WC-2

FAM. R.R.129

FD-2TS

1/2"

1/2"

4"

2"

2" VTR

1 1/4"

1 1/4"

HA-1/2

4"

1

1 7

1

L-6 WC-2 S-1

R.R.135

FD-2TS

4"

1/2"

3/4"

1/2"1/2"

1/2"

4"

2" VTR

1 1/4"1 1/2"

1 1/4"

1/2"

1/2"

HB-1

3/4"

HA-1/2

4"

1

1

1

L-6

WC-2

R.R.137

FD-2TS

4"

1/2"

2"2" VTR

1 1/4" 1 1/4"

L-1

L-1

L-1

1

1

1

1 11

7

7

3

WC-2

WC-2

WC-1

WC-1

WC-1

WC-1

WC-2

WC-2

WC-1

WC-1

SS-1

L-1

L-1

L-1

WH-1

DF-2

CORRIDOR140

JAN.141

WOMEN'S142

FD-2TS

FD-2TS

FD-2TS

FD-2TS

CP-1

1/2"

4"

1/2"

2"

2"1"

1 1/2" VTR

3"

4"

1 1/4"

1 1/4"

2"

2"

4"

4" VTR

3"

3"

3/4"

2 1/2"

2 1/2"

2"

2"

2"

HB-1 3/4"

1 1/4"1 1/4"

2"1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"

1 1/4"2"

2"

2"

2"

2"

1 1/4"

HA-1

HA-1

1

1

7

1

L-2S-2

CATERING103

HOSPITALITY

CAFE150

2" VTR

1/2"

1"

1/2"

2"

3/4"

1/2"

1"

2"

IM-1

1

6

5

4 8

1

CHANGING146.1

6.1 6.9

3/4"

3/4"

3"

FD-2TS

2" VTR

BAPTISTRY146

1

1 1

1

1

1

1

11

1

4 ENLARGED PLUMBING PLANSCALE: 1/4" = 1'-0" 5 ENLARGED PLUMBING PLAN

SCALE: 1/4" = 1'-0" 6 ENLARGED PLUMBING PLANSCALE: 1/4" = 1'-0" 7 ENLARGED PLUMBING PLAN

SCALE: 1/4" = 1'-0"

2 ENLARGED PLUMBING PLANSCALE: 1/4" = 1'-0"

8 ENLARGED PLUMBING PLANSCALE: 1/4" = 1'-0"

9 ENLARGED PLUMBING PLANSCALE: 1/4" = 1'-0" 10 ENLARGED PLUMBING PLAN

SCALE: 1/4" = 1'-0" 11 ENLARGED PLUMBING PLANSCALE: 1/4" = 1'-0"

1 ENLARGED PLUMBING PLANSCALE: 1/4" = 1'-0" 3 ENLARGED PLUMBING PLAN

SCALE: 1/4" = 1'-0"

12 ENLARGED PLUMBING PLANSCALE: 1/4" = 1'-0"

aben
Cochise Tech & Development
Page 5: P001 PLUMBING SCHEDULES & GENER - Cochise Tech …cochisetech.net/wp-content/VMBC/Plans/Mechanical Plumbing Plan.pdf · prior to fabrication and installation the contractor shall

PLU

MB

ING

DETAILS

DO NOT SCALE DRAWING

P501

THIS

DR

AWIN

G IS C

LASSIFIE

D A

SP

AR

T O

F A

N U

NP

UB

LISHED

COLL

ECTIO

N O

F V

ISUAL

AR

T.

UND

ER

THE 1978

COP

YR

IGHT

ACT, IT IS A

N E

XCLU

SIV

EOR

IGIN

AL

WOR

K O

F A

UTHOR

SHIP

.NONE O

F T

HE P

ICTOR

IAL,

GR

AP

HIC

OR

TECHNIC

AL

CHAR

TS O

R D

RAWIN

GS

DEP

ICTED

ON T

HIS

SHEET M

AY

BE R

EP

ROD

UCED

OR

TR

ANSM

ITTED

IN A

NY F

OR

M O

RB

Y A

NY M

EANS W

ITHOUT T

HE

EXP

RESS P

RIO

R W

RITTEN

PER

MIS

SIO

N O

F T

HE A

RCHITECT.

THIS

PLA

N IS P

ROD

UCED

ONLY

FOR

THIS

PR

OJE

CT O

N T

HIS

SITE

AND

MAY N

OT B

E U

SED

AT

OTHER

LOCATIO

NS.

SHEET T

ITLE

:

OR

IGIN

AL

ISSUE: 2

-08-1

6

SEAL:

REV

DATE

DESCR

IPTIO

N

SHEET NUMBER:

PR

OJE

CT: A

C489

PR

OJE

CT:

BAP

TIS

T C

HUR

CH

SIE

RR

A V

ISTA, AZ

VILLA

GE M

EAD

OWS

OR

IGIN

AL

ISSUE

2-8-2

016

0

DANIE

L COOK

AR

CHITECT

290

9 W

ASHIN

GTO

N B

LVD

- O

GD

EN, UT

8440

1P

H: 80

0-5

52-

7137

www.B

GWSER

VIC

ES.c

om

SIE

RR

A V

ISTA, AR

IZONA 8

5635

140

7 S E

L CAM

INO R

EAL

2-28

-20

17OWNER

REVIS

IONS

1

ACCESS FRAME AND COVER TOP OF COVER SHALL BEFLUSH WITH TOP OF FLOOR

COUNTERSUNK SCREW

CAST IRON 1/8BEND

1/8 BEND IF CLEANOUT OCCURS AT END OF LINE

WASTE PIPING

BALANCE OF PIPING SAME ASCLEANOUT TO GRADE

FINISHED FLOOR

BRASS CLEANOUT PLUG AND FERRULE

MAY EXTEND AS A WASTE OR VENT LINE

FINISHED FLOOR

1/8" C.I. BEND

REFERENCED ON DRAWING AS "WCO"

BALANCE OF PIPING SAME AS CLEANOUT TOGRADE

PLUGGED TEE WITHCLEANOUT

CHROME WALL COVER AND SCREW

WALL

FINISHED GRADE

18"x18"x6" THICK CONCRETE PAD

C.I. PIPE (SIZE AS SHOWN ONDRAWINGS)

4" C.I. PIPE

CEMENT PATCH

4" C.I.

CLEANOUT PLUG

C.I. COVER AND FRAME

6" MIN.

VARIES

1'-0"1'-0"

6" LAYERS OF SAND, COMPACTABLE SOIL, OR APPROVED GRAVELPLACED AND COMPACTED 95% MIN. DRY DENSITY AASHTO T-180

CONCRETE SLAB

FINISHED FLOOR

CONCRETE (TYP.)

USE CAULKED OUTLET TYPECONNECTION.

DEEP SEAL P-TRAP

WATERPROOF MEMBRANEFLASHED INTO CLAMPING

COLLAR.

ADJUSTABLE HEAD SET FLUSH WITHFINISHED FLOOR

SLOPE SLOPE

2'-0" x 2'-0" BLOCKOUT

TRAFFIC GRATE

FULL GRATE UNLESS OTHERWISE SCHEDULEDOR SPECIFIED

DOME STRAINER

FLOOR SINK OUTLET (2" MINIMUM)

NO HUB CLAMP (TYP.)3" WASTE MINIMUM FOR COMBINATION WASTEAND VENT SYSTEM

2" x 3" REDUCER REQUIRED FOR ALL FLOOR SINKSFOR COMBINATION WASTE AND VENT SYSTEM

DRAIN BODYFLASHING CLAMP

FLOOR LINE

NON TRAFFIC GRATEHANGER ROD

DOUBLE NUT CLEVIS HANGERTO ROD

PIPE INSULATION

RIGID INSULATION AT SUPPORT22 GAUGE SHEET METAL INSULATION

SHIELD - 12" LONG

CARRIER PIPE

CLEVIS HANGER

12"

10"

12" MIN.ROOFING

ROOF DECKVENT

FLASHING

STAINLESS STEEL CLAMPSEALANT

1"

REDUCED PRESSURE BACKFLOW PREVENTOR. PROVIDE INLET AND OUTLET SHUT-OFF VALVES AND 4 TEST COCKS. (MAY BE SUBSTITUTED WITH DOUBLE CHECK

ASSEMBLY IF APPROVED BY LOCAL AUTHORITY HAVING JURISDICTION)

TO POTABLE WATERSYSTEM

GLOBE VALVE

PRESSURE GAGE (TYP)

UNION (TYP)

BALL VALVE (TYP)

PRESSURE REDUCING VALVE TO HANDLE --- GPM @ 65 PSIDISCHARGE PRESSURE

STRAINER WITHBLOWDOWN

INCOMING WATER SERVICE SLEEVE CONCRETE FLOOR

12" MINIMUMABOVE FLOOR

R

VACUUM RELIEF VALVE

EXPANSION TANKBALL VALVE

COLD WATER SUPPLY

AQUASTATRECIRCULATING HOT WATERLINE AND PUMP

P&T RELIEF VALVE

ANCHOR WATER HEATER TO WALL USE 1" X 18 GA. STRAP WITH#10 X 2 1/2" WOOD SCREWS. TYPICAL OF TWO PLACES.

DRAIN VALVE W/THREADED HOSE CONNECTION

RUN DISCHARGE LINE TO FLOOR DRAIN

DIELECTRIC UNION (TYPICAL)

HOT WATER

THERMOMETER

NOTE:

SET HOT WATER CIRCUIT SETTER TOAPPROXIMATELY 2.8 GPM. SET COLD WATERCIRCUIT SETTER TO PROVIDE 100º WATER ATDISCHARGE

ACCESS PANEL IN WALL3/4"3/4"

THERMOMETER

TO AUTO FILL VALVE PROVIDE BACKFLOWPREVENTER IF FILL NOZZLE IS BELOW BAPTISTRYWATER LEVEL.

BALL VALVE

3/4"BELL & GOSSETCIRCUIT SETTER

WATER LEVEL SENSOR

FILL VALVE ASSEMBLY WITH BACKFLOWPREVENTER

XL 11 KW HEATINGSYSTEM

ELECTRIC DRAIN SYSTEM

1 FLOOR CLEANOUTSCALE: N.T.S. 2 WALL CLEANOUT

SCALE: N.T.S. 3 CLEANOUT TO GRADESCALE: N.T.S. 4 PIPE UNDER SLAB

SCALE: N.T.S.

5 FLOOR DRAINSCALE: N.T.S. 6 FLOOR SINK

SCALE: N.T.S.7 INSULATED PIPE HANGER

SCALE: N.T.S.8 VENT THRU ROOF (FLAT)

SCALE: N.T.S.

9 WATER PRESSURE REDUCING VALVE STATIONSCALE: N.T.S. 10 ELECTRIC WATER HEATER DETAIL

SCALE: N.T.S. 11 BAPTISTRY WATER PIPING DETAILSCALE: N.T.S. 12 BAPTISTRY DETAIL

SCALE: N.T.S.

48

aben
Cochise Tech & Development
Page 6: P001 PLUMBING SCHEDULES & GENER - Cochise Tech …cochisetech.net/wp-content/VMBC/Plans/Mechanical Plumbing Plan.pdf · prior to fabrication and installation the contractor shall

MECHANIC

AL

SCHED

ULE

S& G

ENER

AL

NOTES

DO NOT SCALE DRAWING

M001

THIS

DR

AWIN

G IS C

LASSIFIE

D A

SP

AR

T O

F A

N U

NP

UB

LISHED

COLL

ECTIO

N O

F V

ISUAL

AR

T.

UND

ER

THE 1978

COP

YR

IGHT

ACT, IT IS A

N E

XCLU

SIV

EOR

IGIN

AL

WOR

K O

F A

UTHOR

SHIP

.NONE O

F T

HE P

ICTOR

IAL,

GR

AP

HIC

OR

TECHNIC

AL

CHAR

TS O

R D

RAWIN

GS

DEP

ICTED

ON T

HIS

SHEET M

AY

BE R

EP

ROD

UCED

OR

TR

ANSM

ITTED

IN A

NY F

OR

M O

RB

Y A

NY M

EANS W

ITHOUT T

HE

EXP

RESS P

RIO

R W

RITTEN

PER

MIS

SIO

N O

F T

HE A

RCHITECT.

THIS

PLA

N IS P

ROD

UCED

ONLY

FOR

THIS

PR

OJE

CT O

N T

HIS

SITE

AND

MAY N

OT B

E U

SED

AT

OTHER

LOCATIO

NS.

SHEET T

ITLE

:

OR

IGIN

AL

ISSUE: 2

-08-1

6

SEAL:

REV

DATE

DESCR

IPTIO

N

SHEET NUMBER:

PR

OJE

CT: A

C489

PR

OJE

CT:

BAP

TIS

T C

HUR

CH

SIE

RR

A V

ISTA, AZ

VILLA

GE M

EAD

OWS

OR

IGIN

AL

ISSUE

2-8-2

016

0

DANIE

L COOK

AR

CHITECT

290

9 W

ASHIN

GTO

N B

LVD

- O

GD

EN, UT

8440

1P

H: 80

0-5

52-

7137

www.B

GWSER

VIC

ES.c

om

SIE

RR

A V

ISTA, AR

IZONA 8

5635

140

7 S E

L CAM

INO R

EAL

2-28

-20

17OWNER

REVIS

IONS

1

T

H

C

TITLE

SECTION

SHEET #

MECH ROOF PLAN

DETAIL #

SHEET #

1

EQUIPMENT CALLOUT

SCOPE OF WORK FOR LENNOX PROVIDED EOC, AND CONTROL CONTRACTOR CONTROL INSTALLATIONAND MECHANICAL CONTRACTOR CONTRACTED INDEPENDENT TEST AND BALANCE.

A. EQUIPMENT OPERATIONS CHECK (EOC) (LENNOX PROVIDED) THROUGH BGWS

• TEST ALL LENNOX EQUIPMENT BASED ON THE STANDARD LENNOX EOC REPORT.• CONTACT LENNOX SUPPORT WITH ANY EQUIPMENT DEFICIENCIES AND COORDINATE REPAIROR REPLACEMENT AS NECESSARY TO ASSIST IN PROVIDING OPERATIONAL EQUIPMENT PRIORTO OPENING DATE.• DISTRIBUTE COPIES OF EOC REPORT TO OWNER, MECHANICAL CONTRACTOR ANDENGINEER.

B. TEST AND BALANCE (TAB) (MECHANICAL CONTRACTOR CONTRACTED INDEPENDANT TEST ANDBALANCE)

• UPON ARRIVAL TO THE SITE, INSPECT MECHANICAL SYSTEM AND NOTE ANY DEFICIENCIESTHAT COULD PREVENT PROPER OPERATION AND/OR BALANCING OF THE MECHANICALSYSTEM TO THE GENERAL CONTRACTOR AND MECHANICAL CONTRACTOR.• INSPECT ALL MECHANICAL EQUIPMENT FOR PROPER INSTALLATION PER MEP DESIGN.• TEST ALL MECHANICAL EQUIPMENT PER NEBB STANDARDS FOR AIR BALANCE FOR PROPEROPERATION.• THE BALANCING OF THE MECHANICAL SYSTEM WILL BE PERFORMED TO MEET NEBBSTANDARDS UNLESS SPECIFICALLY REQUESTED OTHERWISE, IN WRITING, BY OWNER OROWNERS ENGINEERING FIRM.• BALANCE ALL RTU’S, GRILLS, REGISTERS AND EXHAUST FANS PER MECHANICAL DESIGN ASNOTED ON MEP DRAWINGS PER NEBB STANDARDS FOR AIR BALANCE.• GENERATE A FIELD REPORT OF ANY OUTSTANDING MECHANICAL DEFICIENCIES, IF ANY, THATCOULD NOT BE RESOLVED DURING THE TAB VISIT AND DISTRIBUTE A COPY TO THE GENERALCONTRACTOR, MECHANICAL CONTRACTOR AND ENGINEER AND NOTE IF A RE-VISIT WILL BEREQUIRED.• GENERATE A COMPLETE TAB REPORT AND SUBMIT TO THE OWNER ,MECHANICALCONTRACTOR AND ENGINEER WITHIN ONE (1) WEEK OF THE COMPLETION OF THE AIRBALANCE.

C. CONTROL INSTALLATION (BGW SUPPLY CONTRACTED CONTROL CONTRACTOR)

• PROVIDE CONTROL INSTALLATION DRAWINGS SHOWING CABLE RUNS ANDLOCATIONS.• PROVIDE, PLENUM COMMUNICATION CABLE BETWEEN RTUS )INSTALLED BYELECTRICAL CONTRACTOR.)• PROVIDE, AND TERMINATE PLENUM CABLE FOR LENNOX PROVIDED SPACESENSORS, HUMIDITY SENSORS AND CO2 SENSORS. WIRE INSTALLATION ANDCONDUIT (IF REQUIRED) BY ELECTRICAL CONTRACTOR.• PROGRAM AND COMMISSION CONTROLS AS REQUIRED TO MEET OWNERSPECIFICATIONS.• PROVIDE REPORT DETAILING COMMISSION OF CONTROLS AND SUBMIT TOOWNER.• PROVIDE OWNER OPERATORS 2 HOURS OF TRAINING.

D. WARRANTY

• LENNOX PROVIDES A ONE (1) YEAR PARTS WARRANTY ON THE WORKMANSHIP OF ALLLENNOX PROVIDED MATERIAL, AND EQUIPMENT, STARTING AT CERTIFICATE OF OCCUPANCY.

E. CLARIFICATIONS AND RESPONSIBILITY OF MECHANICAL & ELECTRICAL CONTRACTOR

• CONDUIT, RACEWAYS SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICALCONTRACTOR. CONTROL CONTRACTOR WILL REQUIRE A CONDUIT, AND WIRE RACEWAY PATHFOR THE SPACE SENSORS IN AREAS NOT ACCESSIBLE, SUCH AS WALLS, SANCTUARY ANDGYMNASIUM AREAS, SUCH THAT ELECTRICAL CONTRACTOR CAN INSTALL CONTROL WIRE ANDSPACE SENSORS.• CABLE (PROVIDED BY THE CONTROL CONTRACTOR) SHALL BE PULLED OR INSTALLED ATEACH LOCATION SHOWN ON THE CONTROL DRAWINGS. (INSTALLED BY ELECTRICALCONTRACTOR)• ELECTRICAL CONTRACTOR SHALL INSTALL ALL SENSORS AND PANEL.• THE EOC, TAB, AND CONTROL INSTALLATION SCOPE WILL BE COORDINATED WITH THEGENERAL AND/OR MECHANICAL CONTRACTOR.• THE GENERAL OR MECHANICAL CONTRACTOR WILL NOTIFY LENNOX AND THE CONTROLCONTRACTOR WITH AT LEAST FOURTEEN (14) DAYS ADVANCED NOTICE THAT THE HVACSYSTEM IS 100% COMPLETE AND READY FOR EOC AND CONTROL TERMINATION.O HIGH VOLTAGE MUST BE CONNECTED TO EACH UNITO GAS MUST BE CONNECTED TO EACH UNITO PROPER PHASE ROTATION MUST BE CONFIRMED AT THE DISCONNECTO ALL STAGES OF HEATING AND COOLING MUST BE CONFIRMED OPERATIONALO UNITS CAN BE PUT IN STANDALONE OPERATION BY SETTING THE UNIT OPERATION TO LCONNECTION/RETURN AIR BACK UP MODE. CONSULT THE M-2 PRODIGY CONTROL MANUALFOR INSTRUCTIONS OR CONTACT LENNOX NATIONAL ACCOUNT TECHNICAL SUPPORT1-800-367-6285 FOR ASSISTANCE.• THE MECHANICAL CONTRACTOR WILL PROVIDE A REPRESENTATIVE ON-SITE DURING THEEOC SERVICE TO ADDRESS DEFICIENCIES FOUND. LENNOX WILL MAKE ALL REASONABLEATTEMPTS TO RESOLVE DEFICIENCIES, IF ANY, WITH THE MECHANICAL CONTRACTOR WHILEONSITE.

F. WORKING HOURS• WORKING HOURS SHALL FOLLOW CONSTRUCTIONS HOURS OR AS REQUESTED BY THEGENERAL CONTRACTOR

1

1

RTU1

1

1

1

1

MECHANICAL GENERAL NOTES MECHANICAL LEGEND

DROP

RISE

DROP

20x10

16''Ø

RISE

DROP

RISE

16''Ø

FSD

16x10

FD

SD

E-1CFM

D-1CFM

D-1CFM

20x10

20x10

20x10 14''Ø

12x10

12x10

D-1CFM

D-1CFM

16''Ø 6''Ø

EXHAUST AIR REGISTER - SQUARE

SUPPLY DIFFUSER - SQUARE

FIRE/SMOKE DAMPER

SMOKE DAMPER

LINEAR DIFFUSERS - SIDE MOUNT

FLEXIBLE DUCT

FIRE DAMPER

MANUAL BALANCING DAMPER

SLOPED DUCT DROP

SLOPED DUCT RISE

FLAT OVAL DUCT

DUCT - RISE

UNDER FLOOR ROUND DUCT

POSITIVE PRESSURE DUCT - DROP

ROUND DUCT

RECTANGULAR DUCT

ROUND DUCT - DROP

ROUND DUCT - RISE

SOUND ATTENUATOR

ROUND TO ROUND TRANSITION

RECTANGULAR TRANSITION - OFFSET

RECTANGULAR TO ROUND TRANSITION

RECTANGULAR TRANSITION

LINEAR DIFFUSER - BOTTOM MOUNT

SUPPLY DIFFUSER - ROUND

SECTION CALLOUT

DETAIL CALLOUT

THERMOSTAT OR TEMPERATURE SENSOR

HUMIDISTAT

CARBON DIOXIDE DETECTOR

POINT OF CONNECTION

POINT OF DEMOLITION

REVISION DELTA

KEYED NOTE CALLOUT

M3011

SCALE: 1/8" = 1' - 0"

M5011

R-1CFM RETURN AIR REGISTER - SQUARE

97ºF Db SUMMER

HVAC DESIGN DATA

OUTSIDE DESIGN TEMPS.: 63ºF Wb SUMMER24ºF Db WINTER

DESIGN ALTITUDE: 4600 FT.

INTERIOR DESIGN DATA

ALL

SUMMER WINTER

Db

74º

%HUMIDITY

50% 72º 40%

Db %HUMIDITY

NOTE:

ALL ROUND DUCTWORK, FITTINGS AND VOLUME CONTROL DAMPERS ARE TO BESPIROSAFE GASKETED DUCT MANUFACTURED BY LINDAB. BGW HAS A NATIONALACCOUNT AGREEMENT WITH LINDAB INC. FOR THIS PROJECT CONTACT LINDABTAKE OFF DEPARTMENT AT (757) 488-7234 EXT. 381 FOR SPIRAL DUCT QUOTATION.

THE DRAWINGS INDICATE DIAGRAMMATICALLY THE EXTENT OF THE WORK. DUE TOTHE SCALE OF THE DRAWINGS, OFFSET, FITTINGS, AND ACCESSORIES MAY NOT BEINDICATED. WORK INDICATED, BUT HAVING DETAILS OMITTED, SHALL BECOMPLETELY PROVIDED BY CONTRACTOR TO PERFORM FUNCTION INTENDED ATNO ADDITIONAL COST.

CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, PLUMBING,MECHANICAL, AND ELECTRICAL DRAWINGS AND SPECIFICATIONS TO AVOIDCONFLICT WITH OTHER TRADES. MINOR VARIATIONS IN LOCATION OF EQUIPMENTSHALL BE MADE ON WRITTEN APPROVAL OF THE ENGINEER AT NO ADDITIONALCOST.

MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PAYMENT, ORDERING, DELIVERYCOORDINATION RECEIVING AND INSTALLATION OF ALL THE LINDAB SUPPLIEDMATERIAL.

THE CONTRACTOR IS REQUIRED TO REVIEW THE MECHANICAL DRAWINGS,MAKING ANY NECESSARY MODIFICATIONS TO ACCOUNT FOR FIELD VARIANCESAND SEND THESE FINAL DRAWINGS TO LINDAB FOR A DUCT QUOTATION. THESEREVISED PLANS ARE TO BE E-MAILED 72 HOURS BEFORE BID TIME TO LINDAB TAKEOFF FOR A PRODUCT QUOTATION.

THE CONTRACTOR MUST APPROVE THE FINAL DUCT DRAWINGS AND BILL OFMATERIAL BEFORE PLACING THE ORDER WITH LINDAB.

NOTE:

MECHANICAL CONTRACTOR TO REVIEW ALL DRAWINGSFOR CONFLICTS WITH STRUCTURE AND OTHER TRADES.MECHANICAL CONTRACTOR TO RESOLVE ALL CONFLICTSWITH ENGINEER PRIOR TO ORDERING, FABRICATING ORINSTALLING DUCTWORK.

NOTE:

1) SPACE ABOVE CEILING IS TO BE USED AS A RETURN AIRPLENUM. ALL MATERIALS TO BE PLENUM RATED.

2) ALL TERMINAL SUPPLY DUCT BRANCHES TO BEEQUIPPED WITH MANUAL BALANCING DAMPER.

3) FLEX DUCT (MAXIMUM 60" LONG) TYPICAL ON EACHDIFFUSER EXCEPT IN EXPOSED APPLICATIONS.

4) PROVIDE TURNING VANES IN ALL RECTANGULARELBOWS. �

EF-1

SYMBOL

GREENHECK G-123-B ROOF

CFM

ARRANGEMENT,ROTATION &DISCHARGE

DOWNBLAST 825

EXHAUST FAN SCHEDULE

0.35 12"

SPECIFICATIONSECTION 233423

HEIGHTABOVE ROOF

(INCHES)SP "WGTYPEMANUFACTURER AND

MODEL NO.

OPERATINGWEIGHT

(LBS.)ACCESSORIES AND

REMARKS

995

RPM

FANDETAIL

NO. RPM

MOTOR

1140

H.P.

ELECTRICAL

VOLT/Ø/Hz.

76

CONTROLMETHOD

1/6

EF-2

EF-3 150 0.35 12"1323 1550 471/20

EF-4

GREENHECK G-080-D WALL SWITCH

EF-5

5

0.3929 1140 661/6GREENHECK G-097-B

EF-6

EF-7

EF-8

120/1/60 MOTORIZED DAMPER, ROOF CURB,SPEED CONTROL

GREENHECK G-123-B 750 0.35 12" WALL SWITCH958 1140 761/6

WALL SWITCH

WALL SWITCH

12"

WALL SWITCH

WALL SWITCH

WALL SWITCH

EF-9

24" x 24"

OVERALLSIZE

DIFFUSER AND GRILLE SCHEDULE

D-1

SYMBOL

TITUS TMS

MIN./MAX.CFM

0/100 4-WAY

BLOW

6"Ø

NECKSIZE

SUPPLY AIR

TYPEACCESSORIESAND REMARKS

LAY-IN

D-2 TITUS TMS 100/240 8"Ø

D-3 TITUS TMS 240/400 10"Ø

24" x 24"4-WAY SUPPLY AIR

24" x 24"4-WAY SUPPLY AIR

LAY-IN

LAY-IN

SPECIFICATIONSECTION 233713

MANUFACTURER ANDMODEL NO.

D-4 TITUS TMS 400/520 12"Ø24" x 24"4-WAY SUPPLY AIR LAY-IN

D-7

250/360 SUPPLY AIR NECK MOUNT

D-8

400/550 SUPPLY AIR NECK MOUNT

24" x 24"E-1 0/130 4-WAY 6"Ø LAY-IN

E-2 130/260 8"Ø

E-3 260/400 10"Ø

24" x 24"4-WAY

24" x 24"4-WAY

LAY-IN

LAY-IN

24" x 24"D-5 TITUS 300FL 400/600 DOUBLEDEFLECTION SUPPLY AIR

D-6

24" x 24"R-1 TITUS PXP 500/1100 N/A RETURN AIR LAY-IN

R-2 TITUS PXP 0/500 24" x 12" LAY-INRETURN AIRN/A

N/A

N/A

EXHAUST AIR

EXHAUST AIR

EXHAUST AIR

120/1/60

120/1/60

120/1/60

1. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO CONSTRUCT A COMPLETE, OPERATIONAL HVAC SYSTEM FOR THEENTIRE PROJECT AS SHOWN ON THESE DRAWINGS, INCLUDING ALL NECESSARY FEES AND PERMITS.

2. THE ENTIRE INSTALLATION SHALL CONFORM TO THE MOST RECENTLY ADOPTED REQUIREMENTS OF THE INTERNATIONAL MECHANICALCODE, INTERNATIONAL PLUMBING CODE, INTERNATIONAL BUILDING CODE, AND ALL OTHER APPLICABLE CITY, COUNTY, AND STATE CODESAND REGULATIONS IN EFFECT AT THE DATE OF THE PERMITTING.

3. COORDINATE THE INSTALLATION OF ALL HVAC PIPING, DUCTWORK, AND EQUIPMENT WITH PLUMBING PIPING, PLUMBING EQUIPMENT, FIREPROTECTION PIPING AND ALL OTHER TRADES INCLUDING BUT NOT LIMITED TO: THE MECHANICAL CONTRACTOR, ELECTRICALCONTRACTOR, FIRE PROTECTION CONTRACTOR, GENERAL CONTRACTOR, AND ANY CONTRACTOR HIRED DIRECTLY BY THE OWNER PRIORTO FABRICATION AND INSTALLATION. WHERE CONFLICTS MAY OCCUR, THEY SHALL BE RESOLVED PRIOR TO INSTALLATION.

4. THE DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENTS AND THE EXTENT OF THE SYSTEM. IT SHALL BE THE WORK OF THECONTRACTOR TO MAKE SUCH SLIGHT ALTERATIONS AS MAY BE NECESSARY TO MAKE THE SYSTEM COMPLETE AND OPERATIONAL INACCORDANCE WITH THE DESIGN INTENT. MAJOR DEVIATIONS SUCH AS CHANGES IN COMPONENT SIZES, WEIGHTS, QUANTITIES, ORMATERIAL REQUIRE PRIOR APPROVAL BY THE CONSULTING ENGINEER.

5. ALL HVAC INFORMATION IS NOT SHOWN ON THE HVAC DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATINGINFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTS INCLUDING ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICALDRAWINGS.

6. THE WORKING DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, THEY DO NOT SHOW EVERY OFFSET,BEND OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FOR HVAC EQUIPMENT ANDPIPING SHALL BE CHECKED AND COORDINATED WITH THE ARCHITECTURAL, MECHANICAL, STRUCTURAL AND ELECTRICAL DRAWINGS.

7. SPACE ABOVE ALL CEILINGS IS EXTREMELY LIMITED. CAREFUL COORDINATION IS REQUIRED WITH ALL TRADES BEFORE ANY PIPE, DUCT,OR EQUIPMENT IS ORDERED AND/OR INSTALLED. 1/8" SCALE SHOP DRAWINGS (SUBMITTED TO BGW FOR APPROVAL) ARE REQUIRED FORALL DIVISION 23 WORK. 1/8" SCALE LINDAB DRAWINGS MUST BE REVIEWED BY MECHANICAL CONTRACTOR AND RETURNED TO BGW FORMODIFICATION PRIOR TO DUCTWORK BEING ORDERED. ANY CONFLICTS AND/OR CHANGES FOUND DURING INSTALLATION THAT RESULTFROM LACK OF COORDINATION BY THE CONTRACTORS DURING THE SHOP DRAWING PROCESS ARE THE RESPONSIBILITY OF THECONTRACTOR.

8. THE DRAWINGS AND SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT EACH OTHER AND THEY SHALL BE INTERPRETED AS ANINTEGRAL UNIT WITH THE ITEMS SHOWN ON ONE AND NOT THE OTHER BEING FURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLEDOUT IN BOTH.

9. DETAILS: THE CONTRACTOR IS RESPONSIBLE TO REVIEW AND USE WHERE APPROPRIATE ALL OF THE MECHANICAL DETAILS SHOWN ONTHE DRAWINGS. DETAILS MAY OR MAY NOT BE CALLED OUT ON THE DRAWINGS WITH SYMBOLS OR KEYED NOTES. ANY CHANGESRESULTING FROM FAILURE TO INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED DETAILS IS THE RESPONSIBILITY OF THECONTRACTOR.

10. PREPARE 6 COPIES OF SUBMITTALS IN AN INDEXED, LABELED FOLDER CONTAINING FULL PERFORMANCE, MATERIAL AND INSTALLATIONINFORMATION ABOUT ALL EQUIPMENT, PIPING, COMPONENTS AND ACCESSORIES TO BE USED.

11. THE STRUCTURE SHOWN ON ALL DETAILS MAY OR MAY NOT PERTAIN TO A PORTION OR ANY PORTION OF THE BUILDING. COORDINATEMOUNTING REQUIREMENTS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.

12. ANY PART OF THIS INSTALLATION THAT FAILS, IS UNFIT, OR BECOMES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED ORREPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

13. ALL EQUIPMENT SHALL PROVIDE THE SCHEDULED PERFORMANCE AT THE SITE ALTITUDE.

14. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. PROVIDEALL FITTINGS, TRANSITIONS, VALVES, DAMPERS, AND OTHER DEVICES AND ACCESSORIES REQUIRED FOR A COMPLETE, WORKABLEINSTALLATION.

15. THE MECHANICAL CONTRACTOR SHALL FURNISH ALL REQUIRED MOTORS. ALL MOTOR STARTING EQUIPMENT, WHEN NOT A PART OF THEEQUIPMENT, WILL BE INSTALLED BY THE ELECTRICAL CONTRACTOR.

16. THE ELECTRICAL CONTRACTOR SHALL RUN CONDUIT FOR ALL HVAC CONTROL WIRING. CONDUIT SHALL RUN FROM THERMOSTATLOCATION TO ABOVE CEILING IN FINISHED AREAS AND TO MECHANICAL UNIT WHERE THERE IS NO CEILING. MECHANICAL CONTRACTORWILL PROVIDE AND INSTALL PLENUM RATED CABLE. MECHANICAL CONTRACTOR SHALL COORDINATE LOCATION AND QUANTITY OF CONDUITWITH ELECTRICAL CONTRACTOR.

17. THE CONTRACTOR IS RESPONSIBLE FOR HVAC EQUIPMENT CHECK-IN, SAFEKEEPING, AND DAMAGE.

18. PROPERLY LUBRICATE ALL PIECES OF EQUIPMENT BEFORE TURNING THE SYSTEM OVER TO THE OWNER.

19. TWO OPERATING AND MAINTENANCE MANUALS SHALL BE PROVIDED IN HARD BACK LOOSE LEAF BINDERS. MANUALS SHALL CONTAINPRODUCT CUT SHEETS AND OPERATING AND MAINTENANCE INSTRUCTIONS ON ALL EQUIPMENT, ACCESSORIES, FIXTURES, VALVES, ETC.,PROVIDED FOR THE PROJECT.

20. UPON COMPLETION OF THE WORK, REMOVE ALL SURPLUS MATERIALS AND RUBBISH. MAKE ALL REQUIRED PATCHING AND REPAIRS OFOTHER TRADES' WORK DAMAGED BY THIS CONTRACTOR, AND LEAVE THE PREMISES IN A CLEAN, ORDERLY CONDITION.

21. THE CONTRACTOR SHALL OPERATE THE SYSTEM AND DEMONSTRATE ALL ASPECTS TO THE ENGINEER AND/OR OWNER, TO PROVE ITSOPERATION. ALL FILTERS USED DURING CONSTRUCTION SHALL BE REPLACED PRIOR TO THE TEST RUN PERIOD.

22. THE CONTRACTOR SHALL GUARANTEE THE HVAC SYSTEM INCLUDING DUCTWORK FOR A PERIOD OF ONE YEAR FROM THE DATE OFCERTIFICATE OF OCCUPANCY. CONTRACTOR TO INCLUDE PRICE FOR FIRST YEAR LABOR WARRANTY ON ALL OWNER SUPPLIED EQUIPMENT.

23. THE CONTRACTOR SHALL, DURING CONSTRUCTION, MAINTAIN A SET OF AS-BUILT REDLINED RECORD DRAWINGS AT THE PROJECT SITE.ALL CHANGES IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, AND ACCESSORIES SHALL BE RECORDED. THESE REDLINES SHALL BEGIVEN TO THE ARCHITECT/ENGINEER AFTER THE FINAL INSPECTION.HVAC GENERAL NOTES.

24. RECORD DRAWINGS SHALL BE PROVIDED TO THE OWNER, ALONG WITH A COMPLETE SET OF EQUIPMENT OPERATING ANDMAINTENANCE MANUALS. REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY IDENTIFIED AND THE NAMES AND ADDRESSES OFAT LEAST ONE SERVICE AGENCY SHALL BE PROVIDED.

BI-POLAR ION GENERATORS

AND MODEL NO.MANUFACTURERSYMBOL

ELECTRICAL

VOLTS/Ø/Hz APPROX. WATTS

ACCESSORIESAND REMARKS

SPECIFICATIONSECTION233333

MAX. CFMINSTALLED IN RTUNO. & (QUANTITY)

AS ALLOWED BY THE 2012 INTERNATIONAL MECHANICAL CODE AND ASHRAE 62-2004 THE OUTSIDE AIR IN THE BUILDING HAS BEEN REDUCED TO 5 CFM PER PERSON.THE SCHEDULED ION GENERATORS REDUCE THE BUILDING POLLUTANTS AND PROVIDE IMPROVED AIR QUALITY WHILE ACHIEVING ENERGY SAVINGS.

IG-8 1,400 120/1/60 1 WATTS INTERLOCK WITH FAN CIRCUITPLASMA AIR 7100 8(1)

IG-9 2,800 120/1/60 2 WATTS INTERLOCK WITH FAN CIRCUITPLASMA AIR 7200 7(1), 9(1)

IG-10 4,200 120/1/60 3 WATTS INTERLOCK WITH FAN CIRCUITPLASMA AIR 7300 1(2), 2(2), 3(2), 4(1), 5(2), 6(1),

UNITS SUPPLIED BY BGW SUPPLY INC. A DIVISION OF BGW ARCHITECTS THROUGH A NATIONAL ACCOUNT

TITUS PAR

TITUS PAR

TITUS PAR

ROOF DOWNBLAST

ROOF DOWNBLAST

ROOF DOWNBLAST

ROOF DOWNBLAST

ROOF DOWNBLAST

ROOF DOWNBLAST

ROOF DOWNBLAST

ROOF DOWNBLAST

5

5

5

5

5

5

5

5

75

75

75

75

75

75

WALL SWITCH

WALL SWITCH

EOC, TAB, & CONTROL SCOPE OF WORK

TITUS 300FL

TITUS 300FL

LAY-IN14" x 14"

10" x 10"

14" x 14"

12" x 12"

16" x 16"

100/250 SUPPLY AIR WALL MOUNTTITUS 300FL 12" x 4"14" x 6"

62" x 18"R-3 TITUS 350FL 1000/3000 N/A RETURN AIR WALL MOUNT

R-4 5000/7000 74" x 38" RETURN AIRN/A

26" x 8"R-5 400/500 N/A RETURN AIR

R-6 200/400 14" x 14" RETURN AIRN/A

TITUS 350FL

TITUS 350FL

TITUS 350FL

WALL MOUNT

WALL MOUNT

WALL MOUNT

60" x 16"

72" x 36"

24" x 6"

12" x 12"

0.3929 1140 661/6GREENHECK G-097-B 12" 120/1/60

0.3929 1140 661/6GREENHECK G-097-B 12" 120/1/60

0.3929 1140 661/6GREENHECK G-097-B 12" 120/1/60

0.3929 1140 661/6GREENHECK G-097-B 12" 120/1/60

0.3929 1140 661/6GREENHECK G-097-B 12" 120/1/60

WEIGHT(LBS)

165

REFRIGERANTLINES

18.0

VOLT/Ø/Hz.

HP-2

OUTDOOR UNIT

46" x 14" x 12" 75

DIMENSIONSW" x H" x D"

CFMRANGE

OUTDOORTEMP (ºF)

570/700

LIQUIDINDOOR

TEMP (ºF)

1/4"

COOLINGCAPACITY

(BTUH)

24,000 208/1/6038" x 38" x 14"20,000

HEATINGCAPACITY

@ 47º(BTUH")

HP-1

SYMBOLMITSUBISHI INDOOR PKA-A24KA4

OUTDOOR PUZ-A24NHA4

SPLIT HEAT PUMP UNIT SCHEDULE

MCA

208/1/60

SPECIFICATIONSECTION 238126

GASVOLT/Ø/Hz.LOCATIONWEIGHT

(LBS)MANUFACTURER AND

MODEL NO.

95

ACCESSORIES ANDREMARKS

0.36

DIMENSIONSW" x H" x D"

46

FLA

1/2"

INDOOR UNIT

CONDENSATE PUMP, DRAIN PAN OVERFLOWSWITCH, WALL MOUNT THERMOSTAT

MASTERCONTROL 131

RACKROOM 133

DOUBLEDEFLECTION

DOUBLEDEFLECTION

DOUBLEDEFLECTION

G-1 0/475 24" x 24" TRANSFERN/ATITUS PAR LAY-IN16"Ø

165 18.046" x 14" x 12" 75570/700 1/4"24,000 208/1/6038" x 38" x 14"20,000MITSUBISHI INDOOR PKA-A24KA4OUTDOOR PUZ-A24NHA4 208/1/60 950.3646 1/2" CONDENSATE PUMP, DRAIN PAN OVERFLOW

SWITCH, WALL MOUNT THERMOSTAT

G-2 0/475 24" x 24" TRANSFERN/ATITUS PAR LAY-IN12"Ø

INTEGRAL TAMPER PROOF THERMOSTAT120/1/6051201500WALL RECESSEDSPRINKLER

VOLTS/Ø/CYCLESBTU/HR.

HEATINGCAPACITY

WATTSLOCATION

QMARK CWH1151DS

SYMBOL

EH-1

ELECTRIC HEATER SCHEDULE SPECIFICATIONSECTION 238239

MOUNTINGARRANGEMENT

MANUFACTURER ANDMODEL NO.

10.5

OPERATINGWEIGHT

(LBS.)ACCESSORIES AND

REMARKS

MOTORIZED DAMPER, ROOF CURB,SPEED CONTROL

MOTORIZED DAMPER, ROOF CURB,SPEED CONTROL

BACKDRAFT DAMPER, ROOF CURB,SPEED CONTROL

BACKDRAFT DAMPER, ROOF CURB,SPEED CONTROL

BACKDRAFT DAMPER, ROOF CURB,SPEED CONTROL

BACKDRAFT DAMPER, ROOF CURB,SPEED CONTROL

BACKDRAFT DAMPER, ROOF CURB,SPEED CONTROL

BACKDRAFT DAMPER, ROOF CURB,SPEED CONTROL

EF-10 ROOF DOWNBLAST 5380 THERMOSTAT0.351355 1550 481/15GREENHECK G-090-D 12" 120/1/60 MOTORIZED DAMPER, ROOF CURB,SPEED CONTROL

ACCESSORIES ANDREMARKS

6000

SYMBOL

RTU-1 17.5

DESIGN COOLING

78.61470 166,200 147,200 62.0 105 288.0 1"

DESIGN HEATINGMOTOR

RPMMOCP

10086

MCA

3

H.P.

TOTAL UNIT

208/3/60 1725

VOLT/Ø/Hz.

ELECTRICAL

2800 1), 2), 4), 8), 11), 12), 15), 16), 19)

ROOFTOP UNITS SUPPLIED BY BGW SUPPLY INC. A DIVISION OF BGW ARCHITECTS THROUGH A LENNOX NATIONAL ACCOUNT

DOWN

DISCHARGE

ROOFTOP UNIT SCHEDULE (GAS HEAT)

RTU-2

RTU-4

17.5

600015 76.4148,700 127,300 61.6 208.0 8069 1725 2500

360.0

260.0

RTU-3 17.5

SPECIFICATIONSECTION 237413

MANUFACTURER ANDMODEL NO.

NOMINALTONS

COOLING

NOMINALHEATINGCAPACITY

(MBH)TOTALCFM

MIN. O.A.CFM

E.S.P.("Wg)

TOTALCAPACITY

SENSIBLECAPACITY

EDB(°F)

EWB(°F)

O.A.(°F)

INPUT(MBH)

OUTPUT(MBH) GAS INLET

OPERATINGWEIGHT

(LBS.)

LENNOX LGH210H4B

360.0

360.0

6000

6000 1470

835

1.0

1470

DX COOLING

(S)EER

EFFICIENCY

12.0

12.0

6000RTU-5 15 77.71300 149,300 131,900 61.9 208.0 8069 1725 2500

RTU-6

RTU-8

12.5 76.8 61.6 1725

11003 75.228,700 23,400 61.3 52.0 3023 0.5 1725 900

260.0

65.0

RTU-7 6 76.352,900 61.5 17250.8

1600

1100

240.0

108.0

5000

2400 300

75

120,200

62,300

108,600 192.0

86.0

5

2

8070

5035

735

12.0

11.0

12.0

18.0

1), 2), 8), 11), 12), 15), 16), 19)

1600RTU-9 4 76.3200 40,800 34,800 61.5 57.0

3/4"

4028 0.75 1725 90070.0 17.6

DOWN

DOWN

DOWN

DOWN

DOWN

DOWN

DOWN

DOWN

1/2"

ACCESSORIES: 1) ECONOMIZER WITH DUAL ENTHALPY CONTROL. 2) RETURN AIR SMOKE DETECTOR. 3) SUPPLY AIR SMOKE DETECTOR. 4) CO2 SENSOR WALL MOUNTED. 5) HUMIDITROL. 6) VIBRATION ISOLATION CURB. 7) SEISMIC RATED CURB. 8) POWER EXHAUST. 9) HUMIDISTAT. 10) PROGRAMMABLE THERMOSTAT. 11) FACTORY INSTALLED DISCONNECT. 12) STANDARD LENNOX CURB. 13) VERTICAL VENT EXTENSION. 14) COMBUSTION AIR EXTENSION. 15) NETWORK BACNEY MODULE AND SENSORS. 16) GFCI OUTLET, FIELD WIRED.17) LP KIT-FIELD INSTALLED. 18) COIL GUARDS-FIELD INSTALLED. 19) AUTO BELT TENSIONER.

LENNOX LGH210H4B

LENNOX LGH210H4B

LENNOX LGH180H4B

LENNOX LGH150S4B

LENNOX LGH072H4B

LENNOX LGH036H4E

LENNOX LGH048H4E

LENNOX LGH180H4B

0.8

0.8

1.0

1.0

1.0

1.0

1.0

105

105

105

105

105

105

360.0

260.0

260.0

65.0

240.0

108.0

70.0

1/2"

1/2"

1"

1"

1), 2), 11), 12), 15), 16), 19)

1), 2), 11), 12), 15), 16)

1), 2), 11), 12), 15), 16)

1), 2), 4), 8), 11), 12), 15), 16), 19)

1), 2), 4), 8), 11), 12), 15), 16), 19)

78.6166,200 147,200 62.0 105 288.0 1" 10086 3 1725 2800 1), 2), 4), 8), 11), 12), 15), 16), 19)12.0360.0

78.6166,200 147,200 62.0 105 288.0 1" 10086 3 1725 2800 1), 2), 4), 8), 11), 12), 15), 16), 19)12.0360.0

3

3

208/3/60

208/3/60

208/3/60

208/3/60

208/3/60

208/3/60

208/3/60

208/3/60

1

aben
Cochise Tech & Development
Page 7: P001 PLUMBING SCHEDULES & GENER - Cochise Tech …cochisetech.net/wp-content/VMBC/Plans/Mechanical Plumbing Plan.pdf · prior to fabrication and installation the contractor shall

MECHANIC

AL

FLO

OR

PLA

N

DO NOT SCALE DRAWING

M101

THIS

DR

AWIN

G IS C

LASSIFIE

D A

SP

AR

T O

F A

N U

NP

UB

LISHED

COLL

ECTIO

N O

F V

ISUAL

AR

T.

UND

ER

THE 1978

COP

YR

IGHT

ACT, IT IS A

N E

XCLU

SIV

EOR

IGIN

AL

WOR

K O

F A

UTHOR

SHIP

.NONE O

F T

HE P

ICTOR

IAL,

GR

AP

HIC

OR

TECHNIC

AL

CHAR

TS O

R D

RAWIN

GS

DEP

ICTED

ON T

HIS

SHEET M

AY

BE R

EP

ROD

UCED

OR

TR

ANSM

ITTED

IN A

NY F

OR

M O

RB

Y A

NY M

EANS W

ITHOUT T

HE

EXP

RESS P

RIO

R W

RITTEN

PER

MIS

SIO

N O

F T

HE A

RCHITECT.

THIS

PLA

N IS P

ROD

UCED

ONLY

FOR

THIS

PR

OJE

CT O

N T

HIS

SITE

AND

MAY N

OT B

E U

SED

AT

OTHER

LOCATIO

NS.

SHEET T

ITLE

:

OR

IGIN

AL

ISSUE: 2

-08-1

6

SEAL:

REV

DATE

DESCR

IPTIO

N

SHEET NUMBER:

PR

OJE

CT: A

C489

PR

OJE

CT:

BAP

TIS

T C

HUR

CH

SIE

RR

A V

ISTA, AZ

VILLA

GE M

EAD

OWS

OR

IGIN

AL

ISSUE

2-8-2

016

0

DANIE

L COOK

AR

CHITECT

290

9 W

ASHIN

GTO

N B

LVD

- O

GD

EN, UT

8440

1P

H: 80

0-5

52-

7137

www.B

GWSER

VIC

ES.c

om

SIE

RR

A V

ISTA, AR

IZONA 8

5635

140

7 S E

L CAM

INO R

EAL

2-28

-20

17OWNER

REVIS

IONS

1

1

2

3

4

5

MANUAL BALANCING DAMPER (TYPICAL).

CONTROL PANEL LOCATION.

RUN REFRIGERANT PIPING FROM INDOOR UNIT TOOUTDOOR UNIT. SIZE PER MANUFACTURESRECOMMENDATIONS RUN CONDENSATE PUMPDISCHARGE FULL SIZE TO SERVICE SINK IN JANITOR 119.

RUN REFRIGERANT PIPING FROM INDOOR UNIT TOOUTDOOR UNIT. SIZE PER MANUFACTURESRECOMMENDATIONS RUN CONDENSATE PUMPDISCHARGE FULL SIZE TO SERVICE SINK IN JANITOR 141.

DROP TO 12" ABOVE FLOOR.

KEYED NOTES

NOTE:

1) SPACE ABOVE CEILING IS TO BE USED AS A RETURN AIR PLENUM. ALL MATERIALS TO BE PLENUMRATED.

2) ALL TERMINAL SUPPLY DUCT BRANCHES TO BE EQUIPPED WITH MANUAL BALANCING DAMPER.

3) FLEX DUCT (MAXIMUM 60" LONG) TYPICAL ON EACH DIFFUSER EXCEPT IN EXPOSED APPLICATIONS.

4) PROVIDE TURNING VANES IN ALL RECTANGULAR ELBOWS.�

NOTE:

MECHANICAL CONTRACTOR TO REVIEW ALL DRAWINGS FOR CONFLICTS WITH STRUCTURE AND OTHERTRADES. MECHANICAL CONTRACTOR TO RESOLVE ALL CONFLICTS WITH ENGINEER PRIOR TO ORDERING,FABRICATING OR INSTALLING DUCTWORK.

R1

R2

R5

R4

DW

B.9

14

d dUP TO EF-3

UP TO EF-4

UP TO EF-2

UP TO EF-5

UP TO EF-6

UP TO EF-7

UP TO EF-8

UP TO EF-9

UP TO EF-1

UP TO RTU-6

UP TO RTU-4

UP TO RTU-2

UP TO RTU-5

UP TO RTU-1

UP TORTU-7

UP TO RTU-8

UP TO RTU-9

6"Ø 6"Ø

6"Ø

6"Ø

6"Ø

6"Ø

6"Ø

6"Ø6"Ø

8"Ø

10"Ø

10"Ø

10"Ø14"Ø10"Ø10"Ø

10"Ø

10"Ø10"Ø

14"Ø

8"Ø

40x32

40x32

40x32

40x32

1

1

8"Ø

16"Ø10"Ø10"Ø10"Ø 14"Ø

10"Ø8"Ø

1

20x14

10"Ø

18"Ø

18x18 8"Ø

10"Ø10"Ø

14"Ø12"Ø

6"Ø

6"Ø6"Ø

6"Ø10"Ø

10"Ø

1

20x18

6"Ø

12"Ø 10"Ø

10"Ø

14"Ø

8"Ø12"Ø

12"Ø

16"Ø

18"Ø

14"Ø

12"Ø

10"Ø

10"Ø

6"Ø

1

48x20

30x26

26"Ø 20"Ø

10"Ø

10"Ø

10"Ø

10"Ø

12"Ø

10"Ø

10"Ø

8"Ø

16"Ø

14"Ø

10"Ø

10"Ø

10"Ø

24"Ø

10"Ø

18"Ø

18"Ø

16"Ø

16"Ø

12"Ø

10"Ø

6"Ø

8"Ø

10"Ø

6"Ø

10"Ø

10"Ø

18"Ø

8"Ø

16"Ø

12"Ø

10"Ø

8"Ø

12"Ø 12"ØSLOPE DOWN

DROP

28x24

28x24

10"Ø

8"Ø

16"Ø

14"Ø

12"Ø

10"Ø

6"Ø

8"Ø

8"Ø

8"Ø

8"Ø

8"Ø

24"Ø

14"Ø

10"Ø

12"Ø

8"Ø

8"Ø8"Ø

8"Ø

20"Ø 16"Ø

10"Ø

14"Ø

6"Ø

8"Ø

8"Ø

8"Ø

8"Ø

8"Ø

18"Ø

16"Ø

10"Ø

10"Ø

10"Ø

10"Ø

10"Ø

6"Ø

10"Ø

6"Ø

6"Ø

10"Ø

1

1

FSD

FSD

FSD

FSD

FSD

T

T

T

TC

TC

T

T C

TC

26x16

40x24

40x24

24x24

24x24

26x20

18x12

DROP

8"Ø

22"Ø

22"Ø

12"Ø

8"Ø

10"Ø

UP TO RTU-3

12"Ø

DROP

24"Ø

24"Ø

34x30

22"Ø

16"Ø

16"Ø14"Ø

14"Ø14"Ø 14"Ø

14"Ø

26"Ø

14"Ø

14"Ø

24"Ø

22"Ø 20"Ø

14"Ø

14"Ø

14"Ø

14"Ø

16"Ø

1

14"Ø

14"Ø

14"Ø 14"Ø

14"Ø

16"Ø20"Ø

22"Ø

24"Ø

26"Ø10"Ø

12"Ø

14"Ø14"Ø14"Ø

14"Ø 14"Ø

22"Ø

20"Ø

16"Ø

14"Ø

14"Ø

14"Ø

14"Ø14"Ø

26"Ø

24"Ø

20"Ø

16"Ø

24"Ø

22"Ø

22"Ø

14"Ø

14"Ø

14"Ø

14"Ø

20"Ø

16"Ø

14"Ø

12"Ø

10"Ø

10"Ø

10"Ø

34x30

2

TC

14"Ø

8"Ø

12"Ø

12"Ø

FSD14"Ø

16"Ø

16"Ø

14"Ø

4

3

14"Ø

10"Ø

10"Ø

12"Ø

DROP3

10"Ø

UP TO EF-10

EH1

HP1HP

2

21'-0" A.F.F.

21'-0" A.F.F.21'-0" A.F.F.

21'-0" A.F.F.

15'-0" A.F.F.15'-0" A.F.F.15'-0" A.F.F.

15'-0" A.F.F.

15'-0" A.F.F.

9'-6" A.F.F.9'-6" A.F.F.

12'-0" A.F.F.

20'-0" A.F.F.

20'-0" A.F.F.

20'-10" A.F.F. 20'-10" A.F.F.

12'-0" A.F.F.

TX-A2

18'-10" A.F.F.

SES2

CHAPEL101

FOYER102

CATERING103

USHER104

VESTIBULE106

PLAY ROOM107

CLASSROOM A108

R.R.109

CLASSROOM B110

R.R.111

CLASSROOM C112

CRAWLERS113

CHECK-IN114 R.R.

115

INFANTS116

OFFICE117

MEN'S118

JAN.119

CORRIDOR120

stg.121

R.R.122 STG.

123

TACTILE124

MOTOR SKILLS125

SENSORY126

MINISTRY127

COUNS.128

FAM. R.R.129

BACKSTAGE/STORAGE130

MASTER CONTROL131

BACK STAGE132

RACK ROOM133

GREEN ROOM134

R.R.135

MAN CAVE136

R.R.137

COUNS.138

BRIDE'S ROOM139

CORRIDOR140JAN.

141

WOMEN'S142

SPRK.143

STORAGE144

HOSPITALITY145

PLATFORM148

CAFE150

san.149

MDP143.1

CHANGING146.1

u u

1

18

187

A A

B B

r r

j

15

15 17

n n

C C

165

5

2

3 9 10 1211

f

l

o o

q

t

6

e

h

4 8 13

p

s

m

k

G

R3

R3

6.1 6.9

h.9

545D-5 545

D-5

545D-5

545D-5

545D-5

545D-5

545D-5

545D-5

545D-5

545D-5

530D-7

530D-7

530D-7

530D-7

530D-7

530D-7

530D-7

530D-7530

D-7

530D-7

R-2

R-1

R-1

R-2

R-2

R-2

R-2

R-1

R-1

R-1

R-1 R-2

R-2

150E-2

150E-2

380D-3

225D-3

165D-2

260D-3

75D-1

90D-1

40D-1

305D-3

300D-3

380D-4

400D-4

70D-1

350D-3

350D-3

75D-1

380D-3

65D-1

220D-3

300D-3

375D-3

300D-3

350D-3

210D-2

190D-2

210D-2

190D-2

230D-235

D-1

165D-2

170D-2

200D-2

165D-2

165D-2

35D-1

185D-2

185D-2

200D-2

200D-2

115D-2

75D-1

325D-3

55D-1

G-1

G-1

75E-1

75E-1

75E-1

75E-1

75E-1

75E-1

75E-1

75E-1

75E-1

300E-3

300E-3

260E-3

265E-3

R-2

40D-1

180D-2

135D-2

285D-3

200D-2

200D-2

100D-1

R-2

R-2

250D-8

250D-8

R-5

290D-3240

D-3

150D-2

180D-2

200D-2

250D-3

295D-3

G-1

G-1 G-2

R-1

165D-2

165D-2

100D-2

400D-3

250D-3

250D-3

100D-2

R-4

R-3

R-3

300D-6

300D-6

250D-6

250D-6

R-4 R-4

285D-3

285D-3

R-6

285D-3

285D-3

285D-3

285D-3

325D-3

285D-3

285D-3

325D-3

325D-3

545D-5

545D-5

545D-5

545D-5 545

D-5

545D-5

545D-5

545D-5

545D-5

545D-5

545D-5

545D-5

545D-5

545D-5

545D-5

545D-5

545D-5

550D-5

545D-5

545D-5

545D-5

3RD PLACE105

SANCTUARY147

BAPTISTRY146

1 MECHANICAL FLOOR PLANSCALE: 1/8" = 1'-0"

aben
Cochise Tech & Development
Page 8: P001 PLUMBING SCHEDULES & GENER - Cochise Tech …cochisetech.net/wp-content/VMBC/Plans/Mechanical Plumbing Plan.pdf · prior to fabrication and installation the contractor shall

MECHANIC

AL

ROOF P

LAN

DO NOT SCALE DRAWING

M102

THIS

DR

AWIN

G IS C

LASSIFIE

D A

SP

AR

T O

F A

N U

NP

UB

LISHED

COLL

ECTIO

N O

F V

ISUAL

AR

T.

UND

ER

THE 1978

COP

YR

IGHT

ACT, IT IS A

N E

XCLU

SIV

EOR

IGIN

AL

WOR

K O

F A

UTHOR

SHIP

.NONE O

F T

HE P

ICTOR

IAL,

GR

AP

HIC

OR

TECHNIC

AL

CHAR

TS O

R D

RAWIN

GS

DEP

ICTED

ON T

HIS

SHEET M

AY

BE R

EP

ROD

UCED

OR

TR

ANSM

ITTED

IN A

NY F

OR

M O

RB

Y A

NY M

EANS W

ITHOUT T

HE

EXP

RESS P

RIO

R W

RITTEN

PER

MIS

SIO

N O

F T

HE A

RCHITECT.

THIS

PLA

N IS P

ROD

UCED

ONLY

FOR

THIS

PR

OJE

CT O

N T

HIS

SITE

AND

MAY N

OT B

E U

SED

AT

OTHER

LOCATIO

NS.

SHEET T

ITLE

:

OR

IGIN

AL

ISSUE: 2

-08-1

6

SEAL:

REV

DATE

DESCR

IPTIO

N

SHEET NUMBER:

PR

OJE

CT: A

C489

PR

OJE

CT:

BAP

TIS

T C

HUR

CH

SIE

RR

A V

ISTA, AZ

VILLA

GE M

EAD

OWS

OR

IGIN

AL

ISSUE

2-8-2

016

0

DANIE

L COOK

AR

CHITECT

290

9 W

ASHIN

GTO

N B

LVD

- O

GD

EN, UT

8440

1P

H: 80

0-5

52-

7137

www.B

GWSER

VIC

ES.c

om

SIE

RR

A V

ISTA, AR

IZONA 8

5635

140

7 S E

L CAM

INO R

EAL

2-28

-20

17OWNER

REVIS

IONS

1

1 PIPE CONDENSATE FULL SIZE TO NEAREST SCUPPER.

KEYED NOTES

NOTE:

1) SPACE ABOVE CEILING IS TO BE USED AS A RETURN AIR PLENUM. ALL MATERIALS TO BE PLENUMRATED.

2) ALL TERMINAL SUPPLY DUCT BRANCHES TO BE EQUIPPED WITH MANUAL BALANCING DAMPER.

3) FLEX DUCT (MAXIMUM 60" LONG) TYPICAL ON EACH DIFFUSER EXCEPT IN EXPOSED APPLICATIONS.

4) PROVIDE TURNING VANES IN ALL RECTANGULAR ELBOWS.�

NOTE:

MECHANICAL CONTRACTOR TO REVIEW ALL DRAWINGS FOR CONFLICTS WITH STRUCTURE AND OTHERTRADES. MECHANICAL CONTRACTOR TO RESOLVE ALL CONFLICTS WITH ENGINEER PRIOR TO ORDERING,FABRICATING OR INSTALLING DUCTWORK.

R1

R2

R5

R4

DO

DO

B.9

14

d d

1

1

1

1

1

1

1

1

1

HP1

HP2

RTU6RTU

4

RTU5

RTU3

RTU1

RTU7

RTU9

RTU8

RTU2

u u

1

18

187

A A

B B

r r

j

15

15 17

n n

C C

165

5

2

3 9 10 1211

f

l

o o

q

t

6

e

h

4 8 13

p

s

m

k

G

R3

R3

6.1 6.9

h.9

EF4

EF5

EF10

EF3

EF2

EF1

EF6

EF9

EF7

EF8

1 MECHANICAL ROOF PLANSCALE: 1/8" = 1'-0"

aben
Cochise Tech & Development
Page 9: P001 PLUMBING SCHEDULES & GENER - Cochise Tech …cochisetech.net/wp-content/VMBC/Plans/Mechanical Plumbing Plan.pdf · prior to fabrication and installation the contractor shall

MECHANIC

AL

DETAILS

DO NOT SCALE DRAWING

M501

THIS

DR

AWIN

G IS C

LASSIFIE

D A

SP

AR

T O

F A

N U

NP

UB

LISHED

COLL

ECTIO

N O

F V

ISUAL

AR

T.

UND

ER

THE 1978

COP

YR

IGHT

ACT, IT IS A

N E

XCLU

SIV

EOR

IGIN

AL

WOR

K O

F A

UTHOR

SHIP

.NONE O

F T

HE P

ICTOR

IAL,

GR

AP

HIC

OR

TECHNIC

AL

CHAR

TS O

R D

RAWIN

GS

DEP

ICTED

ON T

HIS

SHEET M

AY

BE R

EP

ROD

UCED

OR

TR

ANSM

ITTED

IN A

NY F

OR

M O

RB

Y A

NY M

EANS W

ITHOUT T

HE

EXP

RESS P

RIO

R W

RITTEN

PER

MIS

SIO

N O

F T

HE A

RCHITECT.

THIS

PLA

N IS P

ROD

UCED

ONLY

FOR

THIS

PR

OJE

CT O

N T

HIS

SITE

AND

MAY N

OT B

E U

SED

AT

OTHER

LOCATIO

NS.

SHEET T

ITLE

:

OR

IGIN

AL

ISSUE: 2

-08-1

6

SEAL:

REV

DATE

DESCR

IPTIO

N

SHEET NUMBER:

PR

OJE

CT: A

C489

PR

OJE

CT:

BAP

TIS

T C

HUR

CH

SIE

RR

A V

ISTA, AZ

VILLA

GE M

EAD

OWS

OR

IGIN

AL

ISSUE

2-8-2

016

0

DANIE

L COOK

AR

CHITECT

290

9 W

ASHIN

GTO

N B

LVD

- O

GD

EN, UT

8440

1P

H: 80

0-5

52-

7137

www.B

GWSER

VIC

ES.c

om

SIE

RR

A V

ISTA, AR

IZONA 8

5635

140

7 S E

L CAM

INO R

EAL

2-28

-20

17OWNER

REVIS

IONS

1

COORDINATE DIFFUSER TYPE FORLAY-IN OR GYPSUM BOARD CEILING.

SUPPORT FLEX DUCT FROMSTRUCTURE ABOVE. ONE 1" X 22 GA

STRAP

FLEX DUCT SEE DRAWINGS FOR SIZE

MAKE BEND RADIUS 1-1/2 xDUCT RADIUS

NOTE:RETURN SIMILAR BUT WITHOUT DUCT

TIGHTENING BAND

CEILING MATERIAL

5 FT. MAXIMUM.MAX. SAG 1/2" PER FOOT OF SUPPORTSPACING.

SUPPORT FLEX DUCT FROMSTRUCTURE ABOVE. ONE 1" X 22 GASTRAP

METAL FASTENERS :OMARK INSUL-PINS, DURA DYNE FASTENERS OR GRIP NAILS.GRIP NAILS SHALL BE INSTALLED BY "GRIP NAIL AIR HAMMER"OR BY AUTOMATIC FASTENER EQUIP.

LINER TO BE ADHERED TO DUCT WITH 90%MIN. AREA COVERAGE OF ADHESIVE

ALL ENDS OF LINER TO BE COATED WITH ADHESIVE. ENDS OF LINERSHALL BE BUTTED FIRMLY TOGETHER AND TAPED OVER.

LAPPED & BUTTEDCORNERS

DUCT LINER (SEE SPEC. FORTHICKNESS)

TOP AND BOTTOM SECTION OF LINERSHALL OVERLAP THE SIDESDUCT LINER SEE SPEC FOR

THICKNESS

METAL FASTENERS 12" O.C. MAX. FORBELOW 2500 FPM VELOCITY

NOT MORE THAN 2" FROMEDGE OF LINER

THE VELOCITY RATED SIDE OF LINER MUSTFACE THE AIR FLOW

GALV. SHT.METAL DUCT

HHDRIVE

SLIP

AT JOINTS

2424

2224

2624

PLAINS SLIP

RECOMMENDEDGA.

2624

HEMMEDS SLIP

24

24242422

REIN-FORCEDBAR SLIP

MIN.H.

11

11

2624

2224

NONE REQUIREDNONE REQUIRED

1" X 1" X 1/8" @ 60 IN1" X 1" X 1/8" @ 60 IN

IN.

TRANSVERSE REINFORCING (1)

13 - 18

31 - 4219 - 30

UP THRU 12

ALTER'NTBAR SLIP

SHEETMETAL GA.(ALL FOUR

SIDES)

DIMENSION OF LONGESTSIDE. INCHES

MINIMUM REINFORCING ANGLESIZE AND MAXIMUM LONGITUDINALSPACING BETWEEN TRANSVERSE

JOINT & /OR INTERMEDIATEREINFORCING

(1) TRANSVERSE REINFORCING SIZE IS DETERMINED BYDIMENSION OF SIDE TO WHICH ANGLE IS APPLIED.

RECOMMENDEDGA.

RECOMMENDEDGA.

RECOMMENDEDGA.

W1

W2

1. ALL VANED ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BYSMACNA.

2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE VANE TYPEREGARDLESS OF 'W' DIMENSION. ALL SINGLE VANES SHALL HAVE A 2 INCHRADIUS, 1 INCH MAXIMUM.

3. SPACE BETWEEN VANES AND A 3/4 INCH TRAILING EDGE.4. WHEN W1 EQUALS W2 AND W1 IS GREATER THAN 20 INCHES, VANE SHALL BE

DOUBLE VANE TYPE.

TURNING VANES

12" MIN

ROOF MOUNTED EXHAUST FAN WITHBIRD SCREEN

ANCHOR CURB TOHOOD

CANT STRIP

BUILT-UP ROOFING

INSULATIONEXHAUST DUCT SEEDRAWINGS FOR SIZE

GRAVITY BACKDRAFT DAMPER

FRAMING ALL AROUND

ROOF CURB

FLASH AND COUNTERFLASH

1/4" SPONGE RUBBER GASKET ALLAROUND

SUPPORT ANGLE FOR DAMPERATTACHED TO CURB

UNION

TRUSS JOIST

DRAIN CONNECTIONFLUE OUTLET

ECONOMIZER AS SPECIFIED

GAS PIPING. RUN 6" MIN. ABOVE ROOF

SHUT OFF COCK

DIRT LEG

ROOF INSULATION

SEE PLANS FOR SIZE

RETURN AIRLAY IN CEILING

SUPPLY AIR

MAKE TRANSITIONS AS SHOWN ON DRAWINGS TOCONNECT TO DUCTWORK

PROVIDE FLEX CONNECTIONS AT UNIT

ROOF CURB

ELECTRICDISCONNECT

ROOFTOP UNIT

PROVIDE 3" OF ACOUSTICAL INSULATION BELOW THEENTIRE FAN SECTION OF UNIT. SEAL W/ RUBBER CAULKING

TO PREVENT SOUND TRANSFER THROUGH DECK.

CONDENSATE DRAIN (RUN TOFLOOR DRAIN)

COMBINATION SIGHT GLASS ANDMOISTURE INDICATOR

SHUT OFF VALVE WITH GAUGEPORT (TYPICAL).

INDOOR UNIT

LIQUI

D LIN

E

THERMAL BULB

EXPANSION VALVE

LIQUID LINE SOLENOID VALVE

FILTER DRYER

MOUNT OUTDOOR UNIT ONCONCRETE PAD.

SUCT

ION

LINE

DUCT

1-1/2" POCKET SLIP

NEOPRENE COATED FABRICBOLT ON 4" CENTER

1" FLANGE & HEM

AIRFLOW

RETAINING ANGLES ATTACHED TO SLEEVES WITH 1/4"BOLTS OR 1/2" WELDS 6" O.C. BEGIN 2" FROMCORNERS.

DUCT TO DAMPER SLEEVE CONNECTION SHALL BEBREAKAWAY SLIP TYPE. ONE #10 SHEET METALSCREW OR DRIVE SLIPS MAY BE USED TO SECURESIDES.

FUSIBLE LINK WITH LOCK

U.L. RATED COMBINATION FIRE/ SMOKEDAMPER.

DUCTS CONNECTING TO SLEEVE SHALL BEEQUAL TO OR LESS THAN THE SLEEVETHICKNESS.

STEEL SLEEVE.

PROVIDE CLEARANCE OF 1/8" PER FOOT OF DUCTWORK FORTHERMAL EXPANSION. SEE MANUFACTURER'S INSTRUCTIONS.FIRE/SMOKE DAMPER TO BE FURNISHED WITH FACTORY SLEEVE,

FACTORY MOUNTED IONIZATION SMOKE DETECTOR AND ACTUATORMOTOR.

FIRE RATED WALLAPPLY BEAD OF FIRE SEALANT ALL

AROUND

ACCESS DOOR FOR TWO HANDEDRESET.

FIELD MOUNTED OPERATOR/ACTUATOR

DUCT

AUXILIARY OPERATING JACKSHAFT

MINIMUM OVERLAP ON ALL SIDES OFDAMPER TO BE 1"

12 GA. FOR DUCTS 0-47". 2"x2" FOR RETAINING ANGLES MIN. 11/2"x1 1/2", DUCTS 48" AND UP, ALL SIDES.

FUSIBLEROD

FAN CONTACTOR

24V COIL

RED

BLACK

IONIZATIONUNIT

IN UNIT SUPPLYPLENUM

1 DIFFUSER CONNECTIONSCALE: N.T.S. 2 DUCT LINER

SCALE: N.T.S.

3 DUCT CONSTRUCTION DETAILSCALE: N.T.S. 4 SQUARE VANED ELBOWS

SCALE: N.T.S.

5 ROOF MOUNT EXHAUST FANSCALE: N.T.S.

6 ROOFTOP UNIT (GAS)SCALE: N.T.S.

7 REFRIGERANT PIPING SCHEMATIC (4)SCALE: N.T.S.

8 FLEX CONNECTIONSCALE: N.T.S.

9 FIRE/SMOKE DAMPERSCALE: N.T.S.

10 ION GENERATOR WIRING DIAGRAMSCALE: N.T.S.

aben
Cochise Tech & Development