p rog ressive e ngineering i nc. · 2020-04-30 · aisi ts-7-02 - cantilever test method for...
TRANSCRIPT
-
58640 State Road 15 Phone: 574-533-0337
www.p-e-i.com
Goshen, IN 46528 -Fax: 574-533-9736 -
Progressive Engineering Inc.
12' x 12' Floor using 1-1/2" SAPboard Floor DeckingFastened at 6" & 12" to Lumber Trusses Spaced 24" o.c.
This test report contains forty (40) pages, including the cover sheet. Any additions to, alterations of, or unauthorized use of excerpts form this report are expressly forbidden.
RSP INDUSTRIES, INC.
6/5/2018
2018-6149
AISI TS-7 Cantilever Floor Diaphragm Test on a
-
1. TITLE
2. OBJECTIVE
3. TESTED FOR
4. TESTING ORGANIZATION
www.p-e-i.com
5. TESTING PERSONNEL
Director of Testing - Jason R. HoldemanTechnician - Chris Stutzman
6. REFERENCE STANDARDS
7. TEST EQUIPMENT
A.B.C.D.E.
AISI TS-7-02 - Cantilever Test Method for Cold-Formed Steel Diaphragms
Load Cell (PEI No. 602)
58640 State Road 15Goshen, IN 46528
See IAS Evaluation Report TL-178 for ISO 17025 Accreditation.
The tests were not witnessed by the client.
Two (2) Lynair Hydraulic Cylinders, Model No. LH-D401, Bore 3-1/4" and 12" strokeFour (4) Linear Transducers (PEI Nos. 1079, 1085, 1130, and 1131)
This test report pertains only to the specimens tested. It remains the sole responsibility of themanufacturer to provide a product consistent to that which was tested.
ASTM E455-16 - Standard Test Method for Static Load Testing of Framed Floor or Roof DiaphragmConstructions for Buildings
2182 East Aurora Road
Progressive Engineering Inc .
AISI TS-7 Cantilever Floor Diaphragm Test on a 12' x 12' Floor using 1-1/2" SAPboard FloorDecking Fastened at 6" & 12" to Lumber Trusses Spaced 24" o.c.
One (1) Omega Pressure Transducer (PEI No. 633)
Data Acquisition System (PEI No. 566)
Twinsburg, OH 44087
RSP Industries, Inc.
The objective of this test was to determine the horizontal diaphragm strength of a floor diaphragmconstructed per the enclosed details using 1-1/2" SAPboard Floor Decking.
2 of 40 PEI Report No. 2018-6149
-
8. TEST SPECIMEN MATERIALS
A. Floor Sheathing
B. Floor Framing
1.
2.
3.
C. Fasteners
1.
2.
9. TEST SPECIMEN CONDITIONING
10. TEST SPECIMEN CONSTRUCTION
A.
B.
C.
D.
All materials were stored in lab ambient conditions for a minimum of 7 days prior to construction ortesting.
Sheathing to Frame - #8 x 3" long Strong-Drive® WSTNL Subfloor Screw manufacturedby Simpson Strong-Tie®. See Appendix for more information.
Joists to Rim Board and Bracing to Truss - .131" x 3-1/2" long nails, Senco Part No.K529APBXN
Bracing - 2x6 SPF No. 2 Grade lumber.
The frame was squared and then the SAPboards were fastened to it with the long edgeperpendicular to the trusses. The groove was cut off of the starting row and the cut edge washeld flush to the rim boards. The tongue was removed on the opposite side of the sample, sothat the panel was flush with the rim board.
Joists - 18" deep by 138" long trusses manufactured by Allegheny Structural Componentsas OPENJOIST. The trusses were manufactured with varying sizes of SPF lumber finger-jointed and adhered to the top and bottom chords. The truss chords were 2x4 SPF No. 2Grade lumber laid flat, such that the supporting surface was 3-1/2" wide. The averagemeasured moisture content of the top chord was 12.8%.
1-1/2" SAPboard Floor Decking - 48" x 96" panels, with an effective width of 47-1/4",consisting of two (2) layers of 23/32" OSB manufactured by Huber with a sound insulationmaterial adhered between the OSB layers. A tongue and groove edge was present along thelong edges of the panels. The OSB board code information from Huber was "102717 TECOTested PS 2-10, Exposure 1, FLOOR SPAN, 23/32" Perf. Cat 24 oc" and "Mill 229, CrystalHills, VA". The average measured thickness was 1.533". See attached photographs,drawings, and Appendix section for more details.
Six (6) test samples were constructed to an overall dimension of 11'-9" x 12' by PEI personnel.Three (3) were tested with the load applied parallel to the trusses and three (3) were tested with theload applied perpendicular to the trusses.
The trusses were laid out at 24" o.c. A 144" long rim board was attached flush with the top ofeach truss using three (3) nails in each truss. A second rim board was attached flush with thebottom of each truss using three (3) nails in each truss.
Bracing was fastened near the center of the trusses along one of the vertical web posts usingtwo (2) nails in each truss.
The panels were fastened at 6" o.c. around the perimeter, inset 1" from the corners, and 12" o.c. in the field with #8 screws. Fasteners were inset 1/2" from all panel edges and ends. Care was taken to insure that the fasteners were kept flush or slightly below the surface of the panels. See attached drawings for details.
Rim Boards - 2x8 SPF No. 2 Grade lumber.
3 of 40 PEI Report No. 2018-6149
-
11. TEST SETUP
1.
2.
3.
4.
12. TEST PROCEDURE
A.
B.
C.
A Simpson S/HDS Hold Down Anchor was fastened near the top of the tension side truss or joistusing #8 washerhead wood screws. A 2x6 was was attached to the truss webs for the perpendiculartests to provide a frame connection for the hold down. A 5/8" diameter threaded rod was placed thruthe hold down and connected to the rigid steel fixture. A torque of 75 ft-lbs. was applied to the nut onthe threaded rod. The rim board and truss heels on the load side were positioned on a steel tubewhich was set on rollers spaced approximately 24" apart to provide unrestricted horizontalmovement. Two (2) vertical hold downs were placed over the floor on each end of the load side toprevent uplift. Two (2) 1" diameter rollers were placed between the hold down tube and a steel plateon the floor sheathing, with a minimum gap of 1/16" set at the beginning of the test.
Four (4) displacement transducers were placed on the floor diaphragm assembly in the followinglocations:
In-line with the tension joist (Uplift)
In-line with the fixed rim board (Slip)
The data acquisition system was initiated and all of the displacement gauges, pressuretransducer, and the load cell were checked to insure the signal was active. The preload file wasopened and the program was initiated. A preload of approximately 10% of the expectedultimate load.
In-line with the loaded rim board (Total Movement)
In-line with the compression joist (Compression)
The load cell, displacement transducers and pressure transducer were connected to a dataacquisition system.
Prior to testing the diaphragm samples a bare frame was evaluated for shear stiffness in the paralleland perpendicular to truss orientation. This was performed to insure that the frame stiffness was lesthan 2% of the diaphragm stiffness or if above 2% then apply the appropriate adjustment.
The preload was applied at approximately the same rate as is required to attain the anticipatedmaximum load in not less than ten (10) minutes. The preload was held for approximately 5seconds and then was released. The data file was saved and then closed. The load wasremoved for a minimum of one (1) minute.
The test sample was positioned in the test fixture with one of the rim boards or trusses set flush tothe top of a 10"- 30 lb./ft. C-channel. The rim board or truss was then attached to the C-channelusing 1/2" bolts with a maximum spacing of 12" o.c. One (1) 4" x 144" long I-beam was thenattached to the other rim track, flush to the top, using #8 x 2" long washerhead wood screws, set 6"o.c. on the top flange and 6" o.c. on the bottom flange of the I-beam. Two (2) hydraulic cylinderswere positioned on a reaction beam in-line with the I-beam. Note: A 2x6 was attached to thetrusses at the bearing side and load side to aid in clamping or connecting to the test fixturing, but inno way added to the diaphragm capacity or stiffness.
The "test file" was then opened and then the program was initiated with all measurementdevices set to zero. The load was applied using the hydraulic cylinders and manually regulatedusing flow control valves to maintain a load rate of not less than ten (10) minutes to themaximum load. Observations were recorded throughout the test.
4 of 40 PEI Report No. 2018-6149
-
D.
E.
13. TEST RESULTS
14. CONCLUSION
A.
B.
C.
Note: The frame stiffness accounted for less than 2% of the diaphragm stiffness and was thereforenot used in the determination of the shear load.
The data acquisitionsystem was set to record continuouslythroughout the test. The data pagesfound in this report display only ten (10) readings between zero and the maximum load.However, the chart reflects the data as recorded by the acquisition system.
Based on the testing described in this report, when tested per AISI TS-7 Cantilever Test Method, anaverage ultimate shear strength (Sn) of: (1) 773 plf when applied parallel to the trusses and (2) 675plf when applied perpendicular to the trusses, can be attained when using the following:
1-1/2" SAPboard Floor Decking fastened in accordance with Section 10 and drawing B1 in thisreport.
1-1/2" SAPboard Floor Decking fastened using #8 x 3" long Strong-Drive® Subfloor screwsmanufactured by Simpson Strong-Tie®.
Wood trusses manufactured with Spruce-Pine-Fir (SPF) lumber with 2x8 nominal lumber rimboards attached in accordance with Section 10 and the drawings in this report.
See the attached data pages and charts for test results.
The load was released at the point where no further gain could be attained or the netdisplacement had exceeded 2.5". The file was saved and then the maximum load anddisplacement at the maximum load was recorded by the technician, along with a detaileddescription of the failure.
5 of 40 PEI Report No. 2018-6149
-
Date: 5/17/2018
Client: RSP Industries Temperature: (°F): 71
Specimen: Relative Humidity (%): 53
Preload (lbf): 0
Diaphragm Width a (in): 141
Diaphragm Length b (in): 144Test No. 18-6149-PARA - Frame Only Load Duration to Pn(min:sec): 04:16
Load (lbf) Location 1 Location 2 Location 3 Location 4 Δ*0 0 .000" .000" .000" .000" .000"
.1*Pn 7 .001" .000" .018" .000" .017"
.2*Pn 15 .000" .000" .423" .002" .421"
.3*Pn 22 .002" .000" .722" .003" .717"
.4*Pn 30 .004" .000" .846" .003" .839"
.5*Pn 37 .015" .000" 1.703" .010" 1.679"
.6*Pn 45 .015" .000" 1.749" .011" 1.723"
.7*Pn 52 .016" .001" 1.792" .011" 1.765"
.8*Pn 59 .054" .002" 3.902" .037" 3.810"
.9*Pn 67 .055" .002" 3.998" .038" 3.904"Pn 74 .058" .002" 4.083" .039" 3.985"
Ultimate Load (Pn) = 74 lbf Shear Strength (Sn) = 6 plf
P =.4*Pn = 30 lbf Shear Stiffness(G') = 497 plf
Failure:
Notes:
* Δ is derived by the equation Δ = Δ3 - [Δ2 + (width / length)(Δ1 + Δ4)]
Test Conditions
Progressive Engineering Inc.AISI TS-7 Cantilever Diaphragm Test
A 1-1/8" thick OSB Rim Board, 18" tall, was attached to the ends of the trusses, but was later changedto 2x8 SPF for the diaphragm test. OSB Rim Board would offer more stiffness than the 2x8 framingand therefore is worst-case.
Deflection (in)
The Truss Frame System only, no sheathing with load applied parallel to thetrusses.
6 of 40 PEI Report No. 2018-6149
-
Date: 5/23/2018
Client: RSP Industries Temperature: (°F): 69
Specimen: Relative Humidity (%): 62
Preload (lbf): 1,650
Diaphragm Width a (in): 144
Diaphragm Length b (in): 141Test No. 18-6149-PARA-#8SIMP-1 Load Duration to Pn(min:sec): 23:38
Load (lbf) Location 1 Location 2 Location 3 Location 4 Δ*0 0 .000" .000" .000" .000" .000"
.1*Pn 972 .003" .010" .040" .000" .027"
.2*Pn 1,944 .008" .029" .127" .003" .087"
.3*Pn 2,915 .020" .049" .270" .011" .190"
.4*Pn 3,887 .036" .069" .471" .021" .344"
.5*Pn 4,859 .054" .096" .755" .037" .565"
.6*Pn 5,831 .076" .120" 1.107" .053" .856"
.7*Pn 6,802 .101" .143" 1.512" .070" 1.195"
.8*Pn 7,774 .131" .170" 1.983" .089" 1.588"
.9*Pn 8,746 .176" .219" 2.774" .201" 2.170"Pn 9,718 .237" .134" 4.187" .231" 3.574"
Ultimate Load (Pn) = 9,718 lbf Shear Strength (Sn) = 827 plf
P =.4*Pn = 3,887 lbf Shear Stiffness(G') = 138,741 plf
Failure:
Notes:
* Δ is derived by the equation Δ = Δ3 - [Δ2 + (width / length)(Δ1 + Δ4)]
Test Conditions
Progressive Engineering Inc.AISI TS-7 Cantilever Diaphragm Test
Load was applied parallel to the trusses. A 2x8 SPF Rim Board was attached to the ends of thetrusses.
The panels shifted along the T&G joints and panel butt-joints separated resulting in screw shearfailures and truss top chord split at the fasteners. See attached failure drawing for details.
Deflection (in)
1-1/2" SAPboard Floor Decking (T&G) fastened to 2x4 SPF lumber trusses,set 24" o.c., with #8 x 3" lg. Simpson subfloor screws spaced 6" o.c. aroundthe perimeter and 12" o.c. in the field. See drawing no. B1 for details.
7 of 40 PEI Report No. 2018-6149
-
RO
W #
3
RO
W #
2
RO
W #
1
TON
GU
E SI
DE
OF
PAN
EL
JOIS
T #7
JOIS
T #1
PARALLELLOAD DIRECTION
BEARING SIDE (PARALLEL)
ww
w.p
-e-i
.co
m
P ro
gre
ssiv
e
Fa
x (5
74
) 5
33
-97
36
nc
.
58
64
0 S
tate
Ro
ad
15
Go
she
n, I
N 4
65
28
Ph
on
e (
57
4)
53
3-0
33
7
IE n
gin
ee
rin
g
JOB
NO
.
DW
G. N
O.
SCAL
E:
DAT
E:
DW
N. B
Y:
TITL
E:
REV
ISED
ON
:C
LIEN
T:Th
is d
raw
ing
and
all i
nfor
mat
ion
cont
aine
d he
rein
is th
e pr
oper
ty o
f PR
OG
RES
SIVE
EN
GIN
EER
ING
, IN
C. a
nd is
not
to b
e re
prod
uced
w
ithou
t the
writ
ten
perm
issi
on
of
assu
mes
no
resp
onsi
bilit
y fo
r una
utho
rized
use
of
this
dra
win
g.
Pei. P
ei
RSP
IND
UST
RIE
S
CO
NFI
GU
RAT
ION
PA
RA-
1 FA
ILU
RE
J. H
OLD
EMAN
11/8
/18
THIS
DR
AWIN
G IS
A P
ART
OF
TEST
REP
OR
T N
o. 2
018-
6149
= SU
RFA
CE
SPAL
LIN
G=
FAST
ENER
RO
TATI
ON
= SH
EATH
ING
PU
LL-O
VER
= SE
PAR
ATIO
N O
R S
HIF
TIN
G (<
1/4"
)=
SEPA
RAT
ION
OR
SH
IFTI
NG
(>1/
2")
= FA
STEN
ER S
HEA
R
= BO
ARD
BR
EAKA
GE
B4
8 of 40 PEI Report No. 2018-6149
-
Date: 5/30/2018
Client: RSP Industries Temperature: (°F): 75
Specimen: Relative Humidity (%): 57
Preload (lbf): 1,648
Diaphragm Width a (in): 144
Diaphragm Length b (in): 141Test No. 18-6149-PARA-#8SIMP-2 Load Duration to Pn(min:sec): 23:00
Load (lbf) Location 1 Location 2 Location 3 Location 4 Δ*0 0 .000" .000" -- .000" --
.1*Pn 790 .004" .001" -- .005" --
.2*Pn 1,580 .008" .001" -- .015" --
.3*Pn 2,370 .017" .008" -- .035" --
.4*Pn 3,160 .028" .024" -- .064" --
.5*Pn 3,950 .041" .048" -- .103" --
.6*Pn 4,740 .057" .076" -- .151" --
.7*Pn 5,530 .075" .114" -- .212" --
.8*Pn 6,320 .095" .151" -- .280" --
.9*Pn 7,110 .115" .188" -- .380" --Pn 7,900 .148" .246" -- .553" --
Ultimate Load (Pn) = 7,900 lbf Shear Strength (Sn) = 672 plf
P =.4*Pn = 3,160 lbf Shear Stiffness(G') = N/A plf
Failure:
Notes:
* Δ is derived by the equation Δ = Δ3 - [Δ2 + (width / length)(Δ1 + Δ4)]
Test Conditions
Progressive Engineering Inc.AISI TS-7 Cantilever Diaphragm Test
Load was applied parallel to the trusses. A 2x8 SPF Rim Board was attached to the ends of thetrusses. The panels used on this sample were taken from a previously tested sample due to ashortage of material. Gauge #3 was not reading properly during this test and therefore no NetDeflection was attained.
The panels shifted along the T&G joints and panel butt-joints separated resulting in screw shearfailures and truss top chord split at the fasteners. See attached failure drawing for details.
Deflection (in)
1-1/2" SAPboard Floor Decking (T&G) fastened to 2x4 SPF lumber trusses,set 24" o.c., with #8 x 3" lg. Simpson subfloor screws spaced 6" o.c. aroundthe perimeter and 12" o.c. in the field. See drawing no. B1 for details.
PEI Report # 2006-660 (D)
9 of 40 PEI Report No. 2018-6149
-
RO
W #
3
RO
W #
2
RO
W #
1
TON
GU
E SI
DE
OF
PAN
EL
JOIS
T #7
JOIS
T #1
PARALLELLOAD DIRECTION
BEARING SIDE (PARALLEL)
ww
w.p
-e-i
.co
m
P ro
gre
ssiv
e
Fa
x (5
74
) 5
33
-97
36
nc
.
58
64
0 S
tate
Ro
ad
15
Go
she
n, I
N 4
65
28
Ph
on
e (
57
4)
53
3-0
33
7
IE n
gin
ee
rin
g
JOB
NO
.
DW
G. N
O.
SCAL
E:
DAT
E:
DW
N. B
Y:
TITL
E:
REV
ISED
ON
:C
LIEN
T:Th
is d
raw
ing
and
all i
nfor
mat
ion
cont
aine
d he
rein
is th
e pr
oper
ty o
f PR
OG
RES
SIVE
EN
GIN
EER
ING
, IN
C. a
nd is
not
to b
e re
prod
uced
w
ithou
t the
writ
ten
perm
issi
on
of
assu
mes
no
resp
onsi
bilit
y fo
r una
utho
rized
use
of
this
dra
win
g.
Pei. P
ei
RSP
IND
UST
RIE
S
CO
NFI
GU
RAT
ION
PA
RA-
2 FA
ILU
RE
J. H
OLD
EMAN
11/8
/18
THIS
DR
AWIN
G IS
A P
ART
OF
TEST
REP
OR
T N
o. 2
018-
6149
= SU
RFA
CE
SPAL
LIN
G=
FAST
ENER
RO
TATI
ON
= SH
EATH
ING
PU
LL-O
VER
= SE
PAR
ATIO
N O
R S
HIF
TIN
G (<
1/4"
)=
SEPA
RAT
ION
OR
SH
IFTI
NG
(>1/
2")
= FA
STEN
ER S
HEA
R
= BO
ARD
BR
EAKA
GE
B5
10 of 40 PEI Report No. 2018-6149
-
Date: 6/4/2018
Client: RSP Industries Temperature: (°F): 68
Specimen: Relative Humidity (%): 48
Preload (lbf): 1,570
Diaphragm Width a (in): 144
Diaphragm Length b (in): 141Test No. 18-6149-PARA-#8SIMP-3 Load Duration to Pn(min:sec): 27:52
Load (lbf) Location 1 Location 2 Location 3 Location 4 Δ*0 0 .000" .000" .000" .000" .000"
.1*Pn 964 .004" .001" .051" .014" .031"
.2*Pn 1,929 .009" .002" .145" .026" .108"
.3*Pn 2,893 .019" .013" .327" .043" .250"
.4*Pn 3,858 .032" .028" .561" .060" .438"
.5*Pn 4,822 .049" .061" .907" .081" .713"
.6*Pn 5,786 .071" .110" 1.390" .117" 1.087"
.7*Pn 6,751 .094" -- 1.901" .152" 1.649"
.8*Pn 7,715 .115" -- 2.369" .170" 2.079"
.9*Pn 8,679 .136" -- 2.999" .191" 2.665"Pn 9,644 .174" -- 4.838" .221" 4.435"
Ultimate Load (Pn) = 9,644 lbf Shear Strength (Sn) = 821 plf
P =.4*Pn = 3,858 lbf Shear Stiffness(G') = 107,913 plf
Failure:
Notes:
* Δ is derived by the equation Δ = Δ3 - [Δ2 + (width / length)(Δ1 + Δ4)]
Test Conditions
Progressive Engineering Inc.AISI TS-7 Cantilever Diaphragm Test
Load was applied parallel to the trusses. A 2x8 SPF Rim Board was attached to the ends of thetrusses. The panels used on this sample were taken from a previously tested sample due to ashortage of material. The slip gauge was not reading properly at the end of the test, therefore the NetDeflection shown is higher than the actual.
The panels shifted along the T&G joints and panel butt-joints separated resulting in screw shearfailures and truss top chord split at the fasteners. See attached failure drawing for details.
Deflection (in)
1-1/2" SAPboard Floor Decking (T&G) fastened to 2x4 SPF lumber trusses,set 24" o.c., with #8 x 3" lg. Simpson subfloor screws spaced 6" o.c. aroundthe perimeter and 12" o.c. in the field. See drawing no. B1 for details.
PEI Report # 2006-660 (D)
11 of 40 PEI Report No. 2018-6149
-
RO
W #
3
RO
W #
2
RO
W #
1
TON
GU
E SI
DE
OF
PAN
EL
JOIS
T #7
JOIS
T #1
PARALLELLOAD DIRECTION
BEARING SIDE (PARALLEL)
ww
w.p
-e-i
.co
m
P ro
gre
ssiv
e
Fa
x (5
74
) 5
33
-97
36
nc
.
58
64
0 S
tate
Ro
ad
15
Go
she
n, I
N 4
65
28
Ph
on
e (
57
4)
53
3-0
33
7
IE n
gin
ee
rin
g
JOB
NO
.
DW
G. N
O.
SCAL
E:
DAT
E:
DW
N. B
Y:
TITL
E:
REV
ISED
ON
:C
LIEN
T:Th
is d
raw
ing
and
all i
nfor
mat
ion
cont
aine
d he
rein
is th
e pr
oper
ty o
f PR
OG
RES
SIVE
EN
GIN
EER
ING
, IN
C. a
nd is
not
to b
e re
prod
uced
w
ithou
t the
writ
ten
perm
issi
on
of
assu
mes
no
resp
onsi
bilit
y fo
r una
utho
rized
use
of
this
dra
win
g.
Pei. P
ei
RSP
IND
UST
RIE
S
CO
NFI
GU
RAT
ION
PA
RA-
3 FA
ILU
RE
J. H
OLD
EMAN
11/8
/18
THIS
DR
AWIN
G IS
A P
ART
OF
TEST
REP
OR
T N
o. 2
018-
6149
= SU
RFA
CE
SPAL
LIN
G=
FAST
ENER
RO
TATI
ON
= SH
EATH
ING
PU
LL-O
VER
= SE
PAR
ATIO
N O
R S
HIF
TIN
G (<
1/4"
)=
SEPA
RAT
ION
OR
SH
IFTI
NG
(>1/
2")
= FA
STEN
ER S
HEA
R
= BO
ARD
BR
EAKA
GE
B6
12 of 40 PEI Report No. 2018-6149
-
Progressive Engineering Inc.
0
2,000
4,000
6,000
8,000
10,000
12,000
0 0.25 0.5 0.75 1 1.25 1.5 1.75 2 2.25 2.5 2.75 3 3.25 3.5 3.75 4 4.25 4.5 4.75 5
Load
(lbf
)
Net Deflection (in)
RSP Industries, Inc.AISI TS-7 Cantilever Floor Diaphragm Test
using 1-1/2" SAPboard Floor Deckingwith a 6"-12" Fastening Schedule
on 24" o.c. Lumber Trusses (Parallel to Load)
PARA-1 PARA-1 (P) PARA-3 PARA-3 (P)
PARA‐2 not shown due to displacement gauge malfunction
13 of 40 PEI Report No. 2018-6149
-
Date: 5/17/2018
Client: RSP Industries Temperature: (°F): 71
Specimen: Relative Humidity (%): 53
Preload (lbf): 0
Diaphragm Width a (in): 141
Diaphragm Length b (in): 144Test No. 18-6149-PERP - Frame Only Load Duration to Pn(min:sec): 02:17
Load (lbf) Location 1 Location 2 Location 3 Location 4 Δ*0 0 .000" .000" .000" .000" .000"
.1*Pn 7 .001" .000" .097" .002" .094"
.2*Pn 14 .000" .000" .327" .004" .323"
.3*Pn 22 .003" .002" .430" .006" .419"
.4*Pn 29 .018" .008" .901" .013" .863"
.5*Pn 36 .020" .009" .971" .014" .929"
.6*Pn 43 .029" .014" 1.321" .020" 1.259"
.7*Pn 50 .032" .015" 1.379" .021" 1.312"
.8*Pn 57 .033" .015" 1.437" .021" 1.368"
.9*Pn 65 .049" .023" 1.951" .030" 1.850"Pn 72 .069" .034" 2.633" .040" 2.493"
Ultimate Load (Pn) = 72 lbf Shear Strength (Sn) = 6 plf
P =.4*Pn = 29 lbf Shear Stiffness(G') = 393 plf
Failure:
Notes:
* Δ is derived by the equation Δ = Δ3 - [Δ2 + (width / length)(Δ1 + Δ4)]
Test Conditions
Progressive Engineering Inc.AISI TS-7 Cantilever Diaphragm Test
A 1-1/8" thick OSB Rim Board, 18" tall, was attached to the ends of the trusses, but was later changedto 2x8 SPF for the diaphragm test. OSB Rim Board would offer more stiffness than the 2x8 framingand therefore is worst-case.
Deflection (in)
The Truss Frame System only, no sheathing with load applied perpendicular to the trusses.
14 of 40 PEI Report No. 2018-6149
-
Date: 6/5/2018
Client: RSP Industries Temperature: (°F): 69
Specimen: Relative Humidity (%): 66
Preload (lbf): 1,011
Diaphragm Width a (in): 141
Diaphragm Length b (in): 144Test No. 18-6149-PERP-#8SIMP-1 Load Duration to Pn(min:sec): 28:24
Load (lbf) Location 1 Location 2 Location 3 Location 4 Δ*0 0 .000" .000" .000" .000" .000"
.1*Pn 835 .004" .001" .035" .011" .019"
.2*Pn 1,670 .007" .001" .132" .034" .091"
.3*Pn 2,504 .012" .009" .294" .063" .211"
.4*Pn 3,339 .020" .018" .520" .096" .389"
.5*Pn 4,174 .030" .029" .802" .125" .622"
.6*Pn 5,009 .040" .040" 1.158" .151" .931"
.7*Pn 5,844 .050" .055" 1.593" .174" 1.318"
.8*Pn 6,678 .065" .073" 2.097" .192" 1.773"
.9*Pn 7,513 .083" .097" 3.076" .212" 2.690"Pn 8,348 .102" .119" 4.602" .227" 4.161"
Ultimate Load (Pn) = 8,348 lbf Shear Strength (Sn) = 696 plf
P =.4*Pn = 3,339 lbf Shear Stiffness(G') = 100,943 plf
Failure:
Notes:
* Δ is derived by the equation Δ = Δ3 - [Δ2 + (width / length)(Δ1 + Δ4)]
Test Conditions
Progressive Engineering Inc.AISI TS-7 Cantilever Diaphragm Test
Load was applied perpendicular to the trusses. A 2x8 SPF Rim Board was attached to the ends of thetrusses.
The panels shifted along the T&G joints and panel butt-joints separated resulting in screw shearfailures and truss top chord split at the fasteners. See attached failure drawing for details.
Deflection (in)
1-1/2" SAPboard Floor Decking (T&G) fastened to 2x4 SPF lumber trusses,set 24" o.c., with #8 x 3" lg. Simpson subfloor screws spaced 6" o.c. aroundthe perimeter and 12" o.c. in the field. See drawing no. B1 for details.
PEI Report # 2006-660 (D)
15 of 40 PEI Report No. 2018-6149
-
RO
W #
3
RO
W #
2
RO
W #
1
TON
GU
E SI
DE
OF
PAN
EL
JOIS
T #7
JOIS
T #1
BEAR
ING
SID
E (P
ERPE
ND
ICU
LAR
)
PER
PEN
DIC
ULA
RLO
AD D
IREC
TIO
N
TRU
SS S
PLIT
ww
w.p
-e-i
.co
m
P ro
gre
ssiv
e
Fa
x (5
74
) 5
33
-97
36
nc
.
58
64
0 S
tate
Ro
ad
15
Go
she
n, I
N 4
65
28
Ph
on
e (
57
4)
53
3-0
33
7
IE n
gin
ee
rin
g
JOB
NO
.
DW
G. N
O.
SCAL
E:
DAT
E:
DW
N. B
Y:
TITL
E:
REV
ISED
ON
:C
LIEN
T:Th
is d
raw
ing
and
all i
nfor
mat
ion
cont
aine
d he
rein
is th
e pr
oper
ty o
f PR
OG
RES
SIVE
EN
GIN
EER
ING
, IN
C. a
nd is
not
to b
e re
prod
uced
w
ithou
t the
writ
ten
perm
issi
on
of
assu
mes
no
resp
onsi
bilit
y fo
r una
utho
rized
use
of
this
dra
win
g.
Pei. P
ei
RSP
IND
UST
RIE
S
CO
NFI
GU
RAT
ION
PE
RP-
1 FA
ILU
RE
J. H
OLD
EMAN
11/8
/18
THIS
DR
AWIN
G IS
A P
ART
OF
TEST
REP
OR
T N
o. 2
018-
6149
= SU
RFA
CE
SPAL
LIN
G=
FAST
ENER
RO
TATI
ON
= SH
EATH
ING
PU
LL-O
VER
= SE
PAR
ATIO
N O
R S
HIF
TIN
G (<
1/4"
)=
SEPA
RAT
ION
OR
SH
IFTI
NG
(>1/
2")
= FA
STEN
ER S
HEA
R
= BO
ARD
BR
EAKA
GE
B7
16 of 40 PEI Report No. 2018-6149
-
Date: 6/5/2018
Client: RSP Industries Temperature: (°F): 69
Specimen: Relative Humidity (%): 66
Preload (lbf): 1,103
Diaphragm Width a (in): 141
Diaphragm Length b (in): 144Test No. 18-6149-PERP-#8SIMP-2 Load Duration to Pn(min:sec): 28:25
Load (lbf) Location 1 Location 2 Location 3 Location 4 Δ*0 0 .000" .000" .000" .000" .000"
.1*Pn 834 .003" .001" .058" .023" .032"
.2*Pn 1,669 .017" .011" .195" .070" .098"
.3*Pn 2,503 .066" .025" .397" .104" .206"
.4*Pn 3,337 .083" .038" .612" .122" .373"
.5*Pn 4,171 .101" .050" .886" .137" .603"
.6*Pn 5,006 .122" .068" 1.255" .151" .920"
.7*Pn 5,840 .151" .100" 1.772" .167" 1.360"
.8*Pn 6,674 .177" .128" 2.281" .181" 1.803"
.9*Pn 7,509 .205" .167" 2.890" .194" 2.332"Pn 8,343 .233" .214" 3.608" .207" 2.963"
Ultimate Load (Pn) = 8,343 lbf Shear Strength (Sn) = 695 plf
P =.4*Pn = 3,337 lbf Shear Stiffness(G') = 105,253 plf
Failure:
Notes:
* Δ is derived by the equation Δ = Δ3 - [Δ2 + (width / length)(Δ1 + Δ4)]
Test Conditions
Progressive Engineering Inc.AISI TS-7 Cantilever Diaphragm Test
Load was applied perpendicular to the trusses. A 2x8 SPF Rim Board was attached to the ends of thetrusses.
The panels shifted along the T&G joints and panel butt-joints separated resulting in screw shearfailures and truss top chord split at the fasteners. See attached failure drawing for details.
Deflection (in)
1-1/2" SAPboard Floor Decking (T&G) fastened to 2x4 SPF lumber trusses,set 24" o.c., with #8 x 3" lg. Simpson subfloor screws spaced 6" o.c. aroundthe perimeter and 12" o.c. in the field. See drawing no. B1 for details.
PEI Report # 2006-660 (D)
17 of 40 PEI Report No. 2018-6149
-
RO
W #
3
RO
W #
2
RO
W #
1
TON
GU
E SI
DE
OF
PAN
EL
JOIS
T #7
JOIS
T #1
BEAR
ING
SID
E (P
ERPE
ND
ICU
LAR
)
PER
PEN
DIC
ULA
RLO
AD D
IREC
TIO
N
ww
w.p
-e-i
.co
m
P ro
gre
ssiv
e
Fa
x (5
74
) 5
33
-97
36
nc
.
58
64
0 S
tate
Ro
ad
15
Go
she
n, I
N 4
65
28
Ph
on
e (
57
4)
53
3-0
33
7
IE n
gin
ee
rin
g
JOB
NO
.
DW
G. N
O.
SCAL
E:
DAT
E:
DW
N. B
Y:
TITL
E:
REV
ISED
ON
:C
LIEN
T:Th
is d
raw
ing
and
all i
nfor
mat
ion
cont
aine
d he
rein
is th
e pr
oper
ty o
f PR
OG
RES
SIVE
EN
GIN
EER
ING
, IN
C. a
nd is
not
to b
e re
prod
uced
w
ithou
t the
writ
ten
perm
issi
on
of
assu
mes
no
resp
onsi
bilit
y fo
r una
utho
rized
use
of
this
dra
win
g.
Pei. P
ei
RSP
IND
UST
RIE
S
CO
NFI
GU
RAT
ION
PE
RP-
2 FA
ILU
RE
J. H
OLD
EMAN
11/8
/18
THIS
DR
AWIN
G IS
A P
ART
OF
TEST
REP
OR
T N
o. 2
018-
6149
= SU
RFA
CE
SPAL
LIN
G=
FAST
ENER
RO
TATI
ON
= SH
EATH
ING
PU
LL-O
VER
= SE
PAR
ATIO
N O
R S
HIF
TIN
G (<
1/4"
)=
SEPA
RAT
ION
OR
SH
IFTI
NG
(>1/
2")
= FA
STEN
ER S
HEA
R
= BO
ARD
BR
EAKA
GE
B8
18 of 40 PEI Report No. 2018-6149
-
Date: 6/5/2018
Client: RSP Industries Temperature: (°F): 65
Specimen: Relative Humidity (%): 50
Preload (lbf): 1,044
Diaphragm Width a (in): 141
Diaphragm Length b (in): 144Test No. 18-6149-PERP-#8SIMP-3 Load Duration to Pn(min:sec): 22:59
Load (lbf) Location 1 Location 2 Location 3 Location 4 Δ*0 0 .000" .000" .000" .000" .000"
.1*Pn 761 .004" .001" .035" .010" .020"
.2*Pn 1,521 .006" .008" .127" .021" .092"
.3*Pn 2,282 .014" .017" .272" .035" .208"
.4*Pn 3,043 .024" .032" .480" .048" .377"
.5*Pn 3,803 .038" .049" .742" .060" .598"
.6*Pn 4,564 .053" .076" 1.100" .075" .899"
.7*Pn 5,325 .070" .113" 1.568" .090" 1.299"
.8*Pn 6,085 .086" .148" 2.115" .103" 1.782"
.9*Pn 6,846 .103" .189" 2.795" .117" 2.390"Pn 7,607 .120" .224" 3.652" .130" 3.183"
Ultimate Load (Pn) = 7,607 lbf Shear Strength (Sn) = 634 plf
P =.4*Pn = 3,043 lbf Shear Stiffness(G') = 94,866 plf
Failure:
Notes:
* Δ is derived by the equation Δ = Δ3 - [Δ2 + (width / length)(Δ1 + Δ4)]
Test Conditions
Progressive Engineering Inc.AISI TS-7 Cantilever Diaphragm Test
Load was applied perpendicular to the trusses. A 2x8 SPF Rim Board was attached to the ends of thetrusses. The panels used in this test were taken from a previously tested sample due to a shortage inmaterial.
The panels shifted along the T&G joints and panel butt-joints separated resulting in screw shearfailures and truss top chord split at the fasteners. See attached failure drawing for details.
Deflection (in)
1-1/2" SAPboard Floor Decking (T&G) fastened to 2x4 SPF lumber trusses,set 24" o.c., with #8 x 3" lg. Simpson subfloor screws spaced 6" o.c. aroundthe perimeter and 12" o.c. in the field. See drawing no. B1 for details.
PEI Report # 2006-660 (D)
19 of 40 PEI Report No. 2018-6149
-
TON
GU
E SI
DE
OF
PAN
EL
JOIS
T #7
JOIS
T #1
BEAR
ING
SID
E (P
ERPE
ND
ICU
LAR
)
PER
PEN
DIC
ULA
RLO
AD D
IREC
TIO
N
RO
W #
3
RO
W #
2
RO
W #
1
ww
w.p
-e-i
.co
m
P ro
gre
ssiv
e
Fa
x (5
74
) 5
33
-97
36
nc
.
58
64
0 S
tate
Ro
ad
15
Go
she
n, I
N 4
65
28
Ph
on
e (
57
4)
53
3-0
33
7
IE n
gin
ee
rin
g
JOB
NO
.
DW
G. N
O.
SCAL
E:
DAT
E:
DW
N. B
Y:
TITL
E:
REV
ISED
ON
:C
LIEN
T:Th
is d
raw
ing
and
all i
nfor
mat
ion
cont
aine
d he
rein
is th
e pr
oper
ty o
f PR
OG
RES
SIVE
EN
GIN
EER
ING
, IN
C. a
nd is
not
to b
e re
prod
uced
w
ithou
t the
writ
ten
perm
issi
on
of
assu
mes
no
resp
onsi
bilit
y fo
r una
utho
rized
use
of
this
dra
win
g.
Pei. P
ei
RSP
IND
UST
RIE
S
CO
NFI
GU
RAT
ION
PE
RP-
3 FA
ILU
RE
J. H
OLD
EMAN
11/8
/18
THIS
DR
AWIN
G IS
A P
ART
OF
TEST
REP
OR
T N
o. 2
018-
6149
= SU
RFA
CE
SPAL
LIN
G=
FAST
ENER
RO
TATI
ON
= SH
EATH
ING
PU
LL-O
VER
= SE
PAR
ATIO
N O
R S
HIF
TIN
G (<
1/4"
)=
SEPA
RAT
ION
OR
SH
IFTI
NG
(>1/
2")
= FA
STEN
ER S
HEA
R
= BO
ARD
BR
EAKA
GE
B9
20 of 40 PEI Report No. 2018-6149
-
Progressive Engineering Inc.
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
0 0.25 0.5 0.75 1 1.25 1.5 1.75 2 2.25 2.5 2.75 3 3.25 3.5 3.75 4 4.25 4.5
Load
(lbf
)
Net Deflection (in)
RSP Industries, Inc.AISI TS-7 Cantilever Floor Diaphragm Test
using 1-1/2" SAPboard Floor Deckingwith a 6"-12" Fastening Schedule
on 24" o.c. Lumber Trusses (Perpendicular to Load)
PERP-1 PERP-1 (P) PERP-2PERP-2 (P) PERP-3 PERP-3 (P)
21 of 40 PEI Report No. 2018-6149
-
RO
W #
3
RO
W #
2
RO
W #
1
TON
GU
E SI
DE
OF
PAN
EL
GR
OO
VE R
EMO
VED
JOIS
T #7
JOIS
T #1
BEAR
ING
SID
E (P
ERPE
ND
ICU
LAR
)
144"
1411 4
"
48" x
471 4
"96
" x 4
71 4"
96" x
471 4
"
96" x
463 4
"
48" x
471 4
"
48" x
463 4
"
NO
TE:
1) #
8 x
3" L
G. S
TRO
NG
-DR
IVE
SUBF
LOO
RSC
REW
S AT
TAC
HED
TO
FR
AMIN
G 6
" O.C
.AR
OU
ND
PER
IMET
ER A
ND
12"
O.C
. IN
TH
E FI
ELD
.
1"
1/2"
1"
12"
6"
1/2"
463 4"
1"6"
471 4"
471 4"
PER
PEN
DIC
ULA
RLO
AD D
IREC
TIO
N PARALLELLOAD DIRECTION
BEARING SIDE (PARALLEL)
JOB
NO
.
B12018-
6149
DW
G. N
O.
J.H
OLD
EMAN
11/8
/18
SCAL
E:
DAT
E:
DW
N. B
Y:
TITL
E:
REV
ISED
ON
:C
LIEN
T:
THIS
DR
AWIN
G IS
A P
ART
OF
TEST
REP
OR
T N
O.
This
dra
win
g an
d al
l inf
orm
atio
n co
ntai
ned
here
in is
the
prop
erty
of
PRO
GR
ESSI
VE E
NG
INEE
RIN
G,
INC
. and
is n
ot to
be
repr
oduc
ed
with
out t
he w
ritte
n pe
rmis
sion
of
as
sum
es n
o re
spon
sibi
lity
for u
naut
horiz
ed u
se
of th
is d
raw
ing.
1-1/
2" S
APbo
ard
FAS
TEN
ING
6"-
12"
24" O
.C. F
RAM
E
RSP
IN
DU
STR
IES
Pei. P
ei
2018
-614
9
Fa
x (5
74
) 5
33
-97
36
Ph
on
e (
57
4)
53
3-0
33
7G
osh
en
, IN
46
52
85
86
40
Sta
te R
oa
d 1
5
ng
ine
eri
ng
P ro
gre
ssiv
eE
Inc
.
ww
w.p
-e-i
.co
m
22 of 40 PEI Report No. 2018-6149
-
23/3
2" O
.S.B
.
SOU
ND
INSU
LATI
ON
1 1/
2"
0.40
"
0.67
"
0.09
"
0.48
"
0.56
"
0.43
"
ww
w.p
-e-i
.co
m
P ro
gre
ssiv
e
Fa
x (5
74
) 5
33
-97
36
nc
.
58
64
0 S
tate
Ro
ad
15
Go
she
n, I
N 4
65
28
Ph
on
e (
57
4)
53
3-0
33
7
IE n
gin
ee
rin
g
JOB
NO
.
DW
G. N
O.
SCAL
E:
DAT
E:
DW
N. B
Y:
TITL
E:
REV
ISED
ON
:C
LIEN
T:Th
is d
raw
ing
and
all i
nfor
mat
ion
cont
aine
d he
rein
is th
e pr
oper
ty o
f PR
OG
RES
SIVE
EN
GIN
EER
ING
, IN
C. a
nd is
not
to b
e re
prod
uced
w
ithou
t the
writ
ten
perm
issi
on
of
assu
mes
no
resp
onsi
bilit
y fo
r una
utho
rized
use
of
this
dra
win
g.
Pei. P
ei
J.H
OLD
EMAN
11/8
/18
RSP
IN
DU
STR
IES
THIS
DR
AWIN
G IS
A P
ART
OF
TEST
REP
OR
T N
o. 2
018-
6149
SAPb
oard
T&
G D
etai
lB2
2018
-614
9
23 of 40 PEI Report No. 2018-6149
-
2x8
SPF
RIM
BO
ARD
(2 P
LAC
ES)
1.5"
SAP
boar
d FL
OO
R D
ECKI
NG
TRU
SS T
OP
CH
OR
D
RIM
BO
ARD
FAS
TEN
ED T
O
TRU
SS U
SIN
G T
HR
EE (3
).1
31" x
3-1
/2" L
ON
G N
AILS
PER
TR
USS
.TR
USS
HEE
L
Fa
x (5
74
) 5
33
-97
36
nc
.
58
64
0 S
tate
Ro
ad
15
Go
she
n, I
N 4
65
28
Ph
on
e (
57
4)
53
3-0
33
7
In
gin
ee
rin
gP r
og
ress
ive
This
dra
win
g an
d al
l inf
orm
atio
n co
ntai
ned
here
in is
the
prop
erty
of
PRO
GR
ESSI
VE E
NG
INEE
RIN
G,
INC
. and
is n
ot to
be
repr
oduc
ed
with
out t
he w
ritte
n pe
rmis
sion
of
as
sum
es n
o re
spon
sibi
lity
for u
naut
horiz
ed u
se
of th
is d
raw
ing.
Pei. P
ei
THIS
DR
AWIN
G IS
A P
ART
OF
TEST
REP
OR
T N
o. 2
018-
6149
RSP
IN
DU
STR
IES
RIM
BO
ARD
/ TR
USS
DET
AIL
JOB
NO
.
DW
G. N
O.
SCAL
E:
DAT
E:
DW
N. B
Y:
TITL
E:
REV
ISED
ON
:C
LIEN
T:J.
HO
LDEM
AN
8/31
/201
5
B3
24 of 40 PEI Report No. 2018-6149
-
25 of 40 PEI Report No. 2018-6149
jholdemanLine
jholdemanCalloutEnds cut off to overall length of 138"
jholdemanCallout2x4 No. 2 Grade SPF lumber
jholdemanText BoxDimensions marked in RED were verified by PEI personnel
jholdemanRectangle
jholdemanRectangle
jholdemanRectangle
jholdemanCalloutCut off for testing
-
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Test Setup Parallel to Trusses (Frame Only) Test Setup Parallel to Trusses
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Test Setup Parallel to Trusses Test Setup Perpendicular to Trusses (Frame Only)
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Test Setup Perpendicular to Trusses Test Setup Perpendicular to Trusses
Progressive Engineering Inc.
26 of 40 PEI Report No. 2018-6149
-
Sample No. 18-6149-PARA-#8SIMP-1
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Load Side Failure Panel Shift / Rotation
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Screw Shear Panel Shift and Screw Shear
INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Typical Screw Shear
Progressive Engineering Inc.
27 of 40 PEI Report No. 2018-6149
-
Sample No. 18-6149-PARA-#8SIMP-2
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shifting during test Panel Shift and Screw Shear
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Screw Shear Panel Shift and Screw Shear
Panel Shift and Screw Shear
Progressive Engineering Inc.
28 of 40 PEI Report No. 2018-6149
-
Sample No. 18-6149-PARA-#8SIMP-3
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Screw Shear Panel Shift
INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Screw Shear Panel Shift and Screw Shear
Progressive Engineering Inc.
29 of 40 PEI Report No. 2018-6149
-
Sample No. 18-6149-PERP-#8SIMP-1
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Screw Shear Panel Shift / Rotation
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Screw Shear Panel Shift and Top Chord split at T&G Joint
INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Separation
Progressive Engineering Inc.
30 of 40 PEI Report No. 2018-6149
-
Sample No. 18-6149-PERP-#8SIMP-2
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Screw Shear Panel Shift and Screw Shear
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Screw Shear Panel Shift and Screw Shear
Progressive Engineering Inc.
31 of 40 PEI Report No. 2018-6149
-
Sample No. 18-6149-PERP-#8SIMP-3
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Screw Shear Panel Shift and Top Chord split at T&G Joint
INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Shift and Screw Shear Panel Shift and Screw Shear
Panel Shift and Screw Shear Panel Shift and Screw Shear
Progressive Engineering Inc.
32 of 40 PEI Report No. 2018-6149
-
Progressive Engineering Inc.
APPENDIX
RSP INDUSTRIES, INC.2018-6149
33 of 40 PEI Report No. 2018-6149
-
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
SAPboard Stamp SAPboard Stamp
INSERT PICTURE HERE (2.72" H. X 3.63" W.) INSERT PICTURE HERE (2.72" H. X 3.63" W.)
Panel Tongue Detail Panel Groove Detail
INSERT PICTURE HERE (2.72" H. X 3.63" W.)
#8 Subfloor Screws
Progressive Engineering Inc.
34 of 40 PEI Report No. 2018-6149
-
Date:Client:
Specimen:
FastenerHead
DiameterOuter
Thread Dia. Length1 0.335" 0.182" 2.981"
2 0.331" 0.182" 2.984"
3 0.333" 0.182" 2.983"
4 0.334" 0.182" 2.999"
5 0.334" 0.182" 2.985"
6
7
8
9
10
Average: 0.333" 0.182" 2.986"
Comments / Observations:Five (5) fasteners were randomly selected by Chris Stutzman of PEI and measured as indicated above using a digital caliper. These fasteners were used to fasten the SAPboard to the trusses.
Progressive Engineering Inc.Fastener Measurements
6/12/2018
#8 x 3" Long Strong-Drive Subfloor Screws, Part No. WSNTL3R300
RSP Industries
35 of 40 PEI Report No. 2018-6149
-
C-F
-201
7 ©
2017
SIM
PS
ON
STR
ON
G-T
IE C
OM
PAN
Y IN
C.
Simpson Strong-Tie® Fastening Systems
366
Load Tables, Technical Data and Installation Instructions
WSNTL – Allowable Shear – Wood Structural Panel Diaphragms with Framing of Douglas Fir-Larch or Southern Pine for Wind or Seismic Loading (2", 2 1⁄2" and 3" Lengths) (in Pounds per Foot)1-8
Panel Grade
Minimum Nominal
Panel Thickness
(in.)
Minimum Nominal Width
of Framing Members at
Adjoining Panel Edges and Boundaries
(in.)4,5
Blocked Diaphragms Unblocked Diaphragms
Screw spacing (inches) at diaphragm boundaries (all cases), at continuous panel edges parallel to load (Cases 3 and 4),
and at all edges (Cases 5 and 6)6Screws Spaced 6", Maximum,
at Support Edges6
6 4 2 1/2 7 27 Case 1 (no unblocked edges
or continuous joints parallel to
load)
All other configurations (Cases 2,3,4,5
and 6)
Screw Spacing (in.) at Other Panel Edges
6 6 4 3
Structural 1
3⁄82 270 360 530 600 240 180
3 300 400 600 675 265 200
15⁄322 320 425 640 730 285 215
3 360 480 720 820 320 240
Sheathing and
single floor
3⁄82 240 320 480 545 215 160
3 270 360 540 610 240 180
7⁄162 255 340 505 575 230 170
3 285 380 570 645 255 190
15⁄322 290 385 575 655 255 190
3 325 430 650 735 290 215
19⁄322 320 421 640 730 285 215
3 360 480 720 820 320 240
1 . Minimum fastener penetration of 1 1⁄4" into the framing member is required .2 . For wind design, shear capacities may be increased 40% per section 2306 .3 .2 of
the 2006 IBC, 2306 .2 .1 of the 2009 IBC, and 2306 .2 of the 2012 /2015 IBC .3 . Allowable loads are shown at the wood load duration of CD=1 .6 . No further
increases shall be permitted . For shear loads of normal or permanent load duration as defined by the NDS-2012, the values in the table above must be multiplied by 0 .63 or 0 .56, respectively .
4 . The minimum nominal width of framing members not located at boundaries or adjoining panel edges must be 2" .
5 . Framing at adjoining panel edges must be 3" nominal or wider, and screws must be staggered where both of the following conditions are met: (1) screws having penetration into framing of more than 1 1⁄2" and (2) screws are spaced 3" o .c . or less .
6 . Space screws maximum 12" o .c . along intermediate framing members (6" o .c . where supports are spaced 48" o .c .) .
7 . Framing at adjoining panel edges must be 3" nominal or wider, and screws must be staggered where screws are spaced 2" or 2 1⁄2" on center .
8 . See ICC-ES ESR-1472 for allowable shear loads for high load diaphragms .
Load
Framing
Framing
CASE 1 CASE 2
CASE 6 CASE 5
CASE 3 CASE 4
Diaphragm boundary Continuous panel joints
Continuous panel joints Continuous panel joints
Blocking if used
Blocking if used
Strong-Drive ® WSNTL SUBFLOOR ScrewFor Subfloor and Sheathing to wood, Multi-Ply Wood Members
Codes/Standards: ICC-ES ESR-1472; City of L .A . RR25661 (Note: 1 3/4" length not code listed)
For More Product Information, see p . 96
1 3/4" – 3"
Tech
nica
l Inf
orm
atio
n
36 of 40 PEI Report No. 2018-6149
-
C-F
-201
7 ©
2017
SIM
PS
ON
STR
ON
G-T
IE C
OM
PAN
Y IN
C.
Simpson Strong-Tie® Fastening Systems
367
Load Tables, Technical Data and Installation Instructions
WSNTL – Allowable Withdrawal and Pull-Through Loads for Wind or Seismic Loading1-6
Model No.6Nominal Screw Length
(in.)
Thread Length
(in.)
Allowable Pull-Through1 (lb.) Reference Allowable Withdrawal Load per Thread Penetration (lb./in.)Minimum Nominal Panel Thickness (in.)
OSB/Plywood Rated Sheathing, Exposure 1 Framing Member3
7⁄16 15⁄32 19⁄32 23⁄32 2x SPF/HF 2x DFL 2x SP
WSNTL2LS 1.94 1.47
70 71 116 116 93 133 175WSNTL212S 2.50 1.97
WSNTL3S 3.00 2.17
1 . Use the lower of the pull-through or withdrawal values to determine axial design value .2 . Screws must be installed straight into the side grain of the wood main member
with the screw axis at a 90° angle to the wood fibers .3 . The main framing member must be wood having a minimum specific gravity of 0 .50 for
DFL and SP main members, and 0 .42 for SPF and HF main members . DFL is Douglas Fir-Larch . SP is Southern Pine . SPF is Spruce-Pine-Fir . HF is Hem-Fir .
4 . Table based on testing conducted in accordance with AC233 . Design values presented are based on average ultimate values and divided by 5 .
5 . Allowable loads are shown at the wood load duration factor of CD = 1 .0 . Loads may be increased for load duration up to CD = 1 .6 .
6 . The model number may end in the designation L or R, indicating that the screws are packaged as collated or for hand drive, respectively .
Strong-Drive ® WSNTL SUBFLOOR Screw (cont .)
IBC Equivalent Prescriptive Fastening Schedule1
Connection Fastening Location
2015 IBC Table 2304.10.1
19. 1" brace to each stud and plate 2 screws Face
21. 1" x 8" and wider sheathing to each bearing 3 screws Face
24. 1" x 6" subfloor or less to each joist 2 screws Face
2012, 2009 and 2006 IBC Table 2304.9.1
3. 1" x 6" subfloor or less to each joist 2 screws Face
4. Wider than 1" x 6" subfloor to each joist 3 screws Face
20. 1" diagonal brace to each stud and plate 2 screws Face
21. 1" x 8" sheathing to each bearing 3 screws Face
22. Wider than 1" x 8" sheathing to each bearing 3 screws Face
1 . Fastener penetration into the supporting member must be a minimum of 13⁄16" .
Visit our Screw Substitution Calculator at strongtie.com/webapps/screwsubstitutioncalculator/.
Tech
nica
l Inf
orm
atio
n
37 of 40 PEI Report No. 2018-6149
http://strongtie.com/webapps/screwsubstitutioncalculator
-
C-F
-201
7 ©
2017
SIM
PS
ON
STR
ON
G-T
IE C
OM
PAN
Y IN
C.
Simpson Strong-Tie® Fastening Systems
368
Load Tables, Technical Data and Installation Instructions
Simpson Strong-Tie® Strong Drive® WSNTL series #8 flathead, countersunk wood screws are a fast and reliable method for attaching 2-ply and 3-ply girder trusses .
WSNTL – Allowable Loads Comparison of Common Fasteners Used to Attach Truss Plies Together1-6
Fastener7 Length (in.)Diameter
(in.)
Shear (lb.) Withdrawal (lb.)
DFL SP SPF DFL SP SPF
WSNTL212S 2 1⁄2 0.132 85 95 70 133 175 93
WSNTL3S 3 0.132 100 110 85 200 263 140
0.120" collated nail5 3 0.120 81 89 69 44 56 28
0.131" collated nail5 3 0.131 97 106 82 48 61 31
1 . Table values are based on attachment of a 1 1⁄2" side member to a 1 1⁄2" main member of the same species and grade .
2 . Table values are based on the 2012 NDS, CD=1 .0 . Values shall be multiplied by all applicable factors, such as duration of load, etc . except where noted .
3 . Specific Gravities (G) assumed: DFL G = 0 .50, SP G = 0 .55, SPF G = 0 .42 .
4 . The spacing of applied uniform loads to the multi-ply member shall not exceed 24 inches on center .
5 . Assumes collated nail Fyb = 100 ksi .6 . WSNTL212S and WSNTL3S withdrawal values
based on testing per AC233 .7 . The model name may end in the designation L or R, indicating that
the screws are packaged as collated or for hand drive, respectively .
Ply-To-Ply Connection Comparison for a 30' Long 3-Ply Girder – Bottom Chord Loading
Examples based on 3-ply girder spanning 30', 2x6 Southern Pine bottom chords, 825 plf BC load and 1 .15 load duration . Nail and screw spacing is repeated for each layer .
4"o.c.
5"o.c.
Sample Bottom Chord Nailing Requirement for 3-ply Girder using 0.120 x 3" Collated Nails
Bottom chord: 2 rows at 4" o .c . = 360 nails
4"o.c.
5"o.c.
Alternate Fastening using WSNTL3S Screw
Bottom chord: 2 rows at 5" o .c . = 288 screws
Installation:• Screw spacing shall be in accordance with the
fastener schedule provided on the Truss Design Drawing or as otherwise approved by the Truss Designer . Screw spacing shall not exceed 12" on center and shall not be less than 3" on center .
• WSNTL series screws may be installed with the screw heads in either the loaded or unloaded ply . Do not overdrive screws .
• For 3-ply girder assemblies, the WSNTL screws may be installed from the same side as each ply is applied (no flipping of the truss is required) in accordance with BCSI (2006 edition) . Girders that are fastened together at the jobsite must have the fastener heads visible for inspection .
• Stagger the screws in the third ply a minimum of 1" from the screws installed into the first two plies .
• Individual screw locations may be adjusted up to 1⁄2 of the required screw spacing to avoid conflicts with other hardware or to avoid lumber defects . (3" minimum spacing still required .)
• Use minimum of 3" long fasteners to attach hangers to the girder truss .
• A 2,500-rpm motor is recommended .
1" recommended (typ.)
3" min.-12" max.3" min.-12" max.
1¾" min.
¾" min.
¾" min.
Typical Spacing for WSNTL Screw
2-Ply Assembly 3-Ply Assemblies
Truss Plant Installation
Jobsite Installation
Strong-Drive ® WSNTL SUBFLOOR Screw (cont .)
Tech
nica
l Inf
orm
atio
n
38 of 40 PEI Report No. 2018-6149
-
C-F
-201
7 ©
2017
SIM
PS
ON
STR
ON
G-T
IE C
OM
PAN
Y IN
C.
Simpson Strong-Tie® Fastening Systems
369
Load Tables, Technical Data and Installation Instructions
2"–3" WSNTL Fasteners Meet Code RequirementsAs listed in ICC-ES ESR-1472, WSNTL screws meet code requirements for the 2015 and 2012 International Building Code (IBC) and International Residential Code (IRC) . Evaluation report recognized uses of WSNTL screws include the following applications:
• Substitute for 8d and 10d nails in horizontal diaphragms per AWC SDPWS-2008 and IBC (2012 and 2015) Tables 4 .2A, 4 .2B, and 4 .2C
• Code-prescribed wood connections per IBC Tables 2306 .3 .1, 2304 .9 .1 and 2304 .10 .1
• Single, diagonally-sheathed lumber diaphragms per AWC SDPWS Table 4 .2C (IBC 2012 and 2015)
• Prescriptive sheathing applications in IRC Table R602 .3(1) and in structures regulated by the IRC where an engineered design is submitted in accordance with IRC R301 .1 .3
Guidelines for Fastening Diaphragms without GlueThe design of wood floor systems constructed with wood structural panel (WSP) sheathing fastened to framing considers the diaphragm performance of the system as presented in the codes (as affected by framing, sheathing thickness, sheathing layout and fastening) and may also consider the composite action of the sheathing with the framing system (composite action is the combined stiffness of the joist with the sheathing) . The framing systems can be grouped into two classes: (1) sawn lumber and parallel-chord wood trusses, and (2) wood I-joists . WSNTL screws may be used as alternate fasteners to common nails in each floor class subject to certain constraints .
For Diaphragms with a Framing System that is Sawn Lumber or Parallel-Chord Wood TrussesSimpson Strong-Tie WSNTL screws may be used as one-for-one substitutes for 10d common and smaller nails that are specified for horizontal diaphragm design in accordance with the 2015 and 2012 IBC and IRC .
For Diaphragms with Wood I-Joist Framing SystemsI-joist manufacturers use the extra stiffness resulting from composite action when developing allowable floor joist span tables . Therefore, I-joist floor span tables generally assume glued-nailed construction .
1 . For floor systems designed or intended to be glued-nailed:• WSNTL screws may be substituted one-for-one for common nails, without glue,
provided the maximum allowable I-joist span is reduced by 12" compared to the I-Joist manufacturer's glued-nailed spans . The screws shall have at least 1 1⁄4" penetration into the I-joist flange (or full penetration for flanges less than 1 1⁄4" thick) .
• Where glue is used with the screws, no reduction in span is required .
• Check with the I-joist manufacturer for any additional diaphragm requirements .
2 . For floor systems designed or intended to be nailed-only:• WSNTL screws may be substituted one-for-one for common nails, with no
reduction in span, provided at least 1 1⁄4" penetration into the I-joist flange is achieved (or full penetration for flanges less than 1 1⁄4" thick) .
• Check with the I-joist manufacturer for any additional diaphragm requirements .
The Original “No Glue” Solution for Subfloor
Strong-Drive ® WSNTL SUBFLOOR Screw (cont .)
Tech
nica
l Inf
orm
atio
n
39 of 40 PEI Report No. 2018-6149
-
NOTE: SEE SECTION 1 FOR ADDITIONALFASTENERS AT SHEARWALL LOCATIONS
4'-0
"
PROVIDE #8 x 3" WOOD SCREWSAT 6" O/C AT PANEL EDGES
SANDWICH PANEL GLUED TO FLOORTRUSSES WITH SUBFLOOR ADHESIVE
PROVIDE #8 x 3" WOOD SCREWS AT12" O/C AT INTERMEDIATE SUPPORTS
SOUND ABSORPTION PANEL (SAP) BOARD - MIN.REQUIRED FLOOR DIAPHRAGM FASTENERS
UNIT FLOOR FRAMING AT 2'-0" ON CENTER
SCALE: 3/4" = 1'-0"
SECTION 1
DOUBLE TOP PLATE
2x SHEARWALL FRAMING
2x SHEARWALL FRAMING
FLOOR FRAMING AT24" O/C, MAXIMUM
(2) #10 x 4-1/2" LONG WOODSCREWS AT 6" O/C THRU BOTTOMPLATE, SHEATHING LAYERS AND1-1/2" MINIMUM EMBEDMENT INTOFLOOR TRUSS BELOW.
SHEAR ATTACHMENT BYSTRUCTURAL ENGINEER
TOP OR BOTTOM LAYER OF 3/4" STRUCTURALSHEATHING PROVIDES THE STRUCTURALFLOOR DIAPHRAGMS. SEE DETAIL A FORADDITIONAL INFORMATION
SCALE: NO SCALE
DETAIL A
8'-0"
NOTE: SCREW FASTENERSMUST MEET OR EXCEED THECAPACITIES LISTED IN ICC-ESESR-1472
NOTE: SCREW FASTENERSMUST MEET OR EXCEED THECAPACITIES LISTED IN ICC-ESESR-1472
1-1/
2"
NOTE: SECTION FOR REFERENCEONLY. ENGINEER OF RECORD SHALLDESIGN INDIVIDUAL PROJECT FORREQUIRED LOADING CONDITIONS.
SAP BOARD PANELEDGE (TYPICAL)
40 of 40 PEI Report No. 2018-6149
2018-6149 Report Bodypara frame onlypara-1B4para-2B5para-3B6Para Chartperp frame onlyperp-1b7perp-2b8perp-3b9Perp ChartEND DETAIL18in x 12ftB1B2Setup Picsparallel picsperp picsapp coverDetail PicsFastener MeasurementsC-F-2017-p366-3692018-06-26 SAP Board Attachment Detail