Supervision of Water Supply Systems Rehabilitation Works in 17 (21) Towns of Georgia under WIMP (Rehabilitation of Ozurgeti Water Supply System - EIB/WIMP/W/ICB/12-L1)

Due to deteriorated conditions of existing City Network and Transmission Main Pipelines, part of City

Network is to be rehabilitated. 3nr of Pump Stations were to be fully rehabilitated and system modernzied.

Project included: rehabilitation of 3nr pump stations with installation , including complete civil rehabilitation works, provision of new pumps (8nr in total ranging from 360m3/h @ H=65.2m ,to 160m3/h @ H=80.4m), associated Steel Pipes, Valves & Fittings, new Pump Motor Control panels, Building Services, new High Voltage & Low Voltage Switchgear, SCADA System (automatic Pump Control, Flow Measurement, Chlorine Residual Monitoring) and installation of Chlorine Gas Dosing Systems.

Extension of Distribution Network, installation of Distribution Network 5,700m of PE100 Pipe (OD250,

OD200, OD160, OD110, OD90 & OD63), 385m of Steel d219/5mm Pipe, associated 264nr House Connections & associated 2,000m of PE100 Pipe (OD20) and “sectoring” of Network with 19nr Valves.

Page 4: Ozurgeti City / Water Supply Project

ORIGINAL FACADE NEW FACADE

Page 5: Ozurgeti City / Water Supply Project

ORIGINAL STATUS NEW “GRUNDFOS” PUMPS: 3X350/165M3/H, H=65M

Page 6: Ozurgeti City / Water Supply Project
Page 7: Ozurgeti City / Water Supply Project

ORIGINAL PUMP’S CONTROL CABINET NEW PUMP’S CONTROL CABINET

Page 8: Ozurgeti City / Water Supply Project

AUTOMATIC PUMP’S CONTROL

Page 9: Ozurgeti City / Water Supply Project

ORIGINAL STATUS OF EXISTING PUMPS REHABILITATION AND INSTALLATION OF EXISTING PUMPS: 1X630M3/H, H=90M; 1X530M3/H, H=50M

Page 10: Ozurgeti City / Water Supply Project

ORIGINAL CEILING STATUS DISMANTLING OF EXISTING & CONSTRUCTION OF NEW ROOF, CRANE MONORAIL (2T)

Page 11: Ozurgeti City / Water Supply Project

ORIGINAL ROOF SLAB / CEILING STATUS REHABILITATION OF EXISTING ROOF SLAB, NEW PVC CEILING , CRANE MONORAIL (2T)

Page 12: Ozurgeti City / Water Supply Project

NEW ROOF CONSTRUCTION PVC CEILING, CRANE MONORAIL (2T)

Page 13: Ozurgeti City / Water Supply Project

ORIGINAL COLLECTIVE WELL NEW STATUS OF COLLECTIVE WELL

Page 14: Ozurgeti City / Water Supply Project

ORIGINAL COLLECTIVE WELL STATUS COLLECTIVE WELL DURING CONSTRUCTION

Page 15: Ozurgeti City / Water Supply Project

ORIGINAL COLLECTION WELL SUCTION PIPE NEW SUCTION PIPES

Page 16: Ozurgeti City / Water Supply Project

ORIGINAL TRANSFORMER BUILDING REHABILITATED TRANSFORMER BUILDING

Page 17: Ozurgeti City / Water Supply Project

NEW CONTAINER TYPE TRANSFORMER (630KVA)

Page 18: Ozurgeti City / Water Supply Project
Page 19: Ozurgeti City / Water Supply Project

NEW DOUBLE-BUNKER TYPE CHLORINATOR BUILDING

Page 20: Ozurgeti City / Water Supply Project
Page 21: Ozurgeti City / Water Supply Project

DOUBLE BUNKERS FOR CHLORINE GAS CYLINDERS SPRINKLER SYSTEM FOR FLOODING THE CHLORINE GAS CYLINDER

Page 22: Ozurgeti City / Water Supply Project

CHLORINE GENERATION EQUIPMENT, WATER PURIFICATION BY CHLORINE GAS

Page 23: Ozurgeti City / Water Supply Project
Page 24: Ozurgeti City / Water Supply Project

ORIGINAL FAÇADE STATUS NEW FACADE

Page 25: Ozurgeti City / Water Supply Project

ORIGINAL PUMP NEW PUMPS: 3X160M3/H, H=65M

Page 26: Ozurgeti City / Water Supply Project

ORIGINAL PUMP NEW PUMPS DURING INSTALLATION

Page 27: Ozurgeti City / Water Supply Project

ORIGINAL ROOF SLAB, CRANE REHABILITATION WORKS, PVC CEILING, CRANE MONORAIL (2T)

Page 28: Ozurgeti City / Water Supply Project

ORIGINAL COLLECTIVE WELL REHABILITATED WELL

Page 29: Ozurgeti City / Water Supply Project

SUCTION PIPES DURING INSTALLATION

Page 30: Ozurgeti City / Water Supply Project

ORIGINAL FAÇADE, PUMP’S CRANE MONORAIL NEW FAÇADE, MONORAIL CRANE (2T)

Page 31: Ozurgeti City / Water Supply Project

ORIGINAL PUMP’S CONTROL CABINET NEW PUMP’S CONTROL CABINET

Page 32: Ozurgeti City / Water Supply Project

ORIGINAL CHLORINE GAS CHLORINATING EQUIPMENT NEW CHLORINE GENERATION EQUIPMENT

Page 33: Ozurgeti City / Water Supply Project
Page 34: Ozurgeti City / Water Supply Project

NEW TRANSFORMER 400KVA

Page 35: Ozurgeti City / Water Supply Project

EMERGENCY PIT NEXT TO THE CHLORINATOR ROOM – FOR EVACUATION AND DISPOSAL OF CHLORINE GAS CYLINDER IN CASE OF EMERGENCY

MONORAIL CRANES SYSTEM (2T) FOR DELIVERY, REPLACEMENT AND EVACUATION OF CHLORINE GAS CYLINDERS

Page 36: Ozurgeti City / Water Supply Project

ORIGINAL FAÇADE STATUS NEW FAÇADE BEFORE PAINTING

Page 37: Ozurgeti City / Water Supply Project

PS#3 SIDE VIEW WITH NEW PUMP’S CRANE MONORAIL EMERGENCY PIT NEXT TO THE CHLORINATOR ROOM – FOR EVACUATION AND DISPOSAL OF CHLORINE GAS CYLINDER IN CASE OF EMERGENCY

Page 38: Ozurgeti City / Water Supply Project

PS#3 BACKSIDE ORIGINAL STATUS

Page 39: Ozurgeti City / Water Supply Project

ORIGINAL PUMP NEW PUMPS: 2X160/180M3/H, H=80M

Page 40: Ozurgeti City / Water Supply Project
Page 41: Ozurgeti City / Water Supply Project

PRIMER PUMP AUTOMATIC CONTROL OF THE PUMPS

Page 42: Ozurgeti City / Water Supply Project

ORIGINAL CONTROL CABINET NEW CONTROL CABINET

Page 43: Ozurgeti City / Water Supply Project

ORIGINAL TRANSFORMER BUILDING REHABILITATED STATUS

Page 44: Ozurgeti City / Water Supply Project

ORIGINAL TRANSFORMER NEW TRANSFORMER 250KVA

Page 45: Ozurgeti City / Water Supply Project

ORIGINAL STATUS NEW STATUS

Page 46: Ozurgeti City / Water Supply Project

ORIGINAL STATUS OF COLLECTIVE WELL REHABILITATED COLLECTIVE WELL

Page 47: Ozurgeti City / Water Supply Project
Page 48: Ozurgeti City / Water Supply Project

EMERGENCY PIT NEXT TO THE CHLORINATOR ROOM – FOR EVACUATION AND DISPOSAL OF CHLORINE GAS CYLINDER IN CASE OF EMERGENCY

CHLORINE GAS CHLORINE GENERATION EQUIPMENT

Page 49: Ozurgeti City / Water Supply Project

TRANSMISSION/DISTRIBUTION MAIN (KITE MEGRILADZE STREET)

IN TOTAL 1,726M OF PE100, PN12,5 DN200MM TRANSMISSION MAIN PIPE INSTALLED CONNECTING PS#3 TO THE CITY NETWORK

Page 50: Ozurgeti City / Water Supply Project

PIPE MATERIAL, VALVES, HYDRANTS AND FITTINGS

Page 51: Ozurgeti City / Water Supply Project

EXISTING STEEL PIPELINE AND NEW PE PIPELINE, OLD PIPE WAS DISCONNECTED DURING CONSTRUCTION WORKS

TRANSMISSION MAIN PE DN200 CONNECTION TO PS#3

Page 52: Ozurgeti City / Water Supply Project

13NR BRANCHES INSTALLED (PE DN63-160MM) IN TOTAL LENGTH OF 3,060M) WITH 217NR HOUSE CONNECTIONS

PRESSURE TESTING AS PER “SNIP” CONSTRUCTION NORMS AND REGULATIONS 3.05.04-85*

Page 53: Ozurgeti City / Water Supply Project

PE PIPE JOINTS WELDING PREFABRICATED CONCRETE MANHOLES WITH BITUMEN CORROSION PROTECTIVE LAYERS

Page 54: Ozurgeti City / Water Supply Project

LARGE CONSUMER’S SERVICE LINES

Page 55: Ozurgeti City / Water Supply Project

LARGE CONSUMER’S SERVICE LINE MANHOLES

Page 56: Ozurgeti City / Water Supply Project

PIPE SADDLES FOR HOUSE CONNECTIONS SERVICE LINES CONNECTION WITH EXISTING HOUSE CONNECTION

Page 57: Ozurgeti City / Water Supply Project

13NR BRANCHES INSTALLED (PE DN63-160MM) IN TOTAL LENGTH OF 3,060M)

GATE VALVES

Page 58: Ozurgeti City / Water Supply Project

STEEL D219X5MM PIPE IN 385M LENGTH TRENCH EXCAVATION

Page 59: Ozurgeti City / Water Supply Project

EXISTING PIPELINE PARALLEL TO NEW STEEL PIPELINE ABANDONED DURING CONSTRUCTION

Page 60: Ozurgeti City / Water Supply Project

NODE POINTS FOR CONNECTION WITH EXISTING PIPELINES

Page 61: Ozurgeti City / Water Supply Project

PE DN40-250MM IN 900M LENGTH

Page 62: Ozurgeti City / Water Supply Project

47NR HOUSE CONNECTIONS IN 260M LENGTH WATER METER PE BOX

Page 63: Ozurgeti City / Water Supply Project

19NR SECTOR VALVES; 4NR RESIDUAL CHLORINE ANALYSERS; 2NR PRESSURE REDUCING VALVES

PRESSURE REDUCING VALVE SHAFT ON TRANSMISSION MAIN

Page 64: Ozurgeti City / Water Supply Project

PREFABRICATED CONCRETE MANHOLES FOR INSTALLATION OF NEW SECTOR VALVES ON EXISTING NETWORK

Page 65: Ozurgeti City / Water Supply Project

SECTOR VALVES

Page 66: Ozurgeti City / Water Supply Project

FLOW CONTROL – PRESSURE REDUCING VALVE ON TRANSMISSION MAIN