Presentation for USGBC Colorado Rocky Mountain Green on the owner's perspective on net zero energy. Co-presented with Shant

TRANSCRIPT

Page 1: Owning zero usgbc co rmg 2012
Page 2: Owning zero usgbc co rmg 2012

Shanti Pless, LEED APNREL, Commercial Buildings Research Group

Tom Hootman, AIA, LEED APRNL, Director of Sustainability

Page 3: Owning zero usgbc co rmg 2012
Page 4: Owning zero usgbc co rmg 2012
Page 5: Owning zero usgbc co rmg 2012

New Buildings InstituteGetting to Zero 2012 Status Update: A First Look at the Costs and Features of Zero Energy Commercial Buildings (March 2012)

Page 6: Owning zero usgbc co rmg 2012

New Buildings InstituteGetting to Zero 2012 Status Update: A First Look at the Costs and Features of Zero Energy Commercial Buildings (March 2012)

Page 7: Owning zero usgbc co rmg 2012

New Buildings InstituteGetting to Zero 2012 Status Update: A First Look at the Costs and Features of Zero Energy Commercial Buildings (March 2012)

Page 8: Owning zero usgbc co rmg 2012

California PUC 2030

ASHRAE Vision 2020

Federal / EISA 2030

Massachusetts 2030

Living Building Challenge

2030 Challenge

Page 9: Owning zero usgbc co rmg 2012

131K-5K

115K-10K 10K-25K 25K-50K

50K-100K >100K

19 5

8 4New Buildings InstituteGetting to Zero 2012 Status Update: A First Look at the Costs and Features of Zero Energy Commercial Buildings (March 2012)

Page 10: Owning zero usgbc co rmg 2012
Page 11: Owning zero usgbc co rmg 2012

OtherCertifiedSilverGoldPlatinum Source: DBIA Project Database

Average Cost: $334/SFRSF Cost: $259/SF

Cos

t per

Squ

are

Foot

Page 12: Owning zero usgbc co rmg 2012
Page 13: Owning zero usgbc co rmg 2012
Page 14: Owning zero usgbc co rmg 2012
Page 15: Owning zero usgbc co rmg 2012
Page 16: Owning zero usgbc co rmg 2012

Images courtesy of Architectural Nexus

Page 17: Owning zero usgbc co rmg 2012

Image

Image courtesy of GSA, Beck Group and Westlake Reed Leskosky

Page 18: Owning zero usgbc co rmg 2012
Page 19: Owning zero usgbc co rmg 2012
Page 20: Owning zero usgbc co rmg 2012
Page 21: Owning zero usgbc co rmg 2012

New Buildings InstituteEnergy Performance of LEED for New Construction Buildings (March 2008)

Page 22: Owning zero usgbc co rmg 2012
Page 23: Owning zero usgbc co rmg 2012

Goal Setting

Design for Operations

Contractual Performance

Feedback Loop

The Handoff

Manage Plug Loads

Page 24: Owning zero usgbc co rmg 2012

I want a green building

Design a LEED <rating> building

Design a building to use 30% less energy than ASHRAE 90.1-2004

Design a building to use less than 25,000 BTU/sqft

Design a net zero energy building

Page 25: Owning zero usgbc co rmg 2012
Page 26: Owning zero usgbc co rmg 2012
Page 27: Owning zero usgbc co rmg 2012
Page 28: Owning zero usgbc co rmg 2012
Page 29: Owning zero usgbc co rmg 2012
Page 30: Owning zero usgbc co rmg 2012

Safety

LEED Platinum

Energy Star

1. Mission Critical

Page 31: Owning zero usgbc co rmg 2012

2. Highly Desirable800 staff Capacity

25kBTU/sf/year

Architectural integrity

Honor future staff needs

Measurable ASHRAE 90.1

Support culture and amenities

Expandable building

Ergonomics

Flexible workspace

Support future technologies

“How to” manual

Real-time PR” campaign

Secure collaboration with outsiders

Building information modeling

Substantial Completion by 2010

Page 32: Owning zero usgbc co rmg 2012

3. If PossibleNet zero design approach

Most energy efficient building in the world

LEED Platinum Plus

ASHRAE 90.1 + 50%

Visual displays of current energy efficiency

Support public tours

National and global recognition and awards

Support personnel turnover

Page 33: Owning zero usgbc co rmg 2012
Page 34: Owning zero usgbc co rmg 2012
Page 35: Owning zero usgbc co rmg 2012
Page 36: Owning zero usgbc co rmg 2012
Page 37: Owning zero usgbc co rmg 2012
Page 38: Owning zero usgbc co rmg 2012
Page 39: Owning zero usgbc co rmg 2012
Page 40: Owning zero usgbc co rmg 2012
Page 41: Owning zero usgbc co rmg 2012
Page 42: Owning zero usgbc co rmg 2012
Page 43: Owning zero usgbc co rmg 2012
Page 44: Owning zero usgbc co rmg 2012
Page 45: Owning zero usgbc co rmg 2012
Page 46: Owning zero usgbc co rmg 2012
Page 47: Owning zero usgbc co rmg 2012
Page 48: Owning zero usgbc co rmg 2012

Compliance Modeling (Percent better than ASHRAE 90.1)

Predictive Modeling(Absolute energy target)

VERSUS

Page 49: Owning zero usgbc co rmg 2012

COMPETITION DESIGN CONSTRUCTION OPERATIONS

CHARRETTE MODEL AS-DESIGNED MODEL

LEED MODEL + BASELINE AS-BUILT MODEL

OPERATIONS MODEL

Page 50: Owning zero usgbc co rmg 2012

Net Zero Energy Building (After PV):

Site ZEB

0kBtu/SF/year

Source ZEB

-20kBtu/SF/year

Emissions ZEB

-5LB CO2e/SF/year

BClassification

BClassification

BClassification

2030 Baseline

137kBtu/SF/year

LEED Baseline

55kBtu/SF/year

Design/Actual

35kBtu/SF/year

Energy Use Intensity:

Page 51: Owning zero usgbc co rmg 2012
Page 52: Owning zero usgbc co rmg 2012
Page 53: Owning zero usgbc co rmg 2012
Page 54: Owning zero usgbc co rmg 2012
Page 55: Owning zero usgbc co rmg 2012
Page 56: Owning zero usgbc co rmg 2012
Page 57: Owning zero usgbc co rmg 2012
Page 58: Owning zero usgbc co rmg 2012
Page 59: Owning zero usgbc co rmg 2012
Page 60: Owning zero usgbc co rmg 2012

Operators Occupants

Executives IT Managers

Food Service HR Managers

Page 61: Owning zero usgbc co rmg 2012
Page 62: Owning zero usgbc co rmg 2012
Page 63: Owning zero usgbc co rmg 2012

First day of Net zero – June 23, 2011

Page 64: Owning zero usgbc co rmg 2012
Page 65: Owning zero usgbc co rmg 2012

Innovation for Our Energy Future

Measured Versus Modeled Monthly and Cumulative EUI

Page 66: Owning zero usgbc co rmg 2012

Innovation for Our Energy Future

October 2010 – September 2011 Lighting Power Density

Page 67: Owning zero usgbc co rmg 2012

Innovation for Our Energy Future

October 2010 – September 2011 Plug Load Power Density

Note: The elevators are included in the plug loads

Page 68: Owning zero usgbc co rmg 2012

Innovation for Our Energy Future

October 2010 – September 2011 Daily Heating Energy

Page 69: Owning zero usgbc co rmg 2012

Innovation for Our Energy Future

2011 YTD Daily Cooling Energy

Page 70: Owning zero usgbc co rmg 2012

Innovation for Our Energy Future

October 2010 – September 2011 Mechanical System Power Density

Note: The mechanical load is comprised of only fans and pumps

Note: Control of the VFDs was optimized in late October 2010, resulting in energy savings

Note: Control of the dampers was optimized in April 2011, resulting in energy savings

Page 71: Owning zero usgbc co rmg 2012

Coordinate with O&M Plan

Coordinate with Commissioning

Analyze and Report Energy Data

Plan Energy Information System

Page 72: Owning zero usgbc co rmg 2012

Educate and Train Occupants

Manage Plug and Process Loads

Celebrate Success!

Plan for Future Changes