Contents
Issues in Indian Electricity Market Generation and Shortfall Power Consumption Opportunities for DSM DSM measures Competitive Energy Services
Issues
Demand Supply Gap Subsidy in sectors like domestic,
agriculture Limitations in wheeling due to
separate grids Electricity Regulatory bodies in place
for (limited) tariff fixing Private DISCOM players in limited
urban areas
GenerationMW %
Total Thermal 86,975 64.5 %
Coal 71,932 53.4 %
Gas 13,841 10.2 %
Oil 1,201 0.9 %
Hydro 34,130 24.8 %
Nuclear 4,120 3.1 %
Renewable 10,175 7.6 %
Total (MW) 1,35,402
Peak Shortfall 11-12%
Inter-grid transfer 23,000 MW
Opportunities for DSM
Opportunities in Domestic, Agricultural markets
Domestic – Bachat Lamp Yojna Savings through replacement of incandascent
lamps by CFLs distributed by DISCOMs at subsidizes prices – CDM
Agricultural Sector Programmatic approach involving identification
of agricultural feeders, and EE pumpsets Municipal Sector
Water Supply, Street Lighting etc
Bachat Lamp Yojna (BLY)
DISCOM BEE
CERs
CFLs
Buyer in Developed Country
CLF Manufacturer
CERsPayment for CERs
Info on consumers, voltage, identification of sample Household
USERS
Old BulbsRs10-15/CFL
Verification report
CDM Executive Board/Designated operated Entity
Municipal – DSM Delhi Jal Board
Identification of Energy Conservation Measures in Various Sewage Treatment Plants & Sewage Pumping Systems in Delhi Jal Board, India.
Action – Maintaining Unity Power Factor
Key Results - Estimated Savings Potential : Rs. 127 lakhs/annum
Investment Required: Rs. 14.5 lakhs/annum Simple Payback Period: 2 Months Demand Management
DSM measures undertaken
Two part tariff / TOD
Solar lighting Energy Audits
Power factor correction equipment
High Voltage Distribution System
Providing energy efficient equipments by ESCOs
Penalties for harmonic injection
Installation of electronic meters
Dedicated feeders for agricultural sector
Replacement of GSL by CFL
Installation of solar water heaters
Installation of electronic choke
Competitive Energy Services
Started in mid-90s with Government initiative Energy Audit of several government
buildings One major player – DSCL Issues pertaining to
Financing of projects Distribution of benefits Performance guarantees
Expected Learnings on..
Performance Contracting Policy measures Relevant Case Studies Smart Equipments like those for
metering etc.,
Thank You !