MATERIALS REQUIREMENTS
PLANNING MRP
What is MRP?
MRP Input: Master Production Schedule (MPS) Bill of Materials (BOM)
MRP Processing & Output Exploding Netting Offsetting
Advantages & Disadvantages of MRP
Manufacturing Resource Planning (MRPII)
Controls inventory levels, plans production & helps
with manufacturing control system of production of
assembled parts to support forecasted demand
What is Material Requirements Planning?
What is MRP? Developed in 1960s Used in manufacturing
Achieve low per unit costs
Objectives Improve customer service Reduce inventory investment Improve plant operating efficiency
Quantity Schedule
What is MRP?
Demand Managemen
tProduction
Plan
Master Production Schedule
Inventory Record File
Material Requirements Planning
Bill of Materials
Components of MRP
MRP Inputs: MPS & BOM
http://www.resoco.co.uk/rstores.htm
MRP Input: Master Production Schedule
Inputs Forecasts Aggregate Plan
Company policies Inventory File
Take capacity from aggregate plan & allocate Short-range Cost-driven
DescriptionItem Canopy
Item No. 8479
Item Type Manuf.
Product/sales class Ass’y
Value class B
Buyer/planner RB
Vendor/drawing 07142
Phantom code G
Unit price/cost 15
Pegging Y
LLC 3
Physical InventoryOn hand 20
Location Y352
On order 50
Allocated 75
Cycle 5
Difference 4
Inventory File
MRP Input: MPS
Computerized MPS Inputs: forecast, safety stock,
inventory status & lot sizes Calculates: temporary MPS Compares: against load &
capacity
Outputs Rough Cut Capacity Plan
MRP Input: Bill of Materials Raw materials,
assemblies, components, and the quantities of each needed to manufacture an end item
4 Different Contexts: Engineering Manufacturing Sales Service
3 Different Formats Single-Level Indented Modular
MRP Input: BOM Contexts Engineering BOM
Used as products are designed
Manufacturing BOM Used as products are built
Sales BOM As products are ordered
Service BOM As products are maintained
MRP Input: BOM Formats Single Level BOM
Indented BOM
Modular BOM
XYZ Umbrella CompanyBill of Material, Part PH01
Part Number
Description Qty for Each Assembly
Unit of Measure
B100 Base 1 Each
1100 Panel 4 Each
1200 Panel 4 Each
1300 Cross Piece 2 Each
1400 Base Support Bars 4 Each
P100 Receiving Pole 1 Each
1500 Pole 1 Each
1600 Washer 1 Each
1700 Bolt 1 Each
1800 Netting 1 Each
1900 Sand Bag 1 Each
2000 Cover Board 1 Each
C100 Canopy 1 Each
2100 Pole Assembly 1 Each
2200 Button 1 Each
XYZ Umbrella CompanyBill of Material, Part PH01-Umbrella
Part Number
Description Qty for Each Assembly
Unit of Measure
B100 Base 1 Each
P100 Receiving Pole 1 Each
C100 Canopy 1 Each
MRP Processing & Output MRP Matrix 4 basic steps
Exploding Bill of Materials
Netting out Inventory Determining how many
units are required Time-phasing for future
demand & supply
Item: Low-Level Code: Lot Size: Lead Time:
PD 1 2 3 4 5
Gross Requirements
Scheduled Receipts
Projected on Hand
Net Requirements
Planned Order Receipts
Planned Order Releases
MRP Processing Explodes MPS into
amount of Raw materials Parts Subassemblies Assemblies
Netting Order quantity needed
Offsetting Sufficient time to build
goods
Needed in each week of the
planning horizons
MRP Processing: Explosion
Offset Umbrell
a
Base (1)
Receiving Pole
(1)
Canopy (1)
Panel A (4)Panel B (4)
Cross Pieces (2)Base Support Bars
(4)
Pole (1)Washer (1)
Bolt (1)Water/Sand Bag
(1)Cover Board (1)Pole Assembled
(1)Canopy Button (1)
Flat (2)Round (2)
MRP Output
Primary Outputs Recommended Production
Schedule
Recommended Purchasing Schedule
Secondary Reports
Purchase Orders
Action Notices
Advantages & Disadvantages of MRP
Advantages of MRP
Minimize Inventory
Accurate Information
Greater Responsiveness to Market
Future Capacity Planning
Production Planners/Managers
Plant Foremen
Customer Service Representative
Purchasing Manager
Inventory Manager
Company Advantages Individual Advantages
Disadvantages of MRP Reliance on Information
Increased Material Costs
Hazard of Production Slowdown or Shutdown
Hazard of Stock Out
Doesn’t account for Plant & Distribution Capacity
Implementation Difficulties
Evolution of MRP: MRPIIhttp://sapplanning.wordpress.com/2008/01/31/material-master-mrp-tabs/
MRPII: Manufacturing Resource Planning
Developed 1980s
Extended to include Materials, Finance, HR & Plant Capacity
MPS develops MRP Integrates machine & labour capacity
Provides schedule of production Runs according to when materials arrive
Data on cost of production Machine time, labour time & materials provided to finance
MRPII: Advantages & Disadvantages
Includes shop floor feedback & adjusts accordingly
Capacity taken into consideration
Integrates information throughout company
Integration problems
Often limited to one location
No supply chain capabilities
Advantages Disadvantages
In Conclusion
Backward scheduling process for materials
Drastically increased efficiency & decreased inventory upon implementation
Morphed into MRPII
Replaced by more integrated ERP system
Questions
ReferencesAlexander, Dusty. "Integrating Engineering And Manufacturing Bill Of Material (BOM)
Through ERP Software Solutions." Ezine Articles. 2007. Global Shop Solutions. 21 Mar 2009 <http://ezinearticles.com/?Integrating-Engineering-And-Manufacturing-Bill-Of-Material-(BOM)-Through-ERP-Software-Solutions&id=487112>.
Bicheno, John & Elliot, Brian B.R. ‘Managing Demand and Supply of Materials: MRP.’ Operations Management: An Active Approach to Learning. Malden, MA: Blackwell, 1997.
Clancy, Jon. "Engineering Bill of Materials." CIRAS News Vol 32. No 1.1997 21 Mar 2009 <http://www.ciras.iastate.edu/publications/CIRASNews/fall97/bom.html>.
Gaither, Norman. ‘Resource Requirements Planning Systems.’ Production and Operations Management. 6th ed. Orlando, FL: Dryden Press, 1994.
Greasley, Andrew. ‘MPR, JIT and OPT.’ Operations Management in Business. London: Stanley Thornes, 1999.
"Master Scheduling: An Overview." MCTS . March 2009. 21 Mar 2009 <http://www.mcts.com/Master-Scheduling.html>.
Mazzola, Joseph et al. ‘Multistage Manfacturing System: Material Requirements Planning.’ Operations Management: Production of Goods and Services. 3rd ed. Englewood Cliff, NJ: Prentice-Hall, 1992.
ReferencesMbaya, Martin. "The Constraints and Limitations of Manufacturing Resource
Planningas A Tool For Shop Control." Jun 2000 19 Mar 2009 <http://dspace.mit.edu/bitstream/handle/1721.1/28226/47981810.pdf?sequence=1>.
Pandey, P.C.. "MRP II Should its Simplicity Remain Unchanged." Industrial Management 01 05 1996 19 Mar 2009 <http://www.allbusiness.com/specialty-business/579473-1.html>
"Product Structure and Bill of Materials." Conflow Project. March 2009. DRM Associates. 23 Mar 2009 <http://www.npd-solutions.com/bom.html>.
"Sales BOM Implementation." SAP . March 2009. SAP Basis, ABAP Programming . 23 Mar 2009 <http://www.sap-img.com/sap-sd/sales-bom-implementation.htm>.
Sirapobthada, Pantit. IT for Productions & Manufacturing. <http://www.slideshare.net/> 12 March 2009.