  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    1/87

    STRUCTURAL STEEL

    01 01

    29537 DUBAI, UAE .04- 2673738 04-2673663

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    2/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 1 of 86

    MASTER INDEX

    SN Description

    SECTION 1 HOW TO USE THE MANUAL

    1.1. Layout of O&M Manual

    1.2. Scope of Manual

    1.3. Guide to Contents

    SECTION 2 GENERAL OVERVIEW

    2.1. Introduction

    2.2 Brief Description of Fabrication &

    Installation.

    SECTION 3 DESCRIPTION

    3.1 Product

    3.2 Location and Purpose3.3 Design Data

    3.4 Reason for Selection

    SECTION 4 MATERIAL SCHEDULE

    4.1 Material Schedule

    4.2 Manufacturers and Suppliers

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    3/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 2 of 86

    SN Description

    SECTION 5 PARTS IDENTIFICATION AND

    RECOMMENDED SPARES

    5.1 Spare Parts List

    5.2 Manufacturing and Shipping Time

    Required for Imported Spare Parts

    SECTION 6 OPERATION

    6.1 Operation Procedure

    SECTION 7 MAINTENANCE

    7.1 Routine Maintenance

    7.2 Maintenance for Painting if any damages

    7.3 Maintenance for Fire proofing if any

    Damages

    7.4 Schedule for maintenance and inspection

    For Fire proofing

    7.5 Warranty for Fire proofing

    SECTION 8 DISPOSAL INSTRUCTION

    SECTION 9 NAME AND ADDRESS OF MANUFACTURER

    SECTION 10 EMERGENCY INFORMATION

    SECTION 11 MANUFACTURERS LITERATURE

    11.1 Operation & Maintenance Details

    11.2 As Built Drawings

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    4/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 3 of 86

    SECTION - 1

    HOW TO USE THEMANUAL

    INDEX

    1.1 Layout of O&M Manual

    1.2 Scope of Manual

    1.3 Guide to Contents

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    5/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 4 of 86

    1. HOW TO USE THE MANUAL

    This operation and maintenance manual and its objective of providing to the

    reader with an overall & general view of design intent information required for

    operation and maintenance of Fire Proofing & Painting supplied & Applied by

    Eversendai Engineering L.L.C

    1.1 Layout of O&M Manual

    This O&M manual has been organized and created to facilitate the reader to a

    magnitude of general information, manufactures literature, drawings, system details

    and other informations on the fire proofing & Painting. No attempt has been made to

    furnish the basic technical details as it is presumed that only qualified and trained

    manpower will be employed for the operation and maintenance of the equipment

    1.2 Scope of Manual

    This Maintenance manual was created to provide the reader and/or user on how

    the fire proofing and painting shall be maintained. To ensure safe and appropriate usageof the fire proofing and painting, please read the manual carefully prior to start using it.

    Not following the proper instruction may damage the fire proofing and painting.

    1.3 Guide to content

    This manual is intended to provide an overview of the maintenance, operation &

    description of the supplied material on the building. The master index gives of the

    various sections & numbering in order to identify readily & locate specific information.

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    6/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 5 of 86

    SECTION - 2

    GENERAL OVERVIEW

    INDEX

    2.1. Introduction

    2.2 Brief Description of Fabrication & Installation.

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    7/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 6 of 86

    2.1. IntroductionThis Operation and Manual covers structural steel works to the Alshams Tower 1

    (AST) at Al reem island project, Abu Dhabi, U.A.E.

    In order to have good finish, high grade structural steel member are being used

    to construct the structure. In generally, the structural steel members dont

    require the maintenance expect protective coating and any special arrangement

    if applicable

    In this structure, the structural members have been applied with two different

    paint systems & Fire proofing and it is explained briefly as follows

    1. Main Columns 2 Coat system with 200 microns

    2. Skypod Columns 3 Coat system with 250 microns

    3. Floor Beams from Level GF to Level 73 2 Hours fire rating.

    4. Outrigger Plates & Columns @ Level 20&21 and Level 40&41 2 Hours

    fire rating

    The details of the said paint system are explained briefly in the following

    sections.

    Other than that the designed steel members have been fabricated and assembled

    at site by welding and bolting as per design requirement and as per approved

    drawings.

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    8/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 7 of 86

    2.2 Brief Description of Fabrication &Installation.FIRE PROOFING

    1. Prior to the application of Monokote Type MK-6/HY, an inspection shall

    be made to determine that all steel surfaces are acceptable to receive

    fireproofing. The steel to be fireproofed shall be free of oil, grease, excess

    rolling mill scale, excess rust, non-compatible primer, lock down agent or

    any other substance that will impair proper adhesion. When necessary,

    the cleaning of steel surfaces to receive fireproofing shall be the

    responsibility of the general contractor.

    2. The project architect shall determine if the painted/primed structuralsteel to receive fireproofing is compatible with Monokote MK-6/HY.

    3. Many Fire Resistance Designs allow the use of painted metal floor or

    roof deck in place of galvanized decking. Painted decking must be UL listed

    in the specific fire resistance designs and must carry the UL classification

    marking.

    4. Prior to application of Monokote Type MK-6/HY, a bonding agent,

    approved by the fireproofing manufacturer, shall be applied to all concrete

    substrates to receive Type MK-6/HY.

    5. Fireproofing to the underside of roof deck assemblies shall be done

    only after roofing application is complete and roof traffic has ceased.

    6. No fireproofing shall be applied prior to completion of concrete work

    on steel decking.

    Features

    Proven in-place performance

    Low in-place cost

    Fast, efficient application

    UL tested Building Code compliance (ICBO, SBCCI, BOCA, NBCC)

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    9/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 8 of 86

    SECTION 3

    DESCRIPTION

    INDEX

    3.1 Product3.2 Location and Purpose

    3.3 Design Data

    3.4 Reason for Selection

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    10/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 9 of 86

    3.1 Product

    Please refer the attached manufacturers catalogue

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    11/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 10 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    12/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 11 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    13/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 12 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    14/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 13 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    15/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 14 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    16/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 15 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    17/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 16 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    18/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 17 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    19/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 18 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    20/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 19 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    21/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 20 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    22/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 21 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    23/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 22 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    24/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 23 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    25/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 24 of 86

    3.2 Location and Purpose

    LOCATIONPAINT:

    Level: Ground floor to Level 73

    FIRE PROOFING:

    Level: Ground floor to Level 73

    PURPOSE

    PAINT:

    Corrosion protection & Finishing of Structural Steel

    FIRE PROOFING:

    Fire Protection (2 Hours Fire rating for Structural Steel)

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    26/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 25 of 86

    3.3 Design Data

    FIRE PROOFING :

    Monokote Type MK-6/HY

    Physical Properties Value* Test Method

    Dry Density, minimum

    average 240 kg/m3

    (15 pcf) ASTM E 605, UBC STD 7-6

    Bond Strength 16.2 KPa (339 psf) ASTM E-736

    Compression, 10%

    Deformation68.9 KPa (1,440 psf) ASTM E-761

    Air Erosion 0.000 g/m2 (0.000 g/ft2) ASTM E-859

    High Velocity Air Erosion No continued erosion after 4 hours ASTM E-859, UMC STD 6-1

    Corrosion Does not contribute to corrosion ASTM E-937

    Bond Impact No cracking, spalling ordelamination ASTM E-760

    DeflectionNo cracking, spalling or

    delaminationASTM E-759

    Resistance to Mold Growth No growth after 60 days ASTM G 21

    Surface Burning

    Characteristics

    Flame Spread 0

    Smoke Developed 0

    ASTM E-84

    CombustibilityLess than 5 MJ/m2 total, 20 kw/m2

    peak heat releaseASTM E-1354

    Impact Penetration 3.3 cm3Developed by City of San

    Francisco

    Abrasion Resistance 8.3 cm3Developed by City of San

    Francisco

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    27/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 26 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    28/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 27 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    29/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 28 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    30/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 29 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    31/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 30 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    32/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 31 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    33/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 32 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    34/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 33 of 86

    3.4 Reason for Selection

    NOT APPLICABLE

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    35/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 34 of 86

    SECTION 4

    MATERIAL SCHEDULE

    INDEX

    4.1 Material Schedule

    4.2 Manufacturers and Suppliers

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    36/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 35 of 86

    4.1 Material Schedule

    PAINT

    For Main Columns (Level: Ground floor to level 41)

    Primer: Carboguard - E19 & Thinner # 15 (75 Microns)

    Intermediate / Final Coat:Carboguard - 893 MIO (Grey) & Thinner # 2 (125 Microns)

    Total: 200 Microns

    For Skypod Columns (Level: 12 to 73)

    Primer:

    Carboguard - E19 & Thinner # 15 (75 Microns)

    Intermediate Coat:Carboguard - 893 MIO (Grey) & Thinner # 2 (125 Microns)

    Final Coat:Carbothane 834 (White) & Thinner # 25 (50 Microns)

    Total: 250 Microns

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    37/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 36 of 86

    FIRE PROOFING ( Level GF to 73 )

    MUEHLHAN PROCON EMIRATES L.L.C.

    PROJECT LOADING SCHEDULE - REV 2

    CLIENT : M/s EVERSENDAI ENGINEERING

    PROJECT: AL SHAMS TOWER

    CEMENTITIOUS FIREPROOFING ON STRUCTURAL STEEL

    FIRE RATING 2 HOURS / BS 476-21

    MATERIAL USED - MONOKOTE MK- 6 / HY

    S.No. Member Type Size Coating Sides DFT (mm)

    1 Angle ( Deck Support ) ( L42 to L72) EA 70x70x8 3 29

    2

    Angle ( Deck Support in Skypod

    Column

    & Skypod Beam ) ( L42 to L72 )

    EA 100X100X10 3 25

    3 Skypod Column ( L3 to L72 ) CHS 457x12 ALL 15

    4 Skypod Beam ( L3 to L72 ) UB 356x171x51 3 29

    5 Embedment ( L42 to L72 ) PL 20x300x340Exposed

    Locations21

    6 Canopy ( L1, L2, L6, & L8 ) EA 100x100x8Exposed

    Locations29

    7 Canopy ( L1, L2, L6, & L8 ) PFC 300x100x45.5Exposed

    Locations 25

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    38/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 37 of 86

    S.No. Member Type Size Coating Sides DFT (mm)

    8 Canopy ( L1, L2, L6, & L8 ) RHS 450x250x16Exposed

    Locations15

    9 Canopy ( L1, L2, L6, & L8 ) SHS 250x250x9Exposed

    Locations18

    10 Canopy ( L1, L2, L6, & L8 ) UC 305x305x158Exposed

    Locations18

    11 Retrofit ( Level - 05 ) UB 203x133x25 3 34

    12 Retrofit ( Level - 05 ) UC 356x368x129 3 21

    13 Retrofit ( Level - 05 ) UC 356x368x153 3 18

    14 Retrofit ( Level - 05 ) F 400x30 B 390x12 3 18

    Note

    1All thickness (DFT) is extracted from Warrington fire research test report - Table 1 as per

    BS 476:Part 21

    2 For each steel section sizes, thickness of fireproofing is selected in combination of the section factor HP/Aor m-1 and the period of fire rating hours.

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    39/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 38 of 86

    4.2 Manufacturers and Suppliers

    EVERSENDAI ENGG L.L.C

    #33, Al Qusais Industrial Area #1,

    Road #204, 19th Street,

    P.O.Box:29537, DUBAI, U.A.E.

    Tel: 04-2673738, Fax: 04-2673663

    www.eversendai.com

    STONECOR MIDDLE EAST L.L.C

    P.O.Box : 3034, Dubai, U.A.E

    Tel: 04-3470460, Fax: 04-3470242

    Email : [email protected]

    ARABIAN VERMICULITE INDUSTRIES

    P.O.Box : 7137, Dammam 31462, Saudi Arabia

    Tel: 00966-3-8471450, Fax: 00966-8471575

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    40/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 39 of 86

    SECTION 5

    PARTS IDENTIFICATION ANDRECOMMENDED SPARES

    INDEX

    5.1 Spare Parts List5.2 Manufacturing and Shipping Time Required for Imported Spare

    Parts

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    41/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 40 of 86

    5.1 Spare Parts List

    NOT APPLICABLE

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    42/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 41 of 86

    5.2 Manufacturing and Shipping Time Required for

    Imported Spare Parts

    NOT APPLICABLE

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    43/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 42 of 86

    SECTION 6

    OPERATION

    INDEX

    6.1 Operation Procedure

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    44/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 43 of 86

    6.1 Operation Procedure

    Cementitious fireproof coating is inorganic fireproofing formulation

    single Powder component that is mixed with potable water. Impact resistance for this

    material is very low, mechanical impact on these surfaces should be avoided. Pressure

    water should not be forced on cementitious fireproof surfaces.

    Above impacts can result in damaging the cementitious coatings which

    affects the Fire resistance of the steel structure. But in case if any of this damages take

    place on the fireproofed surfaces, below mentioned repairing procedure shall be

    followed.

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    45/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 44 of 86

    SECTION 7

    MAINTENANCE

    INDEX

    7.1 Routine Maintenance

    7.2 Maintenance for Painting if any damages.

    7.3 Maintenance for Fire proofing if any damages.

    7.4 Schedule for maintenance and inspection for fire proofing

    7.5 Warranty for Fire proofing

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    46/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 45 of 86

    7.1 Routine Maintenance

    NOT APPLICABLE

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    47/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 46 of 86

    7.2 Maintenance for Painting if any damages

    Epoxy polymide (Primer), Cycoaliphatic Amine Epoxy (Intermediate coat) & Acrylic

    aliphatic polyurethane ( Final Coat ).

    - Use/Location : Internally exposed & Concealed

    steelwork

    - Paint Manufacturer : Stonecor Middle east L.L.C

    - Shop Preparation : Blast clean to Preparation Grade Sa2

    (BS 7079 Part A1 SA 2.5).

    - Shop Primer : Carboguard E 19- Dry Film Thickness : 75 m minimum

    - Colour : Grey

    - Environmental : VOC: 413 g/l

    - Shop Intermediate : Carboguard 893 MIO

    - Dry Film Thickness : 125 m minimum

    - Colour : Grey

    - Environmental : VOC: 216 g/l

    - Shop Top Coat : Carbothane 834 (Skypod Columns only

    )

    - Dry Film Thickness : 50 m minimum- Colour : Grey

    - Environmental : VOC: 352 g/l

    Refer to Carboline Protective Coatings Carbothane 834 Recommended Working

    Procedures to be read in conjunction with the Carbothane 834 technical data

    sheet and material safety data sheet (MSDS). Provided information is to be

    strictly adhered to. If the steel fabricator does not have the capability of applying

    the complete specified two coat system at works then they are to subcontract the

    painting programme to a contractor recommended by International Protective

    Coatings.

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    48/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 47 of 86

    Surface Preparation and Touch Up at Site

    Surface Preparation

    Mark damaged area.

    Presence of oil/grease should be removed using a suitable degreaser.

    Presence of soluble contaminants should be removed using sweet water.

    Damage to Primer

    Area less than 0.1 sq.meter power tool clean to St 3, to bare metal, using 80 disc

    sander, feather edge to sound coating min. 50 mm.

    ApplyPrimer : Carboguard E 19 - Grey Min. DFT of 75 microns

    Followed by

    Int. Coat : Carboguard 893 MIO -Grey Min. DFT of 125 microns

    Top Coat : Carbothane 834 - Min. DFT of 50 microns (Skypod Columns only )

    Damage to Int Coat

    Area less than 0.1 sq.meter Hand tool clean to St 2, to primer, using 80 disc

    emery paper, feather edge to sound coating min. 50 mm.

    Apply

    Int. Coat : Carboguard 893 MIO -Grey Min. DFT of 125 micronsTop Coat : Carbothane 834 - Min. DFT of 50 microns (Skypod Columns only )

    Damage to Top Coat

    Area less than 0.1 sq.meter Hand tool clean to St 2, to intermediate coat, using 80

    disc emery paper, feather edge to sound coating min. 50 mm.

    Apply

    Top Coat : Carbothane 834 - Min. DFT of 50 microns (Skypod Columns only )

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    49/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 48 of 86

    7.3 Maintenance for Fire proofing if any damages

    Cementitious fireproofing that has been damaged or removed may be repaired

    by hand rush box or hand trowelling freshly mixed product to the affected areas.

    Where damage occurs to fireproof coating, but where the damage does not

    Penetrate through the primer to the steel surface, then the loose coating should be

    knocked down around the affected area. Scratch and rough the existing surface to

    achieve the best

    possible adhesion.

    The removed surface should then be cleaned with potable water or sweep air

    blast.

    If existing coating has become very dry, dampen the surfaces adjacent to the

    repair area with potable water. Thoroughly soak existing coating with clean potable

    water to ensure Adhesion with new material to be placed.

    Mix the cementitious fireproofing material in accordance with the Mixing

    Procedure of manufactures application instruction.

    Apply cementitious fireproofing material using hand rush box or mason spoon

    and trowel to finish level with existing surface.

    If more than one coat is required ensure that preceding coats are left with a

    rough finish well scratched to ensure good bonding of subsequent coats.

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    50/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 49 of 86

    When patch is dry cover with hesin cloth, polythene sheet and cure as specified.

    Where the damage is more severe, resulting in damage to the primer system

    exposing bare steel (particularly in external and humid internal conditions), then the

    primer should be touched up with a zinc rich epoxy primer and allowed to dry, prior to

    the application of cementitious fireproof coating material. It may be necessary to

    remove a further area of fireproof coating surrounding the exposed steel to facilitate

    primer touch-up depending on the scale of damage.

    If the thickness of the patch is greater than 13 mm (1/2), multiple coats will be

    necessary. Application of more thickness may result in cracking and extended drying

    times.

    Materials to be used

    Monokote MK-6/HY

    Potable water for mixing

    Safety

    Monokote MK-6/HY Material are Non-hazardous material as per the

    manufacturers material Safety data sheet. Dust masks shall be used while mixing and

    application.

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    51/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 50 of 86

    7.4 Schedule for maintenance and inspection for Fire

    proofing

    Inspection Schedule

    1 First Inspection August 2011

    2 Second Inspection August 2013

    3 Third Inspection August 2015

    4 Fourth Inspection August 2017

    5 Fifth Inspection August 2019

    Notes

    All necessary access, equipments access to the fireproofing locations, removal

    of obstructions to access to be provided by the client for free charge.

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    52/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 51 of 86

    7.5 Warranty for Fire proofing

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    53/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 52 of 86

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    54/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 53 of 86

    SECTION 8

    DISPOSAL INSTRUCTION

    NOT APPLICABLE

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    55/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 54 of 86

    SECTION 9

    NAME AND ADDRESS OF

    MANUFACTURER

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    56/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 55 of 86

    NAME AND ADDRESS OF MANUFACTURER

    STRUCTURAL STEEL WORKS

    EVERSENDAI ENGG L.L.C

    #33, Al Qusais Industrial Area #1,

    Road #204, 19th Street,

    P.O.Box:29537, DUBAI, U.A.E.

    Tel: 04-2673738, Fax: 04-2673663

    www.eversendai.com

    PAINTING WORKS

    STONECOR MIDDLE EAST L.L.C

    P.O.Box: 3034, Dubai, U.A.E

    Tel: 04-3470460, Fax: 04-3470242

    Email: [email protected]

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    57/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 56 of 86

    FIRE PROOFING WORKS

    CONTACT LIST - APPLICATOR

    Applicator Name : Procon Emirates L.L.C.

    Contact Name : Nagarajan Kothandan

    Designation : Project Manager

    Mobile : 050 4454951

    Telephone : 02-6218662

    Fax : 02-6218829

    E-mail : [email protected] : P.O. Box 27388

    Location : Abu Dhabi

    Country : UAE

    CONTACT LIST SUPLLIER

    Supplier Name : Arabian Vermiculite Industries (AVI)

    Contact Name : Yogesh Harnal

    Designation : Sales Manager

    Mobile : 050 6440691Telephone : 04-2211966

    Fax : 04-2238600

    E-mail : Yogesh:[email protected]

    Address : P.O. Box 7137

    Location : Dammam

    Country : Kingdom of Saudi Arabia

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    58/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 57 of 86

    SECTION 10

    EMERGENCY INFORMATION

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    59/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 58 of 86

    STRUCTURAL STEEL WORKS

    NORMAL WORKING HOURSSATURDAY TO THURSDAY :

    06.30 am to 06.30 pm

    CONTACT PERSONMr.N.S.Rao

    Regional Director

    COMPANY ADDRESS

    EVERSENDAI ENGINEERING L.L.C

    # 33, Al Qusais Industrial Area # 1, Road # 204

    19 th. Street, Post Box : 29537,Dubai, U.A.ETele : 04-2673738, Fax : 04-2673663

    Email id [email protected]

    Website www.eversendai.com

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    60/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 59 of 86

    FIRE PROOFING WORKS

    APPLICATOR

    CONTACT PERSON &

    COMPANY ADDRESS

    Mr. Gautam Arya

    General Manager

    PROCON EMIRATES L.L.C

    Post Box : 27388,Abudhabi, U.A.E

    Tele : 02-6218662, Fax : 02-6218829

    Email id : [email protected]

    Website : www.muehlhan.com

    PRODUCT

    SUPPLIER DETAILS

    ARABIAN VERMICULITE INDUSTRIES

    P.O.Box : 7137, Dammam 31462, Saudi Arabia

    Tel: 00966-3-8471450, Fax: 00966-8471575

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    61/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 60 of 86

    PAINTING WORKS

    PRODUCT

    SUPPLIER DETAILS

    STONECOR MIDDLE EAST L.L.C

    P.O.Box : 3034, Dubai, U.A.E

    Tel: 04-3470460, Fax: 04-3470242

    Email : [email protected]

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    62/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 61 of 86

    SECTION 11

    MANUFACTURERS LITERATURE

    INDEX

    11.1 Operation & Maintenance Details

    11.2 As Built Drawings

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    63/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 62 of 86

    11.1 Operation & Maintenance Details

    NOT APPLICABLE

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    64/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 63 of 86

    11.2 As Built

    Drawings

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    65/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 64 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    1 T1C-C-AR-S-C10-0001 ST-1 GF GA PLAN

    2 T1C-C-AR-S-C10-0002 ST-1 LEVEL 1 GA PLAN

    3 T1C-C-AR-S-C10-0003 ST-1 LEVEL 1 SECTIONAL DETAILS-1

    4 T1C-C-AR-S-C10-0004 ST-1 LEVEL 1 SECTIONAL DETAILS-2

    5 T1C-C-AR-S-C10-0005 ST-1 LEVEL 1 EMBEDMENT DETAILS-1

    6 T1C-C-AR-S-C10-0006 ST-1 LEVEL 1 CONNECTION DETAILS-1

    7 T1C-C-AR-S-C10-0007 ST-1 LEVEL 1 CONNECTION DETAILS-2

    8 T1C-C-AR-S-C10-0008 ST-1 LEVEL 1 EMBEDMENT DETAILS-2

    9 T1C-C-AR-S-C10-0009 ST-1 LEVEL 1 EMBEDMENT DETAILS-4

    10 T1C-C-AR-S-C10-0010 ST-1 LEVEL 1 EMBEDMENT DETAILS-5

    11 T1C-C-AR-S-C10-0011 ST-1 LEVEL 1 CONNECTION DETAILS-6

    12 T1C-C-AR-S-C10-0013 ST-1 TOWER-1 COLUMN SPLICE DETAILS

    13 T1C-C-AR-S-C10-0014 ST-1 LEVEL-1 CANOPY GA PLAN

    14 T1C-C-AR-S-C10-0015 ST-1 LVL-1 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

    15 T1C-C-AR-S-C10-0357 ST-01 LVL-1 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

    16 T1C-C-AR-S-C10-P01-0001 LEVEL 1 EMBEDMENT LAYOUT & DETAILS-1

    17 T1C-C-AR-S-C10-P01-0002 LEVEL 1 EMBEDMENT LAYOUT & DETAILS-2

    18 TIC-C-AR-S-C10-01-D8001-01 LEVEL-1 DECKING SECTIONS & DETAILS

    19 TIC-C-AR-S-C10-01-GA006-01 LEVEL -1 DECKING LAYOUT

    20 T1C-C-AR-S-C10-0016 ST-1 LEVEL 2 CANOPY GA PLAN

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    66/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 65 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    21 T1C-C-AR-S-C10-0017 ST-1 LEVEL 2 CANOPY ROOF SUPPORT SECTIOS & CONNECTION DETAILS

    22 T1C-C-AR-S-C10-0018 ST-1 LEVEL 2 GA PLAN

    23 T1C-C-AR-S-C10-0023 ST-1 LEVEL-2 CONNECTION DETAILS-1

    24 T1C-C-AR-S-C10-0024 ST-1 LEVEL-2 CONNECTION DETAILS-2

    25 T1C-C-AR-S-C10-0025 ST-1 LEVEL-2 CONNECTION DETAILS-3

    26 T1C-C-AR-S-C10-0026 ST-1 LEVEL-2 CONNECTION DETAILS-4

    27 T1C-C-AR-S-C10-0027 ST-1 LEVEL-2 CONNECTION DETAILS-5

    28 T1C-C-AR-S-C10-0028 ST-1 LEVEL-2 CONNECTION DETAILS-6

    29 T1C-C-AR-S-C10-0029 ST-1 LEVEL-2 CONNECTION DETAILS-7

    30 T1C-C-AR-S-C10-0030 ST-1 LEVEL-2 CONNECTION DETAILS-8

    31 T1C-C-AR-S-C10-02-E9001 LEVEL 2 EMBEDMENT DETAILS-1

    32 T1C-C-AR-S-C10-02-E9002 LEVEL 2 EMBEDMENT DETAILS-2

    33 T1C-C-AR-S-C10-02-GA002 LEVEL 2 EMBEDMENT LAYOUT.

    34 T1C-C-AR-S-C10-0383 ST-01 LEVEL-02 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

    35 TIC-C-AR-S-C10-02-D8001-01 LEVEL-2 DECKING SECTIONS & DETAILS

    36 TIC-C-AR-S-C10-02-GA006-01 LEVEL -2 DECKING LAY OUT

    37 T1C-C-AR-S-C10-0019 ST-1 LEVEL 3 GA PLAN

    38 T1C-C-AR-S-C10-0031 ST-1 LEVEL-3 CONNECTION DETAILS-1

    39 T1C-C-AR-S-C10-0032 ST-1 LEVEL-3 CONNECTION DETAILS-2

    40 T1C-C-AR-S-C10-0033 ST-1 LEVEL-3 CONNECTION DETAILS-3

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    67/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 66 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    41 T1C-C-AR-S-C10-0034 ST-1 LEVEL-3 CONNECTION DETAILS-4

    42 T1C-C-AR-S-C10-0035 ST-1 LEVEL-3 CONNECTION DETAILS-5

    43 T1C-C-AR-S-C10-0036 ST-1 LEVEL-3 CONNECTION DETAILS-6

    44 T1C-C-AR-S-C10-0037 ST-1 LEVEL-3 CONNECTION DETAILS-7

    45 T1C-C-AR-S-C10-0038 ST-1 LEVEL-3 CONNECTION DETAILS-8

    46 T1C-C-AR-S-C10-0039 ST-1 LEVEL-3 CONNECTION DETAILS-9

    47 T1C-C-AR-S-C10-03-E9001 LEVEL 3 EMBEDMENT DETAILS-1

    48 T1C-C-AR-S-C10-03-E9002 LEVEL 3 EMBEDMENT DETAILS-2

    49 T1C-C-AR-S-C10-03-GA002 LEVEL 3 EMBEDMENT LAYOUT.

    50 TIC-C-AR-S-C10-03-D8001-01 LEVEL-3 DECKING SECTIONS & DETAILS

    51 TIC-C-AR-S-C10-03-GA006-01 LEVEL -3 DECKING LAY OUT

    52 T1C-C-AR-S-C10-0020 ST-1 LEVEL 4 GA PLAN

    53 T1C-C-AR-S-C10-0040 ST-1 LEVEL-4 CONNECTION DETAILS-1

    54 T1C-C-AR-S-C10-0041 ST-1 LEVEL-4 CONNECTION DETAILS-2

    55 T1C-C-AR-S-C10-0042 ST-1 LEVEL-4 CONNECTION DETAILS-3

    56 T1C-C-AR-S-C10-0043 ST-1 LEVEL-4 CONNECTION DETAILS-4

    57 T1C-C-AR-S-C10-0044 ST-1 LEVEL-4 CONNECTION DETAILS-5

    58 T1C-C-AR-S-C10-0045 ST-1 LEVEL-4 CONNECTION DETAILS-6

    59 T1C-C-AR-S-C10-0046 ST-1 LEVEL-4 CONNECTION DETAILS-7

    60 T1C-C-AR-S-C10-0047 ST-1 LEVEL-4 CONNECTION DETAILS-8

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    68/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 67 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    61 T1C-C-AR-S-C10-0048 ST-1 LEVEL-4 CONNECTION DETAILS-9

    62 T1C-C-AR-S-C10-04-E9001 LEVEL 4 EMBEDMENT DETAILS-1

    63 T1C-C-AR-S-C10-04-E9002 LEVEL 4 EMBEDMENT DETAILS-2

    64 T1C-C-AR-S-C10-04-GA002 LEVEL-4 EMBEDMENT LAYOUT

    65 TIC-C-AR-S-C10-04-D8001-01 LEVEL-4 DECKING SECTIONS & DETAILS

    66 TIC-C-AR-S-C10-04-GA006-01 LEVEL -4 DECKING LAY OUT

    67 T1C-C-AR-S-C10-0021 ST-1 LEVEL 5 GA PLAN

    68 T1C-C-AR-S-C10-0049 ST-1 LEVEL-5 CONNECTION DETAILS-1

    69 T1C-C-AR-S-C10-0050 ST-1 LEVEL-5 CONNECTION DETAILS-2

    70 T1C-C-AR-S-C10-0051 ST-1 LEVEL-5 CONNECTION DETAILS-3

    71 T1C-C-AR-S-C10-0052 ST-1 LEVEL-5 CONNECTION DETAILS-4

    72 T1C-C-AR-S-C10-0053 ST-1 LEVEL-5 CONNECTION DETAILS-5

    73 T1C-C-AR-S-C10-0054 ST-1 LEVEL-5 CONNECTION DETAILS-6

    74 T1C-C-AR-S-C10-05-E9001 LEVEL 5 EMBEDMENT DETAILS-1

    75 T1C-C-AR-S-C10-05-GA002 LEVEL-5 EMBEDMENT LAYOUT

    76 TIC-C-AR-S-C10-05-D8001-01 LEVEL-5 DECKING SECTIONS & DETAILS

    77 TIC-C-AR-S-C10-05-GA006-01 LEVEL -5 DECKING LAY OUT

    78 T1C-C-AR-S-C10-05-RF-GA001 Marking Plan of Retrofit Beam @ Under HCS

    79 T1C-C-AR-S-C10-0055 ST-1 LEVEL 6 GA PLAN

    80 T1C-C-AR-S-C10-0056 ST-1 LEVEL-6 CONNECTION DETAILS-1

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    69/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 68 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    81 T1C-C-AR-S-C10-0057 ST-1 LEVEL-6 CONNECTION DETAILS-2

    82 T1C-C-AR-S-C10-0058 ST-1 LEVEL-6 CONNECTION DETAILS-3

    83 T1C-C-AR-S-C10-0059 ST-1 LEVEL-6 CONNECTION DETAILS-4

    84 T1C-C-AR-S-C10-0060 ST-1 LEVEL-6 CONNECTION DETAILS-5

    85 T1C-C-AR-S-C10-0061 ST-1 LEVEL-6 CONNECTION DETAILS-6

    86 T1C-C-AR-S-C10-0062 ST-1 LEVEL-6 CONNECTION DETAILS-7

    87 T1C-C-AR-S-C10-0388 ST-01 LEVEL-6 CANOPY GA PLAN

    88 T1C-C-AR-S-C10-0389 ST-01 LEVEL-6 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

    89 T1C-C-AR-S-C10-0390 ST-01 LEVEL-6 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

    90 T1C-C-AR-S-C10-06-E9001 LEVEL-6 EMBEDMENT DETAILS-1

    91 T1C-C-AR-S-C10-06-GA002 LEVEL-6 EMBEDMENT LAYOUT

    92 TIC-C-AR-S-C10-06-D8001-01 LEVEL- 6 DECKING SECTIONS & DETAILS

    93 TIC-C-AR-S-C10-06-GA006-01 LEVEL- 6 DECKING LAYOUT

    94 T1C-C-AR-S-C10-0064 ST-01 LEVEL 7 GA PLAN

    95 T1C-C-AR-S-C10-0065 ST-01 LEVEL-7 CONNECTION DETAILS-1

    96 T1C-C-AR-S-C10-0066 ST-01 LEVEL-7 CONNECTION DETAILS-2

    97 T1C-C-AR-S-C10-0067 ST-01 LEVEL-7 CONNECTION DETAILS-3

    98 T1C-C-AR-S-C10-0068 ST-01 LEVEL-7 CONNECTION DETAILS-4

    99 T1C-C-AR-S-C10-0069 ST-01 LEVEL-7 CONNECTION DETAILS-5

    100 T1C-C-AR-S-C10-0070 ST-01 LEVEL-7 CONNECTION DETAILS-6

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    70/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 69 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    101 TIC-C-AR-S-C10-07-D8001-01 LEVEL- 7 DECKING SECTIONS & DETAILS

    102 TIC-C-AR-S-C10-07-GA006-01 LEVEL- 7 DECKING LAYOUT

    103 T1C-C-AR-S-C10-07-E9001 LEVEL-7 TO 19 EMBEDMENT DETAILS-1

    104 T1C-C-AR-S-C10-07-GA002 LEVEL-7 TO 19 EMBEDMENT LAYOUT

    105 T1C-C-AR-S-C10-0071 ST-01 LEVEL 8 GA PLAN

    106 T1C-C-AR-S-C10-0072 ST-01 LEVEL-8 CONNECTION DETAILS-1

    107 T1C-C-AR-S-C10-0073 ST-01 LEVEL-8 CONNECTION DETAILS-2

    108 T1C-C-AR-S-C10-0074 ST-01 LEVEL-8 CONNECTION DETAILS-3

    109 T1C-C-AR-S-C10-0075 ST-01 LEVEL-8 CONNECTION DETAILS-4

    110 T1C-C-AR-S-C10-0076 ST-01 LEVEL-8 CONNECTION DETAILS-5

    111 T1C-C-AR-S-C10-0077 ST-01 LEVEL-8 CONNECTION DETAILS-6

    112 T1C-C-AR-S-C10-0078 ST-01 LEVEL-8 CONNECTION DETAILS-7

    113 T1C-C-AR-S-C10-0391 ST-01 LEVEL-8 CANOPY GENERAL ARRANGEMENT PLAN

    114 T1C-C-AR-S-C10-0392 ST-01 LEVEL-8 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

    115 T1C-C-AR-S-C10-0393 ST-01 LEVEL-8 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

    116 TIC-C-AR-S-C10-08-D8001-01 LEVEL- 8 DECKING SECTIONS & DETAILS

    117 TIC-C-AR-S-C10-08-GA006-01 LEVEL- 8 DECKING LAYOUT

    118 T1C-C-AR-S-C10-0079 ST-01 LEVEL 9 GA PLAN

    119 T1C-C-AR-S-C10-0080 ST-01 LEVEL-9 CONNECTION DETAILS-1

    120 T1C-C-AR-S-C10-0081 ST-01 LEVEL-9 CONNECTION DETAILS-2

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    71/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 70 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    121 T1C-C-AR-S-C10-0082 ST-01 LEVEL-9 CONNECTION DETAILS-3

    122 T1C-C-AR-S-C10-0083 ST-01 LEVEL-9 CONNECTION DETAILS-4

    123 T1C-C-AR-S-C10-0084 ST-01 LEVEL-9 CONNECTION DETAILS-5

    124 T1C-C-AR-S-C10-0085 ST-01 LEVEL-9 CONNECTION DETAILS-6

    125 TIC-C-AR-S-C10-08-D8001-01 LEVEL- 9 to 19 DECKING SECTIONS & DETAILS

    126 TIC-C-AR-S-C10-08-GA006-01 LEVEL- 9 to 19 DECKING LAYOUT

    127 T1C-C-AR-S-C10-0086 ST-01 LEVEL 10 GA PLAN

    128 T1C-C-AR-S-C10-0087 ST-01 LEVEL-10 CONNECTION DETAILS-1

    129 T1C-C-AR-S-C10-0088 ST-01 LEVEL-10 CONNECTION DETAILS-2

    130 T1C-C-AR-S-C10-0089 ST-01 LEVEL-10 CONNECTION DETAILS-3

    131 T1C-C-AR-S-C10-0090 ST-01 LEVEL-10 CONNECTION DETAILS-4

    132 T1C-C-AR-S-C10-0091 ST-01 LEVEL-10 CONNECTION DETAILS-5

    133 T1C-C-AR-S-C10-0092 ST-01 LEVEL-10 CONNECTION DETAILS-6

    134 T1C-C-AR-S-C10-0093 ST-01 LEVEL 11 GA PLAN

    135 T1C-C-AR-S-C10-0094 ST-01 LEVEL-11 CONNECTION DETAILS-1

    136 T1C-C-AR-S-C10-0095 ST-01 LEVEL-11 CONNECTION DETAILS-2

    137 T1C-C-AR-S-C10-0096 ST-01 LEVEL-11 CONNECTION DETAILS-3

    138 T1C-C-AR-S-C10-0097 ST-01 LEVEL-11 CONNECTION DETAILS-4

    139 T1C-C-AR-S-C10-0098 ST-01 LEVEL-11 CONNECTION DETAILS-5

    140 T1C-C-AR-S-C10-0099 ST-01 LEVEL-11 CONNECTION DETAILS-6

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    72/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 71 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    141 T1C-C-AR-S-C10-0114 ST-01 LEVEL 12 GA PLAN

    142 T1C-C-AR-S-C10-0115 ST-01 LEVEL-12 CONNECTION DETAILS-1

    143 T1C-C-AR-S-C10-0116 ST-01 LEVEL-12 CONNECTION DETAILS-2

    144 T1C-C-AR-S-C10-0117 ST-01 LEVEL-12 CONNECTION DETAILS-3

    145 T1C-C-AR-S-C10-0118 ST-01 LEVEL-12 CONNECTION DETAILS-4

    146 T1C-C-AR-S-C10-0119 ST-01 LEVEL-12 CONNECTION DETAILS-5

    147 T1C-C-AR-S-C10-0120 ST-01 LEVEL-12 CONNECTION DETAILS-6

    148 T1C-C-AR-S-C10-0121 ST-01 LEVEL-12 CONNECTION DETAILS-7

    149 T1C-C-AR-S-C10-0122 ST-01 LEVEL 13 GA PLAN

    150 T1C-C-AR-S-C10-0123 ST-01 LEVEL-13 CONNECTION DETAILS-1

    151 T1C-C-AR-S-C10-0124 ST-01 LEVEL-13 CONNECTION DETAILS-2

    152 T1C-C-AR-S-C10-0125 ST-01 LEVEL-13 CONNECTION DETAILS-3

    153 T1C-C-AR-S-C10-0126 ST-01 LEVEL-13 CONNECTION DETAILS-4

    154 T1C-C-AR-S-C10-0127 ST-01 LEVEL-13 CONNECTION DETAILS-5

    155 T1C-C-AR-S-C10-0128 ST-01 LEVEL-13 CONNECTION DETAILS-6

    156 T1C-C-AR-S-C10-0129 ST-01 LEVEL-13 CONNECTION DETAILS-7

    157 T1C-C-AR-S-C10-0130 ST-01 LEVEL 14 GA PLAN

    158 T1C-C-AR-S-C10-0131 ST-01 LEVEL-14 CONNECTION DETAILS-1

    159 T1C-C-AR-S-C10-0132 ST-01 LEVEL-14 CONNECTION DETAILS-2

    160 T1C-C-AR-S-C10-0133 ST-01 LEVEL-14 CONNECTION DETAILS-3

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    73/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 72 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    161 T1C-C-AR-S-C10-0134 ST-01 LEVEL-14 CONNECTION DETAILS-4

    162 T1C-C-AR-S-C10-0135 ST-01 LEVEL-14 CONNECTION DETAILS-5

    163 T1C-C-AR-S-C10-0136 ST-01 LEVEL-14 CONNECTION DETAILS-6

    164 T1C-C-AR-S-C10-0137 ST-01 LEVEL-14 CONNECTION DETAILS-7

    165 T1C-C-AR-S-C10-0138 ST-01 LEVEL 15 GA PLAN

    166 T1C-C-AR-S-C10-0139 ST-01 LEVEL-15 CONNECTION DETAILS-1

    167 T1C-C-AR-S-C10-0140 ST-01 LEVEL-15 CONNECTION DETAILS-2

    168 T1C-C-AR-S-C10-0141 ST-01 LEVEL-15 CONNECTION DETAILS-3

    169 T1C-C-AR-S-C10-0142 ST-01 LEVEL-15 CONNECTION DETAILS-4

    170 T1C-C-AR-S-C10-0143 ST-01 LEVEL-15 CONNECTION DETAILS-5

    171 T1C-C-AR-S-C10-0144 ST-01 LEVEL-15 CONNECTION DETAILS-6

    172 T1C-C-AR-S-C10-0145 ST-01 LEVEL-15 CONNECTION DETAILS-7

    173 T1C-C-AR-S-C10-0146 ST-01 LEVEL 16 GA PLAN

    174 T1C-C-AR-S-C10-0147 ST-01 LEVEL-16 CONNECTION DETAILS-1

    175 T1C-C-AR-S-C10-0148 ST-01 LEVEL-16 CONNECTION DETAILS-2

    176 T1C-C-AR-S-C10-0149 ST-01 LEVEL-16 CONNECTION DETAILS-3

    177 T1C-C-AR-S-C10-0150 ST-01 LEVEL-16 CONNECTION DETAILS-4

    178 T1C-C-AR-S-C10-0151 ST-01 LEVEL-16 CONNECTION DETAILS-5

    179 T1C-C-AR-S-C10-0152 ST-01 LEVEL-16 CONNECTION DETAILS-6

    180 T1C-C-AR-S-C10-0153 ST-01 LEVEL-16 CONNECTION DETAILS-7

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    74/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 73 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    181 T1C-C-AR-S-C10-0154 ST-01 LEVEL 17 GA PLAN

    182 T1C-C-AR-S-C10-0155 ST-01 LEVEL-17 CONNECTION DETAILS-1

    183 T1C-C-AR-S-C10-0156 ST-01 LEVEL-17 CONNECTION DETAILS-2

    184 T1C-C-AR-S-C10-0157 ST-01 LEVEL-17 CONNECTION DETAILS-3

    185 T1C-C-AR-S-C10-0158 ST-01 LEVEL-17 CONNECTION DETAILS-4

    186 T1C-C-AR-S-C10-0159 ST-01 LEVEL-17 CONNECTION DETAILS-5

    187 T1C-C-AR-S-C10-0160 ST-01 LEVEL-17 CONNECTION DETAILS-6

    188 T1C-C-AR-S-C10-0161 ST-01 LEVEL-17 CONNECTION DETAILS-7

    189 T1C-C-AR-S-C10-0162 ST-01 LEVEL 18 GA PLAN

    190 T1C-C-AR-S-C10-0163 ST-01 LEVEL-18 CONNECTION DETAILS-1

    191 T1C-C-AR-S-C10-0164 ST-01 LEVEL-18 CONNECTION DETAILS-2

    192 T1C-C-AR-S-C10-0165 ST-01 LEVEL-18 CONNECTION DETAILS-3

    193 T1C-C-AR-S-C10-0166 ST-01 LEVEL-18 CONNECTION DETAILS-4

    194 T1C-C-AR-S-C10-0167 ST-01 LEVEL-18 CONNECTION DETAILS-5

    195 T1C-C-AR-S-C10-0168 ST-01 LEVEL-18 CONNECTION DETAILS-6

    196 T1C-C-AR-S-C10-0169 ST-01 LEVEL-18 CONNECTION DETAILS-7

    197 T1C-C-AR-S-C10-0170 ST-01 LEVEL 19 GA PLAN

    198 T1C-C-AR-S-C10-0171 ST-01 LEVEL-19 CONNECTION DETAILS-1

    199 T1C-C-AR-S-C10-0172 ST-01 LEVEL-19 CONNECTION DETAILS-2

    200 T1C-C-AR-S-C10-0173 ST-01 LEVEL-19 CONNECTION DETAILS-3

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    75/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 74 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    201 T1C-C-AR-S-C10-0174 ST-01 LEVEL-19 CONNECTION DETAILS-4

    202 T1C-C-AR-S-C10-0175 ST-01 LEVEL-19 CONNECTION DETAILS-5

    203 T1C-C-AR-S-C10-0176 ST-01 LEVEL-19 CONNECTION DETAILS-6

    204 T1C-C-AR-S-C10-0177 ST-01 LEVEL-19 CONNECTION DETAILS-7

    205 T1C-C-AR-S-C10-0100 ST-01 LEVEL-20 GA PLAN

    206 T1C-C-AR-S-C10-0101 ST-01 LEVEL-21 GA PLAN

    207 T1C-C-AR-S-C10-0102 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-1

    208 T1C-C-AR-S-C10-0103 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-2

    209 T1C-C-AR-S-C10-0104 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-3

    210 T1C-C-AR-S-C10-0105 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-4

    211 T1C-C-AR-S-C10-0106 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-5

    212 T1C-C-AR-S-C10-0107 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-6

    213 T1C-C-AR-S-C10-0108 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-7

    214 T1C-C-AR-S-C10-0109 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-8

    215 T1C-C-AR-S-C10-0110 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-9

    216 T1C-C-AR-S-C10-0111 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-10

    217 T1C-C-AR-S-C10-0112 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-11

    218 T1C-C-AR-S-C10-0113 ST-01 LEVEL-20 & 21 TYPICAL SKYPOD DETAILS

    219 T1C-C-AR-S-C10-0178 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-12

    220 T1C-C-AR-S-C10-0179 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-13

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    76/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 75 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    221 T1C-C-AR-S-C10-0180 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-14

    222 T1C-C-AR-S-C10-0181 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-15

    223 T1C-C-AR-S-C10-0182 ST-01 LEVEL-20 & 21 SECTIONAL DETAILS-16

    224 T1C-C-AR-S-C10-0186 ST-01 LEVEL 22 GA PLAN

    225 T1C-C-AR-S-C10-0187 ST-01 LEVEL-22 CONNECTION DETAILS-1

    226 T1C-C-AR-S-C10-0188 ST-01 LEVEL-22 CONNECTION DETAILS-2

    227 T1C-C-AR-S-C10-0189 ST-01 LEVEL-22 CONNECTION DETAILS-3

    228 T1C-C-AR-S-C10-0190 ST-01 LEVEL-22 CONNECTION DETAILS-4

    229 T1C-C-AR-S-C10-0191 ST-01 LEVEL-22 CONNECTION DETAILS-5

    230 T1C-C-AR-S-C10-0192 ST-01 LEVEL-22 CONNECTION DETAILS-6

    231 T1C-C-AR-S-C10-0193 ST-01 LEVEL-22 CONNECTION DETAILS-7

    232 T1C-C-AR-S-C10-11-E9001 LEVEL-22 TO 30 EMBEDMENT detail -01

    233 TIC-C-AR-S-C10-09-GA006-01 LEVEL- 22 & 23 DECKING LAYOUT

    234 TIC-C-AR-S-C10-09-D8001-01 LEVEL- 22 & 23 DECKING SECTION AND DETAILS

    235 T1C-C-AR-S-C10-11-GA002 LEVEL-22 TO 30 EMBEDMENT LAYOUT

    236 T1C-C-AR-S-C10-0194 ST-01 LEVEL 23 GA PLAN

    237 T1C-C-AR-S-C10-0195 ST-01 LEVEL-23 CONNECTION DETAILS-1

    238 T1C-C-AR-S-C10-0196 ST-01 LEVEL-23 CONNECTION DETAILS-2

    239 T1C-C-AR-S-C10-0197 ST-01 LEVEL-23 CONNECTION DETAILS-3

    240 T1C-C-AR-S-C10-0198 ST-01 LEVEL-23 CONNECTION DETAILS-4

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    77/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 76 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    241 T1C-C-AR-S-C10-0199 ST-01 LEVEL-23 CONNECTION DETAILS-5

    242 T1C-C-AR-S-C10-0200 ST-01 LEVEL-23 CONNECTION DETAILS-6

    243 T1C-C-AR-S-C10-0201 ST-01 LEVEL-23 CONNECTION DETAILS-7

    244 T1C-C-AR-S-C10-0202 ST-01 LEVEL 24 GA PLAN

    245 T1C-C-AR-S-C10-0203 ST-01 LEVEL-24 CONNECTION DETAILS-1

    246 T1C-C-AR-S-C10-0204 ST-01 LEVEL-24 CONNECTION DETAILS-2

    247 T1C-C-AR-S-C10-0205 ST-01 LEVEL-24 CONNECTION DETAILS-3

    248 T1C-C-AR-S-C10-0206 ST-01 LEVEL-24 CONNECTION DETAILS-4

    249 T1C-C-AR-S-C10-0207 ST-01 LEVEL-24 CONNECTION DETAILS-5

    250 T1C-C-AR-S-C10-0208 ST-01 LEVEL-24 CONNECTION DETAILS-6

    251 T1C-C-AR-S-C10-0209 ST-01 LEVEL-24 CONNECTION DETAILS-7

    252 TIC-C-AR-S-C10-10-GA006-01 LEVEL- 24 to 30 DECKING LAYOUT

    253 TIC-C-AR-S-C10-10-D8001-01 LEVEL- 24 to 30 DECKING SECTION AND DETAILS

    254 T1C-C-AR-S-C10-0210 ST-01 LEVEL 25 GA PLAN

    255 T1C-C-AR-S-C10-0211 ST-01 LEVEL-25 CONNECTION DETAILS-1

    256 T1C-C-AR-S-C10-0212 ST-01 LEVEL-25 CONNECTION DETAILS-2

    257 T1C-C-AR-S-C10-0213 ST-01 LEVEL-25 CONNECTION DETAILS-3

    258 T1C-C-AR-S-C10-0214 ST-01 LEVEL-25 CONNECTION DETAILS-4

    259 T1C-C-AR-S-C10-0215 ST-01 LEVEL-25 CONNECTION DETAILS-5

    260 T1C-C-AR-S-C10-0216 ST-01 LEVEL-25 CONNECTION DETAILS-6

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    78/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 77 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    261 T1C-C-AR-S-C10-0217 ST-01 LEVEL-25 CONNECTION DETAILS-7

    262 T1C-C-AR-S-C10-0218 ST-01 LEVEL 26 GA PLAN

    263 T1C-C-AR-S-C10-0219 ST-01 LEVEL-26 CONNECTION DETAILS-1

    264 T1C-C-AR-S-C10-0220 ST-01 LEVEL-26 CONNECTION DETAILS-2

    265 T1C-C-AR-S-C10-0221 ST-01 LEVEL-26 CONNECTION DETAILS-3

    266 T1C-C-AR-S-C10-0222 ST-01 LEVEL-26 CONNECTION DETAILS-4

    267 T1C-C-AR-S-C10-0223 ST-01 LEVEL-26 CONNECTION DETAILS-5

    268 T1C-C-AR-S-C10-0224 ST-01 LEVEL-26 CONNECTION DETAILS-6

    269 T1C-C-AR-S-C10-0225 ST-01 LEVEL-26 CONNECTION DETAILS-7

    270 T1C-C-AR-S-C10-0226 ST-01 LEVEL 27 GA PLAN

    271 T1C-C-AR-S-C10-0227 ST-01 LEVEL-27 CONNECTION DETAILS-1

    272 T1C-C-AR-S-C10-0228 ST-01 LEVEL-27 CONNECTION DETAILS-2

    273 T1C-C-AR-S-C10-0229 ST-01 LEVEL-27 CONNECTION DETAILS-3

    274 T1C-C-AR-S-C10-0230 ST-01 LEVEL-27 CONNECTION DETAILS-4

    275 T1C-C-AR-S-C10-0231 ST-01 LEVEL-27 CONNECTION DETAILS-5

    276 T1C-C-AR-S-C10-0232 ST-01 LEVEL-27 CONNECTION DETAILS-6

    277 T1C-C-AR-S-C10-0233 ST-01 LEVEL-27 CONNECTION DETAILS-7

    278 T1C-C-AR-S-C10-0234 ST-01 LEVEL 28 GA PLAN

    279 T1C-C-AR-S-C10-0235 ST-01 LEVEL-28 CONNECTION DETAILS-1

    280 T1C-C-AR-S-C10-0236 ST-01 LEVEL-28 CONNECTION DETAILS-2

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    79/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 78 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    281 T1C-C-AR-S-C10-0237 ST-01 LEVEL-28 CONNECTION DETAILS-3

    282 T1C-C-AR-S-C10-0238 ST-01 LEVEL-28 CONNECTION DETAILS-4

    283 T1C-C-AR-S-C10-0239 ST-01 LEVEL-28 CONNECTION DETAILS-5

    284 T1C-C-AR-S-C10-0240 ST-01 LEVEL-28 CONNECTION DETAILS-6

    285 T1C-C-AR-S-C10-0241 ST-01 LEVEL-28 CONNECTION DETAILS-7

    286 T1C-C-AR-S-C10-0242 ST-01 LEVEL 29 GA PLAN

    287 T1C-C-AR-S-C10-0243 ST-01 LEVEL-29 CONNECTION DETAILS-1

    288 T1C-C-AR-S-C10-0244 ST-01 LEVEL-29 CONNECTION DETAILS-2

    289 T1C-C-AR-S-C10-0245 ST-01 LEVEL-29 CONNECTION DETAILS-3

    290 T1C-C-AR-S-C10-0246 ST-01 LEVEL-29 CONNECTION DETAILS-4

    291 T1C-C-AR-S-C10-0247 ST-01 LEVEL-29 CONNECTION DETAILS-5

    292 T1C-C-AR-S-C10-0248 ST-01 LEVEL-29 CONNECTION DETAILS-6

    293 T1C-C-AR-S-C10-0249 ST-01 LEVEL-29 CONNECTION DETAILS-7

    294 T1C-C-AR-S-C10-0250 ST-01 LEVEL 30 GA PLAN

    295 T1C-C-AR-S-C10-0251 ST-01 LEVEL-30 CONNECTION DETAILS-1

    296 T1C-C-AR-S-C10-0252 ST-01 LEVEL-30 CONNECTION DETAILS-2

    297 T1C-C-AR-S-C10-0253 ST-01 LEVEL-30 CONNECTION DETAILS-3

    298 T1C-C-AR-S-C10-0254 ST-01 LEVEL-30 CONNECTION DETAILS-4

    299 T1C-C-AR-S-C10-0255 ST-01 LEVEL-30 CONNECTION DETAILS-5

    300 T1C-C-AR-S-C10-0256 ST-01 LEVEL-30 CONNECTION DETAILS-6

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    80/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 79 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    301 T1C-C-AR-S-C10-0257 ST-01 LEVEL-30 CONNECTION DETAILS-7

    302 T1C-C-AR-S-C10-0258 ST-01 LEVEL 31 GA PLAN

    303 T1C-C-AR-S-C10-0259 ST-01 LEVEL-31 CONNECTION DETAILS-1

    304 T1C-C-AR-S-C10-0260 ST-01 LEVEL-31 CONNECTION DETAILS-2

    305 T1C-C-AR-S-C10-0261 ST-01 LEVEL-31 CONNECTION DETAILS-3

    306 T1C-C-AR-S-C10-0262 ST-01 LEVEL-31 CONNECTION DETAILS-4

    307 T1C-C-AR-S-C10-0263 ST-01 LEVEL-31 CONNECTION DETAILS-5

    308 T1C-C-AR-S-C10-0264 ST-01 LEVEL-31 CONNECTION DETAILS-6

    309 T1C-C-AR-S-C10-0265 ST-01 LEVEL-31 CONNECTION DETAILS-7

    310 TIC-C-AR-S-C10-11-D8001-01 LEVEL- 31 DECKING SECTIONS & DETAILS

    311 TIC-C-AR-S-C10-11-GA006-01 LEVEL- 31 DECKING LAYOUT

    312 T1C-C-AR-S-C10-0266 ST-01 LEVEL 32 GA PLAN

    313 T1C-C-AR-S-C10-0267 ST-01 LEVEL-32 CONNECTION DETAILS-1

    314 T1C-C-AR-S-C10-0268 ST-01 LEVEL-32 CONNECTION DETAILS-2

    315 T1C-C-AR-S-C10-0269 ST-01 LEVEL-32 CONNECTION DETAILS-3

    316 T1C-C-AR-S-C10-0270 ST-01 LEVEL-32 CONNECTION DETAILS-4

    317 T1C-C-AR-S-C10-0271 ST-01 LEVEL-32 CONNECTION DETAILS-5

    318 T1C-C-AR-S-C10-0272 ST-01 LEVEL-32 CONNECTION DETAILS-6

    319 T1C-C-AR-S-C10-0273 ST-01 LEVEL-32 CONNECTION DETAILS-7

    320 TIC-C-AR-S-C10-12-GA006-01 LEVEL- 32 to 39 DECKING LAYOUT

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    81/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 80 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    321 TIC-C-AR-S-C10-12-D8001-01 LEVEL- 32 to 39 DECKING SECTION AND DETAILS

    322 T1C-C-AR-S-C10-0274 ST-01 LEVEL 33 GA PLAN

    323 T1C-C-AR-S-C10-0275 ST-01 LEVEL-33 CONNECTION DETAILS-1

    324 T1C-C-AR-S-C10-0276 ST-01 LEVEL-33 CONNECTION DETAILS-2

    325 T1C-C-AR-S-C10-0277 ST-01 LEVEL-33 CONNECTION DETAILS-3

    326 T1C-C-AR-S-C10-0278 ST-01 LEVEL-33 CONNECTION DETAILS-4

    327 T1C-C-AR-S-C10-0279 ST-01 LEVEL-33 CONNECTION DETAILS-5

    328 T1C-C-AR-S-C10-0280 ST-01 LEVEL-33 CONNECTION DETAILS-6

    329 T1C-C-AR-S-C10-0281 ST-01 LEVEL-33 CONNECTION DETAILS-7

    330 T1C-C-AR-S-C10-0282 ST-01 LEVEL 34 GA PLAN

    331 T1C-C-AR-S-C10-0283 ST-01 LEVEL-34 CONNECTION DETAILS-1

    332 T1C-C-AR-S-C10-0284 ST-01 LEVEL-34 CONNECTION DETAILS-2

    333 T1C-C-AR-S-C10-0285 ST-01 LEVEL-34 CONNECTION DETAILS-3

    334 T1C-C-AR-S-C10-0286 ST-01 LEVEL-34 CONNECTION DETAILS-4

    335 T1C-C-AR-S-C10-0287 ST-01 LEVEL-34 CONNECTION DETAILS-5

    336 T1C-C-AR-S-C10-0288 ST-01 LEVEL-34 CONNECTION DETAILS-6

    337 T1C-C-AR-S-C10-0289 ST-01 LEVEL-34 CONNECTION DETAILS-7

    338 T1C-C-AR-S-C10-0290 ST-01 LEVEL 35 GA PLAN

    339 T1C-C-AR-S-C10-0291 ST-01 LEVEL-35 CONNECTION DETAILS-1

    340 T1C-C-AR-S-C10-0292 ST-01 LEVEL-35 CONNECTION DETAILS-2

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    82/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 81 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    341 T1C-C-AR-S-C10-0293 ST-01 LEVEL-35 CONNECTION DETAILS-3

    342 T1C-C-AR-S-C10-0294 ST-01 LEVEL-35 CONNECTION DETAILS-4

    343 T1C-C-AR-S-C10-0295 ST-01 LEVEL-35 CONNECTION DETAILS-5

    344 T1C-C-AR-S-C10-0296 ST-01 LEVEL-35 CONNECTION DETAILS-6

    345 T1C-C-AR-S-C10-0297 ST-01 LEVEL-35 CONNECTION DETAILS-7

    346 T1C-C-AR-S-C10-0298 ST-01 LEVEL 36 GA PLAN

    347 T1C-C-AR-S-C10-0299 ST-01 LEVEL-36 CONNECTION DETAILS-1

    348 T1C-C-AR-S-C10-0300 ST-01 LEVEL-36 CONNECTION DETAILS-2

    349 T1C-C-AR-S-C10-0301 ST-01 LEVEL-36 CONNECTION DETAILS-3

    350 T1C-C-AR-S-C10-0302 ST-01 LEVEL-36 CONNECTION DETAILS-4

    351 T1C-C-AR-S-C10-0303 ST-01 LEVEL-36 CONNECTION DETAILS-5

    352 T1C-C-AR-S-C10-0304 ST-01 LEVEL-36 CONNECTION DETAILS-6

    353 T1C-C-AR-S-C10-0305 ST-01 LEVEL-36 CONNECTION DETAILS-7

    354 T1C-C-AR-S-C10-0306 ST-01 LEVEL 37 GA PLAN

    355 T1C-C-AR-S-C10-0307 ST-01 LEVEL-37 CONNECTION DETAILS-1

    356 T1C-C-AR-S-C10-0308 ST-01 LEVEL-37 CONNECTION DETAILS-2

    357 T1C-C-AR-S-C10-0309 ST-01 LEVEL-37 CONNECTION DETAILS-3

    358 T1C-C-AR-S-C10-0310 ST-01 LEVEL-37 CONNECTION DETAILS-4

    359 T1C-C-AR-S-C10-0311 ST-01 LEVEL-37 CONNECTION DETAILS-5

    360 T1C-C-AR-S-C10-0312 ST-01 LEVEL-37 CONNECTION DETAILS-6

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    83/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 82 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    361 T1C-C-AR-S-C10-0313 ST-01 LEVEL-37 CONNECTION DETAILS-7

    362 T1C-C-AR-S-C10-0314 ST-01 LEVEL 38 GA PLAN

    363 T1C-C-AR-S-C10-0315 ST-01 LEVEL-38 CONNECTION DETAILS-1

    364 T1C-C-AR-S-C10-0316 ST-01 LEVEL-38 CONNECTION DETAILS-2

    365 T1C-C-AR-S-C10-0317 ST-01 LEVEL-38 CONNECTION DETAILS-3

    366 T1C-C-AR-S-C10-0318 ST-01 LEVEL-38 CONNECTION DETAILS-4

    367 T1C-C-AR-S-C10-0319 ST-01 LEVEL-38 CONNECTION DETAILS-5

    368 T1C-C-AR-S-C10-0320 ST-01 LEVEL-38 CONNECTION DETAILS-6

    369 T1C-C-AR-S-C10-0321 ST-01 LEVEL-38 CONNECTION DETAILS-7

    370 T1C-C-AR-S-C10-0330 ST-01 LEVEL-39 G A PLAN

    371 T1C-C-AR-S-C10-0331 ST-01 LEVEL-39 CONNECTION DETAILS-1

    372 T1C-C-AR-S-C10-0332 ST-01 LEVEL-39 CONNECTION DETAILS-2

    373 T1C-C-AR-S-C10-0333 ST-01 LEVEL-39 CONNECTION DETAILS-3

    374 T1C-C-AR-S-C10-0334 ST-01 LEVEL-39 CONNECTION DETAILS-4

    375 T1C-C-AR-S-C10-0335 ST-01 LEVEL-39 CONNECTION DETAILS-5

    376 T1C-C-AR-S-C10-0336 ST-01 LEVEL-39 CONNECTION DETAILS-6

    377 T1C-C-AR-S-C10-0337 ST-01 LEVEL-39 CONNECTION DETAILS-7

    378 T1C-C-AR-S-C10-39-E9001 LEVEL-39 EMBEDMENT DETAIL-01

    379 T1C-C-AR-S-C10-39-GA002 LEVEL-39 EMBEDMENT LAYOUT

    380 T1C-C-AR-S-C10-0338 ST-01 LEVEL-40 GA PLAN

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    84/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 83 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    381 T1C-C-AR-S-C10-0339 ST-01 LEVEL-41 GA PLAN

    382 T1C-C-AR-S-C10-0340 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-1

    383 T1C-C-AR-S-C10-0341 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-2

    384 T1C-C-AR-S-C10-0342 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-3

    385 T1C-C-AR-S-C10-0343 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-4

    386 T1C-C-AR-S-C10-0344 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-5

    387 T1C-C-AR-S-C10-0345 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-6

    388 T1C-C-AR-S-C10-0346 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-7

    389 T1C-C-AR-S-C10-0347 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-8

    390 T1C-C-AR-S-C10-0348 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-9

    391 T1C-C-AR-S-C10-0349 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-10

    392 T1C-C-AR-S-C10-0350 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-11

    393 T1C-C-AR-S-C10-0351 ST-01 LEVEL-40 & 41 TYPICAL SKYPOD DETAILS

    394 T1C-C-AR-S-C10-0352 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-12

    395 T1C-C-AR-S-C10-0353 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-13

    396 T1C-C-AR-S-C10-0354 ST-01 LEVEL-40 & 41 SECTIONAL DETAILS-14

    397 T1C-C-AR-S-C10-0355 ST-01 LEVEL-40M GA PLAN

    398 T1C-C-AR-S-C10-0355 ST-01 LEVEL-40M GA PLAN

    399 T1C-C-AR-S-C10-0356 ST-01 LEVEL-40M SECTIONAL DETAILS-1

    400 T1C-C-AR-S-C10-0356 ST-01 LEVEL-40M SECTIONAL DETAILS-1

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    85/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 84 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    401 T1C-C-AR-S-C10-0359 ST-01 LEVEL-40M SECTIONAL DETAILS-2

    402 T1C-C-AR-S-C10-0359 ST-01 LEVEL-40M SECTIONAL DETAILS-2

    403 T1C-C-AR-S-C10-0360 ST-02 LEVEL-40 & 41 SECTIONAL DETAILS-15

    404 T1C-C-AR-S-C10-0361 ST-02 LEVEL-40 & 41 SECTIONAL DETAILS-16

    405 T1C-C-AR-S-C10-0362 ST-02 LEVEL-40 & 41 SECTIONAL DETAILS-17

    406 T1C-C-AR-S-C10-0370 ST-01 LEVEL-42 GA PLAN

    407 T1C-C-AR-S-C10-0425 ST-01 LEVEL 42-49 DECKING LAYOUT

    408 T1C-C-AR-S-C10-0371 ST-01 LEVEL-43 GA PLAN

    409 T1C-C-AR-S-C10-0372 ST-01 LEVEL-44 TO 49 GA PLAN

    410 T1C-C-AR-S-C10-0373 ST-01 LEVEL-44 TO 49 CONNECTION DETAILS-1

    411 T1C-C-AR-S-C10-0374 ST-01 LEVEL-50 GA PLAN

    412 T1C-C-AR-S-C10-0424 ST-01 LEVEL- 50-72 DECKING LAYOUT

    413 T1C-C-AR-S-C10-0375 ST-01 LEVEL-51 TO 55 GA PLAN

    414 T1C-C-AR-S-C10-0376 ST-01 LEVEL-51 TO 55 CONNECTION DETAILS-1

    415 T1C-C-AR-S-C10-0377 ST-01 LEVEL-56 GA PLAN

    416 T1C-C-AR-S-C10-0378 ST-01 LEVEL-57 TO 65 GA PLAN

    417 T1C-C-AR-S-C10-0379 ST-01 LEVEL-57 TO 65 CONNECTION DETAILS-1

    418 T1C-C-AR-S-C10-0380 ST-01 LEVEL-66 GA PLAN

    419 T1C-C-AR-S-C10-0381 ST-01 LEVEL-67 GA PLAN

    420 T1C-C-AR-S-C10-0382 ST-01 LEVEL-68 GA PLAN

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    86/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    MAIN CONTRACTOR

    ARABIAN CONSTRUCTION CO.

    STRUCTURAL STEEL CONTRACTOR

    EVERSENDAI ENGINEERING L.L.C

    Page 85 of 86

    SL.

    NO.DRAWING NO. DRAWING TITLE

    421 T1C-C-AR-S-C10-0406 ST-01 LEVEL-68A (ATTIC FLOOR) GENERAL ARRANGEMENT PLAN

    422 T1C-C-AR-S-C10-0407 ST-01 LEVEL-68A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-1

    423 T1C-C-AR-S-C10-0408 ST-01 LEVEL-68A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-2

    424 T1C-C-AR-S-C10-0412 ST-01 LEVEL-68A & 70A (ATTIC FLOOR) SECTION DETAILS-1

    425 T1C-C-AR-S-C10-0413 ST-01 LEVEL-68A & 70A (ATTIC FLOOR) CONNECTION DETAIL-1

    426 T1C-C-AR-S-C10-0414 ST-01 LEVEL-68A & 70A (ATTIC FLOOR) CONNECTION DETAIL-2

    427 T1C-C-AR-S-C10-0426 ST-01 LEVEL-68A & 70A (ATTIC FLOOR) CONNECTION DETAIL-3

    428 T1C-C-AR-S-C10-0402 ST-01 LEVEL 69 & 70 GENERAL ARRANGEMENT PLAN

    429 T1C-C-AR-S-C10-0402 ST-01 LEVEL 69 & 70 GENERAL ARRANGEMENT PLAN

    430 T1C-C-AR-S-C10-0402 ST-01 LEVEL 69 & 70 GENERAL ARRANGEMENT PLAN

    431 T1C-C-AR-S-C10-0403 ST-01 LEVEL 69 & 70 CONNECTION DETAILS 1

    432 T1C-C-AR-S-C10-0403 ST-01 LEVEL 69 & 70 CONNECTION DETAILS 1

    433 T1C-C-AR-S-C10-0403 ST-01 LEVEL 69 & 70 CONNECTION DETAILS 1

    434 T1C-C-AR-S-C10-0409 ST-01 LEVEL-70A (ATTIC FLOOR) GENERAL ARRANGEMENT PLAN

    435 T1C-C-AR-S-C10-0410 ST-01 LEVEL-70A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-1

    436 T1C-C-AR-S-C10-0411 ST-01 LEVEL-70A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-2

    437 T1C-C-AR-S-C10-0404 ST-01 LEVEL-71 GENERAL ARRANGEMENT PLAN

    438 T1C-C-AR-S-C10-0404 ST-01 LEVEL-71 GENERAL ARRANGEMENT PLAN

    439 T1C-C-AR-S-C10-0404 ST-01 LEVEL-71 GENERAL ARRANGEMENT PLAN

    440 T1C-C-AR-S-C10-0405 ST-01 LEVEL-72 GENERAL ARRANGEMENT PLAN

  • 7/25/2019 Operation and Maintenance Manual for Structural Steel - EVS - Revision 02

    87/87

    Shams Abu Dhabi Project

    Sky Tower, Sun Tower & Podium

    STRUCTURAL STEELOPERATION AND MAINTENANCE

    MANUAL

    SL.

    NO.DRAWING NO. DRAWING TITLE

    441 T1C-C-AR-S-C10-0405 ST-01 LEVEL-72 GENERAL ARRANGEMENT PLAN

    442 T1C-C-AR-S-C10-0405 ST-01 LEVEL-72 GENERAL ARRANGEMENT PLAN

    443 T1C-C-AR-S-C10-0421 ST-01 LEVEL-73 GA PLAN

    444 T1C-C-AR-S-C10-0423 ST-01 LEVEL -73 & 74 SECTIONAL DETAILS-1

    445 T1C-C-AR-S-C10-0422 ST-01 LEVEL-74 GA PLAN