Key On-Going Projects (References) EPC Of Obiafu/Obrikom to Oben (OB3) Gas Transmission Pipeline System LOT B - 67 km X 48-inch This starts from the Intermediate Pigging station at Umukwata (around KP 63.45) in Delta State and terminates at Oben Node in Edo State. The project also include: Engineering Design of the entire Gas transmission pipeline system, LOT A and LOT B (130 km x 48-inch), Construction of the Gas treatment Plant, Launcher and Receiver Stations, Installation of the Line Break Valves, Cathodic protection system, Major and Minor River crossings, Major and Minor Road crossings, Railway crossing, associated Earth and Civil works, Electrical/Instrumentation and Telecommunication works, Testing and commissioning. The project belongs to the Nigerian National Petroleum Corporation (NNPC). It is worthy to note that currently this is the largest Gas transmission pipeline system to be built in Nigeria. ON-GOING EPC of National Integrated Power Project (NIPP) Lot 1 Gas transmission Pipeline System covering 16-inch and 18-inch Gas Pipelines EPC of National Integrated Power Project (NIPP) Lot 1 Gas transmission Pipeline System covering 16-inch and 18-inch Gas Pipelines This includes construction of Gas metering station, Yard Fabrication, Construction and Installation of Cathodic protection systems, Road Crossings, Hook up and Tie-in works, Hot Tap works, Electrical/Instrumentation and Telecommunication works, Earth and associated Civil works, Testing and Commissioning works. The Project belongs to the Niger Delta Power Holding Company Limited and when completed shall supply Gas to Gas Turbine power Plant at Ihobvor, in Edo State of Nigeria.

Upload: anthony-rosa

Post on 23-Dec-2015

60 views

Category:

Documents


12 download

DESCRIPTION

oil EXPERIENCE

TRANSCRIPT

Page 1: Oil Serv Experience

Key On-Going Projects (References)

EPC Of Obiafu/Obrikom to Oben (OB3) Gas Transmission Pipeline System LOT B - 67 km X 48-inch

This starts from the Intermediate Pigging station at Umukwata (around KP 63.45) in Delta State and

terminates at Oben Node in Edo State. The project also include: Engineering Design of the entire

Gas transmission pipeline system, LOT A and LOT B (130 km x 48-inch), Construction of the Gas

treatment Plant, Launcher and Receiver Stations, Installation of the Line Break Valves, Cathodic

protection system, Major and Minor River crossings, Major and Minor Road crossings, Railway

crossing, associated Earth and Civil works, Electrical/Instrumentation and Telecommunication

works, Testing and commissioning. The project belongs to the Nigerian National Petroleum

Corporation (NNPC).

It is worthy to note that currently this is the largest Gas transmission pipeline system to be built in

Nigeria.

ON-GOING

EPC of National Integrated Power Project (NIPP) Lot 1 Gas transmission Pipeline System covering 16-inch and 18-inch Gas Pipelines

EPC of National Integrated Power Project (NIPP) Lot 1 Gas transmission Pipeline System covering

16-inch and 18-inch Gas Pipelines This includes construction of Gas metering station, Yard

Fabrication, Construction and Installation of Cathodic protection systems, Road Crossings, Hook up

and Tie-in works, Hot Tap works, Electrical/Instrumentation and Telecommunication works, Earth

and associated Civil works, Testing and Commissioning works. The Project belongs to the Niger

Delta Power Holding Company Limited and when completed shall supply Gas to Gas Turbine power

Plant at Ihobvor, in Edo State of Nigeria.

ON-GOING

Page 2: Oil Serv Experience

EPC of National Integrated Power Project (NIPP) Lot 2 Gas transmission Pipeline System

EPC of National Integrated Power Project (NIPP) Lot 2 Gas transmission Pipeline System

SYSTEMS This covers 18-inch Gas Pipelines, including construction of Gas metering stations, Yard

Fabrication, Construction and Installation of Cathodic protection systems, River and Road

Crossings, Hook up and Tie-in works, Hot Tap works, Electrical/Instrumentation and

Telecommunication works, Earth and associated Civil works, Testing and Commissioning works.

The Project belongs to the Niger Delta Power Holding Company Limited and when completed shall

supply Gas to Gas Turbine power Plant at Egbema in Imo State and Gbaran - Ubie in Bayelsa State

of Nigeria.

ON-GOING

Construction, Testing and Commissioning Of 37.8 km X 24-inch Oron Gas Pipeline System

This includes Construction and Installation of the flow line systems, Road Crossings, Hook up and

Tie-in works. Testing and Commissioning works. Laying/welding of pipeline, NDT of welded joints,

field joints coating, flush/hydrotest

ON-OING

Engineering, Procurement and Construction for 102.8 km x 12-inch Crude Oil Pipeline System from Umusadege to Eriemu for Umugini Asset Company Limited (UACL)

Scope of work:

1. 1. Construction of 102.8 km x 12-inch Crude Oil Pipeline from Umusadege to Eriemu , both in

Delta State of Nigeria.

2. 2. Construction, Installation and Piping of the Valve Pit inclusive of barred tee at Ogini

3. 3. Associated Earth and Civil works including perimeter fencing at Ogini

4. 4. Provision of portable Water, Valves, Pressure Gauges, pumps, Retaining Tanks etc. as

required for successful Hydro testing.

5. 5. Fabrication and Installation of Pipe supports and shoes at the pig trap locations.

6. 6. Electrical and Instrumentation works.

Page 3: Oil Serv Experience

7. 7. Major and Minor Road crossings.

8. 8. Testing and Commissioning works.

9. 9. Provision of “As built” documentation.

The Project belongs to Umugini Asset company Limited (UACL)

COMPLETED

Upgrade of Ikeja/NGC City Gate For OANDO Gas and Power (Gaslink Nigeria Limited)

The scope consists of the following Phases, namely;

Phase 1: Commissioning of Installed Scrubber/Meters (STREAM 1)

1. 1. Tightening of installed facilities and piping works.

2. 2. Leak test and Nitrogen purging of the installed facilities.

3. 3. Electrical and instrumentation works.

4. 4. Wire brushing and Anti- corrosion works.

5. 5. Commissioning of the scrubber/meter and purging of the facility with Nitrogen prior to

introduction of Gas through the inlet valve.

6. 6. Reinstatement and cleaning of the site.

Phase 2: Installation and commissioning of Scrubber/Meter (STREAM 2)

1. 1. Decommissioning and removal of the existing scrubber.

2. 2. Associated civil works to allow the installation of the new scrubber.

3. 3. Installation of the new scrubber/flow meter and piping works.

4. 4. Fabrication of piping spools for the installation of Automatic drain and vent.

5. 5. Installation of Gantry.

6. 6. Leak test and nitrogen purging of the installed scrubber.

7. 7. Electrical and Instrumentation works.

8. 8. Wire brushing and Anti-corrosion works.

9. 9. Commissioning of the scrubber/meter and purging of the facility with Nitrogen prior to

introduction of Gas through the inlet valve.

10. 10. Reinstatement and cleaning of the site.

The Project belongs to OANDO Gas and Power (Gaslink Nigeria Limited)

Page 4: Oil Serv Experience

ON-GOING

EPC for the Construction of Greater Lagos Phase IV Gas Distribution Network System

EPC for the Construction of Greater Lagos Phase IV Gas Distribution Network System covering a

total of 8.2 km x 12-inch Gas transmission pipeline with the Design capacity of 45mmscfd and an

operating capacity of 30mmscfd to cover IJORA to BONNY CAMP Axis. The project belongs to

Gaslink Nigeria Limited, subsidiary of OANDO Gas and Power. The project is to be carried-out in

three different segments, namely; SEGMENT 1:[ From IJORA 7UP to FIRST POWER BY IJORA

OLOPA], SEGMENT 2: [From IJORA FISH MARKET to NEGRIS IPP (MARINE POWER)],

SEGMENT 3: [ From NEGRIS IPP to BONNY CAMP UNDER-BRIDGE].

ON-GOING

EPC Of Pressure Reduction Metering System (PRMS)

EPC of Pressure Reduction Metering System (PRMS) for the Gas Supply to the Niger Delta Power

Holding Company Limited (NDPHC) Turbine Power Plant at Alaoji. The project belongs to the

Nigerian Gas Company Limited (NGC), subsidiary of the Nigerian National Petroleum Corporation

(NNPC). The project is to be carried-out in two segments, namely; SEGMENT 1 : (Execution of

outstanding Engineering design), SEGMENT 2:(Suppy and Delivery of Equipment and materials

including Cost Insurance and Freight (CIF) to Onne port and delivery to Alaoji Site).

ON-GOING

Page 5: Oil Serv Experience

Summary of Recent Work Experience (On-Going/Completed)

S/

N

NAME OF

PROJECT

BRIEF DESCRIPTION OF

PROJECT SCOPE

CLIENT &

LOCATION

PROJECT

STATUS

1 EPC of

OBIAFU/OBRIKO

M to OBEN (OB3)

Gas transmission

Pipeline system

LOT B (67 km x

48-inch)

• Construction, installation

and commissioning of

OBIAFU/OBRIKOM to OBEN

(OB3) Gas transmission

Pipeline system LOT B (67km

x 48-inch) from the

Intermediate Pigging station

at Umukwata (around KP

63.45) in Delta State and

terminates at Oben Node in

Edo State.

• Complete Engineering

Design of the entire Gas

transmission pipeline system

LOT A & LOT B (130km x 48-

inch)

• Design and Construction of

the Gas treatment Plant,

Launcher and Receiver

Stations

• Installation of the Line Break

Valves

• Cathodic protection system

• Major and Minor River

crossings

• Major and Minor Road

crossings

• Railway crossing

• Associated Earth and Civil

works

• Electrical/Instrumentation

works

Nigerian National

Petroleum

Corporation

(NNPC), Delta

State and Edo

State both in

Nigeria

ON GOING

Page 6: Oil Serv Experience

• Telecommunication works

• Testing and commissioning

2

EPC of 24 km x

24-inch Gas

transmission

Pipeline system

from Owaza to

NDPHC Power

Plant at Alaoji

• Construction, installation

and commissioning of 24km x

24-inch Gas transmission

Pipeline system from Owaza

to NDPHC Power Plant at

Alaoji, including, Four (4)

major road crossings, Third

party facilities crossings, 28-

inch x 24-inch pig traps

• Intermediate Pigging

Stations (IPS)

• Installation of 24-inch Ball

Valve for future connection

• Associated Earth and Civil

works

• Cathodic Protection system

• Electrical/Instrumentation

works

• Testing and commissioning

Nigerian Gas

Company Limited

(NGC). Abia State

of NigeriaCOMPLETE

D

3EPRS of a Gas

Pipeline.

• Mobilizing of resources

• Carrying out construction

and hooking up (sectional

replacement) of 24-inch x

250m Manifold by-pass line

Shell Petroleum

Development

Company Limited

(Bomu), Rivers

State of Nigeria

COMPLETE

D

4 EPC of Oando

128km x 18-inch

• Construction, Installation

and Commissioning of 128km

OANDO Gas and

Power (East

COMPLETE

D

Page 7: Oil Serv Experience

South-South gas

transmission

pipeline system

from Ukanafun in

Akwa Ibom State

to Unicem Plant at

Calabar, Cross

River State

x 18-inch Gas lines

• Scope include R.O.W.

survey, ditching ,

welding/laying of pipeline,

NDT of welded joints, field

joints coating,

flush/hydrotest/drying/Nitroge

n purging of the Gas pipeline

• Associated Earth and civil

works

• Major and minor river

crossing (width ranging from

1.3km to 800m

• Major and Minor road

crossings

• Creek crossings

• Construction of complete

City Gate facilities,

• Construction and Installation

of: PRMS, LBV’S, IPS

• Electrical, Instrumentation

works and

Telecommunication works

• Testing and commissioning.

• The Gas pipeline

transverses across the

following terrains: Land,

swamp, creeks, rocky terrain,

thick forest and Hilly areas.

Horizon Gas

Company Limited)

Akwa Ibom and

Cross River States

of Nigeria

5 EPC for NIPP LOT

1 gas transmission

pipeline system

covering 18-inch

and 16-inch gas

pipelines, including

gas metering

station facilities

• Engineering design, FEED,

Procurement, Construction

and Commissioning of the

following gas pipelines;

• 1.5km x 18-inch from

Escravos to Lagos Pipeline

(ELP) kp 87.928 to Ihobvor

gas metering station

• 1km x 18-inch from Pan

Ocean Oil Company (POOC)

Niger Delta Power

Holding Company

Limited, Ihobvor at

Benin, Edo State

of Nigeria

ON GOING

Page 8: Oil Serv Experience

to ELP

• 14km x 16-inch from NPDC

Oredo flowstation to ELP kp

51.3

• Construction and installation

of gas metering station

facilities

• Construction of asphalted

access road

• Associated Earth and civil

works

• Hot Tap works

• Cathodic protection works,

• Road crossing

• Electrical, Instrumentation

and Telecommunication

works

• Testing and commissioning

6 EPC for NIPP LOT

2 (Egbema and

Gbarain-Ube) gas

transmission

pipeline systems

covering 18-inch

pipeline, including

gas metering

station facilities

A. NIPP EGBEMA LOT 2

• Engineering design, FEED,

Procurement, Construction,

Commissioning of the

following gas pipelines

• 4km x 18-inch from SPDC

East (Egbema main) to

Egbema Power Plant

• 8km x 18-inch from Egbema

West flow station to Egbema

Power plant

• 12km x 18-inch from Addax-

Izombe flow station to

Egbema Power Plant

• Construction and installation

of Gas metering facilities,

• Associated Earth and Civil

works

• Cathodic protection works

• Hot Tap works

• Road crossing

• Electrical , Instrumentation

Niger Delta Power

Holding Company

Limited,

Egbema in Imo

State and Gbarain

- Ube in Bayelsa

State of Nigeria

ON GOING

Page 9: Oil Serv Experience

and Telecommunication

works

• Testing and commissioning

B. NIPP GBARAIN - UBIE

LOT 2

• Engineering design, FEED,

Procurement, Construction,

Commissioning of the gas

pipeline

• 1.5km x 18-inch from SPDC

gas plant to Gbarain gas

metering station

• Construction and installation

of gas metering facility

• Associated Earth and Civil

works

• Cathodic protection works

• Hot Tap works

• Road crossing

• Electrical , Instrumentation

and Telecommunication

works

• Testing and commissioning

7 EPC of 27km x 12-

inch gas

transmission

pipeline system,

including gas

metering station

and pigging station

facilities

• Engineering Design, FEED,

Procurement, Installation and

Commissioning of 27km x 12-

inch Gas Pipeline system.

• Scope include R.O.W.

survey, ditching,

welding/laying of pipeline,

NDT of welded joints, field

joints coating,

flush/hydrotest/drying/Nitroge

n purging of the Gas Pipeline

• Associated earth and civil

works

• Electrical, instrumentation

and cathodic protection works

Geometric Power

Aba Limited

(GPAL) Osisioma

in Aba, Abia State

of Nigeria

COMPLETE

D

Page 10: Oil Serv Experience

• Hot Tap works

• Testing and commissioning.

8

EPC for Akute

Independent

Power Project,

including

construction of

13km x 8-inch

HDPE Gas

transmission

pipeline system

and pressure

reduction metering

system (PRMS)

• Engineering, Procurement,

Construction, Installation, &

Commissioning of 13km x 18-

inch High Density

Polyethylene (HDPE) Gas

transmission pipeline system

• Including the Engineering,

Procurement, Construction,

Installation, and

Commissioning of 12 MW

Gas turbine power plant

• Major and minor river

crossings

• Major and minor road

crossings

• Associated Earth & Civil

works

• Construction and Installation

of PRMS

• Cathodic protection works

• Hot Tap works

• Electrical and

Instrumentation works

• Testing and commissioning

OANDO GAS AND

POWER (Akute

Power Limited)

Akute, Lagos State

of NigeriaCOMPLETE

D

9

Emergency

pipeline repairs

(EPRS) by

sectional

replacements and

clamping on

delivery lines

• Pipelines and facilities leak

repairs by clamping,

reinforcements and sectional

replacement.

• Manifold facilities

maintenance by corrosion

protection, repairs/servicing,

upgrade and replacements,

• Testing and commissioning

TOTAL E&P NIG.

Limited Rumuekpe

Rivers State of

NigeriaCOMPLETE

D

10 Relocation of

600m x 14-inch

gas pipeline

system

• Detail Engineering Design,

Procurement and

Construction of 14-inch x

600m Gas Pipeline across a

river.

Notore Chemical

Industries. Onne,

Rivers State of

Nigeria

Engineering,

Procurement

and weight

coating are

completed.

Page 11: Oil Serv Experience

• Scope also include; ROW

Survey, Dredging, Pipeline,

Ditching, Weld & Lay, NDT,

Field Joint Coating, CP,

Hydro Testing, (cleaning,

Flushing, Pigging, Drying

• Nitrogen Purging of the Line

and Commissioning

Construction

work-scope,

is on-hold.

11

GTS pipeline

emergency

response and

maintenance

contract for NLNG

LTD

• Emergency Land and

Swamp pipelines and

facilities leak repairs by

clamping, composite

materials, sectional

replacement, etc.

• Facilities maintenance by

corrosion protection,

repairs/servicing, upgrade

and replacements.

NLNG (land and

Swamp) On-GOING

(CALL-OUT

CONTRACT)

12

Engineering,

Procurement and

Construction of

Greater Lagos

Phase III Gas

Distribution

Network Systems

for Gaslink Nigeria

Limited

• Construction, Installation

and Commissioning of: 22km

x 18-inch Gas Pipeline, 38km

x 14-inch Gas Pipeline and

45km x 12-inch Gas Pipeline.

• Scope include R.O.W.

survey, pipeline ditch

excavation, welding/laying of

pipeline, NDT of welded

joints, field joints coating,

flush/hydrotest/drying of Gas

pipe lines

• Installation of four (4)

Pressure Reduction and

Metering Stations (PRMS)

• Execution of associated civil

works

• Maintenance of the gas

facility for two (2) years.

OANDO GAS AND

POWER (Gaslink

Nigeria Limited)

Lagos State,

NigeriaCOMPLETE

D

13 Major emergency

pipeline repairs

and manifold

• Installation and

Commissioning of dia. 8-inch

x 5km gas line.

Shell Petroleum

Development

Company Limited

COMPLETE

D

Page 12: Oil Serv Experience

rehabilitation for

swamp areas

• Scope include R.O.W.

survey, pipeline ditch

excavation, welding/laying of

pipeline, NDT of welded

joints, field joints coating, and

flush/hydrotest/drying of Gas

pipeline

• Associated civil works.

Eastern Swamp

Rivers/Bayelsa

States of Nigeria

14

Engineering,

Procurement and

Construction of

Gas Distribution

Network Systems

Phases 1 & 2 for

Gaslink Nigeria

•Construction, Installation and

Commissioning of: 30km x 6-

inch Gas pipeline, 48km x 8-

inch Gas pipeline and 23km x

12-inch Gas pipeline • Right

Of Way ( R.O.W) survey,

pipeline ditch excavation,

welding/laying of gas

pipeline, NDT of welded

joints, field joints coating

• Flush/hydrotest/drying of

gas pipeline

• Installation of CP system

• Associated Earth and Civil

works.

OANDO GAS AND

POWER (Gaslink

Nigeria Limited),

Ikeja Lagos State

of NigeriaCOMPLETE

D

15 23km x 6-inch

Cawthorne

Channel Cryogenic

NGL product

pipeline

• The project was on the

Construction and

Commissioning (in a swamp

terrain) of 23km x 6-inch

Natural Gas Liquid product

pipeline, from Cawthorne

Channel to Bonny .

• This involved R.O.W survey,

and clearing pipeline ditch

excavation/backfilling,

welding/laying, NDT of

welded joints, field joint

coating/holiday detection

• River crossings construction

• Piling and installation of

block valve stations

• Yard fabrication

• Cathodic protection works

Global Gas and

Refining Company

Ltd. Eastern

Swamp Rivers

State of Nigeria

COMPLETE

D

Page 13: Oil Serv Experience

• Hydrotest and drying of the

gas pipeline. As-built

documentation

16

Emergency

pipeline repair

services , land and

swamp

• Emergency Land

flow/pipelines and facilities

leak repairs by clamping and

sectional replacement

• Facilities maintenance by

corrosion protection,

repairs/servicing, upgrade

and replacements.

Nigeria. Agip Oil

Company. Eastern

Land

Rivers/Bayelsa

States of Nigeria

COMPLETE

D

17

Cathodic

protection

grounded

replacement at

Rumukroshe &

Apara sites

• Mobilising resources and

carrying out Sinking of deep

well GROUNDBED

• Installation of the ground

bed facilities

• Electrical and solar

panel/systems

installation/hook-up

Shell Petroleum.

Development.

Company. Limited,

Port Harcourt Land

Rivers State of

Nigeria

COMPLETE

D

18 Engineering,

Procurement and

Construction for

102.8km x 12-inch

Crude Oil Pipeline

System from

Umusadege to

Eriemu for Umugini

Asset Company

Limited (UACL)

• Construction, Installation

and commissioning of

102.8km x 12-inch Crude Oil

Pipeline from Umusadege to

Eriemu

• Construction, Installation of

the Valve Pit and barred Tee

at Ogini

• Associated Earth and Civil

works including perimeter

fencing at Ogini

• Provision of portable water,

valves, pressure gauges,

pumps, retaining tanks etc.

as required for successful

hydrotesting

• Fabrication and Installation

of pipe supports and shoes at

the pig trap location

• Electrical and

Instrumentation works

Umugini Asset

Company Limited

(UACL)

Umusadege/Eriem

u in Delta State of

Nigeria

COMPLETE

D

Page 14: Oil Serv Experience

• Major and minor road

crossings

• Testing and Commissioning

works

• Provision of “As built”

documentation

19

Rehabilitation of

Product Tanks in

Bonny terminal

(Zakhem-Oilserv

limited)

• Total rehabilitation of 21

nos. crude oil storage tanks

• Including surface piping

• Maintenance, repairs and

replacement works

Shell Petroleum

Development

Company. Limited

Eastern Land and

Swamp Bonny,

Rivers State of

Nigeria

COMPLETE

D

20

36-inch Trans

Niger pipeline

manifold

construction

• Mobilizing resources and

carrying out fabrication,

installation

• Hooking up of piping works

via normal process and hot

taps

• Corrosion protection via

painting

• Cathodic protection systems

• Civil works.

Shell Petroleum

Development

Company Limited

Port Harcourt Land

Ogoni area -

Rivers State of

Nigeria

COMPLETE

D

21 Construction &

commissioning of

15km x 12-inch

and 15 km x 4-inch

Elelenwo west to

Agbada 1 bulk and

test pipelines

respectively..

• Design, Procurement,

Installation and

Commissioning of 15km x 12-

inch and 15km x 4-inch oil

pipelines.

• Scope include R.O.W.

survey, pipeline ditch

excavation, creek and

seasonal swamp crossing,

welding/laying of pipeline,

NDT of welded joints, field

joints coating

• Flush/hydrotest/dewatering

of oil lines

• Fabrication

Shell Petroleum

Development

Company Limited

Port Harcourt

Land, Rivers State

of Nigeria

COMPLETE

D

Page 15: Oil Serv Experience

• Installation of two (2)

scraper traps

• Associated facilities design

construction

• Installation of deep well

ground bed (Cathodic

Protection).

22

Laying and

flushing of

pipelines/

abandonment of

delivery lines

• Mobilisation of resources

• Laying of 4-inch water

supply pipeline

• Pigging of pipeline (22km x

20-inch) using foam and gel

pigs train, and inhibited

water.

• Dewatering and mothballing

of pipeline.

Shell Pet. Dev. Co.

Ltd Port Harcourt

land Rivers State

of Nigeria COMPLETE

D

23 Riser replacement

• Riser upgrade works; riser

burial and removing of

substandard risers and

replacing with new ones.

Shell Petroleum

Development.

Company Limited,

Eastern land and

Swamp (Rivers

State)

COMPLETE

D

24

Pipeline repairs,

manifold upgrade

& rehabilitation

(land and swamp)

• Pipelines and facilities leak

repairs by clamping,

reinforcements and sectional

replacement

• Manifold facilities

maintenance by corrosion

protection

• Repairs/servicing, upgrade

and replacements.

Shell Petroleum

Development

Company Limited

Eastern land and

Swamp Rivers and

Bayelsa States of

Nigeria

COMPLETE

D

25 Pipeline clamping

(swamp & land)

• Pipelines leak repairs by

clamping and reinforcements

(using normal methods,

shoring and cofferdam)

Shell Petroleum

Development

Company Limited,

Eastern land and

Swamp Rivers and

COMPLETE

D

Page 16: Oil Serv Experience

Bayelsa States of

Nigeria

26

Replacement of

Aba Gas

Distribution

Network System

• Procurement, Installation

and Commissioning of 6-inch

and 4.3km x 4-inch Gas

pipelines.

• Scope include R.O.W.

survey, pipeline ditch

excavation, welding/laying of

pipeline, NDT of welded

joints, field joints coating

• Road crossings by method

of thrust boring

• Flush/hydrotest/drying of

gas lines, and modification of

gas manifolds

• Associated civil works.

Shell Petroleum

Development

Company Limited,

Eastern Land –

Aba, Abia State of

Nigeria

COMPLETE

D

27

Supply and

installation of

generator set &

overhead tank at

Kalaibiama health

centre

• Supply and installation

works on generator and

overhead tank (civil, electrical

and mechanical works

inclusive)

Shell Petroleum

Development

Company Limited,

Eastern land and

Swamp Rivers

State of Nigeria

COMPLETE

D

28 EPC for the

construction of

greater Lagos

phase iv gas

distribution

network system

covering a total of

8.2 km x 12-inch

gas transmission

pipeline with the

design capacity of

45mmscfd and an

SEGMENT 1: FROM IJORA

7UP TO FIRST POWER BY

IJORA OLOPA

• 1no. Tie-in point at Ijora

using Hot Tapping

mechanism

• 4nos. Road crossing using

Thrust Boring mechanism

• Construction of 3nos

Concrete Valve Pits with

Man-Hole for Sectionalizing

Gaslink Nigeria

Limited, subsidiary

of OANDO Gas

and Power (Lagos

State)

ON GOING

Page 17: Oil Serv Experience

operating capacity

of 30mmscfd to

cover Ijora to

bonny camp axis.

The project will be

carried-out in three

(3) segments.

Valves and Valve Tees

• 1no River crossing at Ijora

Causeway, width 260m using

Horizontal Directional Drilling

(HDD) Technology

• Design, Procurement and

Installation of Fiber Optic

Cable

• Construction of 1.8km x 12-

inch Gas pipeline including

Stringing, Ditching, Weld &

Lay, NDT, Backfilling and

etc…

• Design, Procurement and

Construction of Cathodic

protection system

• Construction and

Connection of 150m x 8-inch

Gas spur pipeline

• Testing, Pre-Commissioning

and Commissioning of the

main Gas pipeline and the

Gas Spurline

SEGMENT 2: FROM IJORA

FISH MARKET TO NEGRIS

IPP (MARINE POWER)

• 1no River crossing at Eko

Bridge, width 986m using

Horizontal Directional Drilling

(HDD) Technology

• 7nos. Road crossing using

Thrust Boring mechanism

and 7nos by open cut method

• Construction of 3nos

Concrete Valve Pits with

Man-Hole for Sectionalizing

Valves and Valve Tees

• Construction of 1.8km x 12-

inch Gas pipeline including

Stringing, Ditching, Weld &

Page 18: Oil Serv Experience

Lay, NDT, Backfilling and

etc…

• Design, Procurement and

Construction of Cathodic

protection system

• Design, Procurement and

Installation of Fiber Optic

Cable

• Construction and

Connection of 150m x 8-inch

Gas Spur pipeline

• Testing, Pre-Commissioning

and Commissioning of the

main Gas pipeline and the

Gas Spur line

SEGMENT 3: FROM

NEGRIS IPP TO BONNY

CAMP UNDER-BRIDGE

• 1no River crossing, width

954m using Horizontal

Directional Drilling (HDD)

Technology

• 3nos. Road crossing using

Thrust Boring mechanism

and 3nos by open cut method

• Construction of 0.6km x 12-

inch Gas pipeline including

Stringing, Ditching, Weld &

Lay, NDT, Backfilling and

etc…

• Construction of 1nos

Concrete Valve Pit with Man-

Hole for Sectionalizing Valves

and Valve Tees

• Design, Procurement and

Construction of Cathodic

protection system

• Design, Procurement and

Installation of Fiber Optic

Page 19: Oil Serv Experience

Cable

• Testing, Pre-Commissioning

and Commissioning of the

main Gas pipeline

29 EPC of the

Pressure

Reduction

Metering System

(PRMS) for the gas

supply to the Niger

Delta Power

Holding Company

Limited (NDPHC)

Turbine Power

Plant at Alaoji. The

scope of work is in

two (2) segments

FIRST SEGMENT:

EXECUTION OF

OUTSTANDING

ENGINEERING DESIGN ON

THE FOLLOWING:

• Cold vent system

comprising of Low and High

pressure blow down facilities

(Valves, Actuated Valves, all

piping, etc. and controlled by

the Programmable Logic

Controller “PLC”

• Fuel/Instrument Gas system

skid including associated

upstream and downstream

piping and electric heating

facilities

• The 6-inch interconnecting

piping between the boiler

package and the heat

exchangers

• Metering station PLC

system for monitoring and

control of the field equipment,

volumetric flow of each meter

run and the totalized

volumetric flow

• Isometric drawings of all

equipment and associated

piping for the plants

• Volumetric control syste

B). SECOND SEGMENT:

Nigerian Gas

Company Limited

(NGC), subsidiary

of NNPC Alaoji,

Abia State of

Nigeria

ON GOING

Page 20: Oil Serv Experience

SUPPLY AND DELIVERY OF

THE FOLLOWING

EQUIPMENT AND

MATERIALS INCLUDING

COST INSURANCE AND

FREIGHT (CIF) TO ONNE

PORT AND DELIVERY TO

ALAOJI SITE:

• 1 no. Inlet Emergency Shut

Down Valve (ESD)

• 2 nos. Stream of heat

exchangers

• 1 no. Instrument and Fuel

Gas systems

• 3 nos. Stream of regulators-

skid packages

• 3 nos. Stream of orifice

metering and 1 no. Turbine

metering-skid packages,

complete with all the

necessary Valves

• Volumetric control system -

1no. Cold vent system

• Dual flow computer

panel/PLC, Remote Terminal

Unit (RTU) panel with hot

standby and interface

protocol for Supervisory

Control Data Acquisition

(SCADA) connection

• 1 no. Gas Chromatograph

(GC) - 1 no. 125 KVA Gas

driven Generator - 1 no. 10

KVA Uninterrupted Power

Supply (UPS) system with

battery bank

• Associated Instrumentation

for the filter separators

including level control Valves

- Installation of the

equipment/materials and

Page 21: Oil Serv Experience

provision of Vendor’s

representatives for the testing

and commissioning of the

completed metring station

• Commissioning and supply

of 2 years operational spare

parts

• Training of NGC operations

and maintenance personnel

• Testing and commissioning

of the PRMS and its

associated facilities including

the Gas Chromatograph

• Provision of “As-Built”

drawings/documentations, all

project data books as well as

the operating and

maintenance manuals

• Submission of the project

Close-Out report to NNPC at

the completion of the contract

SUMMARY OF SHELL PETROLEUM DEVELOPMENT CORPORATION OF NIGERIA LIMITED PROJECTS

S/

NoDESCRIPTION OF PROJECT

COMPLETION

DATE

SPDC PROJECTS

124-inch Gas Flare line by clamping at cawthorn channel (2) Gas

Plant09/2010

Page 22: Oil Serv Experience

224-inch NCTL Post defect repair using Cofferdam at Fusokiri

completion09/2010

324-inch Leak repair using Diamond Wrap at Sanbarth (1)

completion09/2010

418-inch Bunkering points L/R delivery line by clamping at Soku-

Anguliama competition07/2010

5 24-inch Trunk Line by clamping at Bodowest completion 07/2010

6 24-inch Trunk Line by clamping at Kalibiama completion 06/2010

7 20-inch Riser at Buguma Completion 05/2010

8 16-inch Pig retrieval at Nun-River completion 05/2010

9 24-inch Manifold By-Pass Sectional Replacement at Bomu (3) 04/2010

10 16-inch Pig retrieval at Nun-River 03/2010

Page 23: Oil Serv Experience

11 10-inch DL Disused line Salvaging at Nun-River 02/2010

12 24-inch NCTL Leak Repair Using Cofferdam at Opobo Channel 01/2010

13 24-inch NCTL Leak Repair Using Cofferdam at Opobo Channel (3) 01/2010

14 10-inch & 18-inch Bunkering Points at Soku (7) 11/2009

15 Sign Post Installation at SPDC Locations 11/2009

16 28-inchNCTL Leak repair using Cofferdam at Cawthrorne Channel 11/2009

17 10-inch & 18-inch Delivery Line Leak repair at Soku (6) 11/2009

18 10-inch & 18-inch Bunkering Points repair at Soku (5) 10/2009

1928-inch and 24-inch Leak repair by Clamping using Cofferdam at

Boro/Sanbarth10/2009

20 10-inch & 18-inch Bunkering Points Repair at Kpokpokiri 08/2009

Page 24: Oil Serv Experience

21 16-inch TL Defect Point ID & Repair at Kolo-Creek 08/2009

22 28-inch NCTL Leak repair by Clamping at Ogboro 07/2009

2324-inch Riser Leak repair by Sectional Replacement using

Cofferdam at Adamakiri07/2009

24 10-inch DL Leak Repairs @ Oporoma 07/2009

25 28-inch NCTL by clamping at Krakrama (2) 06/2009

26 10-inch DL Bunkering Points Repair at Nun river 06/2009

27 10-inch DL 3 points leak repair at Onyoma 05/2009

28 24-inch Leak Repair NCTL Clamping at Opobo Channel (1) 10/2009

29 30-inch Flange Installation at Bomu (2) 05/2009

Page 25: Oil Serv Experience

3010-inch & 18-inch Bunkering Points Repair by Clamping at Soku

(3)04/2009

3110-inch & 18-inch Bunkering Points Repair by Clamping at Soku

(2)03/2009

32 24-inch LR NCTL Clamping at Bomu (1) 02/2009

33 24-inch LR Gas plant Soku (1) 02/2009

SUMMARY OF NLNG PROJECTS

S/

NoDESCRIPTION OF PROJECT

COMPLETION

DATE

NLNG PROJECTS

1 IP Verification Dig on Soku-Rumuji 28" pipeline 14/2/2014

2 Elok Gas Pipeline Leap Repair 14/2/2014

Page 26: Oil Serv Experience

3 GTS Pipeline Emergency Response and Maintenance. Otari FTO 18/02/2014

4 GTS Pipeline Emergency Response and Maintenance 19/08/2013

5Carry out GTS Proximity Survey on the Rumuji Bonny ROW: Mapping

of GPS Coordinates along the ROW13/07/2012

6

GTS Proximity Survey on the Obiafu-Ubeta: Carry out GTS Proximity

Survey on Ubeta-Obiafu Pipeline to ascertain that the provisions of the

Oil Pipeline Act WRT encroachment and Population Density are met

13/07/2012

7 Field Assessment of the GTS and Gathering Geographic information 04/03/2012

8Direct Current voltage Gradient Survey (DCVG) on Rumuji- Bonny

(KP 32.8-51.51) pipeline in Obite-Ubeta21/03/2012

9Carry out Direct Current Voltage Survey (DCVG) on the Obite-Ubeta

pipeline21/03/2012

10 Carry out Direct Current Voltage Survey (DCVG) on the Soku-Rumuji 21/03/2012

Page 27: Oil Serv Experience

pipeline

11Dig-up Verification of IP Metal Loss Feature at KP 7021 on Ubeta-

Rumuji (T1) Section of GTS 1 in Kreigani13/03/2012

12GTS1 Inspection of Repair Patched Plates on Leak Points - S2

KP13.9 Kreigani Leak site03/01/2012

13 Side Sonar Scan of GTS Pipeline Crossing at Agba Ndele 11/10/2011

14 CP Trouble Shooting of Trains 1, 2 and 3 at NLNG Bonny Plant 09/12/2011

15Backfilling and remediation of exposed T2 pipeline and ROW neat

Gbukuma community22/08/2011

16 Provision of GTS emergency response and maintenance service 08/08/2011

17 GTS-1 CP Remedial works for Obite-Ubeta pipeline section 08/01/2011

18 GTS-1 CP Remedial works for Obite-Rumuji pipeline section 08/01/2011

Page 28: Oil Serv Experience

19 GTS-1 CP Remedial works for Obiafu-Ubeta pipeline section 08/01/2011

20 GTS-1 CP Remedial works for Rumuji-Bonny pipeline section 08/01/2011

21Mechanical backfilling of the Gas transmission Pipeline section

(100m) along the NLNG GTS ROW at GBUKUMA in Rivers State08/2011

22 Sandbagging of new Calabar River Crossing (KP34+612) 19/05/2011

23GTS Pipeline Emergency Response & Maintenance (T2 KP 53.5 Leak

repair)17/9/2010

24Sandbagging of the Sambreiro River Crossing at Odiadje on NLNG's

GTS ROW16/7/2010

25Leak Repair by Screw Plugging & Sleeving on 28-inch Gasline at

Soku Completion06/2010

26 36-inch Gasline Screw Plugging & Sleeving at Okrika 06/2010

27 36-inch GAS LR by screw plugging using Cofferdam at Soku using 01/2010

Page 29: Oil Serv Experience

Houseboat

28 KP 60 Adamakiri Re-Entry 01/2009

SUMMARY OF TOTAL E&P NIGERIA LIMITED

S/

NoDESCRIPTION OF PROJECT

COMPLETION

DATE

TOTAL E&P LIMITED PROJECTS

112-inch Obagi Leak Repair of Explosive Damaged at Rumuekpe

Pipeline (2)10/2009

2 Repair of Explosive Damaged 12-inch at Obagi Pipeline 08/2009