odot certified profilers and operators€¦ · odot certified profilers and operators july 3, 2018...

41
ODOT Certified Profilers and Operators July 3, 2018 This document serves to identify the current ODOT certified profilers and profiler operators. ODOT reserves the right to revoke operator approval prior to certification expiration. Reasons for operator revocation may include but are not limited to the following: Inability to check or recalibrate the longitudinal distance measurements of the equipment upon request; Inability to verify height sensor measurements with a simple block check on the equipment upon request; Inability to demonstrate a bounce test on the equipment upon request; Inability to generate an electronic copy of profiles collected in ProVAL software compatible format at the completion of a data collection run upon request; Inability to provide log sheets describing naming conventions and location descriptions of collected profiles; Failure to notify the ODOT project engineer at least 24 hours in advance of collecting acceptance data; or Inability to follow Supplement 1110 or Supplement 1112 when submitting data to ODOT. ODOT reserves the right to revoke equipment approval prior to certification expiration. Reasons for equipment revocation may include but are not limited to the following (re-certification may take place after remedies/repairs): Longitudinal distance is not within 0.2% and equipment cannot be recalibrated to measure within tolerance; Height sensor(s) are not measuring within 0.01 inch; Equipment fails to pass a bounce test (IRI of 8 inches or less on a project site) and cannot pass after recalibration of accelerometer(s) and/or height sensor(s); Repair or replacement of equipment components such as accelerometers, height sensors, other electronic components including the equipment's computer; Equipment software upgrades/revisions.

Upload: others

Post on 03-Jun-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

ODOT Certified Profilers and Operators

July 3, 2018

This document serves to identify the current ODOT certified profilers and profiler operators. ODOT reserves the right to

revoke operator approval prior to certification expiration. Reasons for operator revocation may include but are not

limited to the following:

Inability to check or recalibrate the longitudinal distance measurements of the equipment upon request;

Inability to verify height sensor measurements with a simple block check on the equipment upon request;

Inability to demonstrate a bounce test on the equipment upon request;

Inability to generate an electronic copy of profiles collected in ProVAL software compatible format at the

completion of a data collection run upon request;

Inability to provide log sheets describing naming conventions and location descriptions of collected profiles;

Failure to notify the ODOT project engineer at least 24 hours in advance of collecting acceptance data; or

Inability to follow Supplement 1110 or Supplement 1112 when submitting data to ODOT.

ODOT reserves the right to revoke equipment approval prior to certification expiration. Reasons for equipment

revocation may include but are not limited to the following (re-certification may take place after remedies/repairs):

Longitudinal distance is not within 0.2% and equipment cannot be recalibrated to measure within tolerance;

Height sensor(s) are not measuring within 0.01 inch;

Equipment fails to pass a bounce test (IRI of 8 inches or less on a project site) and cannot pass after recalibration

of accelerometer(s) and/or height sensor(s);

Repair or replacement of equipment components such as accelerometers, height sensors, other electronic

components including the equipment's computer;

Equipment software upgrades/revisions.

Page 2: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

OH DOT Device

Number

Certification Expiration

Approved Surfaces

Contractor or

Consultant

Operator Name

Device Model

Serial # Style

Number and Type

of Sensor(s)

Host Vehicle or Mounting Position

2 31-May-19 Asphalt Kokosing

Daniel Supron

Ames 8200 820206 High Speed Dual Spot

Lasers Front

Mount

Jim Woltz

Kyle Parker

Trent Nissen

Jarod Lombardi

Tom Strasko

Troy Nissen

3, 4, 5 31-May-19 Asphalt, All for 820299

Shelly Company

Rebecca Kerr

Ames 8200 820799, 820299, 800605

High Speed

Dual Spot Lasers.

Dual Gocator (820299

only)

Front Mount

Dan Johnston

Dan Wamer

Darrel Cooperrider

Edward Marshall

Todd Lowery

Mitchel Bailey

Rob Dobson

8 31-May-19 All Structural

Imaging, LLC

Sean Golembiewski Ames 6200 621306 Lightweight

Dual Line Lasers

John Deere Gator

Tom Anderson

17 31-May-19 All Kokosing

Austin Schroeder

Ames 6200 600402 Lightweight Dual Line

Lasers John Deere

Gator Jason Kleem

Ben Stansbery

Chuck Daley

19 31-May-19 All Shelly & Sands

Ian Labie Ames 6200 620908 Lightweight Daul Spot

Lasers Front Mount

20, 30 31-May-19 All Mar-Zane Materials

Lab

Matt Gross Ames 8300

830308 830110

High Speed

Dual Line Lasers

Front Mount Jeff McGowan

26 31-May-19 All Gerkin

Paving, Inc.

Kyle Borstleman Ames 8200 680206 High Speed

Dual Spot Lasers

Front Mount

Hugh Schink

27, 38 31-May-19 Asphalt

820109, All 830314

Valley Asphalt

Casey Mullenix

Ames 8200,

Ames 8300

820109 , 830314

High Speed

Dual Spot Lasers,

Dual Line Lasers

Front Mount

Brandon Vaught

Matthew Hyden

36, 53 31-May-19 All

DOT Diamond

Core Drilling Inc.

Phil Egnor

Ames 8200 821413, 820018

High Speed Dual Line

Lasers Front

Mount

Phil Egnor Jr.

Matt Szefcyk

Todd Krieg

Page 3: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

OH DOT Device

Number

Certification Expiration

Approved Surfaces

Contractor or

Consultant

Operator Name

Device Model

Serial # Style

Number and Type

of Sensor(s)

Host Vehicle or Mounting Position

37 31-May-19 All

Donley Concrete Drilling & Cutting

Company

Bryan Vance

Ames 8200

821313 High Speed Dual Line

Lasers Front

Mount Clinton

McElfresh

Spencer Cozzarin

39 31-May-19 All APR

Consultants Inc.

Michael Gerardi Ames

8200 820214 High Speed

Dual Line Lasers

Front Mount Nick

McCulla

40 31-May-19 All Brooks

Construction

Jeff Austin

Ames 8300

830615 High Speed Dual Line

Lasers Front

Mount

Kenneth Melchi

Steve Christlieb

42, 44 31-May-19 All E&B Paving

Gary McLeland

Ames 6200, Ames 8200

620115, 820707

Lightweight, High Speed

Dual Spot Lasers

John Deere Gator,Front

Mount Kendall Wright

Micah Meives

47 31-May-19 All Reith-Riley

Patrick Konja

Ames 8300

830716 High Speed Dual Line

Lasers Front

Mount

Jason Howard

Marc Diamente

Chris Speichert

51 31-May-19 All Resource

International

Todd Rickenberg

Ames 8300

830017 High Speed Dual Line

Lasers Frount Mount

Daniel Fisher

Peyman Majidi

52 31-May-19 All INDOT

Dwayne Harris

Ames 8300

831617 High Speed Dual Line

Lasers Frount Mount

Gilbert Truax

Hobert Deaton

Maurice Hendryx

Page 4: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Kokosing Materials Inc. Approved Road Profiler: Device 2

Kokosing Construction Approved Operator: Mr. Daniel Supron

Page 5: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Kokosing Construction Approved Operator: Mr. James Woltz

Kokosing Construction Approved Operator: Mr. Kyle Parker

Page 6: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Kokosing Construction Approved Operator: Mr. Trent Nissen

Kokosing Construction Approved Operator: Mr. Jarod Lombardi

Page 7: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Kokosing Construction Approved Operator: Mr. Troy Nissen

Kokosing Construction Approved Operator: Mr. Tom Strasko

Page 8: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Shelly Company Approved Road Profiler: Device 3

Shelly Company Approved Road Profiler: Device 4

Shelly Company Approved Road Profiler: Device 5

Page 9: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Shelly Company Approved Operator: Ms. Rebecca Kerr

Shelly Company Approved Operator: Mr. Dan Johnston

Page 10: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Shelly Company Approved Operator: Mr. Dan Wamer

Shelly Company Approved Operator: Mr. Darrel Cooperrider

Page 11: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Shelly Company Approved Operator: Mr. Edward Marshall

Shelly Company Approved Operator: Mr. Todd Lowery

Page 12: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Shelly Company Approved Operator: Mr. Mitchell Bailey

Shelly Company Approved Operator: Mr. Robert Dobson

Page 13: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Structural Imaging Approved Road Profiler: 8

Structural Imaging Approved Operator: Mr. Sean Golembiewski

Page 14: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Structural Imaging Approved Operator: Mr. Tom Anderson

Kokosing Construction Approved Road Profiler: Device 17

Page 15: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Kokosing Construction Approved Operator: Austin Schroeder

Kokosing Construction Approved Operator: Ben Stansbery

Page 16: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Kokosing Construction Approved Operator: Chuck Daley

Kokosing Construction Approved Operator: Jason Kleem

Page 17: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Shelly and Sands Approved Road Profiler: Device 19

Shelly and Sands Approved Operator: Mr. Ian Labie

Page 18: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Mar-Zane Approved Road Profiler: Device 20

Mar-Zane Approved Road Profiler: Device 30

Page 19: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Mar-Zane Lab/Shelly and Sands Approved Operator: Mr. Jeff McGowan

Mar-Zane Lab/Shelly and Sands Approved Operator: Mr. Matt Gross

Page 20: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Gerken Paving Inc. Approved Road Profiler: Device 26

Gerken Paving Inc. Approved Operator: Mr. Kyle Borstleman

Page 21: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Gerken Paving Inc. Approved Operator: Mr. Hugh Schink

Valley Asphalt Corp. Approved Road Profiler: 27

Page 22: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Valley Asphalt Corp. Approved Road Profiler: 38

Valley Asphalt Corp. Approved Operator: Mr. Brandon Vaught

Page 23: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Valley Asphalt Corp. Approved Operator: Mr. Casey Mullenix

Valley Asphalt Corp. Approved Operator: Mr. Matthew Hyden

Page 24: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

DOT Diamond Core Drilling: Approved Road Profilers:

Device 36

DOT Diamond Core Drilling: Approved Road Profilers:

Device 53

Page 25: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

DOT Diamond Core Drilling: Mr. Phil Egnor

DOT Diamond Core Drilling: Mr. Phil Egnor Jr

Page 26: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

DOT Diamond Core Drilling: Mr. Matt Szefcyk

DOT Diamond Core Drilling: Mr. Todd Krieg

Page 27: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Donley Concrete Cutting & Drilling Approved Road Profiler: Device 37

Donley Concrete Cutting & Drilling Approved Operator: Mr. Bryan Vance

Page 28: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Donley Concrete Cutting & Drilling Approved Operator: Mr. Clinton McElfresh

Donley Concrete Cutting & Drilling Approved Operator: Spencer Cozzarin

Page 29: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

APR Consultants Inc. Approved Road Profiler: 39

APR Consultants Inc. Approved Operator: Mr. Michael Gerardi

Page 30: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

APR Consultants Inc. Approved Operator: Mr. Nick McCulla

Brooks Construction Approved Profiler: Device 40

Page 31: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Brooks Construction Approved Operator: Mr. Jeff Austin

Brooks Construction Approved Operator: Mr. Kenneth H. Melchi

Page 32: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Brooks Construction Approved Operator: Mr. Steve Christlieb

E & B Paving: Approved Road Profiler: 42

Page 33: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

E & B Paving: Approved Road Profiler: 44

E & B Paving Approved Operator: Mr. Gary McLeland

Page 34: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

E & B Paving Approved Operator: Mr. Micah Meives

E & B Paving Approved Operator: Mr. Kendall Wright

Page 35: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Rieth Riley Approved Road Profiler: Device 47

Rieth Riley Approved Operator: Mr. Mark C. Speichert

Page 36: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Rieth Riley Approved Operator: Mr. Jason Howard

Rieth Riley Approved Operator: Mr. Marc Diamente

Page 37: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Rieth Riley Approved Operator: Mr. Patrick Konja

Resource International, Inc. Approved Road Profiler: Device 51

Page 38: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Resource International Approved Operator: Mr. Daniel Fisher

Resource International Approved Operator: Mr. Peyman Majidi

Page 39: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

Resource International Approved Operator: Mr. Todd Rickenberg

INDOT Approved Road Profiler: 52

Page 40: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

INDOT Approved Operator: Mr. Dwayne Harris

INDOT Approved Operator: Mr. Gilbert Truax

Page 41: ODOT Certified Profilers and Operators€¦ · ODOT Certified Profilers and Operators July 3, 2018 ... (IRI of 8 inches or less on a project site) and cannot pass after recalibration

INDOT Approved Operator: Mr. Hobert Deaton

INDOT Approved Operator: Mr. Maurice Hendryx