october 2011 - caltrans safe routes to schools list

Upload: lakeconews

Post on 07-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    1/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    2/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    3/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    4/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    5/15

    Caltrans Local Assistance Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program

    Fiscal Year 2011/12

    Sorted by Caltrans District

    No. Local Agency Caltrans

    District

    Project Location** School Name(s)** Project Description Federal

    Funds

    39 Sunnyvale 4 Various locations throughout the city Columbia MS, PetersonMS, SVA ES, CupertinoMS,

    Construct sidewalks, bulb-outs, and curb ramps;install in-pavement crosswalk lights, signs, andpavement markings; upgrade (reduce) cornerradius.

    $820,000

    40 Windsor 4 Multiple Schools in Windsor Unified SchoolDistrict

    Windsor MS, CaliCalmecac LanguageAcademy, Brooks ES,Windsor Creek ES

    Conduct pedestrian and bicycle safetyeducation training.

    $310,000

    41 Lompoc 5 Various locations throughout the city Arthur Hapgood ES,Clarence Ruth ES, LaCanada ES, La HondaES, Leonora Fillmore ES,Lompoc Valley MS,Miguelito ES

    Construct sidewalks, curb ramps, and bulb-outs $388,500

    42 Lompoc 5 Multiple Schools in the City of Lompoc Arthur Hapgood ES,Clarence Ruth ES, LaCanada ES, La HondaES, Leonora Fillmore ES,Lompoc Valley MS

    Provide community education and outreach;recruit SRTS taskforce members; hold "walk nroll" to school encouragement as part ofInternational Walk to School and Bike to Workand School Months; conduct SRTS pedestrian

    and bicycle education and trainings; increasetraffic enforcement in school zones

    $402,800

    43 Santa Barbara 5 Clifton St. between Salinas St. and Canada St. Cleveland ES Construct sidewalks, curb and gutter, curbramps, pedestrian refuge islands; minor safetylighting

    $225,000

    44 Santa BarbaraCounty

    5 South side Clark Ave. from west of SR 135 toeast of Norris St.

    Orcutt MS, Patterson RdES

    Construct sidewalk, curb and gutter $350,000

    45 Santa Cruz 5 Various locations throughout the city Westlake ES Construct sidewalks, smaller radius curb

    returns, curb ramps, pedestrian refuge islands;install raised crosswalks

    $503,100

    46 Santa Cruz County 5 Bush St.; Harmon St. between Oak St. andBush St.; Laurel St. between Harmon St. andLomond St.; Lomond St. between Laurel St. andSR 9 (Central Ave.)

    Boulder Creek ES Construct pedestrian path and retaining wall $250,000

    47 Santa Cruz County 5 Multiple Schools in 4 Santa Cruz SchoolDistricts

    Mintie White ES, BayView ES, Ann Soldo ES,HA Hyde ES, Del MarES, Westlake ES,Shoreline MS

    Conduct bicycle and pedestrian education,encouragement, traffic safety enforcement andevaluation

    $399,800

    Page 5 of 1510/11/2011

    ** ES = Elementary SchoolMS = Middle School

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    6/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    7/15

    Caltrans Local Assistance Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program

    Fiscal Year 2011/12

    Sorted by Caltrans District

    No. Local Agency Caltrans

    District

    Project Location** School Name(s)** Project Description Federal

    Funds

    63 Wasco 6 Multiple Schools in the City of Wasco Karl F Clemens ES, PalmAve ES, ThomasJefferson MS, TeresaBurke ES, John L PrueittES, North Kern ChristianSchool

    Develop SRTS plan modeled by the NationalCenter for Safe Routes to School.

    $165,000

    64 Arcadia 7 Various locations throughout the city Hugo Reid ES Construct sidewalks, bulb-outs, and curb ramps;install crosswalks, pedestrian countdown heads,and signs

    $647,700

    65 Azusa 7 Citrus Ave./Gladstone St.; Gladstone St.

    between Citrus Ave. and Barranca Ave.;Fairvale St./Gladstone St.; Little Dalton Washbetween Citrus Ave. and Gladstone St.

    Gladstone ES Construct pedestrian refuge islands, bulb-outs,

    curb ramps; install crosswalks, pedestriancountdown heads, advance stop (bars)markings, signs and striping.

    $1,000,000

    66 Azusa 7 Multiple Schools in the Azusa Unified SchoolDistrict

    Henry Dalton ES, Alice MEllington ES, GladstoneStreet ES, Victor FHodge, Charles H LeeES, Magnolia ES, CliffordD Murray ES

    Provide safety education and encouragementprograms and conduct enforcement activitiesacross the district

    $500,000

    67 Baldwin Park 7 Maine Ave. between SR 83 (Arrow Hwy.) andLos Angeles St.

    Ernest R Geddes ES,Jerry D Holland MS,Margaret Health ES,Pleasant View ES, SantaFe ES

    Construct sidewalks, bulb-outs, and curb ramps;install crosswalks and bike lanes; upgradetraffic signals, signs and striping

    $1,000,000

    68 Bell Gardens 7 Multiple Schools in the City of Bell Gardens Bell Gardens ES, CesarE Chavez ES, Garfield E,Suva ES, Bell GardensMS, Suva MS

    Hold 12 events for safe practices of walking andbicycling to school; 16 page bilingual magazine;develop website

    $170,000

    69 Burbank 7 Keystone St. between Pacific Ave. andRiverside Dr. Thomas Edison ES, SaintFinbar Install bike lanes, bike detection, bike boxes,and crosswalks; construct traffic circles, bulb-outs, curb ramps, and (entry) pedestrian refugeislands

    $689,100

    70 Calabasas 7 Various locations throughout the city Alice C Stelle MS,Chaparral ES, Arthur EWright MS

    Construct crosswalks and upgrade existingcrosswalks, signs and curb ramps; install in-pavement crosswalk lights, flashing beacons,signs and striping.

    $327,800

    Page 7 of 1510/11/2011

    ** ES = Elementary SchoolMS = Middle School

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    8/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    9/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    10/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    11/15

    Caltrans Local Assistance Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program

    Fiscal Year 2011/12

    Sorted by Caltrans District

    No. Local Agency Caltrans

    District

    Project Location** School Name(s)** Project Description Federal

    Funds

    96 Desert HotSprings

    8 Multiple Schools in the City of Desert HotSprings

    Cabot Yerxa ES, JuliusCorsini ES, Two BunchPalms ES, Edward NWenzlaff ES, DesertSprings MS, Painted HillsMS

    Hire A SRTS Coordinator; provide safetyeducation assemblies; bicycle and pedestrianrodeos; printed materials; SRTS workshops;increased law enforcement during school pick-up and drop-off times

    $500,000

    97 Hesperia 8 Willow St. between Third Ave. and Eighth Ave. Joshua Circle ES,Cypress School of theArts, New Life ChristianAcademy, Hesperia MS,Mesa Grande ES,Eucalyptus ES, Lucy ESiegrist ES, Maple ES,Hesperia Christian,Pathways to College

    Construct multi-use path, curb and gutter, curbramps; install crosswalks, signs, and pavementmarkings

    $834,900

    98 Highland 8 McKinley St. between 9th St. and Base Line;Base Line/Valaria Dr.

    Lankershim ES Construct sidewalks, curb and gutter, and curbramps; install in-pavement crosswalk lights andflashing beacons

    $677,200

    99 Highland 8 9th St. between Cunningham St. and PalmAve.; Church Ave./Norwood St.

    Cypress ES, ThompsonES

    Construct sidewalks, curb and gutter, and curbramps; install in-pavement crosswalk lights andflashing beacons

    $510,700

    100 Lake Elsinore 8 Various locations throughout the city Machado ES, ElsinoreES, Elsinore MS, TerraCotta MS, Tuscany HillsES, Canyon Lake MS,Cottonwood Canyon ES

    Install speed feedback signs $355,400

    101 RanchoCucamonga

    8 North side 9th St. from 100' west of VineyardAve. to 800' west of Vineyard Ave.

    Los Amigos ES, RanchoCucamonga MS

    Construct sidewalk, curb and gutter;bicycle/skateboard rack

    $90,800

    102 RanchoCucamonga

    8 Multiple Schools in the City of RanchoCucamonga

    Vineyard MS, Alta LomaMS, Day Creek MS,Summit MS, Ruth MusserMS,

    Conduct bicycle and pedestrian safetyeducation, promotional events like Walk toSchool Days, contests; increased trafficenforcement

    $298,400

    103 Riverside County 8 Whittier Ave. between Yale St. and Cornell St. Ramona ES Widen roadway; construct sidewalks and curbramps; install signs and pavement markings

    $510,300

    Page 11 of 1510/11/2011

    ** ES = Elementary SchoolMS = Middle School

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    12/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    13/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    14/15

  • 8/3/2019 October 2011 - Caltrans Safe Routes to Schools List

    15/15

    Caltrans Local Assistance Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program

    Fiscal Year 2011/12

    Sorted by Caltrans District

    No. Local Agency Caltrans

    District

    Project Location** School Name(s)** Project Description Federal

    Funds

    132 Brea 12 "Tracks at Brea" trail/Brea Blvd.; "Tracks atBrea" trail/State College Blvd.; State CollegeBlvd./Avocado St.

    Laurel ES, Brea MS Install traffic signal with bike (videodetection)/pedestrian traffic control devices,crosswalks, signs; upgrade/modify traffic signals

    $273,600

    133 Costa Mesa 12 E. 19th St. between Newport Blvd. and IrvineAve.

    Mariners ES, WoodlandES, Heinz Kaiser ES,Horace Ensign MS

    Construct raised medians and chokers; minorlandscaping and signs

    $855,900

    134 Costa Mesa 12 Various locations throughout the city Adams ES, California ES,College Park ES, MaudeB Davis ES, Heinz KaiserES, Killybrooke ES,Paularino ES, PomonaES, Everett A Rea ES

    Install (solar powered) speed feedback signsand retrofit existing speed feedback signs,pedestrian countdown heads, (solar powered)flashing beacons, signs and striping

    $796,200

    135 Huntington Beach 12 Various locations throughout the city Helen Stacey MS, Ada EClegg ES

    Install traffic signal, bike lanes, signs andstriping; construct curb ramps.

    $478,500

    136 Irvine 12 Multiple Schools in the City of Irvine Plaza Vista MS,Woodbury ES, Canyon

    View ES, Brywood ES,Alderwood Basics PlusES, Bonita Canyon ES

    Conduct traffic safety education and implementa comprehensive walking/biking to school

    program

    $500,000

    137 La Palma 12 Walker St. between Crescent Ave. and LaPalma Ave.; Crescent Ave. between Walker St.and Moody St.

    Walker MS Install speed feedback signs $174,000

    138 Mission Viejo 12 Var ious locations throughout the city Bathgate ES, Castille ES,Viejo ES, Newhart MS,Barcelona ES, CarlHankey ES, La Paz MS,Montevideo ES, DePortola ES, Cordillera ES

    Construct sidewalk and curb ramps $141,400

    139 Santa Ana 12 Multiple Schools in the City of Santa Ana All ES in Santa Ana Provide pedestrian safety educational campaignand continued encourgement of safety practices

    $338,900

    Totals $66,373,600