Reduce PM Master Data Bottlenecks to Improve Planning with Winshuttle

by

Swamy Veeranki PM Consultant

Newcrest Mining-Australia

Agenda

• Introduction

• Bottlenecks with PM Master data..

• Why Winshuttle ?..

• Winshuttle Usage in PM Area

• Real Examples..

• Recommendations

• Q&A..

Speaker Profile

Swamy Veeranki

Sydney- Australia

• SAP PM Consultant (Certified)

• Instrument engineer

• >20 yrs Process industry exp

• > 10 years consultancy experience

• Several SAP Projects..( Previous company- Accenture)

• Worked in Metals, Mining, Steel, Chemical, Healthcare

• Winshuttle - 2yrs, 100+ Templates

• Winshuttle Products - Transaction, Runner

• Current project - Newcrest Mining, Orange, Australia

Newcrest mining

Australia’s largest gold producer

World's top 5 gold mining company by production, reserves and market capitalization.

ASX Top 20-listed company, with a market capitalisation of around $15 billion and a global workforce of 5,000.

Operations across Australia & Indonesia, West Africa with Exploration activities ongoing in centres across the globe.

Newcrest mining -Locations

Newcrest mining

Using SAP since 2009

SAP Version: ECC 6.0

Modules : PM, MM, HR, FICO, BW

SAP Users ->5000

Newcrest SAP Environment

Bottlenecks – PM Master Data

Data

Creation – Validation - Modification

-Technical Master data ( FLocs, Equipments, BOMs,

Work Centers…etc)

-Planning Master data (Maintenance plans, Task lists, PRT

Documents…etc)

-Transactional Data ( Work orders, Notifications, KPI…etc)

- Mass change of records

Project Details

New Underground Mine 1.9Billion$ Project

+ Processing Plant

15000 New Functional Locations

8000 Maintenance Plans

8000 Task Lists

10000 PRT Documents

35000 Material Records

+ BOMS, PMA, Construction Types

- LSMW ( Legacy system migration workbench)..

Options

- 3rd Party tool ( Quadrate, eCatt, ETL,

Winshuttle, Siamese, Paymetric, OpenHR…..

- Manual Update

2 Persons , 5-6 months

Why Winshuttle?

Advantages

SAP Software Partner

Follows SAP security

Transactional control

Very user friendly-

Create – Populate - Run

No complicated steps

Validate data before loading

No complex training

Winshuttle for Plant Maintenance

Newcrest is using Winshuttle to

Create / Extract / Modify records of

Functional Locations

Equipments

PM Assemblies

BOMS

Maintenance Plans

Task Lists

PRT Documents

Material Records

Notifications

Measuring Points

Work orders

Measuring Docs

Class / Characteristics

Budget Lines

CATS-Time Confirmations

Mass Change

Example – Fixing Maintenance KPI

KPI – Winshuttle

Fleet - Loader

Fleet – Loader Structure

Loader 3 Maintenance Plans

Loader Maintenance Plan

Loader Measuring Point

Measuring Document Update

Loader Master counter Previous reading : 47394

Reading to be entered: 47448

Difference /Excess =100054

Master counter reading entered: 147448

Measuring Document Update

Loader 3 Work Order Generated

M.Plan

Frequenc

y (Hrs)

Plan

s

Orders

Generated

O/night

200 1 500

500 1 200

1000 1 100

2000 2 100

3500 1 29

4000 14 350

5000 1 20

6000 6 100

7000 1 14

7500 1 13

8000 15 188

9000 1 11

10000 18 180

15000 13 87

16000 10 63

18000 7 39

20000 1 5

25000 2 8

32000 1 3

97 2010

Loader Example

Loader 3 Orders Generated- 2010

Loader 7 Orders Generated- 1918

Orders Generated- 5816

Loader 8 Orders Generated- 1898

Fixing KPI Values with Winshuttle

Time for each work order to close =15sec

5816 *15sec =24.23hrs

=>3 days for 1 person

Options..

Loader Example

Using Winshuttle ?

3 minutes to create a Template

1.5 hr to close all unwanted work orders. KPI

normal.

=0.92 secs / Order

Quick fix – Mass Change

Task list

o Task list creation –

o Task list are the most complicated area of PM, with multiple

operations, long text, materials, maintenance packages.

It took 2 days to create a WS Template, and this is the most difficult template we have come across.

Ex: Task list creation

Automatic Notification Creation

Newcrest Mining - Winshuttle

Summary-Winshuttle is very useful for

• Reducing the Bottlenecks by Automating Creation / Validation / Modification of PM data.

• Improving Planners efficiency.. By

Automating Planning Master Data

• Mass change of records..

Reduce PM Master Data bottlenecks to improve planning with Winshuttle