nywea 2012

67
Onondaga County’s Green I f “P j 50” Onondaga County’s Green I f “P j 50” Infrastructure “P roject 50” Construction Infrastructure “P roject 50” Construction Construction Construction Joanne M Mahoney County Executive Joanne M. Mahoney , County Executive Onondaga Lake Amended Consent Judgment (ACJ) Compliance Program New York Water Environment Association 84 th Annual Meeting Tom Rhoads, Commissioner, OCDWEP Matthew Marko, Rita Fordiani CH2M HILL CH2M HILL

Upload: onondaga-county-save-the-rain

Post on 19-Jun-2015

1.330 views

Category:

Technology


0 download

DESCRIPTION

New York Water Environmental Association, Annual Conference. Presented by Tom Rhoads and Matthew Marko on February 6, 2012.

TRANSCRIPT

Page 1: NYWEA 2012

Onondaga County’s Green I f “P j 50” Onondaga County’s Green I f “P j 50” Infrastructure “Project 50” ConstructionInfrastructure “Project 50” ConstructionConstructionConstruction

Joanne M Mahoney County ExecutiveJoanne M. Mahoney, County ExecutiveOnondaga Lake Amended Consent Judgment (ACJ) Compliance Program

New York Water Environment Association84th Annual Meeting

Tom Rhoads, Commissioner, OCDWEP

Matthew Marko, Rita FordianiCH2M HILLCH2M HILL

Page 2: NYWEA 2012

2/6/12

2Onondaga County,Cit f S

g y,New York

City of Syracuse

Onondaga Lake

Onondaga Creek• 7,660 acres• 49 CSOs• ~1 Billion gallons/year CSO Harbor Brook

Page 3: NYWEA 2012

2/6/12

3HistoryHistory• 1988 – Atlantic States Legal Foundation HistoryHistory

Onondaga Lake Facts

files lawsuit against County

• 1989 – Litigation settled through METRO consent judgment Onondaga Lake Facts

Watershed: 285 Square Miles

METRO consent judgment

• 1998 – METRO consent judgment replaced with Amended Consent Judgment (ACJ)

1 Mile Wide – 4.6 Miles Long

Average Depth: 35 feet

Judgment (ACJ)

• 1st ACJ amendment May 1998

• 2006 ACJ Amended to include g p 35

Max Depth: 63 feet

2006 ACJ Amended to include consolidation of ammonia and phosphorus treatment and Harbor Brook conveyances and RTF

1940 – Swimming Banned

1970 – Fishing Banned

y

• 3rd Amendment April 2008 (Extension)

• 2009 ACJ amended to authorize use of Gray and Green infrastructure

Page 4: NYWEA 2012

2/6/12

44th ACJ Amendment Authorized aBalanced Approach to CSO Abatement

Regulatory Goals • Capture and Treat 95% of the

Annual CSO Volume via

Community Impacts/Goals• Improve quality of life through

environmental responsibility

Gray & Green Infrastructure• Achieve water quality

standards in tributaries

• Promote sustainability

• Ensure cost effectiveness in compliance with ACJ milestones

and lakep

• Community revitalization

Major Milestones Major Milestones • 89.5% capture/elimination by 12/31/2013

• 95% capture/elimination by 12/31/2018p / y / /

Page 5: NYWEA 2012

2/6/12

5County Executive Mahoney Announces “Project 50!”“Onondaga County will construct fifty distinct green infrastructure projects to return rain water and snow melt to the ground instead of our sewer system.”

Syracuse

melt to the ground instead of our sewer system.Joanne M. Mahoney, State of the County Address,

March 1, 2011

Syracuse becomes one of ten Green

Cities

Paradigm shifts from planning to construction

Page 6: NYWEA 2012

2/6/12

6Green (and Gray) Infrastructure Program Management Need Increases with Approval of 4th Stipulation

• Green Infrastructure (GI) is an emerging technology and mostly new to Onondaga County Departments▫ Need for a trusted advisor on program implementationD t t f i ti ti d G▫ Department can focus on existing operations, and Gray Program projects, while learning to integrate with GI

• Role of the Green Program Manager• Role of the Green Program Manager▫ Develop strategy that meets ACJ milestones▫ Provide GI expertise on applications, design standards, p pp , g ,construction, and maintenance

▫ Prioritize opportunities based on diverse, dynamic factors▫ Transition to a fully County operated GI Program by 2018

Page 7: NYWEA 2012

2/6/12

7

P j 50!Project 50!Construction

Page 8: NYWEA 2012

2/6/12

8Onondaga CountyCivic Strip

OnCenter Convention Center OnCenter Convention Center 66,000 Square Foot Green Roof66,000 Square Foot Green Roof

Page 9: NYWEA 2012

2/6/12

9

Page 10: NYWEA 2012

2/6/12

10

Page 11: NYWEA 2012
Page 12: NYWEA 2012

2/6/12

12Onondaga CountyCountyCivic Civic Strip

War MemorialWar MemorialWar MemorialCistern Reuse System

War MemorialCistern Reuse System

Page 13: NYWEA 2012

War Memorial Cistern Reuse SystemWar Memorial Cistern Reuse SystemWar Memorial Cistern Reuse SystemWar Memorial Cistern Reuse System

Reusing rainwater appears to allow the ice making to occur one to two degrees warmer than using potable water resulting in energy savings

Page 14: NYWEA 2012

2/6/12

14First Commercial Green Street: Harrison Street

BEFORE: Stormwater enters catch AFTER: Stormwater is diverted toBEFORE: Stormwater enters catch basins and is directly connected to sewer

AFTER: Stormwater is diverted to Green Streets and only overflows to sewer when necessary

Page 15: NYWEA 2012
Page 16: NYWEA 2012

2/6/12

16OnCenter Surface Parking Lot: 290 green spacesg g pGI Technology:Perimeter porous 

h l   d asphalt and treeinfiltration trench

Project Owner:County

Capture Area:134,000 square feet34, q

Runoff Reduction:2,360,000 gallons/year

C i  C  Construction Cost: $812,000 (bid)

$/gallon: $0.48

Page 17: NYWEA 2012

Installation of Stone Storage Bed

Page 18: NYWEA 2012

2/6/12

18OnCenter Surface Parking Lotg

PorousAsphaltP iPerimeter

Page 19: NYWEA 2012

2/6/12

19OnCenter Municipal Parking GarageOnCenter Municipal Parking GarageGI Technology:R f l d     i  Roof leaders to rain gardens

Project Owner:County

Capture Area:72,500 square feet7 ,5 q

Runoff Reduction:1,277,000 gallons/year

C i  C  Construction Cost: $234,000 (bid)

$/gallon:  $0.26

Page 20: NYWEA 2012

2/6/12

20

OnCenter Municipal Parking p gGarage

Bio-Infiltration

Page 21: NYWEA 2012

2/6/12

21

Townsend Parking Lot (“Lot B”)and Townsend Median

Before

and Townsend Median

Page 22: NYWEA 2012

2/6/12

22

Vegetated Infiltration Beds, 90 Trees Planted

Page 23: NYWEA 2012

Base Course Asphalt Installed prior to winter shutdown

Page 24: NYWEA 2012

Volume capture: 975,000 gallons/year

Page 25: NYWEA 2012

2/6/12

25

P j 50!Project 50!Beyond the Civic Strip:y p

Green Streets

Page 26: NYWEA 2012

2/6/12

26Linking with Major Transportationg j pReconstruction Creates Green Progress

Ph 1 C t t 1 d 2Phase 1: Contracts 1 and 2

Image – Barton & Loguidice

Page 27: NYWEA 2012

2/6/12

27Connective Corridor

Capture Area: 6.75 acRun‐off Reduction: 5.16  MG/YearConstruction Cost: $948,700 (bid)$/gallon Runoff Capture $0.18$/gallon CSO Reduction $0 26$/gallon CSO Reduction $0.26

Page 28: NYWEA 2012

2/6/12

28Connective Corridor

Image – Barton & Loguidice

Page 29: NYWEA 2012

2/6/12

29City Road Reconstruction: Pavement RemovalCity Road Reconstruction: Pavement Removalat Geddes Street

GI Technology: BioretentionProject Owner: City of SyracuseCapture Area: 29,700 square feetRun‐off Reduction: 523,000 gallons/yearConstruction Cost: $203,000 (bid)3, ( )$/gallon: $0.55Status: completed

Page 30: NYWEA 2012

2/6/12

30

P j 50!Project 50!CSO Treatment Wetlands

Page 31: NYWEA 2012

CSO Treatment Wetland ProjectCSO Treatment Wetland Project

CSO 018

CSO Treatment Wetland ProjectCSO Treatment Wetland ProjectCompensatory Storage Project Completed in 2011

Proposed

CSO 018

ProposedConstructed Wetland

HarborBrook

Page 32: NYWEA 2012

2/6/12

32Treatment Wetland Eliminates CSO 018(up to design storm)• 144 Acre CSO basin

• 40 overflows / year• Significant Nutrient Removal• Partner with SUNY ESF

Stay tuned for presentationpresentation on this project in 2013in 2013

Page 33: NYWEA 2012

2/6/12

33

P j 50!Project 50!Green Parks

Page 34: NYWEA 2012

Rosamond Gifford ZooElephant Exhibit, 2011

GI T h lp ,

6,000 sq.ft.Green Roof

GI Technology:Green roof

Project Owner:

Porous

County

Capture Area:6,000 square feetPorous

pavement,and rain barrels for

, q

Runoff Reduction:114,000 gallons/year

C i  C  stormwater reuse

Construction Cost: $183,900

$/gallon: $2.27

Page 35: NYWEA 2012

Creekwalk Project Greening: Jefferson to Walton

Porous AsphaltStrip in Parking Lot

Before

Bi iBioretention Rain Garden

Flexi pave

Porous Asphalt

Flexi-pave Porous Walkway

Volume capture: 135,000 gallons/yearPorous AsphaltParking Lot

Page 36: NYWEA 2012

Creekwalk Project Greening: Walton to Fayette

Porous ConcretePorous Asphalt Strip inStrip in Parking Lot

Before

Re-establishedNatural Stream Bank

Volume capture: 119,000 gallons/year

Natural Stream Bank

Page 37: NYWEA 2012

2/6/12

37Rosamond Gifford Zoo Entrance EnhancementRosamond Gifford Zoo Entrance Enhancement

•GI Technology:R i   dRain gardens

•Project Owner:County/City

•Capture Area:39,000 square feet

•Run off Reduction  •Run‐off Reduction: 680,000 gallons/year

•Construction Cost:(bid)

Green Infrastructure Concept for the Zoo Entrance 

$300,000 (bid)

•$/gallon: $0.62p

Page 38: NYWEA 2012

2/6/12

38Rosamond Gifford Zoo Entrance EnhancementRosamond Gifford Zoo Entrance Enhancement

Bio-infiltration Systemscapture capture runoff from surrounding streets

Page 39: NYWEA 2012

2/6/12

39

P j 50!Project 50!Green Schools

Page 40: NYWEA 2012

2/6/12

40Hughes Magnet Schoolg g

New Parking Lot captures runoff from

h l fschool roofand upper lot

Page 41: NYWEA 2012

2/6/12

41

P j 50!Project 50!Green Parking Lotsg

Page 42: NYWEA 2012

2/6/12

42Sunnycrest Park Arena Parking LotSunnycrest Park Arena Parking LotGI Technology:Porous pavementR i   dRain garden

Project Owner:Syracuse Parks Dept.

Capture Area:107,000 square feet7, q

Run‐off Reduction:1,876,000 gallons/yeargallons/year

Construction Cost: $303,000 (bid)

Map of Proposed Sunnycrest Arena Parking Lot Project $/gallon: $0.22

Page 43: NYWEA 2012

Installation of Storage and Infiltration Systems

Page 44: NYWEA 2012

2/6/12

44

Combination of bio retention bio-retention, porous asphalt, and subsurface storage and infiltration systems

Page 45: NYWEA 2012

2/6/12

45Sunnycrest Park Golf Parking Loty g•GI Technology:

Stream Inflow RemovalRain gardenRain gardenPavement Removal

•Project Owner:City of Syracuse Parks DeptCity of Syracuse Parks Dept.

•Capture Area:48,000 square feet

•Run‐off Reduction: 843,000 gallons/yr

•Construction Cost:Construction Cost:

$363,000 (bid)

•$/gallon: $0.52

Page 46: NYWEA 2012

2/6/12

46Sunnycrest Park Golf Parking Loty g

Bio retention and Bio-retention and Infiltration System(Standard Asphalt Parking Lot re-graded)

Page 47: NYWEA 2012

2/6/12

47Project 50: Shifting the ParadigmProject 50: Shifting the Paradigm

Planning for Widespread Implementation of GIPlanning for Widespread Implementation of GI▫ Opportunity/Idea Coordination New Project Formj Database and GIS ManagementProjects include: Parking Lots, Parking Garages, Schools, Lib i P k Fi h P t Offi St t ( i lLibraries, Parks, Firehouses, Post Offices, Streets (commercial and residential), Water Reuse, Wetlands, Roofs, Vacant Lots

▫ Concept Developmentp p Site Visit, watershed identification, BMP Identification Calculator (capture and preliminary cost estimate)

Page 48: NYWEA 2012

2/6/12

48Project 50: Shifting the ParadigmProject 50: Shifting the Paradigm

Planning for Widespread Implementation of GIPlanning for Widespread Implementation of GI▫ Landowner Endorsement Bi‐weekly City‐County Coordination Meetingy y y g(if you think you can do this without a lot of coordination and meetings ‐ you can not)

▫ Field Work and Permitting▫ Field Work and Permitting Survey (including utility identification) Soils Testing (infiltration)g ( ) Environmental Analysis (Phase 1, Analytic Testing, etc.) SERP (SEQR, SHPO, SWPPP/NEPA/Landmark Preservation, etc.)

Page 49: NYWEA 2012

2/6/12

49Project 50: Shifting the ParadigmProject 50: Shifting the ParadigmDesigning 50+ Projects▫ 50% Plans Design Guidance Manual

kfl (fl h ) Design Workflow (flow chart)▫ 90% Plans and Specifications▫ Final (for Construction) Plans Specifications and Bid Forms▫ Final (for Construction) Plans, Specifications, and Bid Forms Comment Adjudication/Quality Assurance

▫ Cost Estimating At Concept and 90%D i C di ti▫ Design Coordination WEEKLY Design and Construction Review Meeting

Page 50: NYWEA 2012

2/6/12

50East Water Street Gateway: Case StudyEast Water Street Gateway: Case Study

Project Features:▫ Bike Boulevard▫ Traffic Calming▫ Private/Commercial collaboration▫ Porous Paver Parking LanesCurb Extensions▫ Curb Extensions

▫ Robust Tree Planter systems• Challenges Include:• Challenges Include:▫ Mid‐street pedestrian crossing▫ Snow plow considerationsp▫ Turning radii for tractor trailers

Page 51: NYWEA 2012

2/6/12

51Water Street Gateway Project ConceptWater Street Gateway Project Concept

GI Technology:GI Technology:Infiltration trench and porous pavers

Project Owner:Project Owner:City of Syracuse

Capture Area:   f t53,000 square feet

Runoff Reduction:924,000 gallons/yr

Construction Cost: $920,000 (bid)

$/gallon: $1 00$/gallon: $1.00

Page 52: NYWEA 2012

2/6/12

52Water Street Gateway Projecty j

Before

Page 53: NYWEA 2012

2/6/12

53Water Street Gateway Projecty j

During

Page 54: NYWEA 2012

2/6/12

54

AfterAfter

Page 55: NYWEA 2012

2/6/12

55Project 50: Shifting the ParadigmProject 50: Shifting the Paradigm• Procurement▫ Contract Documents: Bundling projects as appropriate▫ Advertisement: Pre‐Bid Meeting, Addendum, Bid

• Construction▫ Services During Construction Clarifications, RFIs, Modifications, Change Orders, etc.

▫ Construction Inspection PrimaVera Construction ManagerPrimaVera Construction Manager

▫ Project Completion Reports $/gallon accounting Post‐project communication on challenges/successes

Page 56: NYWEA 2012

2/6/12

56Other Program ElementsOther Program Elements• Legislative Agenda▫ Existing City Ordinances (Stormwater, Tree, Sidewalk)▫ New and Innovative City Ordinances: Permission

• Enhanced Street Tree Program: 8500 new street trees• Enhanced Street Tree Program: 8500 new street trees• Rain Barrel Program: 650 and counting (Goal: 3600)• Vacant Lot Program• Vacant Lot Program• Grant Funding: Federal/State successes• Green Improvement Fund: Onondaga County’s• Green Improvement Fund: Onondaga County sPublic‐Private‐Partnership for Incentivizing GI▫ Grants up to $200,000▫ Stay tuned for a presentation on this, next year!

Page 57: NYWEA 2012

2/6/12

57GIF: Porous Pavers at Hotel Skylery

PorousPaverParkingParkingLot

Page 58: NYWEA 2012

2/6/12

58Public Education and OutreachPublic Education and Outreach• STR Website: www.SaveTheRain.us• Monthly Report: for ACJ Parties County LegislatureMonthly Report: for ACJ Parties, County Legislature• Coalition Partners / Stakeholders City of Syracuse (DPW, Engineering, Law, School District, y y ( g gParks, Zoning, Codes, etc.) ACJ Parties (NYS DEC, ASLF): Policy Committee Academic Community (SU SUNY ESF) Academic Community (SU, SUNY ESF) Community Groups / NFPs Business Community, Large Landowners (hospitals) General Public Manufacturers / Vendors / Suppliers Engineering Community Engineering Community Construction Community (M/WBEs), Bidders Wanted!

Page 59: NYWEA 2012

2/6/12

59MaintenanceMaintenance• Asset Management▫ Asset Definition: Location, quantity, etc.

d d▫ Standard Maintenance Procedures (SMPs)

▫ Computerized Maintenance▫ Computerized Maintenance Management System (Maximo)

Page 60: NYWEA 2012

2/6/12

60

C S dCase Study:City Lot #3C yProject Description provides overviewpof constructed GI for field crew

Page 61: NYWEA 2012

2/6/12

61Engineered Stormwater Plan provides detailon the system as constructed

Page 62: NYWEA 2012

2/6/12

62Educating the Maintenance Staff withGI Technology Fact Sheets

Page 63: NYWEA 2012

2/6/12

63

Maximo as CMMS tool for WEP Green Infrastructure ProgramInfrastructure Program• Work orders include:

M i i i i / b di i▫ Maintenance activities/step by step directions▫ Tools/equipment (including costs)Planned time to complete▫ Planned time to complete

▫ Actual maintenance info is loaded back into Maximo after completionMaximo after completion

• Example maintenance task for E‐06 Porous Pavement Vacuuming followsPavement Vacuuming follows…

Page 64: NYWEA 2012
Page 65: NYWEA 2012

2/6/12

65Measuring Progress: MonitoringMeasuring Progress: Monitoring• ACJ Compliance

l l▫ Annual Report: April SWMM : Volume Capture Goal: 246 MG/Yr by 2018Goal: 246 MG/Yr by 2018 Ambient Monitoring Program(AMP): Water Quality Goal: Wet Weather Standards

• Net Environmental Benefit Analysis• Funding Sources and Financial Tracking

Page 66: NYWEA 2012

2/6/12

66Save the Rain: 2012Save the Rain: 2012• Focus on Efficiency over Quantity▫ Improved Constructability▫ Lower Maintenance

• Unit Price ‐ Quantity BasedConstruction Procurements ▫ Civil Site Work Contract▫ Landscape Installation and Maintenance ContractP t W t M i t C t t d t d b▫ Post‐Warranty Maintenance Contract, conducted byConservation Corps (Community Based Green Jobs)

Page 67: NYWEA 2012

Thank You!

Questions?

Please Visit us atwww.SaveTheRain.us