1 CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation NYU CORE Construction Presentation Prepared for Community Board 2 January 18, 2012

Upload: others

Post on 27-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

1CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

NYU CORE Construction PresentationPrepared for Community Board 2

January 18, 2012

Page 2: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

2CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Construction Impacts – Chapter 20 of the DEIS• Transportation

o Traffico Transito Pedestrianso Parking

• Air Quality• Noise and Vibration• Other Technical Areas

o Historic and Cultural Resourceso Hazardous Materialso Natural Resourceso Open Spaceo Socioeconomic Conditionso Community Facilitieso Land Use and Neighborhood Character

Page 3: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

3CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Phase 1 Construction (2013‐2021)

West Houston Street

West Third Street

Mercer S

treet

LaGuardia Place

TemporaryMercer Entry Plaza

Green

e Street W

alkBleecker Street

ZipperBuilding

(2014‐2018)

BleeckerBuilding

(2018‐2021)

TemporaryGym(2013‐2014)

Toddler Playground

Tempo

rary 

LaGua

rdia Play Area

Relocated Dog Run

Phase 1 Buildings

• Temporary Gym

• Zipper Building

• Bleecker Building

Phase 1 Open Space

• Temporary Mercer Entry Plaza

• Temporary LaGuardia Play Area

• Relocated Dog Run

• Greene Street Walk

• Toddler Playground

Page 4: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

4CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Phase 1 Construction (2013‐2021)

West Houston Street

West Third Street

Mercer S

treet

LaGuardia Place

TemporaryMercer Entry Plaza

Green

e Street W

alkBleecker Street

ZipperBuilding

(2014‐2018)

BleeckerBuilding

(2018‐2021)

TemporaryGym(2013‐2014)

Toddler Playground

Tempo

rary 

LaGua

rdia Play Area

Relocated Dog Run

Phase 1 Buildings

• Temporary Gym

• Zipper Building

• Bleecker Building

Phase 1 Open Space

• Relocated Dog Run

• Temporary Mercer Entry Plaza

• Temporary LaGuardia Play Area

• Greene Street Walk

• Toddler Playground

Page 5: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

5CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Phase 2 Construction (2022‐2031)

West Houston StreetWest Houston Street

West Third Street

Mercer S

treet

LaGuardia Place

Tricycle Garde

n

Mercer Entry Plaza

Bleecker Street

MercerBuilding

(2023‐2028)

LaGuardiaBuilding

(2028‐2031)WSV Play Garden

Public Lawn

PhilosophyGarden

LaGuardia Entry Plaza

LaGuardia Play 

Garden

Phase 2 Buildings

• Mercer Building

• North Block Below Grade Space

• LaGuardia Building

Phase 2 Open Space

• Philosophy Garden and central portion of Public Lawn

• WSV Play Garden

• Mercer Entry Plaza

• Tricycle Garden

• LaGuardia Entry Plaza

• LaGuardia Play Garden

Page 6: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

6CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Phase 2 Construction (2022‐2031)

West Houston StreetWest Houston Street

West Third Street

Mercer S

treet

LaGuardia Place

Tricycle Garde

n

Mercer Entry Plaza

Bleecker Street

MercerBuilding

(2023‐2028)

LaGuardiaBuilding

(2028‐2031)WSV Play Garden

Public Lawn

PhilosophyGarden

LaGuardia Entry Plaza

LaGuardia Play 

Garden

Phase 2 Buildings

• Mercer Building

• LaGuardia Building

• North Block Below Grade Space

Phase 2 Open Space

• Philosophy Garden and central portion of Public Lawn

• WSV Play Garden

• Mercer Entry Plaza

• Tricycle Garden

• LaGuardia Entry Plaza

• LaGuardia Play Garden

Page 7: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

7CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

NYU Commitments to Minimize or Avoid Significant Adverse Impacts

Air Emissions Reduction Program• Diesel Equipment Reduction (e.g., early electrification)• Clean Fuel (ultra‐low‐sulfur diesel [ULSD])• Best Available Tailpipe Reduction Technologies• Utilization of Newer Equipment• Source Location (placement of equipment away from sensitive receptors)• Dust Control

• Idle Restriction

Page 8: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

8CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

NYU Commitments to Minimize or Avoid Significant Adverse Impacts

Noise Reduction Measures Source Controls (i.e., reducing noise levels at the source)

• Construction procedures and equipment that produce noise levels below the requirements of the New York City Noise Control Code

• Early electrification for certain noisy equipment (e.g., concrete vibrators, hoists, man lifts)• Construction sites would be configured to minimize truck back‐up alarm noise• Trucks would not be allowed to idle more than three minutes• Limit equipment on‐site (only necessary equipment on‐site)

Path Controls (e.g., placement of equipment, implementation of barriers or enclosures)

• Noisy equipment shielded and located away from sensitive receptor locations.• Path noise control measures (i.e., portable noise barriers, panels, enclosures, and acoustical 

tents) for certain dominant noise equipment• Acoustical curtains for internal construction activities in the buildings under construction

Page 9: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

9CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

NYU Commitments to Minimize or Avoid Significant Adverse Impacts

Construction Protection Plan (CPP)• University Village has been determined S/NR‐eligible and is designated 

NYC Landmark• Washington Square Village has been determined S/NR‐eligible • CPP would be developed in consultation with LPC to avoid any 

construction‐related impacts on these architectural resources, including ground‐borne vibration and damage from heavy machinery

Page 10: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

10CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

NYU Commitments to Minimize or Avoid Significant Adverse Impacts

Remedial Action Plan (RAP) and Construction Health and Safety Plan (CHASP)• RAP would address requirements for items such as: 

• soil stockpiling, soil disposal and transportation • dust control• quality assurance• contingency measures should petroleum storage tanks or contamination be 

unexpectedly encountered• CHASP would address the following items:

• identify potential hazards that may be encountered during construction• specify appropriate health and safety measures to be undertaken to ensure that 

subsurface disturbance is performed in a manner protective of workers, the community, and the environment (including a Community Air Monitoring Program)

Page 11: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

11CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

NYU Commitments to Minimize or Avoid Significant Adverse Impacts

Rodent Control• Before start of construction, contractor would survey and bait the appropriate 

areas and provide for proper site sanitation• During construction phase, as necessary, contractor would carry out a 

maintenance program• Coordination would be maintained with appropriate public agencies• Only EPA and NYSDEC registered rodenticides would be permitted• Contractor would be required to perform rodent control programs in a manner 

that avoids hazards to persons, domestic animals, and non‐target wildlife

Page 12: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

12CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Significant Adverse Impacts During Construction Identified for:• Transportation

o Traffic 

o Transit

o Pedestrians

o Parking

• Air Quality

• Noise

• Vibration

• Other Technical Areas

o Historic and Cultural Resources

o Hazardous Materials

o Natural Resources

o Open Space

o Socioeconomic Conditions

o Community Facilities

o Land Use and Neighborhood Character

Page 13: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

13CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Significant Impact Criteria During Constructionper CEQR Technical Manual

Traffic• For congested intersection movements, increase in delay of as little as 3 seconds

Transit• For congested subway station stairways, required widening of as little as 2 inches

Pedestrians• For congested sidewalks, increase of as little as 0.6 pedestrians per minute per foot• For congested corners and crosswalks, reduction in pedestrian space of as little as 

0.2 square feet per pedestrian

Page 14: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

14CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Significant Impact Criteria During Constructionper CEQR Technical Manual

Noise• Increase of 3‐5 decibels at a sensitive receptor (residential and open space 

locations) for more than two years

Open Space• Direct Effects:

Substantial displacement of public and private open space resources without replacementSignificant adverse air quality, noise, shadows etc., impacts on open space resources

• Indirect Effects:Over 1% reduction in study area open space ratios (in an underserved area), accounting for changes in population and open space

Page 15: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

15CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Construction Schedule for Buildings – Figure 20‐1 of the DEIS

Page 16: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

16CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Temporary Gym Construction(2013‐2014 for a 9‐month period)Curb Lane Closures and Staging

Net Change in Publicly Accessible Open Space:‐0.10 acres

No Significant Adverse Impacts during this period

Page 17: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

17CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Zipper Building Construction(2014‐2018)Curb Lane Closures and Staging

Page 18: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

18CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Zipper Building Construction(2014‐2018)Open Space AnalysisNet Change in Publicly Accessible Open Space:+0.29 acres

Significant Adverse Impacts

• Noise impacts on Temporary Mercer Entry Plaza

Mitigation Measures

• In addition to existing noise reduction commitments, between DEIS and FEIS, additional options will be explored

Page 19: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

19CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Noise Analysis

Receptor Sites

• 73 receptor sites analyzed

• Directly adjacent to project area or on streets

Noise Sources

• Operation of on‐site construction equipment

• Movement of construction‐related vehicles

Noise Reduction Measures

• NYU commitment to proactive approach

• Source and path controls

Page 20: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

20CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Zipper Building Construction(2014‐2018)Noise Analysis

Mitigation Measures

Washington Square Village buildings: • offer storm windows and re‐caulking• offer new air conditioning units, or offer 

to insulate/seal existing air conditioning units and provide an interior cover

Silver Tower buildings:• offer storm windows and re‐caulking• offer to replace existing PTAC units with 

high‐attenuation PTAC unitsOff‐site buildings:• offer to provide storm windows and /or 

window air conditioning units for buildings without double‐glazed windows and/or alternative ventilation

Significant Adverse Impacts• At adjacent receptors indicated in 

Orange

Page 21: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

21CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Bleecker Building Construction(2018‐2021)Curb Lane Closures and Staging

LaGuardia Place Staging Option Bleecker Street Staging Option

Page 22: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

22CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Bleecker Building Construction(2018‐2021)Open Space Analysis

Net Change in Publicly Accessible Open Space:+0.73 acres

Significant Adverse Impacts

• Temporary displacement of LaGuardia Corner Gardens (LaGuardia Place Staging Option only)

• Significant adverse shadows impact on LaGuardia Corner Gardens (Bleecker Street Staging Option only)

Mitigation Measures

• Between DEIS and FEIS, options will be explored to relocate LaGuardia Corner Gardens. If relocation space cannot be identified, options will be explored to refine construction staging and logistics

Page 23: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

23CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Bleecker Building Construction(2018‐2021)Noise Analysis

Mitigation Measures

Washington Square Village buildings: • offer storm windows and re‐caulking• offer new air conditioning units, or offer 

to insulate/seal existing air conditioning units and provide an interior cover

Silver Tower buildings:• offer storm windows and re‐caulking• offer to replace existing PTAC units with 

high‐attenuation PTAC unitsOff‐site buildings:• offer to provide storm windows and /or 

window air conditioning units for buildings without double‐glazed windows and/or alternative ventilation

Significant Adverse Impacts• At adjacent receptors indicated in 

Orange

Page 24: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

24CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Phase 1 Construction Period(2013‐2021)

Transportation Analyses• No significant adverse impacts identified for: 

• Traffic• Transit • Pedestrians

Page 25: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

25CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Mercer Building ConstructionBelow Grade(2022‐2023)Curb Lane Closures and Staging

Page 26: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

26CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Mercer Building ConstructionBelow Grade(2022‐2023)Open Space AnalysisNet Change in Publicly Accessible Open Space:+0.10 acres

Significant Adverse Impacts

• Temporary significant adverse impact due to decreases in open space ratios in residential (1/2 mile) study area 

Mitigation Measures

• Between the DEIS and FEIS, in coordination with NYC Dept. of Parks and Recreation, investigate the feasibility of full or partial mitigation.

Page 27: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

27CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Mercer Building ConstructionBelow Grade(2023‐2026)Open Space AnalysisNet Change in Publicly Accessible Open Space:+0.10 acres

Significant Adverse Impacts

• Temporary significant adverse impact due to decreases in open space ratios in residential (1/2 mile) study area 

Mitigation Measures

• Between the DEIS and FEIS, in coordination with NYC Dept. of Parks and Recreation, investigate the feasibility of full or partial mitigation.

Page 28: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

28CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Mercer Building ConstructionBelow Grade(2022‐2026)Noise Analysis

Mitigation Measures

Washington Square Village buildings: • offer storm windows and re‐caulking• offer new air conditioning units, or offer 

to insulate/seal existing air conditioning units and provide an interior cover

Off‐site buildings:• offer to provide storm windows and /or 

window air conditioning units for buildings without double‐glazed windows and/or alternative ventilation

Significant Adverse Impacts

• At adjacent receptors indicated in Orange

Page 29: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

29CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Mercer Building ConstructionAbove Grade(2026‐2028)Curb Lane Closures and Staging

Page 30: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

30CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Mercer Building ConstructionAbove Grade(2026‐2028)Open Space Analysis

Net Change in Publicly Accessible Open Space:+1.47 acres

Significant Adverse Impacts

Direct Effects Analysis

• Significant adverse noise impacts on new central open spaces

Mitigation Measures

• In addition to existing noise reduction commitments, between DEIS and FEIS, additional options will be explored

Page 31: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

31CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Mercer Building ConstructionAbove Grade(2026‐2028)Noise Analysis

Mitigation Measures

Washington Square Village buildings: • offer storm windows and re‐caulking• offer new air conditioning units, or offer 

to insulate/seal existing air conditioning units and provide cover

Off‐site buildings:• offer to provide storm windows and /or 

window air conditioning units for buildings without double‐glazed windows and/or alternative ventilation

Significant Adverse Impacts

• At adjacent receptors indicated in Orange

Page 32: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

32CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

LaGuardia Building Construction(2028‐2031)Curb Lane Closures and Staging

Page 33: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

33CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

LaGuardia Building Construction(2028‐2031)Open Space Analysis

Net Change in Publicly Accessible Open Space:+1.50 acres

Significant Adverse Impacts

• No Significant Adverse Direct or Indirect Impacts on Open Space Resources

Page 34: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

34CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

LaGuardia BuildingConstruction(2028‐2031)Noise Analysis

Mitigation Measures

Washington Square Village buildings: • offer storm windows and re‐caulking• offer new air conditioning units, or offer 

to insulate/seal existing air conditioning units and provide an interior cover

Off‐site buildings:• offer to provide storm windows and /or 

window air conditioning units for buildings without double‐glazed windows and/or alternative ventilation

Significant Adverse Impacts

• At adjacent receptors indicated in Orange

Page 35: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

35CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Phase 2 Construction Period(2022‐2031)Transportation AnalysesTraffic Analysis Significant Adverse Impacts

• Significant adverse traffic impacts identified during construction• Significant adverse traffic impacts do not exceed those identified for the 2031 

Build Analysis

Traffic Mitigation Measures• Advancement of 2031 Build Analysis mitigation 

(signal timing adjustments and/or lane restriping)

Page 36: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

36CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Phase 2 Construction Period(2022‐2031)Transportation AnalysesTransit Analysis Significant Adverse Impacts

• Identified at same stairway location as in 2021 and 2031 Build Analysis • Broadway‐Lafayette Station and West 4th Street Station

Potential Transit Mitigation Measures• Advancement of 2031 Build Analysis mitigation 

(stairway widenings or new station entrance)• On‐going coordination with MTA NYCT on the feasibility of these mitigation measures

Pedestrian Analysis Significant Adverse Impacts

• Identified at same corner location as in 2021 and 2031 Build Analysis • Southeast corner of University Place and Waverly Place

Pedestrian Mitigation Measures• Advancement of 2031 Build Analysis mitigation 

(corner “bulb‐out” or sidewalk extension)

Page 37: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

37CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

Full Build Out(2031)

West Houston StreetWest Houston Street

West Third Street

Mercer S

treet

LaGuardia Place

Tricycle Garde

n

Mercer Entry Plaza

Bleecker Street

MercerBuilding

(2023‐2028)

LaGuardiaBuilding

(2028‐2031)WSV Play Garden

Public Lawn

PhilosophyGarden

LaGuardia Entry Plaza

LaGuardia Play 

Garden

Net Change in Publicly Accessible Open Space:+3.1 acres

Green

e Street W

alk

ZipperBuilding

(2014‐2018)

BleeckerBuilding

(2018‐2021)

Toddler PlaygroundRelocated Dog Run

Page 38: NYU CORE Construction Presentation · 2020-06-20 · CB2 Presentation, January 18, 2012 –NYU Core Construction Presentation 2 Construction Impacts –Chapter 20 of the DEIS •

38CB2 Presentation, January 18, 2012 – NYU Core Construction Presentation

http://www.nyu.edu/nyu2031/nyuinnyc/